Loading...
2020-03-17 Parks - Pathways Reviewer: Kim Warren / Pathways Project Manager Planner Assigned: Sonya Allen Project Name: Hills Century Farm North File No: H-2020- 0134 Date: 3.16.20 The following will be required for development of the proposed project: CONDITIONS OF APPROVAL - PATHWAYS 1. The project developer shall design and construct multi-use pathways consistent with the location and specifications set forth in the Meridian Pathways Master Plan Map and Master Pathways Plan Document Chapter 3). Any proposed adjustments to pathway alignment shall be coordinated through the Pathways Project Manager. 2. Prior to submittal of the final plat for City Engineer signature, the applicant shall dedicate public access easements for two multi-use pathways (10’ detached, concrete) through the landscape buffers along S. Eagle Road and Amity Road. Applicant shall also provide a pathway connection via common lot 28, extending north through commercial area to connect with Amity Rd. Submit easement documents to the Planning Division for Council approval and subsequent recordation. The easement shall be a minimum of 14’ wide (10’ pathway + 2’ shoulder each side). Use standard City template for public access easement. Easement checklist must accompany all easement submittals. 3. Construct multi-use pathways per typical paving section(s) shown in the Meridian Pathways Master Plan Chapter 3. 4. The owner (or representative association) of the property affected by each public access easement shall have an ongoing obligation to maintain the multi-use pathway. Rev. 02.11.20