CC - Williams Pipeline 2018 Developers Handbook 2. ' a a . \ / . 2 . • ` � . , , f � I � " ` 14 d% 3r , % � 2f, - OP . . � � . Developers ' Handbook REV Zs SUPPORTING SAFETY INITIATVE q;- NOTES: I. Introduction This handbook outlines the requirements for The handbook is designed to make you aware of the construction or maintenance activities to be followed most common standards and procedures Williams when planning land use development on or near typically requires to protect its facilities in areas of Williams rights of way. The handbook is intended for changing land use. Each proposed development or use by city and county/parish planners, engineers, activity, however, requires a case specific evaluation developers, land surveyors, and anyone involved in by a qualified Williams representative. It should be the initial stages of land development. If Williams is understood that the Williams review of the proposed included in the initial planning stages, project delays activity may require more stringent protective can be avoided and safe development practices in measures than outlined in this handbook. Please the vicinity of pipelines can be attained. become familiar with the contents of this handbook. If you have further questions or need assistance, contact our encroachment hotline at 1-855-245-2300. NORTHWEST 4 OI,EMyNpM 4 1 —�14Fd171G#160.�{$8�f�fi@ � F�o�4bp ag9F4 — whm nu ruin"Pop Yea r y FRANSCII — UFb o GMLwWlISrnmM � oei�h.n * F�mivdr ri rxx.are vnya rx — • udergiarAseora� ` ouusIREAM 1 II. Safety and Reliability settings, and other facilities. In accordance with federal regulations, Williams identifies the location of its pipeline facilities by installing permanent pipeline Safety markers, like the ones shown on the following page, Williams is committed to ensuring the safe operation near road, rail, fences and where necessary to of its natural gas pipeline systems. According to the reduce the possibility of damage or interference by federal Department of Transportation, the the actions of other persons on the pipeline right transmission of natural gas through interstate of way. Pipeline markers may also be strategically pipelines is the safest means of transportation in the placed in extensive areas of open ground to identify United States. The industry enjoys an excellent the location of the pipeline. safety and reliability record. Williams has a thorough damage prevention policy to prevent pipeline The maintenance of pipeline markers and an failures. Damage by outside forces from a third party open, clear right of way at all times is critical to is the leading cause of pipeline failures, which can public safety. Construction or development near lead to serious injury or death. transmission pipelines increases the probability of excavation damage. It is the responsibility of It is critical that excavators follow appropriate Williams, individual landowners, and contractors to guidelines to protect their safety and the integrity ensure that all temporary and permanent pipeline of the pipeline system. markers installed by Williams are protected and Reliability maintained at all times, especially during Williams is committed to reliable delivery of gas construction. Removing or defacing a pipeline transportation services. Communities, factories, marker is a federal criminal offense. You can find hospitals, power plants, businesses, and residences information about other pipelines operating in your depend on our product and services for energy to community by accessing the National Pipeline generate heat and electricity. Mapping System (NPMS) on the Internet at www.npms.phmsa.dot.gov. NPMS provides Williams must and will use every available resource emergency officials access to pipeline maps, along to ensure the safety and reliability of its facilities. with product and operator contact information. Williams does not encourage or support any development or encroachment that interferes with the operation or maintenance of its pipelines. In IV. Williams Right of those cases where development or encroachment cannot be avoided, we seek your help to ensure Way Agreements the safety and reliability of our facilities through proper planning and coordination with a Williams A. Description representative. As a responsible developer, Most of Williams' existing pipeline easements and contractor, or other party engaged in any ground rights were acquired through recorded agreements disturbing activity near Williams pipeline facilities, granting Williams, or its pipeline companies, the right we urge you to read and understand the guidelines to construct, operate, maintain, repair, modify, alter, presented in this publication. protect, change the size of, remove, replace and access a pipeline or pipelines within its easement. Ill. Pipeline Facilities Overview The easement and rights are conveyed with the land in successive purchases and generally allow Williams' transmission operation includes high- the current landowner the right to use and enjoy the pressure steel pipelines ranging in diameter from surface of the easement, as long as that use does 2"to 48", storage facilities, compressor stations, not interfere or conflict with Williams' existing rights. meter stations, cathodic protection equipment, valve 2 B.Width V. Legislation When the original pipeline routes were selected, agricultural, forested or rural environments were A. Federal deliberately chosen whenever possible. In some Williams is regulated by the Department of cases, the original right of way agreement did not Transportation, Pipeline & Hazardous Material specify a defined right of way width or location on Safety Administration (PHMSA). The pipeline safety the lands covered by the agreement, and therefore regulations are administered through Title 49, Code included large sections of land. Where defined, of Federal Regulations, Part 192. Williams' rights of way vary in width from 10' to 200', depending on the number and diameter of the Part 192 prescribes minimum standards for the pipeline(s), terrain, and terms of the right of way safe operation of pipelines. The denser the agreement. population, the more stringent the standards for pipeline design, maximum allowable operating C.Amendments or Modifications pressure, frequency and type of patrols, and leak As the rural environment is altered and land surveys. In addition, Williams supports PHMSA's developments are proposed,Williams, at the request Common Ground Alliance Best Practices. of the landowner, may elect to amend or modify the right of way agreement to reflect the changing land use.Williams can work with developers to B. State incorporate the right of way into the project design, All of the states in which Williams operates have including consent to use the right of way as a damage prevention laws for the protection of 11greenway" or open space area, so long as that use pipelines and other underground utilities. Most does not interfere with Williams' ability to construct, states require excavators to notify their local one- operate and maintain its facilities. call system of their excavation plans. Williams participates in all one-call systems, which coordinate notice of excavation to participating industries. Some jurisdictions provide for triple damages resulting from a failure to notify under the one-call 1dOT system. !fig - • T U1 � P Do Na A rw Ga L AA E 3 I I C. City & County/Parish The Encroachment/Foreign Line Crossing Permit will Local governments often play a major role in typically contain pertinent conditions to be followed regulating land use by means of comprehensive by the encroaching party for the activity planned and planning and zoning. Some counties/parishes is generally reviewed and issued to the encroaching currently offer developer incentives to encourage party on-site. A sample Encroachment/Foreign easement use for parks and open space purposes. Line Crossing Permit is included in the back of this In most cases,Williams supports this initiative for the handbook. joint use of the easement area. A. Encroachment Agreement Some counties/parishes require an additional building An encroachment agreement is specific to the setback from the pipeline easement. Please check project and is required when: local codes before submitting lot layout plans. • Construction/maintenance activities cross under or V1. Encroachments over the natural gas pipeline. • Construction/maintenance activities extend into It is Williams' philosophy to minimize encroachment the right of way. and excavation activity within the limits of our Examples of such construction/maintenance pipeline right of way. Encroaching parties will design activities may include, but are not limited to: projects such that proposed improvements remain outside the pipeline right of way. Improvements that • Street and road crossings will encroach into the right of way will be designed • Ornamental fencing and constructed such that the safe operation and • Blasting or use of explosives in the vicinity maintenance of the pipeline(s) is not diminished. of Williams facilities Many of Williams' right of way agreements prohibit • Heavy equipment crossings encroachments. Williams will enforce provisions in • Large diameter utility crossings its right of way agreements where it believes the continued safe operation and maintenance of the Other activities subject to an encroachment pipeline facilities could be threatened. agreement are determined on a case-by-case basis. Where Williams determines that an activity can In addition, third party construction/maintenance be undertaken without jeopardy to the pipeline activities that necessitate Williams facility system, Williams will require the execution of an modifications (such as, but not limited to, encroachment agreement, issue a Williams pipeline casing extensions, pipeline relocations or Encroachment/Foreign Line Crossing Permit, or issue replacements, and pipeline cathodic protection a letter of no objection, depending upon the type and facility modifications)are addressed in the scope of activity proposed. encroachment agreement. Reimbursement provisions may also be referenced in the The encroachment agreement will contain all encroachment agreement. pertinent terms and conditions to be followed by the encroaching party for the planned activity and A Williams representative generally initiates the may also provide for cost reimbursement to encroachment agreement. The agreement must be Williams. Typically,Williams will seek executed before work begins on the right of way. reimbursement for projects that require significant design review, engineering investigation, field inspections, legal consultation or facility modification. 4 In the event work commences absent such an Who initiates the "'Williams agreement, Williams may take steps to prevent Encroachment/Foreign Line Crossing further activity. Permit"? B. Reimbursement Agreement The agreement is initiated by a local representative of Williams and must be executed before work When is a reimbursement agreement begins on the right of way. required? A reimbursement agreement is typically required for V11. Notification and Construction construction/maintenance activities proposed on the Safety Requirements right of way,which require extensive preliminary engineering and/or field inspection services by Williams personnel. A. Notification In order to prevent unnecessary delays,Williams In addition, Williams will seek a reimbursement encourages close communication with our agreement for any third-party construction/ representatives beginning in the preliminary survey maintenance activities that require modification to and design phase as well as throughout your entire Williams facilities. project. We will be happy to attend pre-construction meetings and provide a safety/informational Who initiates the reimbursement presentation to any interested parties, including agreement? contractors, local government maintenance crews, The agreement is typically initiated by a and developers. representative of Williams and must be executed All of the states in which Williams operates have before any work, preliminary engineering, or field "one-call" laws, which require the excavators to inspection services are performed by Williams. provide 48 to 72 hours notice, depending on local requirements, before any excavating commences. C. Encroachment/Foreign One easy phone call to 811 starts the process to Line Crossing Permit get your underground utility lines marked for free. When is a "Williams Encroachment/ Your local one-call system will notify all participating Foreign Line Crossing Permit" required? utilities in the area of your planned excavation activities and is a simple, yet very effective, means of A Williams Encroachment/Foreign Line Crossing reducing buried utility damage. Permit may be required when: • Construction/maintenance activities cross under or A Williams representative must be onsite, following over the natural gas pipeline 48 to 72 hours prior notice, for all surface and sub- - Construction/maintenance activities extend into the surface activities within the pipeline right of way.Any right of way crossings made without a Williams representative on site will be excavated at the excavator's expense to Examples of such construction/maintenance provide Williams an opportunity to inspect all affected activities may include: pipeline facilities. • Residential water lines • Residential television cable Protect yourself, utility companies, and the • Small diameter drainage or sewer lines public. Call before you dig. • Residential electrical lines • Fences (livestock or typical residential) Federal regulations (OSHA 29CFR Ch. XVII- • Residential sprinkler systems,etc. 1926.651) also require excavators to notify 5 Vill. Plan Design and underground utilities prior to the start of actual Review Requirements excavation. Your state regulations may be more specific, but in any case, failure to notify underground A. Ideal Subdivision Layout utility operators of excavation activities could lead to a citation. In an ideal subdivision layout: Williams often operates its pipelines at high • The entire right of way width is preserved as open pressures. To ensure the safety and reliability of our space. facilities and the public, we require a Williams • The right of way is clear and easily marked. representative to be on site while you work around • Crews can undertake emergency repairs quickly. our facilities. Please contact your local Williams office • The right of way crosses as few landowners as before work commences on, or in close proximity to a possible to minimize accidental "dig-ins". Williams right of way.A Williams representative will be • Routine maintenance and inspections are not on site to inspect the work and monitor the site until hindered. construction is completed. • Lot lines, parallel to the pipeline(s)within the right of way are strongly discouraged and accordingly B. Safety Requirements fences will not be allowed within the right of way, Excavations must be barricaded to protect parallel to the pipelines. pedestrians and vehicles. Proper access into the trench must be provided. Excavations must be When the proposed development plans call for the properly sloped or shored, as required to comply with dedication of a street/road right of way to the city, state and Federal OSHA requirements. county/parish, or state, it is important to note that Williams' existing easement is superior to this Stockpiling brush, trash, or other debris on the right action and its rights are not diminished. The of way is prohibited, as it may conceal pipeline agency involved may require you to obtain an markers and hinder pipeline inspections or routine amended easement. maintenance. Contact your local Williams office concerning burning restrictions. Pipeline easement in residential subdivision t ,.7a 332 I * i Ti 711{. 2 �' d'a 77 85 17 r r... I x I 73 7#f 7T 20 �.� 04 85 p R} j # 127'I+s''' Ps�1ip1 10 +' i ,i. bbI i } 4 i ti 4 37 I TGb 17�yI:IP� I13ii�--5r - -- � -yr—` i [ i M Y H r 107 f r' 32i MF 11 IR7 f f '�p�� � � r, I slip so 170�s iC Ins f3 I'1Z _ -- •' 9 Ap 2 xis MOM1}3 1#0 i j t7} 77! IT3 if }7R 6 B. Subdivision Plans to review proposed road-crossing plans. Additional • Williams requires a minimum of 30 business review time will be necessary for proposed days to review preliminary plans for impacts to divided highways, interstate highways and other the easement and to insure that all proposed road construction projects which require pipeline improvements are designed in accordance with modifications. Williams Requirements for Landowner and Third • Provide a scope of work, description, and plan and Party Construction (Section IX). profile drawings with your plans. Profiles are required • An open space trail, free of fences, trees and other to show depth of cover over each Williams pipeline deep-rooted plants, is the ideal right of way use. (existing and finished grade) and the clearance This reduces the public exposure by minimizing the between each Williams pipeline and any proposed opportunity for accidental "dig-ins." When this is not utilities. possible, lot division on either boundary of the right • Please include a location map showing the project of way is preferable to splitting the right of way site area, including sufficient geographical between lots. No lot lines, parallel to the pipelines references such as legal property lines, roads, are allowed within the right of way and accordingly and appropriate deed information to the properties fences will not be allowed within the right of way, impacted. parallel to the pipelines. Construction, maintenance • When new rights of way are acquired or dedicated, and routine inspections can be disruptive to the the costs for pipeline modifications will generally be landowner when the easement is split between lots. borne by the developer, state, county/parish, or city • An encroachment agreement (formal recorded highway department. agreement) is usually executed between Williams • Williams must be given the opportunity to make and the developer/landowner to address the terms a pipeline inspection prior to the start of road and conditions associated with the new land use. construction. • Williams representatives will work with your surveyor(s) and will stake the location of its pipeline IX. Williams Requirements facilities. This information should then be included for Landowner and Third in the plan and profile drawings submitted to Party Construction Williams. C. Street and Road Crossing Plans See the following page. • Williams requires a minimum of 30 business days Aerial view of ideal easement in developed area a41 i � 4 j 4I fit. xr � r 7 Wi1Ii i 4�� Williams Requirements for Landowner & Third Party Construction Rev.10/11/2017 The following Williams specifications are minimum requirements to be followed when planning land use development on or near Williams right of way. Each proposed development or activity requires a site specific evaluation by a qualified Williams representative.It should be understood that the Williams review of the proposed activity may require more stringent protective measures than outlined below. PIPELINE FACILITIES AND LEGISLATION Williams'transmission operation includes high-pressure steel pipelines ranging in diameter from 2"to 48". Williams pipeline facilities include compressor stations,meter stations,storage facilities,cathodic protection equipment,valve settings and other facilities located within the limits of its rights-of-way, leased,and fee properties. Williams is regulated by the Department of Transportation,Pipeline&Hazardous Material Safety Administration(PHMSA).The pipeline safety regulations are set forth in Title 49,Code of Federal Regulations,Part 192"Transportation of Natural and Other Gas by Pipeline—Minimum Federal Standards." Williams will require that all Federal,State,and local ordinances and applicable utility set backs are complied with to the full extent. ENCROACHMENTS It is Williams philosophy to minimize encroachments and excavation activity within the limits of our pipeline right of way.Encroaching parties will design projects such that proposed improvements remain outside the pipeline right of way.Improvements that will encroach into the right of way will be designed and constructed such that the safe operation and maintenance of the pipelines is not diminished.Many of Williams right of way agreements prohibit encroachments.Williams will enforce applicable provisions in its right of way agreements where it believes the continued safe operation and maintenance of the pipeline facilities could be threatened. NOTIFICATION AND CONSTRUCTION SAFETY REQUIREMENTS 1. In order to prevent unnecessary delays,Williams encourages close communication with our representative throughout your entire project.A Williams representative should participate in all pre-construction meetings.In addition,Williams can conduct a safety/informational presentation to any interested parties,including contractors,local governmental maintenance crews,and developers. 2. "One Call"systems require 48 to 72 hours'notice prior to any excavation activities or equipment use on or in close proximity to Williams pipeline facilities.Dial 811 to be connected to your State One Call system.No equipment use or excavation will occur in the vicinity of Williams facilities until notification to"One Call"has been made.A Williams representative will be on site prior to and during any equipment use or excavation activities.Any crossings made without a Williams representative on site will be excavated at the excavator's expense to provide Williams an opportunity to inspect all affected pipeline facilities. 3. Excavations must be barricaded to protect Williams pipelines from exposure to vehicular traffic and to ensure public safety.Williams representatives must be provided safe access to all open excavations.Excavations must be properly sloped or shored in accordance with OSHA regulations. PLAN DESIGN AND REVIEW REQUIREMENTS 1. Residential and/or commercial developments will be laid out such that the right of way is designated as"open"or"common"space.Maintaining an open right of way reduces public exposure and minimizes disruptions during pipeline maintenance and construction.Lot divisions will be established on either side of the right of way resulting in the actual right of way being"open"or"common"areas. 2. In most cases,Williams will require the submittal of two or more full size plan and profile drawings to the appropriate Williams office for prior review and written approval by Williams.All drawings must show,in detail,all of Williams facilities and other features that will allow Williams to determine the impact of the proposed construction or maintenance activity on its facilities.Encroachment plans will include a scope of work, description,and a location map depicting the project site area.Sufficient geographical references such as legal property lines,roads,and appropriate deed information for the properties involved will be provided. 3. In order to ensure that all proposed improvements are designed in accordance with Williams encroachment specifications,Williams requires a minimum of thirty business days lead-time to review proposed encroachments.Encroachments involving road crossings will require additional 8 review time.Any proposed road which requires pipeline modifications or a dedicated right of way will require significant lead-time. 4. If there are any changes to approved plans,additional review by Williams and subsequent written authorization will be required. 5. In some cases,there is a significant delay between the review and approval of submitted plans and actual construction.In such cases, proposed encroachment related activities will be subject to Williams requirements in effect at the time the work actually takes place. WILLIAMS EASEMENT,PERMITS AND AGREEMENTS 1. A Williams Encroachment/Foreign Line Crossing Permit Form or a letter of no objection may be required for any proposed construction within Williams right of way.This document prepared by Williams,will outline the responsibilities,conditions,and liabilities of each party.If required, this document must be executed by the encroaching party and in Williams possession prior to any work being performed on the right of way. 2. Williams will determine if a recorded encroachment agreement will be required for any proposed construction within Williams right of way.This agreement,prepared by Williams,will outline the responsibilities,conditions,and liabilities of each party.This agreement will be fully executed and in Williams possession prior to any work being performed on the right of way. 3. Williams will determine if a reimbursement agreement will be required for any construction within Williams right of way.This agreement, prepared by Williams,will outline the reimbursement procedure for necessary and appropriate preliminary engineering and actual field inspection work.This fully executed agreement,including a check made payable to the applicable Williams pipeline company for the estimated cost of Williams services,will be in Williams possession prior to any work being performed on the right of way. GENERAL REQUIREMENTS 1. No above ground structures or appurtenances are to be located within the Williams right of way.The structures and appurtenances include,but are not limited to:utility poles,towers,foundations,guy wires,structures supporting aerial lines,satellite dishes,manholes,catch basins,utility pedestals,transformers,fire hydrants,utility sheds,decks,swimming pools with associated improvements,etc. 2. An authorized Williams representative must be on site prior to and during any surface-disturbing work or equipment crossings performed within the right of way.Williams representative will assist in determining the location of the pipeline,the right of way width,and existing cover over the pipeline and will remain on site to monitor all activities within the right of way. 3. No cut or fill on the Williams right of way is permitted without Williams written approval. 4. Williams,at its discretion,may request evidence of comprehensive general liability insurance coverage(up to$5,000,000 coverage)and other appropriate and usual insurance prior to any activity,maintenance,and/or construction on or near Williams right of way and facilities.In the event of significant excavation under or over Williams pipelines,Williams will require that the applicable Williams pipeline company be named as additional insured on the Certificate of Liability Insurance.The insurance limits,terms,and conditions that may be required will be dependent on the specific facilities potentially impacted and what would be usually and prudently obtained in similar industry situations. 5. All foreign lines will cross Williams right of way at an angle as near to 90 degrees as possible.In situations where there are multiple parallel Williams pipelines,the proposed foreign lines will either cross over or under all of Williams pipelines in the right of way.No horizontal or vertical bends are permitted within Williams right of way.Parallel occupancy of Williams right of way will not be permitted. 6. All foreign lines crossing Williams pipeline or related facilities will be installed with a minimum of 24"of clearance between the existing Williams facilities and the proposed foreign line.The foreign line will be installed at a uniform depth across the full width of the Williams right of way. Williams may require that all foreign lines be installed under its existing pipelines and related facilities. 7. Williams facilities are electrically protected against corrosion.Each metallic foreign line that enters or crosses Williams right of way must have a test lead installed.In addition,the utility contractor installing the metallic foreign line must excavate and expose one or more of Williams existing pipelines to provide for the installation of test leads by Williams employees.All necessary measures(coatings,electrical bonds,etc.)will be taken to ensure that the proposed pipe or utility is adequately protected from potential interference effects.Requests for cooperative testing will be directed to Williams Division Office,"Attn.:Supervisor,Asset Integrity." 8. Williams may require that foreign lines be identified with permanent aboveground markers where the lines enter and exit the Williams right of way.It is the line owner's responsibility to obtain any rights to install the markers,and to maintain the markers.A direct burial warning tape should be placed 12"to 18"above the foreign line and extend across the entire width of Williams right of way. 9. Foreign lines crossing Williams facilities will be installed in accordance with all applicable codes and requirements governing such installations. 10. Stockpiling brush,trash,or other debris on the right of way is prohibited,as it may conceal pipeline markers and hinder pipeline inspections or routine maintenance. 9 EXCAVATION AND BLASTING 1. Plans for excavation on the right of way require prior approval by Williams.No machine excavation will be performed within 24"of Williams pipelines or related facilities.Williams onsite representative may require hand digging at a distance greater than 24". 2. When a backhoe is used for excavation,the bucket teeth should be curled under each time the bucket is brought back into the ditch to reduce the chance of the teeth contacting the pipeline.Side cutters must be removed from all buckets.At the discretion of Williams onsite representative,a bar may have to be welded across the bucket teeth. 3. No mechanical excavation may be performed by reaching over any Williams facilities. 4. Prior to any plowing or ripping of soil on the right of way,particularly in association with agricultural activities,plans should be reviewed with your local Williams representative to ensure proper cover exists.No vibratory plows are permitted to be used on the Williams right of way. 5. A detailed blasting plan must be submitted for review and written authorization prior to any proposed blasting within 200'(1,500'for surface mining)of Williams pipeline facilities and a Williams representative must be on site during all blasting.In order to provide for necessary and appropriate analysis by Williams,each licensed blasting contractor must also complete and submit a Williams Blasting Data Sheet.The blasting plan and data sheets must be submitted a minimum of ten business days prior to the proposed blasting.Specific requirements applicable to proposed blasting will be provided to the licensed blasting contractor. DISTURBANCE,MAINTENANCE AND VEGETATION 1. No trees are permitted on Williams right of way.Additionally,the canopy of any trees planted adjacent to the right of way must not extend into the right of way at maturity.Any branches extending into the right of way will be side cut by Williams at its discretion. 2. With prior approval from Williams,some types of low growing,shallow-rooted shrubs may be permitted on the right of way provided their maximum mature height will not exceed 5'and are not within 5'of the edge of the pipeline.Williams requires that the mature plantings will not prevent Williams representatives from seeing down the right of way during routine patrols or walking down the right of way directly over the pipelines as they perform required inspections. Under no circumstances will mechanical equipment be used in the planting of shrubs. 3. Williams reserves the right to cut and/or remove plantings as required in the operation,inspection,and maintenance of its pipeline facilities; further,Williams assumes no responsibility for any cost involved in the replacement of said cut and/or removed landscape plantings. 4. All sprinkler or irrigation systems will require review by a Williams representative.Sprinkler heads will not be permitted within 10'of any pipeline or related facility. All crossings of the Williams pipelines or related facilities with feeder lines will be hand dug. EQUIPMENT CROSSING 1. To protect Williams pipelines from external loading,Williams must perform an engineering evaluation to determine the effects of any proposed equipment use.Mats,timber bridges,or other protective materials deemed necessary by Williams will be placed over Williams facilities for the duration of any loading.Protective materials will be purchased,placed,and removed at no cost to Williams.The right of way must be returned to its original condition. 2. Williams may require temporary markings to identify areas where equipment use is authorized. 3. No vibratory equipment is permitted within the limits of,or in close proximity to,the Williams right of way. FENCES 1. A site specific inspection is required to determine whether the proposed fence posts must be kept a minimum of 4'or 5'from the edge of any Williams pipeline or related pipeline facility.A Williams representative must be on site to determine the location of the fence posts within the right of way and for the duration of the digging of the posts.Posts installed within the right of way must be hand dug.All proposed fence crossings over Williams pipelines will cross at an angle of 90°,or as near as reasonably practicable. 2. Williams will have the free right of ingress and egress.Williams may require that new fences have a 12'wide gate installed within the right of way at a location approved by Williams.The gate will be installed as to minimize vehicular and equipment travel over the existing Williams facilities. LOGGING AND TIMBER OPERATIONS 1. Before any logging or timber operations can begin on Company ROW,obtain written approval from the company. 2. Additional requirements may include,but are not limited to,the installation of land ramps,plates,or temporary erosion controls. 3. Refer to Insurance requirement in#4 of the General Requirements above. 10 4. An authorized Company representative must be on site prior to and during any surface disturbing work or equipment crossing performed within the ROW. 5. The encroaching entity must meet with a Company representative at least three days prior to the completion of the project to discuss site restoration. NON-OCCUPANCY STRUCTURE This section details encroachment details on sheds,barns,car ports,retaining walls,storage drums,garages,large debris,old cars,trailers, scrap metal,boulders,satellite dishes,manholes,fire hydrants,etc.Buildings or structures,whether occupied or not,may not be constructed within a Company easement.No above ground structures or appurtenances are to be located within the Company ROW.The structures and appurtenances include,but are not limited to:towers,satellite dishes,manholes,catch basins,utility pedestals,transformers,fire hydrants, utility sheds,playhouses,garages,patios,slabs/foundations,decks,swimming pools with associated improvements,or similar structures.Large debris such as old cars,trailers,scrap metal,boulders,etc.,will not be permitted on the ROW.The ROW must be kept clear for maintenance and inspection. OCCUPANY STRUCTURE This section includes buildings,houses,occupancy trailers/mobile homes,patios,decks,play grounds,play houses,swimming pools, workshops,or similar structures.Occupied aboveground structures are prohibited within Company ROW,in order to provide for adequate maintenance and operation of Company facilities. OVERHEAD CROSSING UTILITY 1. Overhead line crossings will be installed with a minimum of 30'of vertical clearance above the Williams right of way to provide adequate equipment clearance.No poles or appurtenances will be located on the Williams right of way. 2. Overhead line crossings will not be installed within 25'(measured horizontally)of any gas vent(e.g.relief valve,blow down vent). 3. Overhead lines will cross Williams facilities at an angle as near to 90 degrees as possible. 4. In addition to these Williams minimum clearances,all local utility minimum clearances must be adhered to. PARALLEL UTILITY Parallel occupancy on an existing ROW is not allowed unless approved by the Manager,Operations.This includes trenched,bored,and above ground installation of pipelines,cables,conduits,overhead utilities,or fences. ROAD,RAIL,PAVED AND UNPAVED TRANSPORTATION 1. Williams must complete a preliminary engineering evaluation for all roads,streets,driveways,etc.,proposed on Williams right of way.Any pipe casing,concrete slabs,or other protection required by Williams will be installed at no expense to Williams.Williams may require a pipeline inspection prior to construction. 2. The recommended minimum total cover over Williams existing pipelines is 66"at all driveways,highways,roads,streets,etc.The recommended minimum total cover over Williams existing pipelines in adjacent drainage ditches is 48". 3. Vibratory equipment is prohibited within the limits of the Williams right of way.Vibratory equipment is not permitted to be used for achieving applicable compaction requirements. 4. Driveways,highways,roads,streets,etc.crossing over Williams pipeline facilities will cross at an angle as near to 90 degrees as possible.All crossings must be over straight pipe and at locations free of any crossovers.Parallel occupancy of the right of way will not be permitted. 5. Williams will retain the right to cut all present and proposed driveways,highways,roads,streets,etc.and will have no responsibility for restoration,loss of use or access,or any other costs. 6. Access to the earth above each pipeline for leak detection(flame ionization)and cathodic protection surveys must be maintained. SUBSURFACE CROSSING UTILITY 1. Utilities crossing Williams facilities are required to be cased to protect the integrity of the utility and the safety of Williams and third party excavators in the future. 11 2. All buried communications(other than single residential telephone and TV)crossing Williams facilities will be installed in steel casing for the full width of Williams right of way. 3. All buried electric cables(other than 24 volt DC power lines),including single residential service drops,crossing Williams facilities will be installed in steel casing for the full width of Williams right of way. 4. All buried single residential telephone,cable TV,and 24 volt DC power will be encased in schedule 40 PVC casing for the full width of Williams right of way. 5. All fiber optic cable,including single drops,will be installed in steel casing for the full width of Williams right of way. 6. All sanitary sewer and pressurized water lines will be protected with steel casing for the full width of Williams right of way.Gravitational flow systems will be either:(1)ductile iron or steel pipe(adequately protected from Williams cathodic protection system),(2)plastic pipe installed in steel casing,or(3)concrete pipe for the full width of Williams right of way.No piping connections will be allowed within 5'of any Williams pipeline.All ductile iron utility crossings will include restrained joints for the full width of Williams right of way. 7. No septic tanks,liquid disposal systems,or hazardous waste disposal systems will be allowed on Williams right of way or within 25'of Williams facilities.This prohibition includes,but is not limited to,facilities that have the potential of discharging effluent from sewage disposal systems, the discharge of any hydrocarbon substance,the discharge or disposal of any regulated waste,or any other discharge that may prove damaging or corrosive to Williams facilities. 8. All plastic combustible material lines will be installed in steel casing for the full width of Williams right of way. 9. Williams may require that steel combustible material lines(adequately protected from Williams cathodic protection system)be installed under existing Williams pipeline facilities. 10. Williams existing pipeline facilities will be test pitted to verify the horizontal and vertical location of all facilities prior to any proposed boring operations.Once all required test pits have been performed,both plan view and profile drawings will be submitted to Williams.Plan and profile drawings are required for all proposed boring operations. 11. All proposed bores will include the installation of steel casing for the full width of Williams right of way. 12. Prior to any boring,inspection holes will be excavated to verify the depth of the bore as it approaches each pipeline.Inspection holes must be excavated to allow Williams on site representative to visually see the boring head prior to the point where it travels beneath each pipeline.The contractor must provide and maintain instrumentation to accurately locate the boring head. SURFACE WATER 1. Williams may conduct preliminary engineering studies for any proposed drainage channels or ditches that will discharge toward or within the right of way.Drainage channels or ditches must be adequately protected from erosion and provide a minimum of 48"of cover over the pipelines. Altering(clearing,re-grading,or changing alignment of)an existing drainage channel or ditch requires written approval from Williams. 2. Impoundment of water on Williams right of way is not permitted.Soil erosion control measures will not be installed within the Williams right of way without prior written Williams approval. STATEMENT REGARDING RIGHTS 1. Nothing contained herein will be construed to convey,waive,or subordinate any of Williams existing rights whatsoever. 2. Williams will be fully and completely compensated for any damages to its facilities resulting from the acts of third parties who are working in the vicinity of Williams facilities with or without Williams consent. 3. Williams will be indemnified from and against all claims,losses,demands,damages,causes of action,suits,and liability of every type and character,including all expenses of litigation,court costs,and attorney's fees,for injury to or death of any person,or for damage to any property,arising out of or in connection with third party work in the vicinity of Williams facilities. 12 WILLIAMS ENCROACHMENT/FOREIGN LINE CROSSING PERMIT FORM **Must read when using this form:"Williams Requirements for Landowner&Third Party Construction" Permit No. ® WARNING Revision Date One Call Report No. Call before you dig. This Encroachment/Foreign Line Crossing Permit is made and entered into on the date indicated below by and between the encroaching party("PERMITTEE")and("COMPANY"),as set forth below,for the purpose of allowing PERMITTEE to construct or maintain an encroachment and/or foreign line crossing on company's right of way or facilities. Facilities shall include,but are not limited to:fee properties,easements,pipelines,and valve sites. Encroaching Party"PERMITTEE": Company Name"COMPANY": Name: COMPANY Representative: Address: Address: Phone: Phone: Landowner's Name: Division/District: Phone: COLLECT CALLS ACCEPTED ENCROACHMENT/FOREIGN LINE CROSSING LOCATION Line/Tract No Parcel Name/ID Latitude Longitude Section Township Range County/Parish State Alignment Sheet/Map No. milepost Engineering Stations ROWWidth/Config. Type of Encroachment/Foreign Line Crossing 3rd PartyCrossing LandownerActivity New Development Other ENCROACHMENT/FOREIGN LINE CROSSING DESCRIPTION Attach Company's Foreign Line Sketch to this Permit as Exhibit"A"illustrating encroachment or foreign line crossing.If applicable,insert additional conditions not reflected in this Permit as Exhibit"B".Both Exhibits shall become a part hereof.Brief Description of encroachment/foreign line crossing: Does Encroachment or Foreign Line Crossing require excavation or survey per WiISOP O&M Procedure 70.10.01 section 5.1? ❑No ❑Yes If yes,record form WGP-0092 No.or survey information: YOUR LOCAL ONE CALL NUMBER IS If damage to"COMPANY"facilities is a resultof negligence bythe encroaching party's(PERMITTEE'S)fail ureto adhere tothe state"CALL BEFORE YOU DIG"law,"COMPANY"will pursue restitution to the full extent ofthe law. This permitisgranted subjectto the terms,requirements,and conditions shown belowand strictlyin accordance with specifications shown in the"Williams Requirements for Landowner&Third Party Construction",located in 75.01.01,Attachment A. • Itis understood thatthe PERMITTEE will cause the encroachment and/or foreign line facilities located within the right ofway and easement.Should COMPANY remove any crossing at no expense to COMPANY.PERMITTEE agrees to supply COMPANY such encroachments,foreign line crossings or portions thereof,COMPANY will not be plans and drawings,in detail,illustrating the proposed encroachment and/orforeignline liable to PERM ITTEE or its successors or assigns for any damages resulting by reason crossing and COMPANY'S facilities,unless COMPANY elects not to require such of such removal,except for those damages arising out of the sole negligence of plans. COMPANY. • So that"Company"may schedule its personnel and not delay PERMITTEE'S work, • COMPANY will request evidence of general liability and other appropriate and usual PERMITTEE agrees to notify""COMPANY"48-72 hours before any work commences insurance priorto any activity and/or construction on or near COMPANY rights-of-way. onornear its right of wayFacilities. In the event of excavation under COMPANY pipelines,the applicable COMPANY • This permit does not change or modify any provisions of"COMPANY'S existing right- pipeline must be named as additional insured.Any rights of subrogation or recovery of-way contracts or easements,unless such easements are required to be amended will be waived in favor of WGP.The insurance limits,terms and conditions that may as a result of PERM ITTEES encroachment and/orforeign line crossing.PERMITTEE be required will be dependent on the specific facilities potentially impacted and what acknowledges that the granting ofthis Permit may require amendment ofthe existing would be usually and prudently obtained in similar industry situations. right of way contract oreasementto reflects change in land use Orland rights. • This permit shall be revocable in the event of noncompliance of any terms, PERMITTEE requirements,conditions,and specifications ofthis Permit upon written notice given to On this day of_,20 ,I acknowledge that I have received, PERMITTEE and/or current owner ofrecord. and reviewed with a"COMPANY"representative,the requirements,conditions and • PERMITTEE agrees to save harmless COMPANY,its officers,agents,employees and specifications ofthis Permit.I also understand the provision and prescribed penalties its subcontractors and theirofficers,agents and employees from any and all claims for as provided under the law regarding excavation. damages,injury or death resulting from the continuation and maintenance of said By: encroachment and/or foreign line crossing.A COMPANY representative must be Title: present during all construction activities that may impact the pipeline facilities. PERMITTEE shall be Iiableforall costs incurred foranydamages. COMPANY • PERMITTEE agrees that COMPANY may remove any encroachment and/or foreign By: line crossing,or portion thereof,if in COMPANY'S judgment it is reasonably necessary to do so in order to construct,alter,maintain,repair or replace gas transmission Title: W GP O151 12/2012 Williams Proprietary Information•For Internal Williams Use Only Page 1 of 1 13 Pipelines and Informed Planning Alliance The Pipeline & Hazardous Material Safety Administration (PHMSA) initiated the Pipelines and Informed Planning Alliance (PIPA)to help communities make risk- MFirrlin,,nand' informed decisions for land use planning and development adjacent to In rmed Planning transmission pipelines. Allian€e One way to protect communities and reduce transmission pipeline risks is for developers to be aware of transmission pipeline locations and risks when making decisions regarding development within 1,000 feet of pipelines. It is important that his dialogue between developers and pipeline operators occurs early in the planning process while changes can more easily be made. PIPA has developed recommended practices for protecting communities, protecting transmission pipelines, and communicating among stakeholders. You can access PIPA's recommended practices at http://primis.phmsa.dot.gov/comm/pipa/landuseplanning.htm. Sample of PIPA New Development Recommended Practices DEVELOPMENT/LOCAL PROPERTY TRANSMISSION NO. TITLE AND PRACTICE STATEMENT GOVERNMENT OWNER OPERATOR ND02 Gather Information for Design of Property Development near Yes Yes Transmission Pipelines In designing a proposed property development the property developer/ owner should use all reasonable means to obtain information about transmission pipeline facilities in the area of the proposed development. ND03 Review Acceptability of Proposed Land Use of Transmission Pipeline Yes Right of Way Prior to Design The property developer/owner should review preliminary information about acceptable land uses on a transmission pipeline right of way prior to the design of a property development. ND04 Coordinate Property Development Design and Construction with Yes Yes Transmission Pipeline Operator When property development is planned within the consultation zone (reference PIPA Recommended Practice BL05),the property developer/ owner and the transmission pipeline operator should communicate to ensure possible impacts of pipeline incidents and maintenance needs are considered during development design and construction. ND08 Collaborate on Alternate Use and Development of Transmission Yes Yes Yes Pipeline Right of Way Property developers/owners, local governments and transmission pipeline operators may collaborate on alternative use of the transmission pipeline right of way and related maintenance. ND17 Reduce Transmission Pipeline Risk in New Development for Yes Yes Residential,Mixed-Use,and Commercial Land Use New development within a transmission pipeline planning area (see PIPA Recommended Practice BL06)should be designed and buildings located to reduce the consequences that could result from a transmission pipeline incident and to provide adequate access to the pipeline for operations and maintenance. ND18 Consider Transmission Pipeline Operation Noise and Odor in Design Yes Yes Yes and Location of Residential,Mixed-Use,and Commercial Land Use Development 14 Remember, Call Before You Dig. A new, federally-mandated national "Call Before You Dig" number, 811, was created to help protect you from unintentionally hitting underground utility lines while working on digging projects. If you plan to dig or do any type of excavation, be sure to dial 811 at least three business days before you begin. Calling 811 before every digging job gets your underground utility lines marked for free. Know what's below. Call before you dig. One free, easy call gets your utility lines marked AND helps protect you from injury and expense. How 811 Works One easy phone call to 811 starts the process to get your underground utility lines marked for free. When you call 811 from anywhere in the country, your call will be routed to your local One Call Center. Local One Call Center operators will ask you for the location of your digging job and route your call to affected utility companies. Your utility companies will then send a professional locator to your location to mark your lines within a few days. Once your underground lines have been marked, you will know the approximate location of your utility lines and can dig safely. What Are the Signs of a Natural Gas Pipeline Leak? What Should I Do if I Suspect a Pipeline Leak? • Blowing or hissing sound Your personal safety should be your first concern: • Dust blowing from a hole in the ground Evacuate the area and try to prevent • Continuous bubbling in wet or flooded areas anyone from entering. • Gaseous or hydrocarbon odor 0 Abandon any equipment being used in or • Dead or discolored vegetation in an otherwise near the area. green area 0 Avoid introducing any sources of ignition • Flames, if the leak has ignited to the area. • Call 911 or contact local fire or law enforcement. • Notify the pipeline company. • Do not attempt to extinguish a natural gas fire, and do not attempt to operate valves. 02018 The Williams Companies,Inc.All rights reserved. 0115/04373