Loading...
CC - Applicant Response to Staff ReportPLANNING SERVICES April 25, 2020 Mayor Simison Meridian City Council Mr. Bill Parsons, Planning Supervisor 33 Broadway Avenue, Suite 102 Meridian, ID 83642 P.O. Box 405 Boise, ID 83701 RE: LUPINE COVE SUBDIVISION RESPONSE TO STAFF REPORT FOR CITY COUNCIL HEARING REVISED LUPINE COVE PRELIMINARY PLAT Dear Mayor Simison and City Council: In response to the staff report and the Planning & Zoning Commission Hearing, the applicant and project team offer the following comments for your consideration. The preliminary plat for Lupine Cove was revised shortly after the Planning & Zoning Commission hearing to correct deficiencic s identified by the Commission. A copy of the original and revised preliminary plats are attached for your convenience and reference. KEY AREAS IDENTIFIED BY P&Z COMMISSION AND STAFF • A STUB STREET HAS BEEN INCORPORATED INTO THE PRELIMINARY PLAT o A stub) street at the north PL to match the approved stub street in Aegean Subdivision is included • OPEN SPACE UPDATES o The storm water facility and artesian well discharge have been separated and theartesian well discharge will be routed to the McFadden Drain via a stream water feature as shown on the revised plat. o The ct 1 -de -sac has been removed from the open space area. o The gross open space is now 10.9%. o The n �t open space (subject site less McFadden Drain area) is now 12.9%. o The applicant is still proposing the same amenities as originally proposed which Fxceeds the standards per the staff report. • ELIMINATION OF SHARED DRIVEWAYS o All of the shared driveways have been removed from the preliminary plat. LAND USE PLANING - DUE DILIGENCE - INDIVIDUAL ASSESSMENTS • REDUCED JENSITY o The nsity has been reduced by 7% to 25 new building lots and the existing • OTHER o The requirement to modulate the rear faces of the residences along McDermott Road has been noted and will be incorporated. o Modifying the fence height along the north property line has also been noted and will be incorporated into the landscape plan. DISCUSSION The subject site has a challenging geometry. The revised layout is generally consistent with the original layout but has incorporated all of the elements indicated by the P&Z Commission as being lacking in the original layout as detailed above. The McFadden Drain bounds the site on the north and east as confirmed by NMID. The staff report misidentifies the northern section as the Five Mile Creek which is actually located on the north boundary of Aegean Subdivision where it abuts The Oaks Subdivision. Two open space calculations are offered above. The applicant has no control over the McFadden Drain easement. This easement area is a 46,100 s.£ lot. Mr. Curtis and NMID have declined to allow the applicant to provide any amenity use of the easement area. When subtracting the easement from the subject si e area the open space calculation is 12.9%. 33,386 s.f. / 258,746 s.f. (gross area less the drain eas meat area) = 12.9%. The on-site artesian well wit substantial discharge is treated as pre -development flows. To improve the amenities for the subdivision while still using the artesian well discharge a stream water amenity has been included in the northern common lot open space and is separate from the storm water facility. Tree mitigation was also discussed at the P&Z Commission hearing. At that meeting an exhibit was provided that shows there are a number of site trees that are not necessary to remove. Trees that are candidates for remaining inc de the dense row along the south property line which provides a buffer for the residences inA pple Valley Subdivision. While these residences are about 500 -feet from the south property line he tree row adds an extra layer of buffering. Upon submittal of the final plat an Alternative Corr pliance application will be submitted with a revised tree mitigation pian that retains as many trees as possible. The applicant and project team will work with staff to resolve any remaining mitig4tion requirements. We would also like to note at no neighbors were in attendance at the P&Z Commission hearing and there was no written opp sition to the proposed preliminary plat. SUMMARY The revised Lupine Cove has incorporated all of the key issues identified on Page 11 of the Staff Report. It is, in fact, a far suerior layout and comments by the P&Z Commission and staff are appreciated. LAND USE PLANNING - DUE DILIGENCE • INDIVIDUAL ASSESSMENTS i With the revised layout the applicant and project team has demonstrated that they heard the Commission concerns and revised the layout in conformance with their comments. We believe the Lupine Cove preliminary plat is ready for either City Council approval or to be remanded back to the P&Z Commission as the City Council wishes. Thank you in advance for your consideration. Best regards, i RILEY Ls�A-�-T-iltQs PLANNING SER7CES LLC Penelope Constantikes Principal LAND USE PLANNING - DUE DILIGENCE - INDIVIDUAL ASSESSMENTS 5 O g J /Z V cc 0 A Ogg o N;£ I IM, i � o � Illlllill 66 �� ai aL 132 36 +I 2 yyCl9HrE� III h xx �6pn III I o jj I {IE i � o � Illlllill 66 �� ai aL 132 36 +I III h xx �6pn III I o z'�oK III ' t m •\nom R W6Ooq IIi ill I I I , i � o � Illlllill 66 �� ai aL 132 36 Lu cn W cc 11AI:i 41"105 6ti D AI%HWI 3R 9 2YM1YS Ti1a63D'Jd ' � °4 � _ tsuMMO same an sviu 3m an DOWN six NOISiA108fiS 3A0� 3Nidfll a s a � ,rg 8 _ o `JPYIMe ]O srsW oho F m 0 a. Gila 7 r ,rg 8 _ o `JPYIMe ]O srsW oho Gila HY, eggoh9 E ffffffff 2kv y� �� o �U, ' Y " w tXk! .��-. E v'. m w aT IIII�4[®0e0 ,rg 8 _ o `JPYIMe ]O srsW oho 22 o �U, ' Y " w tXk! .��-. E v'. m w aT ,rg 8 _ o `JPYIMe ]O srsW oho