2020-06-01 Parks - Updated Pathways Conditions
Reviewer: Kim Warren / Pathways Project Manager
Planner Assigned: Sonya Allen
Project Name: Twelve Oaks East MDA, AZ File No: H-2020-0014 Date: 6.1.2018
The following will be required for development of the proposed project:
CONDITIONS OF APPROVAL - PATHWAYS
1. The project developer shall design and construct multi-use pathways consistent with the location
and specifications set forth in the Meridian Pathways Master Plan Map and Master Pathways
Plan Document Chapter 3). Any proposed adjustments to pathway alignment shall be
coordinated through the Pathways Project Manager.
2. Prior to Certificate of Occupancy, the applicant shall record a public access easement for the
multi-use pathway(s) north of the Ten Mile Drain, running the full length of the project’s southern
boundary and connecting to Linder Road. The easement shall be located outside of the NMID
easement unless permission is obtained via license agreement to locate all or part of pathway
within it.
As a provision of the amended DA, a pathway and public access easement shall also be required
to connect the above pathway west to the bridge crossing, continuing as far as the western
boundary of the previous Twelve Oaks development. This pathway was not shown on the plan
at the time of the previous DA and for that reason was not conditioned earlier.
A public access easement and detached, multi-use pathway (concrete sidewalk) shall also be
provided along Linder Road, north of the Ten Mile Pathway.
Easements shall be 14’ wide (10’ pathway + 2’ shoulder each side) and be situated to allow for
full maintenance operations by the district.
3. Construct multi-use pathways per typical paving section(s) shown in the Meridian Pathways
Master Plan Chapter 3.
4. The owner (or representative association) of the property affected by each public access
easement shall have an ongoing obligation to maintain the multi-use pathway.
5. 6’ high open vision fencing shall be installed between pathways and (live) water irrigation canals
and laterals as detailed in the Meridian Pathways Master Plan, Chapter 3, page 3-5. All other
fence details per UDC 11-3A-7. Not required along a drain.
6. Project developer shall be responsible for obtaining license agreement and other permission(s)
as required for constructing within irrigation district easements.
7. Should any discrepancy exist between these conditions of approval and the requirements of the
irrigation district, the developer shall work with Pathways Project Manager to achieve a pathway
design that meets both City and irrigation district objectives. City requirements as stated shall
Rev. 04.23.19
not (nor are they intended to) override those of the irrigation district having jurisdiction over the
project area.
Rev. 04.23.19