Loading...
17-20_Meridian_Pediatrics_Landscape Plans154153156163165164 167 [ - ]v v v v v v v A.CONTRACTOR SHALL REPORT TO LANDSCAPE ARCHITECT ALL CONDITIONS WHICH IMPAIR AND/OR PREVENT THE PROPER EXECUTION OF THIS WORK, PRIOR TO BEGINNING WORK. B.FINISH GRADES TO BE SMOOTH AND EVEN GRADIENTS WITH POSITIVE DRAINAGE IN ACCORDANCE WITH SITE GRADING PLAN. REMOVE RIDGES AND FILL DEPRESSIONS, AS REQUIRED TO MEET FINISH GRADES. PLACE 4" OF MEDIUM GRIND BARK MULCH OVER SUBGRADE SOIL TO ACHIEVE FINISH GRADE. FINISH GRADE RELATED TO ADJACENT SITE ELEMENTS SHALL BE: B.A.1-INCH BELOW TOP OF ADJACENT PAVEMENT, VALVE BOX, VAULT, ETC. B.B.3-INCHES BELOW TOP OF CURB UNLESS NOTED OTHERWISE. C.ALL PLANTING BEDS SHALL HAVE A MINIMUM OF 18" OF TOPSOIL, SOD AREAS A MINIMUM OF 12" OF TOPSOIL. SPREAD, COMPACT AND FINE GRADE TOPSOIL TO A SMOOTH AND UNIFORM GRADE. D.RE-USE EXISTING SURFACE TOPSOIL WHERE POSSIBLE. VERIFY SUITABILITY OF SURFACE SOIL TO PRODUCE TOPSOIL MEETING REQUIREMENTS AND AMEND WHEN NECESSARY. TOPSOIL SHALL BE A LOOSE, FRIABLE, SANDY LOAM, CLEAN AND FREE OF TOXIC MATERIALS, NOXIOUS WEEDS, WEED SEEDS, ROCKS, GRASS OR OTHER FOREIGN MATERIAL AND A PH OF 5.5 TO 7.0. IF ON-SITE TOPSOIL DOES NOT MEET THESE MINIMUM STANDARDS, CONTRACTORS ARE RESPONSIBLE TO EITHER: A) PROVIDE APPROVED IMPORTED TOPSOIL, OR B.) IMPROVE ON-SITE TOPSOIL WITH METHODS APPROVED BY LANDSCAPE ARCHITECT. SUPPLEMENT WITH IMPORTED TOPSOIL WHEN QUANTITIES ARE INSUFFICIENT. CLEAN TOPSOIL OF ROOTS, PLANTS, SODS, STONES, CLAY LUMPS AND OTHER EXTRANEOUS MATERIALS HARMFUL TO PLANT GROWTH. E.IF IMPORTED TOPSOIL FROM OFF-SITE SOURCES IS REQUIRED, PROVIDE NEW TOPSOIL THAT IS FERTILE, FRIABLE, NATURAL LOAM, SURFACE SOIL, REASONABLY FREE OF SUBSOIL, CLAY LUMPS, BRUSH, WEEDS AND OTHER LITTER, AND FREE OF ROOTS, STUMPS, STONES LARGER THAN 2 INCHES IN ANY DIMENSION, AND OTHER EXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT GROWTH. F.OBTAIN TOPSOIL FROM LOCAL SOURCES OR FROM AREAS HAVING SIMILAR SOIL CHARACTERISTICS TO THAT FOUND AT PROJECT SITE. OBTAIN TOPSOIL ONLY FROM NATURALLY, WELL-DRAINED SITES WHERE TOPSOIL OCCURS IN A DEPTH OF NOT LESS THAN 4 INCHES. G.ALL LANDSCAPE AREAS SHALL BE WEED FREE AT THE TIME OF LANDSCAPE INSTALLATION.REMOVE ALL ROOTS, WEEDS, ROCKS AND FOREIGN MATERIAL ON THE SURFACE. H.NEW TREE PLANTING, SEE DETAIL 1/L210 AND 2/L210. CONTRACTOR SHALL STAKE ALL TREES DEEMED NECESSARY, I.E..... FROM BEING BLOWN OVER, PLANTED WITH LOOSE ROOT BALL, ETC. CONTRACTOR'S OPTION. I.NEW SHRUB PLANTING. SEE DETAIL 2/L210. J.ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN NURSERYMAN STANDARDS FOR TYPE AND SIZE SHOWN. PLANTS WILL BE REJECTED IF NOT IN A SOUND AND HEALTHY CONDITION. K.ALL PLANT MATERIAL SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR BEGINNING AT THE DATE OF SUBSTANTIAL COMPLETION. REPLACE ALL PLANT MATERIAL FOUND DEAD OR NOT IN A HEALTHY CONDITION IMMEDIATELY WITH THE SAME SIZE AND SPECIES AT NO COST TO THE OWNER. L.TREE PIT BACKFILL PLANTING MIX: BLEND TOPSOIL AND SOIL AMENDMENTS AND FERTILIZER FOR TREE PIT BACKFILL AT THE FOLLOWING RATES. BLEND AMENDMENTS THOROUGHLY WITH SOIL BACKFILL. TREE PITS SHALL BE 5'x5'x1.5' (37.5 CF/ 1.5 CY). L.A.APPLICATION RATES: L.A.A.HUMIC ACID: 25 LBS PER TREE PIT L.A.B.COMMERCIAL GRADE COMPOST - 10 CUBIC FEET PER TREE PIT L.A.C.PLANTING TABLET FERTILIZER - 4 TABLETS PER TREE PIT L.A.D.CALCIFIED DIATOMACEOUS EARTH - 75 LBS PER TREE PIT M.SHRUB PIT BACKFILL PLANTING MIX: BLEND TOPSOIL AND SOIL AMENDMENTS AND FERTILIZER FOR SHRUB PIT BACKFILL AT THE FOLLOWING RATES. BLEND AMENDMENTS WITH THOROUGHLY WITH SOIL BACKFILL. SHRUB PITS SHALL BE 2.5'x2.5'x1' (6.25 CF/ 0.25 CY). M.A.APPLICATION RATES: M.A.A.HUMIC ACID: 2 LBS PER SHRUB PIT M.A.B.COMMERCIAL GRADE COMPOST - 2 CUBIC FEET PER SHRUB PIT M.A.C.PLANTING TABLET FERTILIZER - 2 TABLETS PER SHRUB PIT M.A.D.CALCIFIED DIATOMACEOUS EARTH - 15 LBS PER SHRUB PIT N.IMMEDIATELY CLEAN UP ANY TOPSOIL OR OTHER DEBRIS ON THE SITE CREATED FROM LANDSCAPE OPERATIONS AND DISPOSE OF PROPERLY OFF SITE. O.CONTRACTOR SHALL SUBMIT MATERIAL SAMPLES FOR LANDSCAPE ROCK MULCH TO LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PROCUREMENT. LANDSCAPE BOULDERS, PHOTO SUBMITTAL IS ADEQUATE. FOR ROCK MULCH, SUBMIT 1 GALLON BAG SAMPLE TO OWNER. Landscape NotesProject Information DEVELOPER MERIDIAN PEDIATRICS 3653 N. LOCUST GROVE RD. MERIDIAN, IDAHO 83646 208.338.5437 COLE ARCHITECTS, PLLC STAN COLE BOB BOWEN 1008 W. MAIN ST. BOISE, IDAHO 83702 208.345.1800 THE LAND GROUP DOUG RUSSELL MELISSA DREW 462 E. SHORE DR. STE 100 EAGLE, IDAHO 83616 208.939.4041 Project Calculations A.PROTECT THE CRITICAL ROOT ZONE OF THE TREES TO BE RETAINED ON SITE: (NOTE: CRITICAL ROOT ZONE IS THE AREA DIRECTLY BELOW THE DRIP LINE OF THE TREE.) A.A.CONSTRUCT PROTECTIVE FENCING OF CHAIN-LINK AROUND THE CRITICAL ROOT ZONE PRIOR TO DEMOLITION OR CONSTRUCTION. A.B.DO NOT ALLOW COMPACTION BY EQUIPMENT TRAFFIC DURING CONSTRUCTION OR DURING DEMOLITION. A.C.DO NOT ALLOW CEMENT TRUCKS TO RINSE WITHIN THE PROTECTION AREA, ANYWHERE THAT TREE ROOTS EXIST OR IN PLANNED PLANTING BEDS. A.D.DO NOT STOCKPILE MATERIALS, DEBRIS OR DIRT WITHIN THE TREE PROTECTION AREA. A.E.MAINTAIN WATERING WITHIN THE CRITICAL ROOT ZONE FROM MID-APRIL TO MID-OCTOBER AT THE RATE OF NOT LESS THAN THE EQUIVALENT OF 1-1/2" OF WATER OVER THE ENTIRE AREA PER WEEK. A.F.DO NOT TRENCH, EXCAVATE, FILL OR OTHERWISE DISTURB THE SOIL WITHIN THE CRITICAL ROOT ZONE. A.G.ADJUST PROPOSED IMPROVEMENT LOCATIONS AS REQUIRED TO AVOID DAMAGING TREE ROOTS. B.PROTECT THE CROWN AND TRUNK OF TREES TO BE RETAINED ON SITE: B.A.OPERATE EQUIPMENT IN SUCH A WAY AS TO AVOID CONTACT WITH TREE TRUNKS OR BRANCHES. B.B.PRUNING OF PUBLIC PROPERTY TREES SHALL BE PERFORMED BY A LICENSED ARBORIST. C.ALL TREES DAMAGED OR DESTROYED DURING CONSTRUCTION SHALL BE REPLACED USING THE FOLLOWING CRITERIA: EXISTING TREE REPLACEMENT 1" TO 6" CALIPER.........................2X CALIPER OF TREE REMOVED 6" TO 12" CALIPER......................1.5X CALIPER OF TREE REMOVED > 12" OR LARGER CALIPER.........1X CALIPER OF TREE REMOVED EXAMPLE: IF AN 8" CALIPER TREE IS REMOVED, AN ACCEPTABLE REPLACEMENT WOULD BE (3) 4" CALIPER TREES OR (4) 3" CALIPER TREES. Tree Protection Notes: Project Calculations ·STREET BUFFERS: N/A ·RESIDENTIAL SUBDIVISION TREES: N/A ·COMMON OPEN SPACE: 9692 SQ. FT. ·QUALIFIED OPEN SPACE: N/A ·NUMBER OF TREES PROVIDED: 34 ·MITIGATION FOR REMOVAL: N/A HORIZONTAL SCALE: 1" = 20' Landscape Cover Sheet 10'20'0 Vicinity Map C:\Users\kiana\Documents\Revit\17-20MeridianPediatrics_KIANA-cole-RGB-1397099.jpg PROJECT NUMBER ARCHITECT: PROJECT PHASE PROJECT NAME: COLE ARCHITECTS | 1008 W Main St Boise, ID 83702 | (208) 345-1800 colearchitects.net CONSULTANT: STAMP: SHEET NUMBER: SHEET NAME: REVISIONS: PROJECT INFORMATION: 3653 N LOCUST GROVE RD MERIDIAN, ID 83646 17-20 08.04.2017 MERIDIAN PEDIATRICS CDs MARK DATE DESCRIPTION PN: 117094 FOR CERTIFICATE OF ZONING SUBMITTAL ONLYLandscape Cover Sheet L000 154153156163165164 167 [ - ]v v v v v v v 20' (3)MF (3)CH (6)HO (3)CK (3)SG (3)PL (5)HP (4)MF (3)CK (1)PF (3)PH (3)HO (3)RF (3)HP (1)PH (1)HB (3)HP (2)CH (1)FC (1)PF (6)LE (2)GA (2)FC (3)HO (3)PH (3)HP (1)PH (3)HP (1)HB(3)HP (2)RF (3)RF (3)HB (6)HP (3)PL (3)CK (3)HB (2)SG (5)HO (1)PH (6)CK(6)CK 1 1 1 1 3 2 2 2 3 SETBACK EXISTING BUILDING Material Legend NEW SOD, TIE INTO EXISTING LAWN. EXISTING DECIDUOUS TREE TO BE PRESERVED AND PROTECTED, REFERENCE TREE PROTECTION NOTES ON L1.00. SIZES NOTED ON PLAN. EXISTING TREE TYPES: FRAXINUS SPECIES (ASH TREE) PYRUS SPECIES (PEAR TREE) EXISTING EVERGREEN TREE TO BE PRESERVED AND PROTECTED, REFERENCE TREE PROTECTION NOTES ON L1.00. SIZES NOTED ON PLAN. EXISTING TREE TYPES: PINUS (PINE TREE) EXISTING LANDSCAPE TO BE PRESERVED AND PROTECTED. TREES CODE BOTANICAL NAME / COMMON NAME CONT CAL QTY FC FRAXINUS PENNSYLVANICA `CIMARRON` / GREEN ASH CLASS II; 50`H X 30`W B & B 2"3 GA GINKGO BILOBA `AUTUMN GOLD` TM / MAIDENHAIR TREE CLASS II; 45`H X 35`W B & B 2"2 LE LIRIODENDRON TULIPIFERA `EMERALD CITY` TM / EMERALD CITY TULIP TREE CLASS III; 45`H X 25`W B & B 2"6 PF PINUS FLEXILIS `VANDERWOLF`S PYRAMID` / VANDERWOLF`S PYRAMID PINE EVERGREEN; 25`H X 15`W B & B 2 SHRUBS CODE BOTANICAL NAME / COMMON NAME CONT FIELD2 QTY CH CORNUS ALBA `BAILHALO` TM / IVORY HALO DOGWOOD 5`H X 5`W 3 GAL 5 CK CALAMAGROSTIS X ACUTIFLORA `KARL FOERSTER` / FEATHER REED GRASS 3`H X 2`W 2 GAL 21 HB HELICTOTRICHON SEMPERVIRENS `BLUE OATS` / BLUE OAT GRASS 2`H X 2`W 1 GAL 8 HO HEMEROCALLIS X `STELLA DE ORO` / STELLA DE ORO DAYLILY 1`H X 1`W 1 GAL 17 HP HEMEROCALLIS X `PARDON ME` / PARDON ME DAYLILY 1.5`H X 1.5`W 1 GAL 26 MF MISCANTHUS SINENSIS `FLAMINGO` / FLAMINGO JAPANESE SILVER GRASS 5`H X 4`W 1 GAL 7 PH PINUS SYLVESTRIS `HILLSIDE CREEPER` / HILLSIDE CREEPER SCOTCH PINE 2`H X 8`W 2 GAL 9 PL PHYSOCARPUS OPULIFOLIUS `LITTLE DEVIL` TM / DWARF NINEBARK 4`H X 4`W 2 GAL 6 RF ROSA X `NOARE` / FLOWER CARPET RED GROUNDCOVER ROSE 3`H X 4`W 1 GAL 8 SG SPIRAEA JAPONICA `GOLDMOUND` / GOLDMOUND SPIREA 3`H X 4`W 2 GAL 5 PLANT SCHEDULE Keynotes: 1.EXISTING WOOD FENCE TO BE PRESERVED AND PROTECTED. 2.TIE PROPOSED LANDSCAPE INTO EXISTING LANDSCAPE. 3.NEW PARKING LOT CONFIGURATION AND STRIPPING, REFERENCE CIVIL SITE PLANS. HORIZONTAL SCALE: 1" = 20' Landscape Plan 10'20'0 C:\Users\kiana\Documents\Revit\17-20MeridianPediatrics_KIANA-cole-RGB-1397099.jpg PROJECT NUMBER ARCHITECT: PROJECT PHASE PROJECT NAME: COLE ARCHITECTS | 1008 W Main St Boise, ID 83702 | (208) 345-1800 colearchitects.net CONSULTANT: STAMP: SHEET NUMBER: SHEET NAME: REVISIONS: PROJECT INFORMATION: 3653 N LOCUST GROVE RD MERIDIAN, ID 83646 17-20 08.04.2017 MERIDIAN PEDIATRICS CDs MARK DATE DESCRIPTION PN: 117094 FOR CERTIFICATE OF ZONING SUBMITTAL ONLYLandscape Plan L110 NOTES: 1.THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR A MINIMUM OF 1 YEAR. ALL STAKING SHALL BE REMOVED AT THE END OF THE ONE YEAR WARRANTY PERIOD. 2.IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT BEFORE PROCEEDING. 3.LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT MATERIAL. 4.WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE. 5.WATER TREE TWICE WITHIN THE FIRST 24 HOURS. 6.IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. PREVAILING WIND DIRECTION REMOVE DEAD/DAMAGED BRANCHES AND PRUNE TO INTERNATIONAL SOCIETY OF ARBORICULTURE STANDARDS; IMPROPERLY PRUNED TREES (AS DETERMINED BY THE LANDSCAPE ARCHITECT) SHALL BE REMOVED AND REPLACED. SET ROOTBALL ON NATIVE UNDISTURBED SUBSOIL COMMERCIAL SLOW RELEASE FERTILIZER TABLETS BACKFILL WITH SOIL PLANTING MIX. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION. 3" THICK ROCK MULCH LAYER, KEEP ROCK MULCH 3" AWAY FROM TRUNK. ROCK MULCH TYPE PER PLAN. 2" x 2" x 8' CEDAR STAKE - DO NOT PENETRATE ROOTBALL. SEE NOTE 1. SET STAKES PARALLEL TO PREVAILING WIND. RUBBER CINCH TIE FINISH GRADE ROOT PROBE SOIL LINE UTILIZE SOIL/ROOT PROBE AROUND TRUNK (APPROX. 3-4" AWAY FROM TRUNK) TO LOCATE HIGHEST ROOTS. HIGHEST ROOTS SHOULD BE POSITIONED AT OR SLIGHTLY ABOVE GRADE LEVEL. REMOVE BURLAP, TWINE, AND WIRE BASKET FROM TOP 12 OF ROOTBALL, REMOVE ALL NAILS, TIES, AND PLASTIC FROM ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO WRAP THE ROOTBALL, IT SHALL BE COMPLETELY REMOVED. ONLY BIODEGRADEABLE BURLAP SHALL BE LEFT ON THE BOTTOM OF THE ROOTBALL. 2x ROOTBALL DIAMETER 3x ROOTBALL DIAMETER6"TREE WRAP TRUNK PROTECTION, REMOVE AFTER INSTALLATION 3" 1 Deciduous Tree Planting Scale: NTS NOTES: 1.THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR A MINIMUM OF 1 YEAR. ALL STAKING SHALL BE REMOVED AT THE END OF THE ONE YEAR WARRANTY PERIOD. 2.IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT BEFORE PROCEEDING. 3.LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT MATERIAL. 4.WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE. 5.WATER TREE TWICE WITHIN THE FIRST 24 HOURS. 6.IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. PREVAILING WIND DIRECTION REMOVE DEAD/DAMAGED BRANCHES AND PRUNE TO INTERNATIONAL SOCIETY OF ARBORICULTURE STANDARDS; IMPROPERLY PRUNED TREES (AS DETERMINED BY THE LANDSCAPE ARCHITECT) SHALL BE REMOVED AND REPLACED. SET ROOTBALL ON NATIVE UNDISTURBED SUBSOIL COMMERCIAL SLOW RELEASE FERTILIZER TABLETS BACKFILL WITH SOIL PLANTING MIX. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION. 3" THICK ROCK MULCH LAYER, KEEP ROCK MULCH 3" AWAY FROM TRUNK. ROCK MULCH TYPE PER PLAN. 2" x 2" x 8' CEDAR STAKE - DO NOT PENETRATE ROOTBALL. SEE NOTE 1. SET STAKES PARALLEL TO PREVAILING WIND. RUBBER CINCH TIE FINISH GRADE ROOT PROBE SOIL LINE UTILIZE SOIL/ROOT PROBE AROUND TRUNK (APPROX. 3-4" AWAY FROM TRUNK) TO LOCATE HIGHEST ROOTS. HIGHEST ROOTS SHOULD BE POSITIONED AT OR SLIGHTLY ABOVE GRADE LEVEL. REMOVE BURLAP, TWINE, AND WIRE BASKET FROM TOP 12 OF ROOTBALL, REMOVE ALL NAILS, TIES, AND PLASTIC FROM ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO WRAP THE ROOTBALL, IT SHALL BE COMPLETELY REMOVED. ONLY BIODEGRADEABLE BURLAP SHALL BE LEFT ON THE BOTTOM OF THE ROOTBALL. 2x ROOTBALL DIAMETER 3x ROOTBALL DIAMETER 3" 2 Coniferous Tree Planting Scale: NTS 4" MIN.DEPTHBACKFILL WITH SOIL PLANTING MIX. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION. WATER RETENTION BASINROCK MULCH LAYER 3" DEPTH. ROCK MULCH TYPE PER PLAN. COMMERCIAL FERTILIZER TABLETS 3 Shrub Planting Scale: NTS C:\Users\kiana\Documents\Revit\17-20MeridianPediatrics_KIANA-cole-RGB-1397099.jpg PROJECT NUMBER ARCHITECT: PROJECT PHASE PROJECT NAME: COLE ARCHITECTS | 1008 W Main St Boise, ID 83702 | (208) 345-1800 colearchitects.net CONSULTANT: STAMP: SHEET NUMBER: SHEET NAME: REVISIONS: PROJECT INFORMATION: 3653 N LOCUST GROVE RD MERIDIAN, ID 83646 17-20 08.04.2017 MERIDIAN PEDIATRICS CDs MARK DATE DESCRIPTION PN: 117094 FOR CERTIFICATE OF ZONING SUBMITTAL ONLYLandscape Details L210