April 14, 2020
Project Narrative
El Tenampa Restaurant – Building Improvement
906 N Main Street
Meridian, ID 83642
Dear Planning Staff,
The proposed project is an existing restaurant that is installing a patio for outdoor seating. The project
includes installing new steel fencing, a new exterior door for patio access, and new exterior paint. The
main modification is the addition of the patio, as this will affect the site.
The existing building will be painted to improve exterior appearance. The new door will replace an existing
window, and these elements will maintain the same look as the existing windows. Allowing for employee
and customer access to the patio, this accessible door will have full glazing with a side and a top transom
window. The existing west canopy will be removed.
For site modifications, the patio design be set back to maintain at least 5’-0” for the linear pedestrian clear
zone. The patio will also have two exits, with accessible gates being located on the north and south sides
of the patio. The patio fence will be steel fencing with a pattern similar to the adjacent business to the
north, which currently has an outdoor patio. For allowable encroachments, the patio will include tables,
chairs, and umbrellas.
We hope that the City of Meridian finds this patio design and updated exterior look to be suitable to the
site and its context. If you have any questions, please do not hesitate to contact me at (208) 331-9031.
Sincerely,
Caitlin Kessler, Project Lead
erstad ARCHITECTS
general notes:
A. CONTRACTOR TO VERIFY ALL DIMENSIONS IN FIELD. NOTIFY
ARCHITECT IF DISCREPANCIES ARE FOUND.
B. UNLESS NOTED OTHERWISE, ALL EXTERIOR WALLS ARE
DIMENSIONED TO FACE OF EXISTING FINISH.
keynotes:
1. NEW STEEL FENCE.
2. NEW ACCESSIBLE GATE -MATCH FENCE PATTERN
3. NEW TABLES, CHAIRS, AND UMBRELLAS.
4. EXISTING ADJACENT BUSINESS PATIO
0
A2.11
1
DOOR NUMBER
BUILDING ELEVATION
101A
vicinity map
not to scale
SITE
PINE AVE
MERIDIAN RDMAIN STSTATE AVE
2ND ST16' - 0"22' - 0" 9 ' - 0 "CLEAR ZONE
5' - 0" MIN.8' - 0"4' - 6"101
3' - 6"
3' - 6"CLEAR ZONE5'
-
0"
MI
N.
1 2
2
N MAIN STREETE PINE AVENUE
EXISTING BUILDING
EXISTING BUILDING
(NOT IN SCOPE)
a3.11 1
a3.11
2
+/- 30' - 0"
1
EXISTING PARKING
(NOT IN SCOPE)
4
mkt-02
1
mkt-02 2
date:
drawn:
checked:
project:ALL CONSTRUCTION MUST COMPLY WITH THE 'FEDERAL REGISTER', PART VI OF THE DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT, OFFICE OF THE ASSISTANT SECRETARY FOR FAIR HOUSING AND EQUAL OPPORTUNITY-24 CFR CHAPTER 1-FINAL FAIR HOUSING ACCESSIBILITY GUIDELINES DATED WED. MARCH 6, 1991. THE PROJECT MUST ALSO MEET THE REHABILITATION ACT OF 1973 AS AMENDED AS IMPLEMENTED BY THE 'UNIFORM FEDERAL ACCESSIBILITY STANDARDS' (UFAS) AND IN CASE OF CONFLICTS, THE STANDARD THAT WILL PROVIDE THE GREATEST DEGREE OF ACCESSIBILITY SHALL BE COMPLIED WITH.(208) 331-9031 erstadarchitects.comrevision:erstad A R C H I T E C T S, PA310 north 5th street, boise idaho 83702 a2.11
site plan and
floor plan906 n main streetmeridian, idaho 83642cw
ck
04.14.2020
marketing
design
reviewel tenampa restaurant -building improvement1/4" = 1'-0"
floor plan
1" = 10'-0"
site plan
el tenampa restaurant -
building improvement
906 n main street
meridian, idaho 83642
architectural
erstad ARCHITECTS
caitlin kessler
310 n 5th street
boise, id. 83702
ph. (208) 331-9031
caitlin@erstadarchitects.com
eA
architectural
a2.11 site plan and floor plan
a3.11 exterior elevations
project information
THE SCOPE OF THIS PROJECT INCLUDES
INSTALLING NEW STEEL FENCING, A NEW
EXTERIOR DOOR FOR PATIO ACCESS, AND NEW
EXTERIOR PAINT TO IMPROVE EXTERIOR
APPEARANCE.
drawing schedule
drawings symbols
no. desc. date
general notes:
A. DO NOT SCALE HATCH PATTERNS. FOR MATERIAL REPRESENTATION
ONLY.
B. EXTERIOR JOINTS AROUND WINDOW AND DOOR FRAMES, OPENINGS
BETWEEN WALLS AND FOUNDATIONS, BETWEEN WALLS AND ROOF,
BETWEEN WALLS AND PANELS, AT PENETRATIONS OF UTILITY SERVICE
THROUGH WALLS, FLOORS, AND ROOFS, AND ALL OTHER SUCH OPENINGS
INTO BUILDINGING SHALL BE SEALED, CAULKED, GASKETED, OR
WEATHERSTRIPPED TO LIMIT AIR LEAKAGE AROUND THEIR PERIMETER
WHEN IN CLOSED POSITION.
keynotes:
1. NEW STOREFRONT WINDOW/DOOR -SEE SCHEDULE
2. NEW STEEL FENCE
3. NEW GATE
4. REMOVE EXISTING CANOPY FABRIC. FRAME TO REMAIN. FABRIC
TO BE REPLACED -TO BE DETERMINED BY OWNER.
5. EXISTING STONE SILL TO REMAIN
6. EXISTING WINDOW TO REMAIN
7. EXISTING DOOR TO REMAIN
0
paint color legend:
PT1 SHERWIN-WILLIAMS CARMELIZED (SW 9186)
PT2 SHERWIN-WILLIAMS CAVERN CLAY (SW 7701)
PT3 SHERWIN-WILLIAMS COPPER WIRE (SW 7707)
7"8' - 0"7"8' - 3"
2
4
1
5
7
6 6 6
6
6
PT1
PT2 PT2
PT2
PT2
PT1
PT3
PT3
PT3PT3PT3
32
4
6 6 6
6 6
7
PT1
PT3
frame type notes
1. SEE WINDOW SPECIFICIATIONS FOR GLAZING TYPES.
2. FIELD-VERIFY SIZES AND EXTENTS OF ALL
STOREFRONT SYSTEMS PRIOR TO ORDERING.
3. PROVIDE INSULATED TEMPERED GLAZING WHERE INDICATED
WITH SYMBOL T
4. PROVIDE INSULATED GLAZING WHERE INDICATED
WITH SYMBOL I3"7"2"2"4' - 6"2"3' - 0"
FINISH FLOOR
15' - 5"2' - 7"door type
FINISH FLOOR
A10"5' - 10"4"4"4"
T
PER SCHEDULE
PER SCHEDULE2"
T
I
ABBREVIATIONS
FF FACTORY FINISH
AL ALUMINUM
GL GLAZING
GLAZING SCHEDULE
T 1" INSULATED
TEMPERED GLAZING
REMARKS
1.
door schedule remarks
date:
drawn:
checked:
project:ALL CONSTRUCTION MUST COMPLY WITH THE 'FEDERAL REGISTER', PART VI OF THE DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT, OFFICE OF THE ASSISTANT SECRETARY FOR FAIR HOUSING AND EQUAL OPPORTUNITY-24 CFR CHAPTER 1-FINAL FAIR HOUSING ACCESSIBILITY GUIDELINES DATED WED. MARCH 6, 1991. THE PROJECT MUST ALSO MEET THE REHABILITATION ACT OF 1973 AS AMENDED AS IMPLEMENTED BY THE 'UNIFORM FEDERAL ACCESSIBILITY STANDARDS' (UFAS) AND IN CASE OF CONFLICTS, THE STANDARD THAT WILL PROVIDE THE GREATEST DEGREE OF ACCESSIBILITY SHALL BE COMPLIED WITH.(208) 331-9031 erstadarchitects.comrevision:erstad A R C H I T E C T S, PA310 north 5th street, boise idaho 83702 a3.11
exterior
elevations906 n main streetmeridian, idaho 83642cw
ck
04.14.2020
marketing
design
reviewel tenampa restaurant -building improvement1/4" = 1'-0"
west elevation1
1/4" = 1'-0"
south elevation2
DOOR SCHEDULE
NUMBERTYPEHEIGHTWIDTHTHICKNESSDOOR CONSTRUCTIONDOOR FINISHGLAZINGFRAME TYPEFRAME CONSTRUCTIONFRAME FINISHRATING (MIN.)REMARKS101 A 7' - 0" 3' - 0" 0' - 2" AL/GL AL T 1 AL FF -
no. desc. date