Loading...
2020-05-18 COMPASS Communities in Motion 2040 2. 0 Development Review The Community Planning Association of Southwest Idaho (COMPASS) is the metropolitan planning organization (MPO) for Ada and Canyon Counties. COMPASS has developed this review as a tool for local governments to evaluate whether land developments are consistent with the goals of Communities in Motion 2040 2.0 (CIM 2040), the regional long-range transportation plan for Ada and Canyon Counties. This checklist is not intended to be prescriptive, but rather a guidance document based on CIM 2040 2.0 goals. Development Name: Modern Craftsman Agency: Meridian CIM Vision Category: Future Neighborhood New households: 195 New jobs: 25 Exceeds CIM forecast: No CIM Corridor: Chinden Blvd (US 20/26) Level of Stress considers facility type, number of vehicle �� Pedestrian level of stress: R lanes, and speed. Roads with G or PG ratings better Bicycle level of stress: R support bicyclists and pedestrians of all ages and comfort levels. '• Housing within 1 mile: 980 A good jobs/housing balance - a ratio between 1 and Jobs within 1 mile: 90 1.5 - reduces traffic congestion. Higher numbers Jobs/Housing Ratio: 0.1 indicate the need for more housing and lower numbers indicate an employment need. Nearest police station: >4 miles Developments within 1.5 miles of police and fire �! Nearest fire station: 2.2 miles stations ensure that emergency services are more efficient and reduce the cost of these important public services. Farmland consumed: Yes ,Farmland contributes to the local economy, creates Farmland within 1 mile: 923 acres additional jobs, and provides food security to the region. •� Development in farm areas decreases the productivity �and sustainability of farmland. r- Nearest bus stop: >4 miles Residents who live or work less than 1/2 mile from Nearest public school: 2.4 miles critical services have more transportation choices. Nearest public park: 0.8 miles Walking and biking reduces congestion by taking cars off P011Nearest grocery store: 1.9 miles the road, while supporting a healthy and active lifestyle. Recommendations US Highway 20/26 (Chinden Boulevard) is in the COMPASS Transportation Improvement Program (TIP) with construction now occurring to widen the corridor to five-lanes, with two through lanes in each direction and a two way left center turn lane (Key #21858). Ultimately, US 20/26 will be widened from four to six travel lanes with continuous flow intersections and a detached multiuse path on each side of the roadway. More information about US 20/26 in the Communities in Motion 2040 2.0 plan is available at: https://compassidaho.orci/CIM2040-2.0/. The proposal is on the fringe of urban development in an area removed from employment centers and existing public transportation. The closest bus service is more than four miles away. However, the proposal is a mix of residential and retail, which may mitigate new traffic congestion by decreasing the amount of single occupancy vehicle trips generated on the transportation network and encouraging non-motorized travel. More information about COMPASS and Communities in Motion 2040 2.0: Web: www.compassidaho.org Email info@compassidaho.org .�'�. CO M PAS S More information about the development review process: 1111 r http://www.compassidaho.orci/dashboard/devreview.htm � WIN COMMUNITY PLANNING ASSOCIATION ' of Southwest Idaho US 20/26 (Chinden), . to Linder Road, Ada County 4 Regionally Significant: ❑ ❑ Inflated COMPASS PM: Federal PM: Key# : 21858 Congestion Reduction/System Reliability O = Requesting Agency: Private Developer Freight Movement and Economic Vitality w Project Year: 2019-2020 Transportation Safety -_ H.y 29 Total Previous Expenditures: $6,187 Community Infrastructure Total Programmed Cost: $18,103 FOI Total Cost(Prev. + Prog.): $24,290 AC A'16•zC Project Description : Widen US 20/26 (Chinden Boulevard)from SH-16 to the existing five-lane section, approximately 700 feet to the west of Linder Road to five lanes (two through lanes in each direction and a two way left center turn lane). The project will include turn lanes and raised medians where necessary. Project funded and constructed by the developer of the Costco shopping center using State Tax Anticipated Revenue(STAR)financing. Funding Source STAR Program External to ITD Financials Local Match 100.00% Cost Preliminary Preliminary Right-of-Way Utilities Construction Construction Total Federal Share Local Share Year* Engineering Engineering Engineering Consulting 2020 80 345 1,780 0 1,100 12,298 I 15,603 I 0 15,603 2021 0 0 2,500 0 0 0 I 2,500 I 0 2,500 Fund $80 $345 $4,280 $0 $1,100 $12,298 $18,103 $0 $18,103 Totals: US 1 • • ' • . • to • Ada County Sar Regionally Significant: E� W Inflated COMPASS PM: Federal PM: Key# : 20367 Congestion Reduction/System Reliability Requesting Agency: ITD Freight Movement and Economic Vitality Id Transportation Safety Project Year: 2023 Total Previous Expenditures: $250 Community Infrastructure Total Programmed Cost: $5,608 - eridian Total Cost(Prev. + Prog.): $5,858 Project Description : Widen US 20/26 (Chinden Boulevard)from Star Road to SH-16 in Ada County. The project will add one additional lane in both directions. Funding Source HSI Program State Highway-Safety Local Match 7.34% Cost Preliminary Preliminary Right-of-Way Utilities Construction Construction Total Federal Share Local Share Year* Engineering Engineering Engineering Consulting 2020 0 -100 0 0 0 0 I -100 I -93 -7 Fund $0 ($100) $0 $0 $0 $0 ($100) ($93) ($7) Totals: Funding Source TEC rogram State Hwy-Safety&Capacity(Capacity) 'Local Match 7.34%� Cost Preliminary Preliminary Right-of-Way Utilities Construction Construction Total Federal Share Local Share Year* Engineering Engineering Engineering Consulting 2020 0 100 100 0 0 0 200 185 15 2023 0 0 1,020 0 408 4,080 5,508 5,104 404 Fund $0 $100 $1,120 $0 $408 $4,080 $5,708 $5,289 $419 Totals: `PD=Preliminary Development(projects with development activity Sorted by Project Name Page 85 of 86 but no programmed year of construction) All Values in Thousands of Dollars Tuesday,April 14,2020 156 1:05 PM