Loading...
CC - Engineer Statement ENGINEERING P . C . Civil Engineering * Project Management DATE: April g, 2020 TO: City of Meridian 33 E. Broadway Ave Meridian, ID 83642 RE: Warrick Subdivision #3 To whom it may concern: Based on a geotechnical report and experience with various projects in this immediate area, groundwater is at least 5 feet below existing ground elevation. All streets have been designed so that the centerline of the street is at least 3 feet above seasonal groundwater. Respectfully submitted, u 9 1 C, �TF 0 F ,�P P yq� Chad S. Kinkela, P.E. CK Engineering, P.C. CK Engineering 13oo E.State St Suite 102 Eagle,ID 83616 208.869.0590 mobile chad@ck-engineers.com