Loading...
Application 310 no. 5th street • boise, idaho 83702 • phone 208.331.9031 • fax 208.331.9035 • email:info@erstadarchitects.com April 14, 2020 Project Narrative El Tenampa Restaurant – Building Improvement 906 N Main Street Meridian, ID 83642 Dear Planning Staff, The proposed project is an existing restaurant that is installing a patio for outdoor seating. The project includes installing new steel fencing, a new exterior door for patio access, and new exterior paint. The main modification is the addition of the patio, as this will affect the site. The existing building will be painted to improve exterior appearance. The new door will replace an existing window, and these elements will maintain the same look as the existing windows. Allowing for employee and customer access to the patio, this accessible door will have full glazing with a side and a top transom window. The existing west canopy will be removed. For site modifications, the patio design be set back to maintain at least 5’-0” for the linear pedestrian clear zone. The patio will also have two exits, with accessible gates being located on the north and south sides of the patio. The patio fence will be steel fencing with a pattern similar to the adjacent business to the north, which currently has an outdoor patio. For allowable encroachments, the patio will include tables, chairs, and umbrellas. We hope that the City of Meridian finds this patio design and updated exterior look to be suitable to the site and its context. If you have any questions, please do not hesitate to contact me at (208) 331-9031. Sincerely, Caitlin Kessler, Project Lead erstad ARCHITECTS general notes: A. CONTRACTOR TO VERIFY ALL DIMENSIONS IN FIELD. NOTIFY ARCHITECT IF DISCREPANCIES ARE FOUND. B. UNLESS NOTED OTHERWISE, ALL EXTERIOR WALLS ARE DIMENSIONED TO FACE OF EXISTING FINISH. keynotes: 1. NEW STEEL FENCE. 2. NEW ACCESSIBLE GATE -MATCH FENCE PATTERN 3. NEW TABLES, CHAIRS, AND UMBRELLAS. 4. EXISTING ADJACENT BUSINESS PATIO 0 A2.11 1 DOOR NUMBER BUILDING ELEVATION 101A vicinity map not to scale SITE PINE AVE MERIDIAN RDMAIN STSTATE AVE 2ND ST16' - 0"22' - 0" 9 ' - 0 "CLEAR ZONE 5' - 0" MIN.8' - 0"4' - 6"101 3' - 6" 3' - 6"CLEAR ZONE5' - 0" MI N. 1 2 2 N MAIN STREETE PINE AVENUE EXISTING BUILDING EXISTING BUILDING (NOT IN SCOPE) a3.11 1 a3.11 2 +/- 30' - 0" 1 EXISTING PARKING (NOT IN SCOPE) 4 mkt-02 1 mkt-02 2 date: drawn: checked: project:ALL CONSTRUCTION MUST COMPLY WITH THE 'FEDERAL REGISTER', PART VI OF THE DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT, OFFICE OF THE ASSISTANT SECRETARY FOR FAIR HOUSING AND EQUAL OPPORTUNITY-24 CFR CHAPTER 1-FINAL FAIR HOUSING ACCESSIBILITY GUIDELINES DATED WED. MARCH 6, 1991. THE PROJECT MUST ALSO MEET THE REHABILITATION ACT OF 1973 AS AMENDED AS IMPLEMENTED BY THE 'UNIFORM FEDERAL ACCESSIBILITY STANDARDS' (UFAS) AND IN CASE OF CONFLICTS, THE STANDARD THAT WILL PROVIDE THE GREATEST DEGREE OF ACCESSIBILITY SHALL BE COMPLIED WITH.(208) 331-9031 erstadarchitects.comrevision:erstad A R C H I T E C T S, PA310 north 5th street, boise idaho 83702 a2.11 site plan and floor plan906 n main streetmeridian, idaho 83642cw ck 04.14.2020 marketing design reviewel tenampa restaurant -building improvement1/4" = 1'-0" floor plan 1" = 10'-0" site plan el tenampa restaurant - building improvement 906 n main street meridian, idaho 83642 architectural erstad ARCHITECTS caitlin kessler 310 n 5th street boise, id. 83702 ph. (208) 331-9031 caitlin@erstadarchitects.com eA architectural a2.11 site plan and floor plan a3.11 exterior elevations project information THE SCOPE OF THIS PROJECT INCLUDES INSTALLING NEW STEEL FENCING, A NEW EXTERIOR DOOR FOR PATIO ACCESS, AND NEW EXTERIOR PAINT TO IMPROVE EXTERIOR APPEARANCE. drawing schedule drawings symbols no. desc. date general notes: A. DO NOT SCALE HATCH PATTERNS. FOR MATERIAL REPRESENTATION ONLY. B. EXTERIOR JOINTS AROUND WINDOW AND DOOR FRAMES, OPENINGS BETWEEN WALLS AND FOUNDATIONS, BETWEEN WALLS AND ROOF, BETWEEN WALLS AND PANELS, AT PENETRATIONS OF UTILITY SERVICE THROUGH WALLS, FLOORS, AND ROOFS, AND ALL OTHER SUCH OPENINGS INTO BUILDINGING SHALL BE SEALED, CAULKED, GASKETED, OR WEATHERSTRIPPED TO LIMIT AIR LEAKAGE AROUND THEIR PERIMETER WHEN IN CLOSED POSITION. keynotes: 1. NEW STOREFRONT WINDOW/DOOR -SEE SCHEDULE 2. NEW STEEL FENCE 3. NEW GATE 4. REMOVE EXISTING CANOPY FABRIC. FRAME TO REMAIN. FABRIC TO BE REPLACED -TO BE DETERMINED BY OWNER. 5. EXISTING STONE SILL TO REMAIN 6. EXISTING WINDOW TO REMAIN 7. EXISTING DOOR TO REMAIN 0 paint color legend: PT1 SHERWIN-WILLIAMS CARMELIZED (SW 9186) PT2 SHERWIN-WILLIAMS CAVERN CLAY (SW 7701) PT3 SHERWIN-WILLIAMS COPPER WIRE (SW 7707) 7"8' - 0"7"8' - 3" 2 4 1 5 7 6 6 6 6 6 PT1 PT2 PT2 PT2 PT2 PT1 PT3 PT3 PT3PT3PT3 32 4 6 6 6 6 6 7 PT1 PT3 frame type notes 1. SEE WINDOW SPECIFICIATIONS FOR GLAZING TYPES. 2. FIELD-VERIFY SIZES AND EXTENTS OF ALL STOREFRONT SYSTEMS PRIOR TO ORDERING. 3. PROVIDE INSULATED TEMPERED GLAZING WHERE INDICATED WITH SYMBOL T 4. PROVIDE INSULATED GLAZING WHERE INDICATED WITH SYMBOL I3"7"2"2"4' - 6"2"3' - 0" FINISH FLOOR 15' - 5"2' - 7"door type FINISH FLOOR A10"5' - 10"4"4"4" T PER SCHEDULE PER SCHEDULE2" T I ABBREVIATIONS FF FACTORY FINISH AL ALUMINUM GL GLAZING GLAZING SCHEDULE T 1" INSULATED TEMPERED GLAZING REMARKS 1. door schedule remarks date: drawn: checked: project:ALL CONSTRUCTION MUST COMPLY WITH THE 'FEDERAL REGISTER', PART VI OF THE DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT, OFFICE OF THE ASSISTANT SECRETARY FOR FAIR HOUSING AND EQUAL OPPORTUNITY-24 CFR CHAPTER 1-FINAL FAIR HOUSING ACCESSIBILITY GUIDELINES DATED WED. MARCH 6, 1991. THE PROJECT MUST ALSO MEET THE REHABILITATION ACT OF 1973 AS AMENDED AS IMPLEMENTED BY THE 'UNIFORM FEDERAL ACCESSIBILITY STANDARDS' (UFAS) AND IN CASE OF CONFLICTS, THE STANDARD THAT WILL PROVIDE THE GREATEST DEGREE OF ACCESSIBILITY SHALL BE COMPLIED WITH.(208) 331-9031 erstadarchitects.comrevision:erstad A R C H I T E C T S, PA310 north 5th street, boise idaho 83702 a3.11 exterior elevations906 n main streetmeridian, idaho 83642cw ck 04.14.2020 marketing design reviewel tenampa restaurant -building improvement1/4" = 1'-0" west elevation1 1/4" = 1'-0" south elevation2 DOOR SCHEDULE NUMBERTYPEHEIGHTWIDTHTHICKNESSDOOR CONSTRUCTIONDOOR FINISHGLAZINGFRAME TYPEFRAME CONSTRUCTIONFRAME FINISHRATING (MIN.)REMARKS101 A 7' - 0" 3' - 0" 0' - 2" AL/GL AL T 1 AL FF - no. desc. date