Elevations3
1
2
4
5
3
1
2
4
5
PRAXIS 3 SCALE: 1/8" = 1'-0"Exterior Elevations 2.102.28.2020First Federal Bank
1/8" = 1'-0"2.1
2 North Elevation
1/8" = 1'-0"2.1
1 East Elevation
1
4
3
5
2
1
3
5
2
PRAXIS 3 SCALE: 1/8" = 1'-0"Exterior Elevations 2.202.28.2020First Federal Bank
1/8" = 1'-0"2.2
2 South Elevation
1/8" = 1'-0"2.2
1 West Elevation
PRAXIS 3 SCALE:Exterior Perspective 2.302.28.2020First Federal Bank
1.2.
3.
6.4.5.
METAL COMPOSITE MATERIAL PANEL
SYSTEM
FIBER CEMENT PLANK
LAP SIDING
EIFS -EXTERIOR INSULATION & FINISH SYSTEM
PCP -PORTLAND CEMENT PLASTER
CLEAR ANODIZED
STOREFRONT
MANUFACTURED STONE
VENEER-CULTURED STONE
5
A101
_
6
A101
_
6'-0"6'-0"
12'-0"
EQ3'-0"3'-0"EQ
12'-0"12'-0"SLOPE 1/4" / 1'-0"8 YARD
DUMPSTER
120°
CURB LINE CURB
LINE
13'-4"12'-6"DOOR LATCH AT EACH LEAF TO
HOLD DOORS IN OPEN POSITION.
1 2 0 °2.4
4
2.4
2
2.4 3
1
2.5
_
2
2.5
_
6" STEEL BOLLARD
GALVANIZED
METAL DECKING
CANE BOLTS,
DOOR LATCH AT EACH LEAF TO
HOLD DOORS IN OPEN POSITION.
BRACING. HSS 2" x
2" x 1/4"
FRAME ATTACHED TO C4 x 5.4
CHANNEL, ATTACHED TO
ROTATING SLEEVE, TYP.7'-4"2
2.5
_
5
6
6
A101
_
STONE CAP
2
2.5
_3'-0"4'-4"5
6
5
A101
_
STONE CAP
1
2.5
_
5
6
PRAXIS 3 SCALE: 1/4" = 1'-0"Site Details -Dumpster Enclosure Plan and Elevations 2.402/28/20First Federal Bank
1/4" = 1'-0"2.4
1 Dumpster Enclosure - Plan
1/4" = 1'-0"2.4
4 Dumpster Enclosure - Front
1/4" = 1'-0"2.4
2 Dumpster Enclosure - Rear
1/4" = 1'-0"2.4
3 Dumpster Enclosure - Side
6
A101
_
STEEL BOLLARD,
PAINTED
2
2.5
_
STONE VENEER
ON 8" CMU
THICKENED SLAB
STONE COPING
EIFS ON 8" CMU 7'-4"4'-4"3'-0"5
A101
_1
2.5
_
ELASTOMERIC
PAINT EP-1
SLOPE 1/4" / 1'-0"
GATE,
SEE ELEV.
STEEL BOLLARD,
PAINTED
STONE VENEER
ON 8" CMU
THICKENED SLAB
STONE COPING
EIFS ON 8" CMU
1/2" PREMOLDED EXPANSION JOINT MATERIAL AT
ALL CONCRETE AREAS.
NOTE: EXPANSION JOINT NOT NEEDED AT AREAS
OF ASPHALT PAVING OR GRAVEL FILL
STANDARD STEEL PIPE SHOP PRIMED WITH RUST
INHIBITOR PRIMER. SEE PLANS AND ELEVATION
FOR PIPE SIZE.
FILL SOLID WITH CONCRETE.
PAINT AS INDICATED ON FINISH SCHEDULESUNO4'-0"3'-0"6"T/PAVING
CONCRETE BASE
4"
SEALANT
TOPGARD BOLLARD CAP TO MATCH,
PIPE SIZE. PAINT TO MATCH BOLLARD,
EP-2 FINISH
PRAXIS 3 SCALE: As indicatedSite Details -Dumpster Enclosure Section and Details 2.502/28/20First Federal Bank
1/4" = 1'-0"2.5
1 Dumpster Enclosure - Section A
1/4" = 1'-0"2.5
2 Dumpster Enclosure - Section B
3/4" = 1'-0"2.5
3 Detail -Typical Bollard