M2.4_Roof HVAC Plan - Area DRTU
109D
RTU
108D
RTU
107D
RTU
106D
RTU
105D
RTU
104D
RTU
103D
RTU
102D
RTU
101D
11 12 13 14
N
S
T
M
CU
101
219
219
219
219
219
219
219
219
219
206 225
5
M3.1
8"ø
4"ø
8"ø
240
240
204
AREA 'A'
AREA 'B'
AREA 'D'
AREA 'E'AREA 'C'
DRAWING NO.:
2400 E. Riverwalk Drive
Boise, Idaho 83706
www.lkvarchitects.com
208.336.3443
DATE:
LKV PROJECT #:
DRAWN BY:
CHECKED BY:
18-186
M2.4
ROOF HVAC PLAN ROOF HVAC PLAN ROOF HVAC PLAN ROOF HVAC PLAN ----
AREA DAREA DAREA DAREA D
03/13/202003/13/202003/13/202003/13/2020
GPBGPBGPBGPB
WACWACWACWACBLUE VALLEY ELEMENTARY SCHOOLWEST ADA SCHOOL DISTRICTW. AMERICAN FORK DR.BID SET
SYMBOL USED FOR NOTE CALLOUT.
NORTH
Keyed Notes
Key Plan
1/8" = 1'-0"1 ROOF HVAC PLAN - AREA D Revisions# DescriptionDate204 ROUTE 4" DRYER EXHAUST DUCT UP TO ROOF AND TERMINATE WITH C&J
METAL PRODUCTS VERTICAL DRYER VENT WITH INTEGRAL BACK DRAFT
DAMPER OR EQUAL. DRYER VENT SHALL BE CONSTRUCTED OF 26 GAUGE
SHEET METAL AND BE 4" DIAMETER AND 12" HIGH. (SPECIFY DIFFERENT
GAUGE, DIAMETER, AND HEIGHT IF NEEDED. THE VALUES LISTED ARE
STANDARD) PROVIDE WITH ROOF FLASHING AND STORM COLLAR.
206 ROUTE REFRIGERANT LINE FROM CONDENSING UNITS TO INDOOR UNIT.
INSULATE ALL SUCTION LINES WITH FLEXIBLE FOAM PIPE INSULATION OF
THICKNESS INDICATED IN THE SPECIFICATIONS. COVER ALL INSULATED
SUCTION LINES EXPOSED ON THE EXTERIOR OF THE BUILDING WITH
E-FLEX GUARD BY AIREX MANUFACTURING INC. AT EXTERIOR WALL
PENETRATION PROVIDE TITAN GS30 OUTLET BY AIREX MANUFACTURING
INC. MOUNT ON PLATFORM.
219 MOUNT RTU ON MANUFACTURERS ROOF CURB. PROVIDE WEATHER
PROOF FLEXIBLE CONNECTORS AT SUPPLY AIR AND RETURN AIR DUCT
CONNECTIONS TO UNIT.
225 PROVIDE REFRIGERANT HOOD OVER PIPING THROUGH ROOF.
240 PROVIDE WITH MANUFACTURERS ROOF CAP.
3/12/2020