Loading...
2020-06-02 Parks - Pathways Adrienne Weatherly From:Kimberly Warren Sent:Tuesday, June 2, 2020 10:31 AM To:Adrienne Weatherly Cc:Bill Parsons Subject:200602 Gem Innovation School H-2020-0043- AZ Attachments:200602 Gem Innovation School H-2020-0043- AZ.docx Adrienne and Bill – I’m a bit late with these. If still possible, please add to the record just to be proper. Applicant is aware and pathways are shown on current site plan as required. Thanks! Kim 1 Reviewer: Kim Warren / Pathways Project Manager Planner Assigned: Bill Parsons Project Name: Gem Innovation School File No: H-2020-0043 Date: 1 June 2020 The following will be required for development of the proposed project: CONDITIONS OF APPROVAL - PATHWAYS 1. The project developer shall design and construct multi-use pathways consistent with the location and specifications set forth in the Meridian Pathways Master Plan Map and Master Pathways Plan Document Chapter 3). Any proposed adjustments to pathway alignment shall be coordinated through the Pathways Project Manager. 2. Prior to submittal of the final plat for City Engineer signature, the applicant shall submit a public access easement for a detached, multi-use pathway running the length of the McDermott Rd. frontage, and a second multi-use pathway along the south of the property to connect to existing pathway in Oaks North subdivision. Submit easement paperwork to the Planning Division for Council approval and subsequent recordation. Easements shall be a minimum of 14’ wide (10’ pathway + 2’ shoulder each side). Use standard City template for public access easement. Easement checklist must accompany all easement submittals. 3. Construct multi-use pathways per typical paving section(s) shown in the Meridian Pathways Master Plan Chapter 3. 4. The owner (or representative association) of the property affected by each public access easement shall have an ongoing obligation to maintain the multi-use pathway. Rev. 04.23.19