Loading...
2020 05-20 Paramount Site PlanC 1 pp ir ir e e e e t e e s ir ir ir ir e e s s e ir ir e e w ir e t pp e e t g g g g g g g g g g g g g g g g g g g g g g g jb jb bel bel bel FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO btel btel btel btel btel btel btel btel btel btel btel btel btel btel btel btel btel btel btel btel btel btel btel FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO g g g g g g g g g g g g g g g g g g g g g g g g g g bel bel bel bel bel bel bel bel bel bel bel bel bel bel bel bel bel bel bel bel bel bel bel bel bel bel bel bel bel bel bel bel bel bel bel e e e e e SIG SIG SIG SIG SIG SIG SIG SIG SIG SIG SIG SIG SIG SIG SIG SIG SIG SIG SIG SIG SIG SIG SIG SIG SIG SIG SIG SIG SIG SIG SIG SIG SIG SIG w sd pp ir iirr ir ir A A C 2 4 4 1 B B 3 LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD R30' R30' PROPOSED BUILDING 5376 SF FUTURE IMPROVEMENTS FUTURE IMPROVEMENTS FUTURE IMPROVEMENTS US HWY 20/26 N FOX RUN WAY R10' R5' R5' R5' R5' R5' R5' SIDEWALK BY OTHERS. FINAL SIDEWALK GRADES SHALL BE PROVIDED PRIOR TO EARTHWORK AND LANDSCAPE FINISHING FRONTAGE IMPROVEMENTS FOR FOX RUN ARE BY OTHERS. CONTRACTOR SHALL ENSURE THAT GRADES AT TIE IN POINTS ARE COORDINATED. ANY DISCREPANCEY SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER. TEMPORARY CONDITIONS MAY BE REQUIRED. CONTRACTOR SHALL ASSUME THAT A SAW CUT ALONG FOX RUN ASPHALT IS NEEDED FOR CLEAN TIE IN WITH DRIVEWAY APPROACH R10' COMMON LOT 1 (FUTURE ROW) LOT 2 LOT 3 LOT 5 EXISTING PARCEL 2 COMMON LOT 1 (FUTURE ROW) R10' AREA: 23,651 SF (0.54 ACRES) AREA: 9,719 SF (0.22 ACRES) AREA: 47,137 SF (1.08 ACRES) AREA: 30,944 SF (0.71 ACRES) AREA: 36,583 SF (0.84 ACRES) R5' 30' 9' 108' 18' 108' 30' 9' 63' 9' 9' 72' 18' 36' 21.2' 16.8' 81' 34.6' 28' 19' 28' 19' 19' 25' 19' 107.8' 249' 198' 132.4' 19' 25' 8.5' 63' 8.5' 28' 10' 45' 7.6' 12' 18' 7.4' 28.2' 18.8' 16.5' 2.9' 40.5' 59.3' 5.2' 12.6' 90' 9.5' 20.6' 372.5' 24.8' 19' 25' 19' 19' 25' 19' 151' 7' 2.9' 50.5' 39.4' 8.9' 110' 5' 15.8' 73.5' 26' 92.8' 14.9' 15.8' 6.5' 9' 6.5' 6' W 87.8' 4' 5' 8' 5.5' 5.5' 52.7' 10.4' 15.5' BUILDING COORDINATE TABLE GRIDLINE INTERSECTION A-1 A-4 C-1 C-4 Northing 728046.60 728047.64 727996.10 727997.14 Easting 2451832.45 2451722.45 2451831.97 2451721.97 H O R R O C K S E N G I N E E R S N 0 20' 40' SCALE: 1" = 20' MISCELLANEOUS KEYNOTES PROPERTY BOUNDARY EXISTING RIGHT OF WAY FUTURE RIGHT OF WAY PUBLIC UTILITY EASEMENT INGRESS-EGRESS EASEMENT PERMANENT EASEMENT TEMPORARY EASEMENT A B C D E F G NOTES: 1. DIMENSIONS ARE TO FACE OF CURB UNLESS SHOWN OTHERWISE. 2. ALL RADII ON FACE OF CURB IN PARKING AREA ARE 3' UNLESS OTHERWISE NOTED. 3. JOINTS AND CONSTRUCTION OF CONCRETE AREAS SHALL BE PER ISPWC SD-714, SD-714A, SD-714B. 4. JOINT PATTERNS PER ISPWC ARE A MINIMUM STANDARD SEE LANDSCAPE ARCHITECT PLANS FOR ADDITIONAL DETAILING. 5. ADA RAMPS SHALL INCLUDE TRUNCATED DOMES PER STANDARD ISPWC DETAILS AND SHALL EXTEND THE LENGTH OF RAMP OPENING. 6. PARKING LOT STRIPING AS SHOWN SHALL MEET CITY OF MERIDIAN SPACING REQUIREMENTS AND LOCATION OF SPACES AS SHOWN. PARKING ANALYSIS BUILDING AREA 5376 SF REQUIRED STALLS 11 PROVIDED STALLS 101 HANDICAP STALLS REQUIRED * 1 HANDICAP STALLS PROVIDED ** 6 NOTES: * PER ADA REQUIREMENTS ** INCLUDES 3 VAN ACCESSIBLE STALLS BUILDING ANALYSIS BUILDING AREA TOTAL 5376 SF BUILDING TYPE (IBC) * - NOTES: * BUILDING TYPE TO BE VERIFIED WITH ARCHITECTURAL PLANS, ARCHITECTURAL PLANS TO SUPERCEDE. 13 01 01 01 06 06 12 13 12 12 11 11 02 13 06 03 05 04 02 02 10 08 08 08 08 08 08 DRAWN BY | REVISIONS © | ALL RIGHTS RESERVED CHECKED BY | PARAMOUNT URGENT CARE CONSTRUCTION DOCUMENTS MERIDIAN, IDAHO FOR PERMIT 5.19.2020 2019 11.25.19 01:22 PM | H:\!2019\ID-1870-1908 BVA Paramount - Urgent Care\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\PLANS\ID-1870-1908_05_SITE PLAN.dwg SICKLES SUNDERLAGE 5.19.2020 11.14.19 09:30 AM | H:\!2019\ID-1870-1908 BVA Paramount - Urgent Care\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\PLANS\ID-1870-1908_05_SITE PLAN.dwg CS001 SITE PLAN - 07 07 07 A A A A B B B B C C C C 09 09 09 13 14 14 15 17 16 01 12 01 A A MATCH LINE SEE SHEET CS002 18 CONSTRUCTION KEYNOTES INSTALL HEAVY DUTY ASPHALT PAVEMENT. SEE SHEET CS003 FOR TYPICAL PAVEMENT SECTIONS. INSTALL CONCRETE SIDEWALK (ISPWC SD-709) INSTALL ADA ACCESSIBLE RAMP WITH DETECTABLE WARNING PAD (ISPWC SD-712, SD-712C, & SD-712G, MIDBLOCK) HANDICAP PARKING SIGN HANDICAP PARKING SIGN - VAN ACCESSIBLE 6" VERTICAL CURB AND GUTTER (ISPWC SD-701) FUTURE BUILDING PACKAGE (BY OTHERS, FOR REFERENCE ONLY) LANDSCAPE AREA PER LANDSCAPE ARCHITECT PLANS INSTALL LIGHT DUTY ASPHALT PAVEMENT, SEE SHEET CS003 FOR CONCRETE PAVEMENT SECTION INSTALL ONE (1) BICYCLE PARKING STALL WITH TWO (2) INVERTED U RACKS, SEE SHEET CS003 FOR DETAIL (CONCRETE LIGHT DUTY SECTION) MATCH EXISTING TOP BACK OF CURB PLACE 4-INCH WHITE PAINT STRIPING 6" "MODIFIED" REVERSE SLOPE CURB & GUTTER, SEE SHEET CS003 FOR DETAIL COORDINATE WITH OTHERS FOR CONNECTION TO FUTURE IMPROVEMENTS. INSTALL TEMPORARY 2' ASPHALT CURB IF CURRENT CONSTRUCTION PRIOR TO FUTURE IMPROVEMENT CONSTRUCTION. INSTALL HEAVY DUTY CONCRETE ASPHALT PAVEMENT, SEE SHEET CS003 FOR TYPICAL PAVEMENT SECTIONS. REINFORCEMENT IN DUMPSTER PAD TO EXTEND 10' MINIMUM BEYOND FACE OF ENCLOSURE. SEE DETAIL CS003 PROPOSED TRASH ENCLOSURE BY OTHERS, REFER TO ARCHITECTURAL PLANS. 4' CUT IN TEMPORARY ASPHALT CURB 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 09 09 09 06 06 06 13 13 09 08 09 12 12 12 12 12 12 13 D E E E D F F F G G G 03 03 02 02 02 02 08 08 08 D