Loading...
2020-03-30 ACHD Final Report Charlene Way From:Joseph Dodson Sent:Monday, March 30, 2020 11:59 AM To:City Clerk Subject:FW: H-2020-0006 Teakwood Place Attachments:MPP20-0004 Teakwood Place.pdf Hello, Please add the attached file to the public record for the above referenced project. This is the ACHD staff report. Thank you, Joseph Dodson | Current Associate Planner City of Meridian | Community Development 33 E. Broadway Ave., Meridian, Idaho 83642 Phone: 208.884.5533 | Built for Business, Designed for Living All e-mail messages sent to or received by City of Meridian e-mail accounts are subject to the Idaho law, in regards to both release and retention, and may be released upon request, unless exempt from disclosure by law. From: Dawn Battles <Dbattles@achdidaho.org> Sent: Monday, March 23, 2020 4:17 PM To: hesscommcorp@gmail.com Cc: dl@leavittengineers.com; Joseph Dodson <jdodson@meridiancity.org>; Bill Parsons <bparsons@meridiancity.org> Subject: MPP20-0004/ H-2020-0006 Teakwood Place External Sender - Please use caution with links or attachments. Here is the finalized ACHD staff report for the request located at 1835 E. Victory Road. I did make the changes to allow for the closure of the driveway with the 2nd phase. Please let me know if you have any questions. Thanks, Dawn Battles, Planner Ada County Highway District 208-387-2618 1 Development Services Department CHD Project/File: Teakwood Place/ MPP20-0004/ H-2020-0006 This is an annexation with rezone and a preliminary plat consisting of 33-residential lots on 7.4 acres. Lead Agency: The City of Meridian Site address: 1835 E. Victory Road �� J Ap proval: R;- royal. March 23 2020 °_r■ pp � - - Applicant: Bruce Hessing � Hesscomm Corp 6700 Linder Road - �i� Ai Meridian, ID 83646 `' Engineer: Dan Lardie �j�,; ��Z Leavitt &Associates Engineers 1324 1st Street South Nampa, ID 83651 Staff Contact: Dawn Battles Will 1' Phone. 387-6218 -- - � E-mail: dbattles(cb-achdidaho.org A. Findings of Fact 1. Description of Application: The applicant is requesting approval for annexation with rezone from RUT(Rural-Urban Transition)to R-8(Medium-Density Residential)and a preliminary plat consisting of 28 residential lots and 5 common lots on 7.4 acres. There is 1 existing home that is proposed to remain until Phase 2 is developed. The applicant's proposal for R-8 zoning is consistent with the City of Meridian's comprehensive plan which calls for medium-density residential uses for this site. 2. Description of Adjacent Surrounding Area: Direction I Land Use Zoning North Medium-Density Residential R-8 South Medium-Low Density Residential R-4 East Rural-Urban Transition RUT West Medium-Density Residential R-8 3. Site History: ACHD has not previously reviewed this site for a development application. 4. Transit: Transit services are not available to serve this site. 1 Teakwood Place/ MPP20-0004/ H-2020-0006 5. Pathway Crossings: United States Access Board R304.5.1.2 Shared Use Paths. In shared use paths, the width of curb ramps runs and blended transitions shall be equal to the width of the shared use path. AASHTO's Guidelines for the Development of Bicycle Facilities 5.3.5 Other Intersection Treatments: The opening of a shared use path at the roadway should be at least the same width as the shared use path itself. If a curb ramp is provided, the ramp should be the full width of the path, not including any flared sides if utilized. . . . Detectable warnings should be placed across the full width of the ramp. FHWA's "Designing Sidewalks and Trails for Access" (1999) reflected common ADA-related concepts: Chapter 6, Page 16-6: The width of the ramp should be at least as wide as the average width of the trail to improve safety for users who will be traveling at various speeds. In addition, the overall width of the trail should be increased, so the curb ramp can be slightly offset to the side. The increased width reduces conflict at the intersection by providing more space for users at the bottom of the ramp. 6. New Center Lane Miles: The proposed development includes 0.13 centerline miles of new public road. 7. Impact Fees: There will be an impact fee that is assessed and due prior to issuance of any building permits. The assessed impact fee will be based on the impact fee ordinance that is in effect at that time. The impact fee assessment will not be released until the civil plans are approved by ACHD. 8. Capital Improvements Plan (CIP)/ Integrated Five Year Work Plan (IFYWP): • Locust Grove Road is scheduled in the IFYWP to be widened to 5-lanes from Victory Road to Overland Road in 2022 which will include the reconstruction/widening of Bridge #2087. • Eagle Road is scheduled in the IFYWP to be widened to 5-lanes from Amity Road to Victory Road in 2021. • The intersection of Victory Road and Locust Grove Road is scheduled in the IFYWP to be constructed as a multi-lane roundabout in 2021. • Victory Road is listed in the CIP to be widened to 3-lanes from Locust Grove Road to Eagle Road between 2021 and 2025. B. Traffic Findings for Consideration 1. Trip Generation: This development is estimated to generate 264 vehicle trips per day; 28 vehicle trips per hour in the PM peak hour, based on the Institute of Transportation Engineers Trip Generation Manual, 101" edition. 2. Condition of Area Roadways Traffic Count is based on Vehicles per hour(VPH) Functional PM Peak Hour PM Peak Hour Roadway Frontage Classification Traffic Count Level of Service Victory Road 287-feet Minor Arterial 843 "F" * Acceptable level of service for a three-lane minor arterial is "E" (720 VPH). 3. Average Daily Traffic Count (VDT) Average daily traffic counts are based on ACHD's most current traffic counts. • The average daily traffic count for Victory Road west of Eagle Road was 10,767 on June 13, 2017. 2 Teakwood Place/ MPP20-0004/ H-2020-0006 C. Findings for Consideration 1. South Meridian Transportation Study The South Meridian Transportation Plan (SMTP) is a long-range planning tool used to identify future roadway, intersection, and corridor needs in the South Meridian Area. Providing a framework for future roadway improvements based on the land use designations. The plan was created in collaboration with the City of Meridian and was adopted by the ACHD Commission in September of 2009. The SMTP recommends that Victory Road be constructed as 3-lanes throughout the South Meridian area. 2. Level of Service Planning Thresholds Victory Road a. Policy: Level of Service Planning Thresholds: District Policy 7205.3.1 states that, Level of Service Planning Thresholds have been established for principal arterials and minor arterials within ACHD's Capital Improvement and are also listed in section 7106. Unless otherwise required to provide a Traffic Impact Study under section 7106, a proposed development with site traffic less than 10% of the existing downstream roadway or intersection peak hour traffic shall not be required to provide mitigation for a roadway or intersection that currently exceeds the minimum acceptable level of service planning threshold or V/C ratio. b. Staff Comments/Recommendations: Victory Road currently exceeds the acceptable level of service planning threshold for a 3-lane Minor Arterial. The trips generated from this site will contribute less than 3% to the total PM peak hour traffic on Victory Road. Therefore, consistent with District policy 7205.3.1 Level of Service Planning Threshold, which states, a proposed development with site traffic less than 10% of the existing downstream roadway or intersection peak hour traffic shall not be required to provide mitigation; no improvements are required along this street section. 3. Victory Road a. Existing Conditions: Victory Road is improved with 3-travel lanes, vertical curb, gutter, and no sidewalk abutting the site. There is 60-feet of right-of-way for Victory Road (25-feet from centerline). b. Policy: Arterial Roadway Policy: District Policy 7205.2.1 states that the developer is responsible for improving all street frontages adjacent to the site regardless of whether or not access is taken to all of the adjacent streets. Master Street Map and Typology Policy: District Policy 7205.5 states that the design of improvements for arterials shall be in accordance with District standards, including the Master Street Map and Livable Streets Design Guide. The developer or engineer should contact the District before starting any design. Street Section and Right-of Way Width Policy: District Policy 7205.2.1 & 7205.5.2 states that the standard 3-lane street section shall be 46-feet (back-of-curb to back-of-curb) within 70 feet of right-of-way. This width typically accommodates a single travel lane in each direction, a continuous center left-turn lane, and bike lanes. Sidewalk Policy: District Policy 7205.5.7 requires a concrete sidewalk at least 5-feet wide to be constructed on both sides of all arterial streets. A parkway strip at least 6-feet wide between the back-of-curb and street edge of the sidewalk is required to provide increased safety and protection of pedestrians. Consult the District's planter width policy if trees are to be placed within the parkway strip. Sidewalks constructed next to the back-of-curb shall be a minimum of 7-feet wide. 3 Teakwood Place/ MPP20-0004/ H-2020-0006 Detached sidewalks are encouraged and should be parallel to the adjacent roadway. Meandering sidewalks are discouraged. A permanent right-of-way easement shall be provided if public sidewalks are placed outside of the dedicated right-of-way. The easement shall encompass the entire area between the right- of-way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located wholly within the public right-of-way or wholly within an easement. Minor Improvements Policy: District Policy 7203.3 states that minor improvements to existing streets adjacent to a proposed development may be required. These improvements are to correct deficiencies or replace deteriorated facilities. Included are sidewalk construction or replacement; curb and gutter construction or replacement; replacement of unused driveways with curb, gutter and sidewalk; installation or reconstruction of pedestrian ramps; pavement repairs; signs; traffic control devices; and other similar items. ACHD Master Street Map: ACHD Policy Section 3111.1 requires the Master Street Map (MSM) guide the right-of-way acquisition, arterial street requirements, and specific roadway features required through development. This segment of Victory Road is designated in the MSM as a Residential Arterial with 3-lanes and on-street bike lanes, a 46-foot street section within 74-feet of right-of-way. c. Applicant Proposal: The applicant is proposing to construct a pavement pathway abutting the site. The applicant is proposing to construct a 20-foot wide emergency access only onto Victory Road located at the northwest property line. d. Staff Comments/Recommendations: Consistent with District Sidewalk policy, the applicant should be required to construct 5-foot wide detached concrete sidewalk or 7-foot wide attached concrete sidewalk abutting the site. Provide a permanent right-of-way easement to 2-feet behind back of sidewalk for any sidewalk placed outside of the dedicated right-of-way. The applicant's proposal to construct a 20-foot wide emergency access only onto Victory Road located at the northwest property line meets District policy and should be approved. The emergency access should be restricted with a gate or bollards, located outside of the right-of- way, as determined by the appropriate fire department. This segment of Victory Road is listed on the no-cut moratorium. Any pavement cuts to Victory Road must be approved by the ACHD pavement cut committee. 4. Internal Local Streets a. Existing Conditions: There are no local streets within the site. Fathom Street stubs to the site's west property line. b. Policy: Local Roadway Policy: District Policy 7207.2.1 states that the developer is responsible for improving all local street frontages adjacent to the site regardless of whether or not access is taken to all of the adjacent streets. Street Section and Right-of-Way Policy: District Policy 7207.5 states that right-of-way widths for all local streets shall generally not be less than 47-feet wide and that the standard street section shall be 33-feet (back-of-curb to back-of-curb). Standard Urban Local Street-33-foot Street Section and Right-of-way Policy: District Policy 7207.5.2 states that the standard street section shall be 33-feet (back-of-curb to back-of- curb)for developments with any buildable lot that is less than 1 acre in size. This street section shall include curb, gutter, and minimum 5-foot wide concrete sidewalks on both sides and shall typically be constructed within 47-feet of right-of-way. 4 Teakwood Place/ MPP20-0004/ H-2020-0006 Continuation of Streets Policy: District Policy 7207.2.4 states that an existing street, or a street in an approved preliminary plat, which ends at a boundary of a proposed development shall be extended in that development. The extension shall include provisions for continuation of storm drainage facilities. Benefits of connectivity include but are not limited to the following: • Reduces vehicle miles traveled. • Increases pedestrian and bicycle connectivity. • Increases access for emergency services. • Reduces need for additional access points to the arterial street system. • Promotes the efficient delivery of services including trash, mail and deliveries. • Promotes appropriate intra-neighborhood traffic circulation to schools, parks, neighborhood commercial centers, transit stops, etc. • Promotes orderly development. Sidewalk Policy: District Policy 7207.5.7 states that five-foot wide concrete sidewalk is required on both sides of all local street, except those in rural developments with net densities of one dwelling unit per 1.0 acre or less, or in hillside conditions where there is no direct lot frontage, in which case a sidewalk shall be constructed along one side of the street. Some local jurisdictions may require wider sidewalks. The sidewalk may be placed next to the back-of-curb. Where feasible, a parkway strip at least 8-feet wide between the back-of-curb and the street edge of the sidewalk is recommended to provide increased safety and protection of pedestrians and to allow for the planting of trees in accordance with the District's Tree Planting Policy. If no trees are to be planted in the parkway strip, the applicant may submit a request to the District, with justification, to reduce the width of the parkway strip. Detached sidewalks are encouraged and should be parallel to the adjacent roadway. Meandering sidewalks are discouraged. A permanent right-of-way easement shall be provided if public sidewalks are placed outside of the dedicated right-of-way. The easement shall encompass the entire area between the right- of-way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located wholly within the public right-of-way or wholly within an easement. Cul-de-sac Streets Policy: District policy 7207.5.8 requires cul-de-sacs to be constructed to provide a minimum turning radius of 45-feet; in rural areas or for temporary cul-de-sacs the emergency service providers may require a greater radius. Landscape and parking islands may be constructed in turnarounds if a minimum 29-foot street section is constructed around the island. The pavement width shall be sufficient to allow the turning around of a standard AASHTO SU design vehicle without backing. The developer shall provide written approval from the appropriate fire department for this design element. The District will consider alternatives to the standard cul-de-sac turnaround on a case-by-case basis. This will be based on turning area, drainage, maintenance considerations and the written approval of the agency providing emergency fire service for the area where the development is located. c. Applicant's Proposal: The applicant is proposing to extend Fathom Street into the site (as Hessing Avenue) and construct the local internal streets as 33-foot street sections with rolled curb, gutter and 5-foot wide concrete sidewalk within 47-feet of right-of-way. The applicant is proposing to terminate the internal local street, Hessing Avenue, into a cul-de- sac turnaround with a turning radius of 50-feet. 5 Teakwood Place/ MPP20-0004/ H-2020-0006 d. Staff Comments/Recommendations: The applicant's proposal to extend Fathom Street into the site (as Hessing Avenue) and construct the local internal streets as 33-foot street sections with rolled curb, gutter and 5-foot wide concrete sidewalk within 47-feet of right-of-way meets District policy and should be approved as proposed. The applicant should be required to construct the cul-de-sac to provide a minimum turning radius of 45-feet. The right-of-way should extend to 2-feet behind back of sidewalk. 5. Roadway Offsets a. Existing Conditions: There are no existing roadways within the site. b. Policy: Local Offset Policy: District policy 7207.4.2, requires local roadways to align or provide a minimum offset of 125-feet from any other street (measured centerline to centerline). c. Applicant's Proposal: The applicant is proposing to construct the internal local streets with a minimum offset of 125-feet. d. Staff Comments/Recommendations: The applicant's proposal meets District policy and should be approved. 6. Stub Streets a. Existing Conditions: There is an existing stub street, Fathom Street, at the site's west property line that is proposed to be extended into the site as a local street. b. Policy: Stub Street Policy: District policy 7207.2.4.3 states that stub streets will be required to provide circulation or to provide access to adjoining properties. Stub streets will conform with the requirements described in Section 7207.2.4, except a temporary cul-de-sac will not be required if the stub street has a length no greater than 150-feet. A sign shall be installed at the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE." In addition, stub streets must meet the following conditions: • A stub street shall be designed to slope towards the nearest street intersection within the proposed development and drain surface water towards that intersection; unless an alternative storm drain system is approved by the District. • The District may require appropriate covenants guaranteeing that the stub street will remain free of obstructions. Temporary Dead End Streets Policy: District policy 7207.2.4.4 requires that the design and construction for cul-de-sac streets shall apply to temporary dead end streets. The temporary cul-de-sac shall be paved and shall be the dimensional requirements of a standard cul-de-sac. The developer shall grant a temporary turnaround easement to the District for those portions of the cul-de-sac which extend beyond the dedicated street right-of-way. In the instance where a temporary easement extends onto a buildable lot, the entire lot shall be encumbered by the easement and identified on the plat as a non-buildable lot until the street is extended. c. Applicant Proposal: The applicant has proposed to construct a stub street, Richardson Street, to the east, located 479-feet south of Victory Road (measured centerline-to-centerline). 6 Teakwood Place/ MPP20-0004/ H-2020-0006 The applicant has proposed to construct a driveway type turnaround on Richardson m Street (illustrated). m d. Staff Comments/Recommendations: The applicant's proposal to construct aLO a stub street, Richardson Street, to the east, located 479-feet south of Victory Road r : meets District policy and should be approved. _ _ SON-=- - > The applicant's proposal to construct a driveway type turnaround on Richardson ? 1 Street does not meet District policy and s k eon 1 should not be approved. The applicant should be required to II construct a temporary cul-de-sac is { turnaround at the terminus of the stub street as it extends greater than 150-feet in length. The temporary turnaround should be paved and constructed to the same dimensional standards as a standard cul-de-sac turnaround. If the turnaround extends onto a buildable lot, the entire lot shall be encumbered by the easement and identified on the plat as a non-buildable lot until the street is extended. The applicant should install a sign at the terminus of the stub street that states, "THIS ROAD WILL BE EXTENDED IN THE FUTURE." 7. Driveways 7.1 Victory Road a. Existing Conditions: There is an existing driveway to provide access to the existing home located 181-feet east of the site's west property line. b. Policy: Access Points Policy: District Policy 7205.4.1 states that all access points associated with development applications shall be determined in accordance with the policies in this section and Section 7202. Access points shall be reviewed only for a development application that is being considered by the lead land use agency. Approved access points may be relocated and/or restricted in the future if the land use intensifies, changes, or the property redevelops. Access Policy: District policy 7205.4.6 states that direct access to minor arterials is typically prohibited. If a property has frontage on more than one street, access shall be taken from the street having the lesser functional classification. If it is necessary to take access to the higher classified street due to a lack of frontage, the minimum allowable spacing shall be based on Table 1 a under District policy 7205.4.6, unless a waiver for the access point has been approved by the District Commission. Successive Driveways: District policy 7205.4.6 Table 1 a, requires driveways located on minor arterial roadways with a speed limit of 45 MPH to align or offset a minimum of 380-feet from any existing or proposed driveway. Driveway Width Policy: District policy 7205.4.8 restricts high-volume driveways (100 VTD or more) to a maximum width of 36-feet and low-volume driveways (less than 100 VTD) to a maximum width of 30-feet. Curb return type driveways with 30-foot radii will be required for high- volume driveways with 100 VTD or more. Curb return type driveways with 15-foot radii will be required for low-volume driveways with less than 100 VTD. 7 Teakwood Place/ MPP20-0004/ H-2020-0006 Driveway Paving Policy: Graveled driveways abutting public streets create maintenance problems due to gravel being tracked onto the roadway. In accordance with District policy, 7205.4.8, the applicant should be required to pave the driveway its full width and at least 30- feet into the site beyond the edge of pavement of the roadway and install pavement tapers in accordance with Table 2 under District Policy 7205.4.8. Cross Access Easements/Shared Access Policy: District Policy 7202.4.1 states that cross access utilizes a single vehicular connection that serves two or more adjoining lots or parcels so that the driver does not need to re-enter the public street system. c. Applicant's Proposal: The applicant is proposing to close the existing driveway onto Victory Road with Phase 2 of the development. The existing home and accessory structures will be removed at that time. d. Staff Comments/Recommendations: The applicant's proposal to use the existing driveway onto Victory Road located 181-feet east of the site's west property line does not meet District Access Management or Successive Driveway policies. The site has access to a lesser classified street within the proposed subdivision, and it does not meet the minimum offset of 380-feet from an existing driveway (located 308-feet to the west) and Siduri Avenue (located 52-feet to the east) on the north side of Victory Road. However, staff recommends a modification of policy to approve the use of the driveway due to the low traffic volume, it's an existing driveway and the applicant has proposed to close the driveway with the 2"d phase of the project. The applicant should be required to close the existing driveway with vertical curb, gutter and 5-foot wide detached concrete or 7-foot wide attached concrete sidewalk before final signatures on phase 2 of the plat. 8. Tree Planters Tree Planter Policy: Tree Planter Policy: The District's Tree Planter Policy prohibits all trees in planters less than 8-feet in width without the installation of root barriers. Class II trees may be allowed in planters with a minimum width of 8-feet, and Class I and Class III trees may be allowed in planters with a minimum width of 10-feet. 9. Landscaping Landscaping Policy: A license agreement is required for all landscaping proposed within ACHD right-of-way or easement areas. Trees shall be located no closer than 10-feet from all public storm drain facilities. Landscaping should be designed to eliminate site obstructions in the vision triangle at intersections. District Policy 5104.3.1 requires a 40-foot vision triangle and a 3-foot height restriction on all landscaping located at an uncontrolled intersection and a 50-foot offset from stop signs. Landscape plans are required with the submittal of civil plans and must meet all District requirements prior to signature of the final plat and/or approval of the civil plans. 10. Other Access Victory Road is classified as minor arterial roadway. Other than the access specifically approved with the application, direct lot access is prohibited to this roadway and should be noted on the final plat. D. Site Specific Conditions of Approval 1. Construct 5-foot wide detached concrete sidewalk or 7-foot wide attached concrete sidewalk abutting the site. Provide a permanent right-of-way easement to 2-feet behind back of sidewalk for any sidewalk placed outside of the dedicated right-of-way. 2. Construct a 20-foot wide emergency access only onto Victory Road located at the northwest property line meets District policy and should be approved. The emergency access should be restricted with a gate or bollards, located outside of the right-of-way, as determined by the appropriate fire department. 8 Teakwood Place/ MPP20-0004/ H-2020-0006 3. Extend Fathom Street into the site (as Hessing Avenue) and construct the local internal streets as 33-foot street sections with rolled curb, gutter and 5-foot wide concrete sidewalk within 47-feet of right-of-way 4. Terminate the internal local street, Hessing Avenue, into a cul-de-sac turnaround with a turning radius of a minimum of 45-feet. The right-of-way should extend to 2-feet behind back of sidewalk. 5. Construct the internal local streets with a minimum offset of 125-feet. 6. Construct a stub street, Richardson Street, to the east, located 479-feet south of Victory Road. 7. Construct a temporary cul-de-sac turnaround at the terminus of the stub street, Richardson Street. The temporary turnaround should be paved and constructed to the same dimensional standards as a standard cul-de-sac turnaround. If the turnaround extends onto a buildable lot, the entire lot shall be encumbered by the easement and identified on the plat as a non-buildable lot until the street is extended. 8. Install a sign at the terminus of the stub street that states, "THIS ROAD WILL BE EXTENDED IN THE FUTURE." 9. As part of Phase 2, close the existing driveway onto Victory Road located 181-feet east of the site's west property line with vertical curb, gutter and 5-foot wide detached concrete or 7-foot wide attached concrete sidewalk. The closure of the driveway will be required before final signatures on phase 2 of the plat. 10. Direct lot access is prohibited to Victory Road other than the access approved with this application and shall be noted on the final plat. 11. Submit civil plans to ACHD Development Services for review and approval. The impact fee assessment will not be released until the civil plans are approved by ACHD. 12. Payment of impact fees is due prior to issuance of a building permit. 13. Comply with all Standard Conditions of Approval. E. Standard Conditions of Approval 1. All proposed irrigation facilities shall be located outside of the ACHD right-of-way (including all easements). Any existing irrigation facilities shall be relocated outside of the ACHD right-of-way (including all easements). 2. Private Utilities including sewer or water systems are prohibited from being located within the ACHD right-of-way. 3. In accordance with District policy, 7203.3, the applicant may be required to update any existing non- compliant pedestrian improvements abutting the site to meet current Americans with Disabilities Act (ADA) requirements. The applicant's engineer should provide documentation of ADA compliance to District Development Review staff for review. 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number)for details. 5. A license agreement and compliance with the District's Tree Planter policy is required for all landscaping proposed within ACHD right-of-way or easement areas. 6. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant 9 Teakwood Place/ MPP20-0004/ H-2020-0006 shall be required to call DIGLINE (1-811-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled)are compromised during any phase of construction. 8. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Standards unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 10. Construction, use and property development shall be in conformance with all applicable requirements of ACHD prior to District approval for occupancy. 11. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of ACHD. The burden shall be upon the applicant to obtain written confirmation of any change from ACHD. 12. If the site plan or use should change in the future, ACHD Planning Review will review the site plan and may require additional improvements to the transportation system at that time. Any change in the planned use of the property which is the subject of this application, shall require the applicant to comply with ACHD Policy and Standard Conditions of Approval in place at that time unless a waiver/variance of the requirements or other legal relief is granted by the ACHD Commission. F. Conclusions of Law 1. The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. 2. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular transportation system within the vicinity impacted by the proposed development. G. Attachments 1. Vicinity Map 2. Site Plan 3. Utility Coordinating Council 4. Development Process Checklist 5. Appeal Guidelines 10 Teakwood Place/ MPP20-0004/ H-2020-0006 4' - _-� MON - N Yll It � " - iL• � l .b r T •�• � �� 1 111� 1 1 111• SITE PLAN RA515 OF BEARING N69'59'41"E 2560.68' WrIAM WWMSION 91 PAGE 10.659 s SHERBR001 OWS NO. I ❑HdSF 1 -'�kil3S�.�u x �i �, Y EOOH 77 PAOE S. ,a Fi E Y�CTORI ', SO�ElFTCCUG+LLCR� q x� � m p oea _ � 0ty5p� ea.a I s Y' .s a u' eoa• � �! § S6aii F �W 9i a o0o g Sf eon•. sax 5 W 4,a s ® by- 17 59W a. mV �QN Aa a IMF € �'•asi Rio 12 Teakwood Place/ MPP20-0004/ H-2020-0006 Ada County Utility Coordinating Council Developer/Local Improvement District Right of Way Improvements Guideline Request Purpose: To develop the necessary avenue for proper notification to utilities of local highway and road improvements, to help the utilities in budgeting and to clarify the already existing process. 1) Notification: Within five (5)working days upon notification of required right of way improvements by Highway entities, developers shall provide written notification to the affected utility owners and the Ada County Utility Coordinating Council (UCC). Notification shall include but not be limited to, project limits, scope of roadway improvements/project, anticipated construction dates, and any portions critical to the right of way improvements and coordination of utilities. 2) Plan Review: The developer shall provide the highway entities and all utility owners with preliminary project plans and schedule a plan review conference. Depending on the scale of utility improvements, a plan review conference may not be necessary, as determined by the utility owners. Conference notification shall also be sent to the UCC. During the review meeting the developer shall notify utilities of the status of right of way/easement acquisition necessary for their project. At the plan review conference each company shall have the right to appeal, adjust and/or negotiate with the developer on its own behalf. Each utility shall provide the developer with a letter of review indicating the costs and time required for relocation of its facilities. Said letter of review is to be provided within thirty calendar days after the date of the plan review conference. 3) Revisions: The developer is responsible to provide utilities with any revisions to preliminary plans. Utilities may request an updated plan review meeting if revisions are made in the preliminary plans which affect the utility relocation requirements. Utilities shall have thirty days after receiving the revisions to review and comment thereon. 4) Final Notification: The developer will provide highway entities, utility owners and the UCC with final notification of its intent to proceed with right of way improvements and include the anticipated date work will commence. This notification shall indicate that the work to be performed shall be pursuant to final approved plans by the highway entity. The developer shall schedule a preconstruction meeting prior to right of way improvements. Utility relocation activity shall be completed within the times established during the preconstruction meeting, unless otherwise agreed upon. Notification to the Ada County UCC can be sent to:50 S. Cole Rd. Boise 83707, or Visit iducc.com for e-mail notification information. 13 Teakwood Place/ MPP20-0004/ H-2020-0006 Development Process Checklist Items Completed to Date: ®Submit a development application to a City or to Ada County ®The City or the County will transmit the development application to ACHD ®The ACHD Planning Review Section will receive the development application to review ®The Planning Review Section will do one of the following: ❑Send a"No Review" letter to the applicant stating that there are no site specific conditions of approval at this time. ®Write a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ®Write a Commission Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. Items to be completed by Applicant: ❑For ALL development applications, including those receiving a "No Review" letter: • The applicant should submit one set of engineered plans directly to ACHD for review by the Development Review Section for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD, then architectural plans may be submitted for purposes of impact fee assessment.) • The applicant is required to get a permit from Construction Services(ACHD)for ANY work in the right-of-way, including, but not limited to, driveway approaches, street improvements and utility cuts. ❑Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DID YOU REMEMBER: Construction (Non-Subdivisions) ❑ Driveway or Property Approach(s) • Submit a "Driveway Approach Request" form to ACHD Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. ❑Working in the ACHD Right-of-Way Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application"to ACHD Construction—Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >600 sf of concrete or asphalt. Construction (Subdivisions) ❑ Sediment&Erosion Submittal • At least one week prior to setting up a Pre-Construction Meeting an Erosion&Sediment Control Narrative&Plan, done by a Certified Plan Designer, must be turned into ACHD Construction to be reviewed and approved by the ACHD Stormwater Section. ❑ Idaho Power Company • Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being scheduled. ❑ Final Approval from Development Services is required prior to scheduling a Pre-Con. 14 Teakwood Place/ MPP20-0004/ H-2020-0006 Request for Appeal of Staff Decision 1. Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of the final decision made by the Development Services Manager when it is alleged that the Development Services Manager did not properly apply this section 7101.6, did not consider all of the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or enforcement of the ACHD Policy Manual. a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged the applicant for the processing of appeals, to cover administrative costs. b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary and Clerk of the District, which must be filed within ten (10)working days from the date of the decision that is the subject of the appeal. The notice of appeal shall refer to the decision being appealed, identify the appellant by name, address and telephone number and state the grounds for the appeal. The grounds shall include a written summary of the provisions of the policy relevant to the appeal and/or the facts and law relied upon and shall include a written argument in support of the appeal. The Commission shall not consider a notice of appeal that does not comply with the provisions of this subsection. c. Time to Reply: The Development Services Manager shall have ten (10) working days from the date of the filing of the notice of appeal to reply to the notice of the appeal, and may during such time meet with the appellant to discuss the matter, and may also consider and/or modify the decision that is being appealed. A copy of the reply and any modifications to the decision being appealed will be provided to the appellant prior to the Commission hearing on the appeal. d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal will be noticed and scheduled on the Commission agenda at a regular meeting to be held within thirty (30) days following the delivery to the appellant of the Development Services Manager's reply to the notice of appeal. A copy of the decision being appealed, the notice of appeal and the reply shall be delivered to the Commission at least one (1) week prior to the hearing. e. Action by Commission: Following the hearing, the Commission shall either affirm or reverse, in whole or part, or otherwise modify, amend or supplement the decision being appealed, as such action is adequately supported by the law and evidence presented at the hearing. 15 Teakwood Place/ MPP20-0004/ H-2020-0006