Loading...
Elevationsgeneral notes: A. DO NOT SCALE HATCH PATTERNS. FOR MATERIAL REPRESENTATION ONLY. B. EXTERIOR JOINTS AROUND WINDOW AND DOOR FRAMES, OPENINGS BETWEEN WALLS AND FOUNDATIONS, BETWEEN WALLS AND ROOF, BETWEEN WALLS AND PANELS, AT PENETRATIONS OF UTILITY SERVICE THROUGH WALLS, FLOORS, AND ROOFS, AND ALL OTHER SUCH OPENINGS INTO BUILDINGING SHALL BE SEALED, CAULKED, GASKETED, OR WEATHERSTRIPPED TO LIMIT AIR LEAKAGE AROUND THEIR PERIMETER WHEN IN CLOSED POSITION. keynotes: 1. NEW STOREFRONT WINDOW/DOOR -SEE SCHEDULE 2. NEW STEEL FENCE 3. NEW GATE 4. REMOVE EXISTING CANOPY FABRIC. FRAME TO REMAIN. FABRIC TO BE REPLACED -TO BE DETERMINED BY OWNER. 5. EXISTING STONE SILL TO REMAIN 6. EXISTING WINDOW TO REMAIN 7. EXISTING DOOR TO REMAIN 0 paint color legend: PT1 SHERWIN-WILLIAMS CARMELIZED (SW 9186) PT2 SHERWIN-WILLIAMS CAVERN CLAY (SW 7701) PT3 SHERWIN-WILLIAMS COPPER WIRE (SW 7707) 7"8' - 0"7"8' - 3" 2 4 1 5 7 6 6 6 6 6 PT1 PT2 PT2 PT2 PT2 PT1 PT3 PT3 PT3PT3PT3 32 4 6 6 6 6 6 7 PT1 PT3 frame type notes 1. SEE WINDOW SPECIFICIATIONS FOR GLAZING TYPES. 2. FIELD-VERIFY SIZES AND EXTENTS OF ALL STOREFRONT SYSTEMS PRIOR TO ORDERING. 3. PROVIDE INSULATED TEMPERED GLAZING WHERE INDICATED WITH SYMBOL T 4. PROVIDE INSULATED GLAZING WHERE INDICATED WITH SYMBOL I3"7"2"2"4' - 6"2"3' - 0" FINISH FLOOR 15' - 5"2' - 7"door type FINISH FLOOR A10"5' - 10"4"4"4" T PER SCHEDULE PER SCHEDULE2" T I ABBREVIATIONS FF FACTORY FINISH AL ALUMINUM GL GLAZING GLAZING SCHEDULE T 1" INSULATED TEMPERED GLAZING REMARKS 1. door schedule remarks date: drawn: checked: project:ALL CONSTRUCTION MUST COMPLY WITH THE 'FEDERAL REGISTER', PART VI OF THE DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT, OFFICE OF THE ASSISTANT SECRETARY FOR FAIR HOUSING AND EQUAL OPPORTUNITY-24 CFR CHAPTER 1-FINAL FAIR HOUSING ACCESSIBILITY GUIDELINES DATED WED. MARCH 6, 1991. THE PROJECT MUST ALSO MEET THE REHABILITATION ACT OF 1973 AS AMENDED AS IMPLEMENTED BY THE 'UNIFORM FEDERAL ACCESSIBILITY STANDARDS' (UFAS) AND IN CASE OF CONFLICTS, THE STANDARD THAT WILL PROVIDE THE GREATEST DEGREE OF ACCESSIBILITY SHALL BE COMPLIED WITH.(208) 331-9031 erstadarchitects.comrevision:erstad A R C H I T E C T S, PA310 north 5th street, boise idaho 83702 a3.11 exterior elevations906 n main streetmeridian, idaho 83642cw ck 04.14.2020 marketing design reviewel tenampa restaurant -building improvement1/4" = 1'-0" west elevation1 1/4" = 1'-0" south elevation2 DOOR SCHEDULE NUMBERTYPEHEIGHTWIDTHTHICKNESSDOOR CONSTRUCTIONDOOR FINISHGLAZINGFRAME TYPEFRAME CONSTRUCTIONFRAME FINISHRATING (MIN.)REMARKS101 A 7' - 0" 3' - 0" 0' - 2" AL/GL AL T 1 AL FF - no. desc. date