Loading...
TM Crossing #4 Pedestrian Pathway Easement (2020-070570) Project Name(Subdivision): TM Crossing#4 PEDESTRIAN PATHWAY EASEMENT ADA COUNTY RECORDER Phil McGrane 2020-070570 BOISE IDAHO Pgs=6 CHE FOWLER 06/11/2020 01:48 PM THIS AGREEMENT, made this 9th day of Jun, CITY OF MERIDIAN, IDAHO NO FEE Idaho limited liability company and DWT Investments LLC, an Idaho limited liability company, collectively hereinafter referred to as "Grantor", and the City of Meridian, an Idaho municipal corporation, hereinafter referred to as"Grantee"; WITNESSETH: WHEREAS, Grantor is the owner of real property on portions of which the City of Meridian desires to establish a public pathway; and WHEREAS, the Grantor desires to grant an easement to establish a public pathway and provide connectivity to present and future portions of the pathway; and WHEREAS, Grantor shall construct the pathway improvements upon the easement described herein; and NOW, THEREFORE,the parties agree as follows: THE GRANTOR does hereby grant unto the Grantee an easement on the following property, described on Exhibit "A" and depicted on Exhibit "B" attached hereto and incorporated herein. THE EASEMENT hereby granted is for the purpose of providing a public pedestrian pathway easement for multiple-use non-motorized recreation, with the free right of access to such facilities at any and all times. TO HAVE AND TO HOLD, said easement unto said Grantee, its successors and assigns forever. THE GRANTOR hereby covenants and agrees that it will not place or allow to be placed any permanent structures, trees, brush, or perennial shrubs or flowers within the area described for this easement, which would interfere with the use of said easement, for the purposes stated herein. IT IS EXPRESSLY UNDERSTOOD AND AGREED, by and between the parties hereto, that the Grantor shall repair and maintain the pathway improvements. THE GRANTOR hereby covenants and agrees with the Grantee that should any part of the easement hereby granted become part of, or lie within the boundaries of any public street, Pedestrian Pathway Easement REV. 01/01/2020 Meridian City Council Meeting Agenda June 9,2020— Page 56 of 318 I I I then, to such extent such easement hereby granted which lies within such boundary thereof or which is a part thereof, shall cease and become null and void and of no further effect and shall be completely relinquished . THE GRANTOR does hereby covenant with the Grantee that it is lawfully seized and possessed of the aforementioned and described tract of land, and that it has a good and lawful right to convey said easement, and that it will warrant and forever defend the title and quiet possession thereof against the lawful claims of all persons whomsoever. IN WITNESS WHEREOF, the said Grantor has hereunto subscribed its signature the day and year first hereinabove written. GRANTOR: SCS INVES MENTS LLC, an Idaho limited liability company By: WN A " Michael A. Hall , President DWT INVESTMENTS LLC, an Idaho limited liability company By: Brighton Co r ion , its Manager By: Robert L . Phillips, President STATE OF IDAHO ) ss . County of Ada ) This record was signed or acknowledged before me on //412020 by Michael A. Hall , President of SCS Investments LLC , an Idaho limite iab ' i company. APRIL ALAINE COMMISSION #63192 NOTARY PUBLIC *NotaryublricIdaho STATE OF IDAHO 5 My commission expires : filaAmL� STATE OF IDAHO ) ss . County of Ada This record was signed or acknowlecidged before me on / 2020 by Robert L . Phillips , President of Brighton Corporation , the Manager of D Investments LLC , an Idaho limited liability company. ,I AMANDA MCCURRY Notary Public for Ida _ COMMISSION #29628 My commission expires : r ��1 ZZ) 2 � NOTARY PUBLIC STATE OF IDAHO JW COMMISSION EXPIRES O4H�23 Pedestrian Pathway Easement REV. 01 /01 /2020 Meridian City Council Meeting Agenda June 9 , 2020 — Page 57 of 318 GRANTEE: CITY OF MERIDIAN Robert E. Simison, Mayor Attest by Chris Johnson, City Clerk STATE OF IDAHO, ) : SS. County of Ada ) This record was acknowledged before me on 6-9-2020 (date) by Robert E. Simison and Chris Johnson on behalf of the City of Meridian, in their capacities as Mayor and City Clerk,respectively. (stamp) Notary Signature My Commission Expires: 3-28-2022 Pedestrian Pathway Easement REV. 01/01/2020 Meridian City Council Meeting Agenda June 9,2020— Page 58 of 318 I E N G I N E E R I N G April 15,2020 Project No.18-160 Pathway Easement Legal Description Exhibit A A parcel of land for a Pathway Easement,situated in a portion of the Northeast 1/4 of the Southwest 1/4 of Section 14,Township 3 North, Range 1 West, B.M.,City of Meridian,Ada County, Idaho,and being more particularly described as follows: Commencing at a found aluminum cap marking the Center 1/4 corner of said Section 14,which bears S89°11'30"E a distance of 2,656.47 feet from a found aluminum cap marking the West 1/4 corner of said Section 14,thence following the easterly line of said Southwest 1/4,S00°35'29"W a distance of 1,280.19 feet to the POINT OF BEGINNING. Thence following said easterly line,S00°35'29"W a distance of 14.11 feet; Thence leaving said easterly line, N82'15'46"W a distance of 139.74 feet; Thence N89°36'50"W a distance of 257.85 feet; Thence N00°44'32"E a distance of 14.00 feet; Thence S89°36'50"E a distance of 258.66 feet; Thence S82°15'46"E a distance of 138.88 feet to the POINT OF BEGINNING. Said parcel contains 5,566 square feet, more or less,and is subject to all existing easements and/or rights-of-way of record or implied. All subdivisions,deeds,record of surveys,and other instruments of record referenced herein are recorded documents of the county in which these described lands are situated in. Attached hereto is Exhibit B and by this reference is hereby made a part of. \0 l L A N,0 S CENSfp Gib 1 662 �9rF Of �OP� �<< Y KE \ I ,�-o 9233 West State Street Boise, Idaho 83714 0 208.639.6939 kmengllp.com Meridian City Council Meeting Agenda June 9,2020— Page 59 of 318 258.66 it143�ptG 138.88 257.85 .§28l 46"V" 139.74 Title: Date: 04-15-2020 Scale: 1 inch=80 feet File: Tract 1: 0.128 Acres: 5566 Sq Feet:Closure=n89.0700e 0.01 Feet: Precision=1/127200: Perimeter=823 Feet 001=s00.3529w 14.11 004=n00.4432e 14.00 002=n82.1546w 139.74 005=s89.3650e 258.66 003=n89.3650w 257.85 006=s82.1546e 138.88 Meridian City Council Meeting Agenda June 9,2020— Page 60 of 318 BASIS OF BEARINGS POINT OF COMMENCEMENT S89'11'30"E 2656.47' CENTER 1/4 CORNER SECTION 14 a1 WEST A1/4 CORNER O SECTION 14 N _ I-- m 17 z o 0N N_ 03 O � N Ln LO W M N UNPLATTED 0 0 a POINT OF r_ �tv 6' TM CROSSING MBEGINNING SUBDIVISION No.2 L2 =, INTERSTATE84 0 a a X N LINE TABLE d o LINE# LENGTH DIRECTION d 0 L1 14.11 SO'35'29"W 3 a L2 139.74 N82'15'46"W 0 0 L3 14.00 NO'44'32"E Q E L4 138,88 S82'15'46"E 0 75 150 300 Q pE LAND S Plan Scale �\O E N SFa 0 04 1 662 LEGEND FOUND ALUMINUM CAP 9pf ;OF �pQ 0 CALCULATED POINT !(EH��c.� PROPERTY BOUNDARY LINE 0 — — — —SECTION LINE �Q --------EASEMENT LINE F E N G I N E E R I N G Ri 9233 WEST STATE STREET = BOISE,IDAHO 83714 i PHONE 208 639-6939 I Exhibit B kmengllpxom City of Meridian Pathway Easement DATE: April,2020 a PROJECT: 18-160 SHEET: Situated in a portion of the NE 1/4 of the SW 1/4, 1 OF 1 Sec.14,T.3N., RAW.,B.M.,City of Meridian,Ada County, ID a Meridian City Council Meeting Agenda June 9,2020— Page 61 of 318