Loading...
Public UtilityENGINEERINGINTERMOUNTAIN UTILITY UTILITY REPRESENTATIVES REPRESENTATIVES PHONE WATER EROSION CONTROL CITY OF MERIDIAN, ADA COUNTY, IDAHO PARCELS C,D & E AND LOT 7 UNA MAS SUBDIVISION VERRASO NORTH TITLE SHEET FOR GOVT LOT 4 SECTION 4, T. 3 N, R.1 E., B.M. “ ” ENGINEERINGINTERMOUNTAIN ENGINEERINGINTERMOUNTAIN ENGINEERINGINTERMOUNTAIN (208) 941-1245 AS PREPARED BY: Intermountain Engineering 2587 SouthSide Blvd.. Melba, Idaho 83641 March 20, 2020 STORM DRAINAGE CALCULATIONS FOR: VERRASO VILLAGE NORTH Meridian, Idaho 3/20/20 CALCULATIONS FLOW CALCULATIONS PIPE SIZING AND HYDRAULIC GRADE CALCULATIONS DETENTION VOLUME CALCULATIONS POND VOLUME CALCULATIONS GENERAL NOTES The pond volume calculations are based on an average of the water surface area and the pond bottom area, applied over the design pond depth. Runoff water will enter the drop inletrs after being collected and flowing in the gutter plate. Water then flows through a sand and greese trap before entering the sepage bed. All water will be retained on site and percolate into the underlying soils. There will be no discharge off site. Flow and volume for the basin areas were calculated using the Rational Method. The "C" coefficient used in the calculations is based on weighted values as shown. Since historical drainage is not available, a 100-yr event is examined. These calculations employ the Manning Equation. The hydraulic grade is based on calculated flow and selected pipe size. Since an outfall is not provided, detention volume is based on the rational method using the 100 year storm over the worst case time of concentration & 1 hour 100 year storm. RATIONAL METHOD Q=CiA where: Q = Runoff Rate, cfs C = Runoff Coefficient i = Storm Intensity, in./hr. A = Basin Area(s), acres MANNING EQUATION V=1.49R2/3S1/2 / n where: V = Velocity, fps R = Hydraulic Radius, ft. S = Channel Slope, ft./ft. n = Manning Roughness Coefficient PERCOLATION VOLUME (SCS TRIANGULAR UNIT HYDROGRAPH METHOD) V=(Area)(Perc. rate)(t )/ (12)(60) where: V = Volume, cu. ft. Area = Infiltration bed area, sf Perc. rate = percolation rate, in/hr t = worst-case duration, min. ORIFICE EQUATION Q=(Coefficient)(3.1416 x Radius2)(64.4 x Head)1/2 where: Head=W.S.E. - Center of Orifice =81.50-78.14 =3.4' OTHER EQUATIONS USED Q=VA where: Q = Flow, cfs V = Velocity, fps A = Cross Sectional Area, sq. ft. EQUATIONS USED IN CALCULATIONS 2015 Engineering Division Development Policy Manual Division 100 Rev. Date: February 17, 2015 Section 106 - 19 of 20 INTERMOUNTAIN ENGINEERING Verraso Village North 2587C Southside Blvd. Melba, Idaho 83641 Meridian, Idaho (208) 941-1245 (FAX) 495-2469 DATE 3/20/2020 ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- PRE- DEVELOPED FLOW AND VOLUME CALCULATION Area 1 FILE: Verraso North PAGE ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The weighted runoff Coefficient for the developed site is calculated. C = RUNOFF COEFFICIENT (EXIBIT "B" Recommended "C" Coefficients for "Rational Method Equation" - Peak Rate of Discharge) Cu = UNIMPROVED AREA RUNOFF COEFFICIENT = 0.10 Cd = DEVELOPED SINGLE FAMILY RESIDENTIAL RUNOFF COEFFICIENT = 0.50 (or use calculated (weighted) value if higher) BLDG & PAVED ACRES (0.95) + LANDSCAPED ACRES (0.10) = ------------------------------------------------------------------------------------------------------------------------------------- TOTAL ACRES 0.885 * (0.95) +0.375 * (0.10) = ----------------------------------------------------------------------------------------------------------0.70 1.260 PRE-DEVELOPED FLOW AND VOLUME CALCULATIONS The pre-developed flow for the project site and the upstream area from the site are calculated using the Rational Method. The time of concentration is based on overland flow to a point of channelization and then the travel time in the existing channel to the downstream end of the concerned area. The pre-developed volume is calculated using the SCS Triangular Unit Hydrograph. Pre-developed volume and flow are based on the 100-year storm event and site caracteristics. Note the basin area is only accounting for the area of the basin that we will be able to discharge from. BASIN CHARACTERISTICS BASIN AREA=0.00 acres OVERLAND FLOW LENGTH=345.00 feet OVERLAND SLOPE=1.21% RUNOFF COEFFICIENT (C)=0.10 FLOW AND VOLUME CALCULATION RESULTS OVERLAND TIME OF CONCENTRATION 31.4 min 100 YEAR STORM INTENSITY (i)= 1.57 in/hr 100 YEAR PEAK FLOW (Q)=0.00 cfs NO DISCHARGE 100 YEAR VOLUME (from SCS triangular unit hydrograph)= - cf 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0FLOW (cfs)TIME (min) SCS TRIANGULAR UNIT HYDROGRAPH PRE-DEVELOPED FLOW INTERMOUNTAIN ENGINEERING Verraso Village North 2587C Southside Blvd. Melba, Idaho 83641 Meridian, Idaho (208) 941-1245 (FAX) 495-2469 DATE 3/20/2020 ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- POST- DEVELOPED FLOW AND VOLUME CALCULATIO Area 1 FILE: Verraso North PAGE ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Post-developed flow for the basin areas are also calculated using the Rational Method. The time of concentration is based on a combination of lot to street time, gutter time and applicable pipe time prior to reaching the retention area. The lot time is calculated using Manning's kinematic solution (Overton and Meadows 1976). This equation is also used for sheet flow of less than 300 feet. The gutter time is calculated using the travel length along the gutter and the gutter velocity at the design slope. Pipe time is calculated using the pipe travel length and an average pipe velocity calculated using manings formula. STORM RETURN PERIOD = 100 YEAR BASIN CHARACTERISTICS BASIN AREA= 1.260 acres 2 YEAR 24 HOUR RAINFALL (in)= 1.20 in OVER GRASS FLOW TO CURB & GUTTER 20.00 feet LOT SLOPE =0.01 FT/FT MANNING'S n FOR GRASS= 0.24 CONCRETE CURB & GUTTER roll GUTTER FLOW LENGTH=0.00 feet GUTTER SLOPE=0.40% MANNING'S n FOR CURB= 0.016 PIPE LENGTH=- feet PIPE DIAMETER= 12 IN PIPE SLOPE 0.0022 MANNING'S n FOR PIPE= 0.013 AVERAGE PIPE VELOCITY= 1.94 ft/sec RUNOFF COEFFICIENT (C)=0.70 (weighted) FLOW AND VOLUME CALCULATION RESULTS LOT TRAVEL TIME= 8.5 min. GUTTER TRAVEL TIME= 0.0 min. PIPE TRAVEL TIME= 0.0 min. Method 1 Method 2 uses Tc 1hr, 100 yr. Tc TOTAL TIME OF CONCENTRATION 8.5 min 60.00 min 100 YEAR STORM INTENSITY (i)= 4.11 in/hr 1.00 in/hr 100 YEAR PEAK FLOW (Q)= 3.61 cfs 0.88 cfs 100 YEAR VOLUME (from SCS triangular unit hydrograph)= 2,453 cf 4,221 cf 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 0.0 5.0 10.0 15.0 20.0 25.0FLOW (cfs)TIME (min) SCS TRIANGULAR UNIT HYDROGRAPH POST-DEVELOPED FLOW INTERMOUNTAIN ENGINEERING Verraso Village North 2587C Southside Blvd. Melba, Idaho 83641 Meridian, Idaho (208) 941-1245 (FAX) 495-2469 DATE 3/20/2020 ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- DETENTION/RETURN VOLUME CALCULATIONS Area 1 FILE: Verraso North PAGE ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The method calculates the required detention volume by subtracting the calculated pre-developed volume from the post-developed SCS Triangular Unit Hydrograph. Then the volume is increased by 15 percent to compensate for detention volume losses due to sediment between maintenance periods. STORM RETURN PERIOD = 100 YEAR UNIT HYDROGRAPH METHOD PRE-DEVELOPED SITE DISCHARGE = 0.00 cfs (worst case design) POST-DEVELOPED VOLUME = 4,221 cf (worst case design) DETENTION VOLUME REQUIRED = 4221 cf 15% VOLUME FOR SEDIMENT = 633 cf TOTAL VOLUME REQUIRED = 4854 cf POND VOLUME CALCULATIONS The pond volume calculations are based on the equasion s Also included in this section are infiltration bed calculations. Infiltration bed volume calculations are based on void space in the drain rock and percolation volume which occurs over the time base for the post-developed SCS Triangular Unit Hydrograph. If infiltration beds are not used, then only the pond bottom percolation is considered. REQUIRED DETENTION =4854 cf POND VOLUME CALCULATION POND BOTTOM AREA =3329.00 sf POND WATER SURFACE AREA =4138.00 sf POND TOP BANK ELEV =2561.86 ft POND WATER SURFACE ELEV =2561.86 ft POND INVERT ELEV =2561.46 ft SEASONAL GROUND WATER =2540.00 Testhole showed no water at 10' BELOW GROUND POND FREEBOARD = 0.00 ft INVERT TO GROUND H2O = 21.46 ft POND DEPTH = 0.40 ft POND STORAGE= 1493.40 cf INFILTRATION BED CALCULATION INFILTRATION BED BOTTOM AREA =480.00 sf (entire bottom L = 60.0 W= 8.0 INFILTRATION BED DEPTH =8.00 ft VOID SPACE IN DRAIN ROCK= 40% PERCOLATION RATE =8.00 in/hr VOLUME IN VOIDS = 1536.00 cf PERCOLATION VOLUME = 854 cf INFILTRATION STORAGE = 3884 cf TOTAL DETAINED VOLUME = 5377 cf > 4854 cf (required) THEREFORE STORAGE IS ADEQUATE 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 0.0 5.0 10.0 15.0 20.0 25.0FLOW (cfs)TIME (min) SCS TRIANGULAR UNIT HYDROGRAPH POST-DEVELOPED FLOW INTERMOUNTAIN ENGINEERING Verraso Village Three 2587C Southside Blvd. Melba, Idaho 83641 Meridian, Idaho (208) 941-1245 (FAX) 495-2469 DATE 4/05/2017 ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- PRE- DEVELOPED FLOW AND VOLUME CALCULATION Area 1 FILE: Verraso Three PAGE ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- TIME REQUIRED TO DISSIPATE VOLUME TIME CALCULATION ASSUMES A DISCHARGE OFFSITE EQUAL TO THE CALCULATED PRE-DEVELOPED FLOW OF 0.00 CFS AND PERCOLATION OVER THE POND BOTTOM AREA EQUAL TO 8 in./hr. TIME = 15.17 hours