Loading...
2020-06-03 Parks - Pathways Conditions (AWENDIAN�--- Parks and Recreation Reviewer: Kim Warren/ Pathways Project Manager Planner Assigned: Sonya Allen Date: 3 June 2020 Project Name: Quartet Northeast File No: H-2020-0017- PP,AZ The following will be required for development of the proposed project: CONDITIONS OF APPROVAL- PATHWAYS 1. The project developer shall design and construct multi-use pathways consistent with the location and specifications set forth in the Meridian Pathways Master Plan Map and Master Pathways Plan Document Chapter 3). Any proposed adjustments to pathway alignment shall be coordinated through the Pathways Project Manager. 2. Prior to submittal of the final plat for City Engineer signature,the applicant shall submit a public access easement for two multi-use pathways. One shall be located on the north side of the Five Mile Drain, connecting from Black Cat Road to the east project boundary. Pathway shall be located outside of the NMID easement unless permission is obtained to place all or part of pathway within the easement. Additionally, applicant shall provide a pathway connection extending from the Five Mile Drain to the north project boundary. Consider routing this pathway through subdivision common areas and then north along proposed Sunnyside Ave or future collector road. (Alignment flexible,so long as north-south connection is established). Submit easement paperwork to the Planning Division for Council approval and subsequent recordation. Easements shall be a minimum of 14' wide (10' pathway+ 2' shoulder each side). Use standard City template for public access easement. Easement checklist must accompany all easement submittals. 3. Construct multi-use pathways per typical paving section(s) shown in the Meridian Pathways Master Plan Chapter 3. 4. The owner (or representative association) of the property affected by each public access easement shall have an ongoing obligation to maintain the multi-use pathway. 5. 6' high open vision fencing shall be installed between pathways and(live)water irrigation canals and laterals as detailed in the Meridian Pathways Master Plan, Chapter 3, page 3-5. All other fence details per UDC 11-3A-7. Drains are not considered to be live water. 6. Project developer shall be responsible for obtaining license agreement and other permission(s) as required for constructing within irrigation district easements. 7. Should any discrepancy exist between these conditions of approval and the requirements of the irrigation district,the developer shall work with Pathways Project Manager to achieve a pathway design that meets both City and irrigation district objectives. City requirements as stated shall not(nor are they intended to)override those of the irrigation district having jurisdiction over the project area. Rev.04.23.19