PZ - ITD Variance Acceptance Letter �pANO
* F Your Safety • Your Mobility IDAHO TRANSPORTATION DEPARTMENT
a P.O. Box 8028 • Boise, ID 83707-2028
yyn Q�� Your Economic Opportunity (208)334-8300 • itd.idaho.gov
A�gTg71 pN Q?
April 14, 2020
Chhang Ream
CR Engineering
181 East 50th Street
Garden City, ID 83714
VIA EMAIL
RE: Black Cat Chinden Apartments—ITD Response to Proportionate Share Variance Request
Dear Mr. Ream,
The Idaho Transportation Department (ITD) has reviewed your letter dated 3/18/2020 requesting Black Cat
Apartment's proportionate share contribution for the ultimate segment between Levi Lane and Tree Farm Way to be
based on the US 20/26 Corridor Preservation study 2040 design year totals. We appreciate the economic opportunity
you are bringing to the city of Meridian and willingness to participate in a proportionate share contribution towards
the US 20/26 corridor.The department has determined that this is a reasonable request that can be accommodated.
ITD reviewed your provided analysis and agree with the revised proportionate share contribution of$47,591(0.79%)
for the ultimate US 20/26 buildout between Levi Lane and Tree Farm Way.The remaining conditions in ITD's TIS
acceptance letter dated December 30, 2019 still apply.
• Removal of existing approach on US 20/26 approximately 285ft east of Black Cat Road.
• Proportionate share contribution of$51,874(21.8%)towards westbound right turn lane at Black Cat Road.
We look forward to working with you on the permit application for removal of the existing approach on US 20/26. ITD
will send a revised letter to the city of Meridian as well to reflect the adjusted proportionate share amount. If you have
any questions, please do not hesitate to contact me at justin.price@itd.idaho.gov or 208-334-8340.
Sincerely,
Justin Price
District 3 Traffic Engineer
Cc:
Deb Nelson—Givens Pursley
Greg Hector—Baron Property Services
Sonya Allen—City of Meridian
Page 1 of 1