Loading...
Elevations3 1 2 4 5 3 1 2 4 5 PRAXIS 3 SCALE: 1/8" = 1'-0"Exterior Elevations 2.102.28.2020First Federal Bank 1/8" = 1'-0"2.1 2 North Elevation 1/8" = 1'-0"2.1 1 East Elevation 1 4 3 5 2 1 3 5 2 PRAXIS 3 SCALE: 1/8" = 1'-0"Exterior Elevations 2.202.28.2020First Federal Bank 1/8" = 1'-0"2.2 2 South Elevation 1/8" = 1'-0"2.2 1 West Elevation PRAXIS 3 SCALE:Exterior Perspective 2.302.28.2020First Federal Bank 1.2. 3. 6.4.5. METAL COMPOSITE MATERIAL PANEL SYSTEM FIBER CEMENT PLANK LAP SIDING EIFS -EXTERIOR INSULATION & FINISH SYSTEM PCP -PORTLAND CEMENT PLASTER CLEAR ANODIZED STOREFRONT MANUFACTURED STONE VENEER-CULTURED STONE 5 A101 _ 6 A101 _ 6'-0"6'-0" 12'-0" EQ3'-0"3'-0"EQ 12'-0"12'-0"SLOPE 1/4" / 1'-0"8 YARD DUMPSTER 120° CURB LINE CURB LINE 13'-4"12'-6"DOOR LATCH AT EACH LEAF TO HOLD DOORS IN OPEN POSITION. 1 2 0 °2.4 4 2.4 2 2.4 3 1 2.5 _ 2 2.5 _ 6" STEEL BOLLARD GALVANIZED METAL DECKING CANE BOLTS, DOOR LATCH AT EACH LEAF TO HOLD DOORS IN OPEN POSITION. BRACING. HSS 2" x 2" x 1/4" FRAME ATTACHED TO C4 x 5.4 CHANNEL, ATTACHED TO ROTATING SLEEVE, TYP.7'-4"2 2.5 _ 5 6 6 A101 _ STONE CAP 2 2.5 _3'-0"4'-4"5 6 5 A101 _ STONE CAP 1 2.5 _ 5 6 PRAXIS 3 SCALE: 1/4" = 1'-0"Site Details -Dumpster Enclosure Plan and Elevations 2.402/28/20First Federal Bank 1/4" = 1'-0"2.4 1 Dumpster Enclosure - Plan 1/4" = 1'-0"2.4 4 Dumpster Enclosure - Front 1/4" = 1'-0"2.4 2 Dumpster Enclosure - Rear 1/4" = 1'-0"2.4 3 Dumpster Enclosure - Side 6 A101 _ STEEL BOLLARD, PAINTED 2 2.5 _ STONE VENEER ON 8" CMU THICKENED SLAB STONE COPING EIFS ON 8" CMU 7'-4"4'-4"3'-0"5 A101 _1 2.5 _ ELASTOMERIC PAINT EP-1 SLOPE 1/4" / 1'-0" GATE, SEE ELEV. STEEL BOLLARD, PAINTED STONE VENEER ON 8" CMU THICKENED SLAB STONE COPING EIFS ON 8" CMU 1/2" PREMOLDED EXPANSION JOINT MATERIAL AT ALL CONCRETE AREAS. NOTE: EXPANSION JOINT NOT NEEDED AT AREAS OF ASPHALT PAVING OR GRAVEL FILL STANDARD STEEL PIPE SHOP PRIMED WITH RUST INHIBITOR PRIMER. SEE PLANS AND ELEVATION FOR PIPE SIZE. FILL SOLID WITH CONCRETE. PAINT AS INDICATED ON FINISH SCHEDULESUNO4'-0"3'-0"6"T/PAVING CONCRETE BASE 4" SEALANT TOPGARD BOLLARD CAP TO MATCH, PIPE SIZE. PAINT TO MATCH BOLLARD, EP-2 FINISH PRAXIS 3 SCALE: As indicatedSite Details -Dumpster Enclosure Section and Details 2.502/28/20First Federal Bank 1/4" = 1'-0"2.5 1 Dumpster Enclosure - Section A 1/4" = 1'-0"2.5 2 Dumpster Enclosure - Section B 3/4" = 1'-0"2.5 3 Detail -Typical Bollard