CC - West Ada District Facilities Plan West Ada School District
School Facility Plan
2016 - 2028
VICTORY MIDDLE SCHOOL -
HILLSDALE Qp��
�tiST Ad � I
VA
19501
ti
�����L DIS`�4 �
Table of Contents
BondHistory .............................................................................................................................................3
EnrollmentTrends.....................................................................................................................................4
Enrollment Projections Methodology.....................................................................................................6
Elementary School Enrollment Projections...........................................................................................8
Middle School Enrollment Projections...................................................................................................9
High School Enrollment Projections.....................................................................................................10
BondTimeline..........................................................................................................................................12
PlantFacility Levy.....................................................................................................................................13
PlantFacility Budgeting...........................................................................................................................14
Plant Facility Capital Projects..................................................................................................................17
Appendix...................................................................................................................................................18
x ..
4 f
4 �
Christine Donnell School of the Arts
2
Bond Issues
December 1957 May 1978
Amount: $805,000 Amount:$12,000,000
Percentage:73.80% Percentage: 71.18%
Projects: -- Projects:
Mary McPherson Eagle Hills Elementary
Meridian Elementary Linder Elementary
Eagle Elementary Silver Sage Elementary
Ustick Elementary Frontier Elementary
Lake Hazel Middle
May 1959
Amount: $807,655 November 1982
Percentage:69.40% Amount:$9,000,000
Projects: Percentage: 65.38
Meridian High School Projects: Failed
Additions to Eagle Jr. High
Remodel of Jr.High October 1983
Amount:$9,750,000
May 1971 Percentage: 54.46%
Amount: $1,885,000 Projects: Failed
Percentage:84.16%
Projects: May 1985
Lowell Scott Middle School Amount:$7,500,000
Gateway Elementary Percentage: 68.59%
Addition to Mary McPherson Projects:
Centennial High
November 1973
Amount: $3,235,349
Percentage:73.47%
Projects:
Meridian High -
1- CENTENNIAL-NIGH SCHOOL _
October 1975 _
Amount: $4,500,000
Percentage:68.87%
Projects I
Star Elementary
Christine Donnell Elementary Centennial High
Summerwind Elementary December 1988
Addition to Meridian High Amount:$6,860,000
117 Percentage: 54.99%
Projects: Failed
---Z October 1990
Amount:$11,885,000
- -_--—- Percentage: 68.07%
Projects:
Chief Joseph Elementary
Pioneer Elementary
R Four elementary additions
Summerwind Elementary
3
Bond Issues
September 1993 September 2002
Amount: $32,300,000 Amount:$57,200,000
Percentage: 71.56% Percentage:83.37%
Projects: Projects:
Eagle High Sawtooth Middle
Eagle Middle Discovery Elementary
Hunter Elementary
March 1995 µw Meridian Academy Classroom
Amount: $27,400,000 Andrus Elementary Building
Percentage: 53.18% Centennial High Auditorium
Projects: Failed Site Acquisition
September 1995 September 2005
Amount: $14,700,000 Amount:$139,800,000
Percentage:64.52% Percentage:72.22%
Projects: Failed Projects:
Rocky Mountain High
May 1996 Heritage Middle
Amount: $20,900,000 Pathways Middle
Percentage:73.77% Galileo K-8
Projects: Prospect Elementary
Seven Oaks Elementary Desert Sage Elementary
Chaparral Elementary Paramount Elementary
Spalding Elementary Siena Elementary
Cecil D.Andrus Elementary Site Acquisition
September 1998 August 2015
Amount: $26,995,000 Amount:$104,000,000
Percentage:82.45% Percentage: 62.78%
Projects: Projects: Failed
River Valley Elementary
Peregrine Elementary March 2015
Lewis&Clark Middle Amount:$96,000,000
Percentage:71.64%
Projects:
September 2000 Victory Middle
Amount: $45,300,000 Star Middle
Percentage:87.06% Hillsdale Elementary
Projects: Meridian High Exansion
Mountain View High
Ponderosa Elementary Total: $454,913,004
Technology Updates
Site Acquisition
4'
4 - ..
Enrollment Trends
Student Enrollment
39,000 38,212
38,000 37,337
37,000 36,487
36,111
36,000 35,645
35,086
35,000 34,582
34,125
34,000 33,449
33,000
32,000
31,000
08-09 09-10 10-11 11-12 12-13 13-14 14-15 15-16 16-17
West Ada
School Enrollment and Capacity
2016-2017
Enroll Cap Enroll Cap
Barbara Morgan STEM Academy 448 450 Siena Elementary 619 800
Cecil D Andrus Elementary 658 650 Silver Sage Elementary 354 405
Chaparral Elementary School 524 650 Star Elementary 475 420
Chief Joseph School of the Arts 565 650 Summerwind STEM Academy 430 481
Christine Donnell Elementary 553 559 Ustick Elementary 440 545
Desert Sage Elementary 637 650 Willow Creek Elementary 561 650
Discovery Elementary 586 650 Crossroads Middle 151 160
Eagle Elementary 442 450 Eagle Middle 1276 1000
Eagle Hills Elementary 563 545 Heritage Middle 1277 1000
Spalding STEM Academy 766 770 Lake Hazel Middle 890 1000
Frontier Elementary 370 548 Lewis and Clark Middle 1131 1000
Galileo STEM Academy 779 800 Lowell Scott Middle 1035 1000
Gateway Elementary 340 531 Meridian Middle 1024 1250
Hillsdale Elementary 542 650 Pathways Middle 129 150
Hunter Elementary 757 650 Sawtooth Middle 1063 1000
Joplin Elementary 389 489 Victory Middle 791 1000
Lake Hazel Elementary 439 539 Centennial High 1824 1900
Mary McPherson Elementary 460 566 Central Academy 159 175
Meridian Elementary 450 586 Eagle Academy 151 175
Paramount Elementary 583 650 Eagle High 1921 1800
Pepper Ridge Elementary 611 650 Idaho Fine Arts Academy 189 190
Peregrine Elementary 531 650 Meridian Academy 163 175
Pioneer School of the Arts 692 700 Meridian High 1651 2400
Ponderosa Elementary 611 650 Mountain View High 2298 1800
Prospect Elementary 744 650 Renaissance High 751 800
River Valley Elementary 474 650 Rocky Mountain High 2330 1800
Seven Oaks Elementary 417 650 Total 38014 39709
5
Enrollment Projections
Methodology
Forecasting enrollment requires taking several factors into consideration:
• Current enrollment by school level
• School capacities
• Historic rates of enrollment increase
• Mapping of proposed subdivisions
• Calculating enrollment increases based on proposed subdivisions
• Evaluation of COMPASS residential construction estimates
• Estimation of the timeframe of new construction
The forecasting model used for this facility plan began with current enrollment by school. West Ada has a variety
of school capacity levels,with Silver Sage being the smallest(capacity 405) and Meridian High School being the largest
(capacity 2400).
As a result of a fairly uniform building design at the Preliminary Residential Plats
elementary level,many of these schools have a similar capacity
of 650 students. The same is true at the middle school level,
where starting in the 1995 with the opening of Eagle Middle 015
School,West Ada has continued to build the same facility to
° 125
serve middle school students. Lewis&Clark Middle,Saw- zu
tooth Middle,Heritage Middle,and Victory Middle utilize the 823
same floor plan,which provides enough classroom space for Y
1,000 students. 69 �°s� z3 �^ 201 237
At the high school level,the building designs are 598 1�
less uniform,but nevertheless the high school capacities are 533
428 ,063
similar,with Eagle High,Mountain View,and Rocky Moun- zza '°
tain designed to serve 1800 students. Centennial High has a 5 141 44° °,44 193 12 b
slightly larger capacity of 1900. 1,9
53° 95 ME 173
Projecting future enrollment utilizes approved prelim- °
inary residential plat data,census data on students per house- 1 51 z319
hold,and also considers historic enrollment increase trends. 105� 107 5
The preliminary residential plats are mapped across the district
336
using ArcGIS,a geodatabase software. The individual plats
are then queried to calculate the number of future residential 2 9 31-
dwellings by geographic area. Using the 2010 U.S.census data, 77
the number of future homes is used to calculate future enroll-
5
ment by attendance area(elementary,middle,and high). This q Q n
data was incorporated into a worksheet with formulas that can
then calculate future enrollment by attendance area. 3g
These calculations were compared to Community
Planning Association of Southwest Idaho (COMPASS) growth
data and historic data. COMPASS is an area-wide planning agency that largely forecasts for city and road planning pur-
poses. On a district-wide basis,the COMPASS data would predict that enrollment would increase by 1400 students,on av-
erage,per year for the next 10 years. This,however,is 400 students above the the school district's rate of student enrollment
increase. All of these students,of course,will not enroll in West Ada schools,instead electing to enroll in charter or private
schools or to elect to home school. The comparison between COMPASS and the district's historic enrollment increase
provides some confidence that calculating on average increase of 1,000 students per year is a reasonable estimate.
Calculating Future Enrollment
Current Enrollment+ (#plats X.8 students per household)/13 grades
= new students per grade by geographic area
@1,000 New Students Per Year Across All Grades
6
Enrollment Projections
Methodology
_ COMPASS
i � it ..r'.st AN-t School l��strict'.20t6-2019
Residential Growth +SWSE
wE
2016-2019 Projections
5
COMPASS data would predict enrollment
increases of 1400 students per year, on
average over the next 10 years.
$, West Ada's 20 year annual average increase is 927 stu-
dents per year.
The average over the last 10 years is 665
students per year.
Each map graphically displays where COMPASS
New Resltlential°nits « anticipates residential growth, starting with the period
between 2016-2019 and concluding with the period
'mil U 1 2 C 0 M P A S,S� ending in 2026.
Mlles
Projected Growth b Number of Units in West Ada School District:2016-2021 Pro'ected GrowthbNumber of Units In West Ada School District:2016-2026
Residential Growth Residential Growth
2016-2021 2016-2026
slew
F fax
` t _F ,.. New Resitlentiat Units
New Residentlal Units 7— oYEAR aw t
n zs „
zs
zs-so
10
211-s00 ��t 0 1 2, C 0 M PASS 25t-5a0 hl 1 2
' sot-teas N C O M P A S S
Miles ®�•• Mlles ®•��•••••�•='""•�
7
Elementary School
Enrollment Projections
Because of the many choices families make
regarding where to attend elementary school, 11/18/2016 Predicted Elementary Attendance
projecting elementary
^enrollment by individ- A 0 E D E F G t , K L
aul school proved difficult. 1 53 179 0 ° 403 0 O 85 0 266
In an attempt to better inform elemen-
t 0 0 0 30
tary projections,projections were combined 28 103 70 14 269 44FlaatinB Faatker
by regions:
3 268 351 12 326 0 92 143 1370 230 263
stain st.
• North Elementary:North of Chinden — Multirflier
4 93 253 O 0 32 218 0 r. 394 0 x co ki ea 1
• South Elementary: South of I-84 aofaaaeg 6
• Mid-East Elementary: Between I-84 and 5 0 0 0 0 6 202 133 102 131 64 0 96
cmnaen
Chinden and east of Eagle Road ' °6 1 5 552 233
221 163 McMillan
• Mid-West: Between I-84 and Chinden and 8
7 74 271 42 515 495 581 243 348
west of Eagle Road. 326 Y•tl=k
178 4 119
By 2028, 216 elementary enrollment will have 8 0 139 222 w 422 250 22'
291 Faimew
increased by 4090 students. However,because 8 145 44
277
9 58 26 303 231 233 184
0 52 Franklyn
of under-enrolled schools in the mid-east 78 122
10 4 124 45 279 6 127
area of the district,there is the opportunity to 0 0 0—,I.na
decrease the need for new schools by just over 11 15 30 83 100
Vlc
700 students. Because of the underenrollment 19 ,z 284
12 9 107 a
231 225 0 nmLry
in the Mid-East area of the district, enrollment
will exceed total elementary capacity by 3342. 13 6 25 " 21
Lab xaal Lake Hazel
Utilizing the capacity in the underenrolled 14 0 4 25
schools is a challenge West Ada will have to 15 qq W P Y o mba
address. xnkkam xa 3 ° i
u
10000
9000
8000
7000
6000
5000
4000
3000
2000
Jan-16 Jan-17 Jan-18 Jan-19 Jan-20 Jan-21 Jan-22 Jan-23 Jan-24 Jan-25 Jan-26 Jan-27 Jan-28
--*---South Elementary MID-WEST elementary MID-EAST elementary North Elementary
8
Middle School
Enrollment Projections
By 2028, middle school student enrollment is
Predicted Middle Schoo]Attendance
projected to exceed capacity by 2798 students.
Including the addition of Star Middle School
in the fall of 2018,without further new
schools, enrollment will exceed middle school 3 ..t.
State
capacity by 30%. If the attendance areas were 4
drawn to create completely equal enrollment, 5 b ne a
the schools with a capacity of 1,000 would 6 2 5 275 ,69747371*72410
,87 226 ,88 90 66 M Mllae
have enrollment Of 1302. 1 O 37 7O7 25 325 ,96 209 ,64
44 O O O 73 67 ,47 ,72 2864
` 44 130 120 125 ra�r�eew
To provide capacity for the increase in enroll- 9 36 6 201 129 133 92 22 * 102 r.aenba
ment,three new middle schools will need to 10 0 2 62 25 „2 O 90 25 64
_ - ,9 42
be constructed by 2028. At today's cost ($30 11 250 6 44 149 97092 89 92 o eaaea
million) the total cost will be$90 million at 6 ,3 9 ,5 50
12 6 56
204 pm.
the middle school level. 3 12 5 2 9 4 29 96 M.
2 2
52
1a I 7 I , 7 67 25
Columbia
� _ J & d �397
talc. Ca acit Balanced
1727 1276 1000 0727s 1302 a«
Heriti 1260 1277 1000 111 1112
Lake Ha 1209 890 3000 209 1302
Lewis&Clark 1246 1131 1000 246 1302
Lo 11 Scott 1025 1035 1000 25 1302
1468 1024 1250 218 1628
Sawtooth 1287 1063 1000 287 1302
1776 1000 776 1302
1030 791 1000 30 1302
12048 6 7 9250 12049
11/15/2016 Middle School Growth
1800
1700
1600
1500
1400
1300
1200
1100
1000
900
800
Jan-16 Jan-17 Jan-18 Jan-19 Jan-20 Jan-21 Jan-22 Jan-23 Jan-24 Jan-25 Jan-26 Jan-27 Jan-28
--*---Eagle tHeritage (Lake Hazel --X—Lewis&Clark --I—Lowe]I Scott
tMeridian Sawtooth —Star(Open 2018)—Victory
9
High School
Enrollment Projections
By 2028,high school enrollment will exceed current 11,18,2016 Predicted HS attendance
A B C D E F G H I I ) K L
capacity among major high schools by 4389 students 1 55 O O 0 161 250 O O O O O 178
(57%). e
2 0 449 O 203 1 0 28 6ks O 296 O „
76 6
If the schools'enrollments were perfectly balanced 3 17 163 58 *0 350 1 O9; 187 136
as a percentage of capacity,the schools would have 4 0 ,3, 0 13 0 374 0 257 °
the following enrollments: 5 51 32 ° 5 151 '29 90 26 67 0 45 cn,nden
CHS-2760 6 W 12 3 —2 A410 217 329 260 135 94
EHS-2614 , 0 49 13 312 291 384 ,9O 226 256 253 ra.raU.�llan
MHS- 3486 111 83 n�k
ft O O O 95 216 ,39 91
MVHS-2614 62 190 224 Fairview
RMHS -2614 � w 54 9 231 142 ,04 ,08
,61 Franklin
to ° B 83 21 128 O 25 44 57
5 0 0 2 O 27 39 Overlana
These numbers are calculated by subtracting the 227 11 2189 59 ,ss 234 123 t y
Eagle 11- 215
Meri 3412 16 40 1.
students who,on average,attend one of West Adas 12 Mt.V; 2892 ° 84 254 283 100
other high school programs (IFAA,Renaissance, Rocky 29�6
1:t 13 3 ,5 t92Meridian Academy,etc). 14 10 ° v -E15 -Based on current preliminary plats,the largest A80D G l H I O I N K L
TOTAL 15,224 - 227•5
enrollment increase will occur in the Eagle High School Cap-� Calc -227, -16 Rala—d Ss[udena 1
Centennial 1,900 2,189 1,962 1,824 2,760 completed 1
attendance area,followed by Meridian High. The Ea81, 1,800 3J55 3,52R Z330 Z614 pofc1-- 4
Meridian 2.400 3,412 3,185 1,651 3,486
Mtn.View 1,8o0 2,892 2,665 2,298 2,614
smallest increase in enrollment willoccur in the RockyM n. 1,8o0 2,976 2,7491 2,330 2,614
%700 15,224 14,089 10,433 14,089
Centennial High attendance area. Over Capacity 57% 45.2%
11/15/2016 High School Growth
4000
3500
3000
2500
2000
r � �
1500
Sep-16 Sep-17 Sep-18 Sep-19 Sep-20 Sep-21 Sep-22 Sep-23 Sep-24 Sep-25 Sep-26 Sep-27 Sep-28
Centenial 1900 Eagle 1800 Meridian 2400 Mt. View 1800 Rocky 1800
10
Enrollment Projections
Percentage of Students Over Capacity
% under or over capacity in 2016 and 2028
School Capacity Capacity
in 2016 in 2028
High School
4389 students
Centennial -0.6% 3.4% Over Capacity
Eagle 6.1% 96.0%
Meridian -13.3% 43.6% If West Ada opens two
Mt. View 17.4% 48.1% high schools by 2028,the
seven large high schools
Rocky 23.9% 52.7% will be,
on average, 112 students
over capacity
Middle School
Eagle 57.1% 72.7% - - - - -Heritage 3 2.0% 2 8.0% 2798 students
Lake Hazel -4.1% 20.9% Over Capacity
Lewis & Clark 15.6% 24.6%
Lowell Scott 1.9% 2.5% West Ada will need to
build three middle schools
Meridian -4.2% 21.8% by 2028
Sawtooth 17.9% 28.7%
Star (Open 2018) -22.1% _ 77.6%
Victory -21.0% 3.0%
Elementary School
3342 Students
[South Elementary -2.2% 18.8% Over Capacity
MID- WEST elementary -8.7% 17.9%
West Ada will require one
MID-EAST elementary -23.3% -20.7% new elementary in the
North Elementary -23.4% 59.0% south;two in the mid-
west; and two new
elementary schools in the
North
11
Bond Timelines
Opening Date Project Bond Date
Fall 2020 High School 2018
Middle School
2024 Elementary School South - 2022
Elementary School Mid-West
Elementary School North
2025 Middle School 2023
2026 High School 2024
Middle School
Elementary School North
2028 Elementary School Mid West 2026
Projected growth data was used to estimate the timing of future school needs. The estimates were made
based on when, in total, enrollment exceeds capacity at each set of grade levels by the number of students to fill
a new school. For example, in fall 2020,projections estimate that there will be 1852 more high school students
than capacity in the district's current large high schools. The challenge with this timing is the enrollment num-
bers in some geographic areas will create significant challenges. For example,in the fall of 2020, Eagle High
could have enrollment of 2444 students with a capacity of 1800. Whether these enrollment numbers materialize
depends on the rate of construction and sale of proposed residential subdivisions across the district.
11/27/2016 Growth Summary with 12 yr build
Cap I Current I Predicted enrollment
Sep-16 Sep-17 Sep-18 Sep-19 Sep-20 Sep-21 Sep-22 Sep-23 Sep-24 Sep-25 Sep-26 Sep-27 Sep-28
High School
Centenial 1900 1888 1893 1899 1907 1913 1918 1923 1931 1937 1942 1947 1954 1962
Eagle 1800 1909 2042 2176 2309 2444 2576 2710 2845 2980 3111 3246 3378 3528
Meridian 2400 2160 2243 2329 2412 2498 2584 2668 2752 2834 2918 3004 3086 3185
Mt.View 1800 2114 2160 2206 2251 2294 2341 2387 2432 2477 2524 2568 2613 2665
Rocky 1800 2230 2274 2316 2360 2403 2446 2490 2530 2573 2615 2658 2703 2749
TOTAL 9700 10301 10612 10926 11239 11552 11865 12178 12490 12801 13110 13423 13734 14089
Excess 601 912 1226 1539 1852 2165 2478 2790 3101 3410 3723 4034 4389
Middle School
Eagle 1000 1571 1671 1270 1316 1361 1405 1450 1494 1540 1585 1631 1676 1727
Heritage 1000 1320 1343 1159 1172 1184 1196 1207 1219 1232 1242 1254 1266 1280
Lake Hazel 10001 959 9791 1000 10221 1041 10621 1083 11031 1125 11461 1165 11851 1209
Lewis&Clark 1000 1156 1162 1171 1178 1186 1192 1200 1207 1214 1223 1231 1238 1246
Lowell Scott 1000 1019 1019 1020 1021 1021 1022 1022 1022 1023 1024 1024 1025 1025
Meridian 1250 1208 1262 1242 1265 1287 1310 1333 1354 1377 1399 1420 1444 1468
Sawtooth 1000 1179 1188 1196 1206 1215 1223 1232 1240 1251 1260 1268 1277 1287
Star(Open 2018) 1000 0 0 779 878 975 1075 1173 1271 1369 1468 1566 1665 1776
Victory 1000 790 810 830 851 870 890 909 928 948 968 987 1008 1030
TOTAL 92501 9202 9434 9667 9909 10140 10375 10609 10838 11079 11315 11546 11784 12048
Excess -48 184 417 659 890 1125 1359 1588 1829 2065 2296 2534 2798
Elementary School
South Elementary 4860 4752 4836 4922 5006 5090 5174 5259 5342 5426 5514 5596 5680 5774
MID-WEST elementary 8035 7337 7511 7689 7865 8044 8216 8390 8569 8745 8919 9097 9274 9471
MID-EAST elementary 3611 2771 2779 2786 2794 28011 28091 2816 2825 28321 28391 2848 2854 2863
North Elementary 2950 2261 2460 2661 2862 3062 3264 3463 3666 3867 4066 4265 4465 4690
TOTAL 19456 17121 17586 18058 18527 18997 19463 19928 20402 20870 21338 21806 22273 22798
Excess -2335 -1870 -1398 -929 -459 71 472 946 1414 1BB21 2350 2817 3342
12
Plant Facility
Levy
The plant facility levy is a voter-approved levy that generates revenue that is allowed to be used for capital projects,
building maintenance,site acquisition,and capital purchases. West Ada School District has received plant levy authority
from its voters since 1972. The levy was reauthorized in 1982, 1990, 1998,and 2007. The voter authority granted in 2007
expires after the 2016-2017 school year.
Unlike a supplemental levy,which sets a fixed amount that a school district can levy,a plant levy sets an amount up to
which a district can levy. The 2007 election provided West Ada School District the authori-
ty to levy up to$20 million per year for capital projects.
With a proposed
Over the last 10 years,the district has levied,on average,$15,096,480 in plant levy revenue. plant levy of up to
This does not count the 2010-2011 school year when the district levied$2,394,214 to pre- $16 million per year
vent an increase in the school district's levy rate during the height of the recession.
and the current total
Unlike other taxing districts,an increase in the market value does not increase the amount property value, the
of revenue received by the district. Instead,the cost per$100,000 of taxable value decreas- levy rate will decrease
es. For example,West Ada levied$20 million in plant revenue for the 2014-2015 school $23 per $100,000
year,resulting in a levy rate of$142.50 per$100,000 of taxable property value. This school
year West Ada also levied$20 million in plant levy revenue,but because the total taxable of taxable property
property value has increased by$2.8 billion,the resulting levy rate is now$118.80 per value.
$100,000.
Parents and community members have consistenly given West Ada Schools high marks for how well the school district's
schools are maintained. However,survey results also indicate that maintaining schools is also a priority for parents. In
the verbatim responses this desire for quality schools is reflected in comments from parents about specific areas of school
that need to be repaired or improved. This data is used to help direct plant facility project planning.
2014 2015 2016
100% 96% 0 100% 96% 92% 100% 96% o
91/ 89/0
80% 80% 80%
60% 60% 60%
40% 40% 40%
20% 20% 20%
0% 0% 0%
The district's The district's The district's The district's The district's The district's
schools are clean schools are well schools are clean schools are well schools are clean schools are well
maintained maintained maintained
Percent"Strongly Agree"and"Agree" Percent"Strongly Agree"and"Agree" Percent"Strongly Agree"and"Agree"
13
Plant Facility
Expenditures
Over the last decade,West Ada has used plant facility revenue to repair roofs,carpet and paint schools,construct new
school space,and make capital improvments. Some of the major projects over the last 10 years include the following:
• Construction of Renaissance High School
Provided 800 additional high school seats,helping relieve Standard Maintenance Replacement Schedule:
overcrowding at the district's large high schools
• Construction of Willow Creek Elementary Roof Replacement 10r cycle
Provided relief for Paramount Elementary,which had Carpet Replacement 10 year ear cycle
student enrollment over 800 in a building constructed for Painting 7year cycle
650 students Blacktop Replacement 25-30year cycle
• Construction of Pathways Middle School Seal Coat 10 year cycle
After 10 years,provides a classroom building for a school that had,since its
inception in 2006,been operated in a collection of 10 portable buildings
• Remodel of Meridian High School
Expanded the school's capacity by 300 seats,improved electrical and HVAC systems,
created classrooms that follow the district's standard size configuration(900 square feet),and updated systems to
meet the educational needs of the 21st century
Maintenance projects typically consume the majority of plant levy revenue as budgeted in the 2016-2017 school year.
Capital Outlay 2016-17 Capital Outlay Plant Levy History
■Equipment Equipment 1,725,664
15% Technology 3,525,000 year Levy Rate/Amount
■Technology Maintenance 11,749,336
Major Construct 7,000,000
■Maintenance Total 24,000,000 2016-17 1.18838262
is ■Ma;or $20,000,000
Construction/Sites
2015-16 1.316941
$20,000,000
2014-15 1.425011
Maintenance $20,000,000
2013-14 1.597974
for 24% ■Roofing $19,236,806
19% ■Painting 2012-13 1.226563
■Floors&Ceilings
_ ■Blacktop $13,022,953
21% 7 ■Electrical 2011-12 0.927545
- ■Minor Building Improvements
■District Maintenance $9,608,565
2010-11 0.214829
$2,394,214
Maintenance 2009-10 1.061656
Roofing 2,861,200 $14,000,000
Painting 1,357,427 2008-09 1.309623
Floors&Ceilings 809,393
Blacktop 2,484,100 $20,000,000
Electrical 848,363 2007-08 0.725533
Minor Building Improvements 2,211,438
District Maintenance 1,177,415 $11,000,000
Total 11,749,336
14
Plant Facility
Budgeting
On an annual basis,West Ada solicits and receives school maintenance,construction,and capital improve-
ment requests from the distict's school administrators and from vaious departments including curriculum,technology,
and maintenance. These requests are analyzed and prioritized in a series of categories based on the most pressing
needs and the estimated costs. Following are the plant facility categories in a typical budget year:
• Paint
Examples include applying external sealer and interior and exterior painting.
• Blacktop
Examples include fixing damaged sidewalks,repairing and replacing failing parking lots,replacing tennis
courts,and fixing running tracks.
• Floors and Ceilings
These projects include replacing floor tiles and worn-out carpet,re-finishing gym floors,and fixing
ceiling tiles.
• Mechanical systems
The district maintains a variety of cooling and heating
systems depending on the age of the building. Projects
include replacing furnaces,heat pumps,exhaust fans,
and HVAC units.
• Roofing
School roofs are analyzed and replaced on a 20-25
year cycle. A new elementary school roof costs
approximately$700,000.
• Minor building improvements
Examples of these projects include fixing and and re
placing broken of worn out windows,sinks,toilets,
wallpaper,gymnasium equipment,drinking fountains,
door locks and hardware.
• Electrical
These projects generally update older electrical systems
either to increase their capacity or to improve safety. Interior painting at Pepper Ridge Elementary
• Plumbing
These repairs include repairing sewer lines and water lines,
replacing fixtures,replacing water heaters,and completing other plumbing repairs.
• Irrigation/Playground
Playgrounds and school fields often require fence repairs,equipment repairs or replacement,tree removal, and
installation of gates to the grounds for public access.
77
_Z'
Replacement of track at Mountain View High School Christine Donnell Elementary
Re-roof Project
15
Plant Facility
Budgeting
• District Projects
District plant levy projects are usually either to acquire property to
build future schools or large capital projects. For example,Willow ?_
Creek Elementary was built over a three year period using plant
levy revenue to meet the demands of overcrowding.
• Technology
Examples of technology requests include district network-wide
equipment in addition to upgrades to school computer labs or
school-level equipment needed for the district's computer network.
• Custodian 4
Custodial requests include large-scale cleaning equipment
including floor scrubbers,backpack vacuum clean
ers,pressure washer and other devices needed to
keep schools clean.
• Grounds
Grounds requests include mowers,irrigation
equipment,vehicles,and equipment for fertilizing
grounds.
• Curriculum
Curriculum purchases are typically for educational
materials used in classrooms across the district.
• Career Technical Education
Spending from the plant levy for career technical
programs is often for the remodel or development
of classroom space to offer a career technical
program. For example,the program requested
funding to develop a diesel mechanic Eagle High School Exterior Paint
program at the Ada Professional Technical programs housed at
Meridian High.
• Miscellaneous
Examples of uncategorized projects include replacement of portable buildings,installation of bike racks,
enclosure of elementary libraries in existing buildings,purchase of white boards,installation of new lockers,
or replacement of safety and lab equipment.
Pathways Middle School opened
in 2006 in a collection of 10
portables. The portables have
served about 1500 students since
its inception. Groundbreaking
on a permanent facility was in
November 2016. The 25,000
PATHWAYS ID LE SCHOOL
square foot school building will
_ open in the fall of 2017. The
�� ��. project's cost,which was funded
by the Plant Facility Levy, is $6.2
-� million.
16
Capital Projects
2017-2027
West Ada School District maintains 4,418,769 square feet of building space in 56 facilities. Maintaining these facil-
lities over the next ten years will require a similar investment of as has been made over the last ten years.
Since 2007 the district has average just over$15 million in Plant Facility Revenue. Based on that experience,with
the addition of 10 new schools by 2028,a Plant Facility Levy with authority up to$16 million per year should be adequate
to maintain the communities$454,913,004 investmenent in the current schools. In addition to ongoing maintenance,the
Plant Levy would allow West Ada to make improvements to existing facilities to bring them up to 21st Century standards
of educational environment. Some of the following potential capital projects could be funded in part by the Plant Facility
Levy,while others might become part of future bond measures:
Site Acquisition for Future Schools
West Ada School District currently owns five elementary sites. To prevent
development costs for land,purchasing property in advance of development
saves the district-and its taxpayers-on the cost per acre. To stay ahead of
development,West Ada will need to purchase at lease one additional site north
of Chinden and another site south of 1-84. Because a square mile and a half of
residential development at 3.5 homes per acre generates enough elementary Stu-
dents to fill an elementary school with a capacity of 650 students,additional site
will also need to be acquired in North Meridian. Fortunately,these sites,which
are 8 to 10 acres in size may be donated by the development community.
Secondary sites,however,are more difficult to acquire v /
by donation. A typical middle school site is 28 - 30
acres;a high school site is approximately 55 acres.
Over the next ten years West Ada will need to add -
three high school sites and three middle school sites to
its inventory in order to meet the need for schools in '
the future. r
1 /
Current Sites for Future Schools ►_
(see appendix)
Elementary Sites
Birchstone Creek(Linden Park) -NW corner of Black-
cat Rd. &Ustick Rd.
Cedar Springs(Brookside) -N.Venable Lane (Venable
&Ustick)
Keego Springs (Pleasant View) -Blackcat Rd. &Chin-
den Blvd. Enclosing the open libraries at Silver Sage,Barbara Morgan,and
New Hope Elem Site-New Hope&Star Chief Joseph Elementary schools has created a improved learning
Southridge Sub (Blue Valley) - Overland Rd. &Linder environment for students.
Rd.
Other schools built during that same time period with similar
Secondary Sites designs-Joplin,Christine Donnell,and Eagle Hills-would
Chinden Middle Site-Chinden Rd. &Black Cat Rd. benefit from similar remodels.
Hill Middle/High Sch. Site(was Union MS Site)
-Amity Rd. &Eagle Rd.
Star High School Site (Star) -Floating Feather Rd. &Pollard Rd.
Grove High School Site-W.Amity Rd. &So.Ten Mile Rd.
17
Capital Projects
2017-2027
Renaissance High School Classroom Additions
As Renaissance High has continued to grow to a capacity of 800
students,the school has outgrown the initial classrooms that were a
constucted in the former Jabil Manufacturing facility. Remaining 'wc e
undeveloped space in the facility is still available for classroom space
that will provide adequate classrooms for a 800 students. This is the -
final phase of the Renaissance project.
Lake Hazel Elementary and Eagle Elementary School of the
Arts
Lake Hazel Elementary,which opened in 1974,is a school design un-
like any other in the West Ada. The configuration of the classrooms,
which are pie-shaped,are not conducive to handling the class sizes
typically experienced today. More significantly,the school is located Renaissance High School
in close proximity to Lake Hazel Road,which was a lightly-traveled rural road
in 1974,but has developed into a major arterial today.
The parking and bus area is inadequate today,a problem that will
be exacerbated as the Ada County Highway District continues on plans to make Lake Hazel Road a major east-west bypass
of Boise and Meridian. Making Lake Hazel a viable school in the future may require the school to be rebuilt at the south-
ern end of the property away from the expanding roadway. At the same time,the school's capacity could be increased from
539 students to 650 students to provide more school capacity for the enrollment growth projected for south of I-84 in the
next 10 years.
The main classroom building at Eagle Elementary School of the Arts
opened in 1959;the facility on the lower portion of the campus was
built in 1940. Like Lake Hazel Elementary,at the time Eagle Ele-
mentary was built the location was appropriate for the traffic and -
proximity to the road.As Eagle Road has become a more significant ..
north-south roadway in West Ada,bus and parent drop-off at Eagle LAKE eAZEC
Elementary has become more congested. This problem will continue
to worsen over time. Over the next ten years,road improvements _
near the school may provide the opportunity to create access to the
school from a less-congested roadway than Eagle Road. The oppor-
tunity to expand the school's capacity,increase classroom sizes to
meet today's standards,and improve traffic safety could present itself
over the next ten years by relocating the main school building on its Lake Hazel Elementary School
current property.
Spalding Elementary and Pioneer Elementary Gymnasiums
Since becoming schools of choice over the last decade,both Spalding and Pioneer Elementary schools regularly operate
with more than 700 students. Unlike the elementary schools built today,which have both a cafeteria and a gymnasium,at
these two schools the gym and cafeteria is a single,shared facility. This space limitation makes scheduling all students for
physical education difficult,an issue that could be solved by adding a gymnasium to each of these two schools.
18
Capital Projects
2017-2027
Meridian High Auditorium
The Meridian High School remodel has created a learning environment that matches the learning environments of other
West Ada high schools. The remodel and renovation project also increased the school's capacity to 2400 students. The
school's auditorium,however,only seats 125 audience members. The art building at Meridian High School is as old and
outdated as the academic building. To bring the auditorium to a size that could accomodate a single grade level would re-
quire an auditorium for 600. Space that exists and is not in use on the school's campus would make this addition possible.
Rebound School of Opportunity
Rebound School of Opportunity provides a unique,on-line edu-
cation program for students who are 18-21 who never received a
high school diploma and also serves at-risk high school students
who have had behavioral issues that make the schools closery
monitored environment a successful educational environment.
The program is currently housed in a leased facility on Water-
tower Street. This year the school has nearly reached capacity by
mid-year. Without expanding space,some students will need to
be turned away,losing the opportunity to offer a program that
leads to a high school diplima. In addition,the facility
is leased. Over the next ten year,building a permanent
facility for this school will both provide a setting to
serve more students and also be a more efficient use of- — :
tax dollars.
Eagle High and Rocky Mountian Artificial Turf -- ---
The turf at Eagle High was originally paid for by the
school's booster groups 10 years ago. Like other
capital assets donated by parent groups,the ongo-
ing maintenance becomes the responsibility of West
Ada. A group of parents presented a compeling case
to the Board of Trustess demonstrating that turf is Meridian High School Articial Turf Replacement
a more efficient use of resources than maintaining grass fields be-
cause of the signicant increase in the number of students who
can use the field,expanding its daily use from football only to band,physical education,and other sports. The process of
replacing turf that has reached its expected usage began with the replacement of
turf at Meridian High during the summer of 2016. The Eagle High turf will have to be replaced in the summer of 2017 to
ensure a safe playing surface. Over the next 10 years,Rocky Mountain will require being replaced.
Achievement House
Opportunity school is a program for special needs students who need a unique small-school setting to be successful in
school. Currently,the program is located in a house on Pine Street that is owned by West Ada School District. With an
increasing number of students who need a similar learning environment,the program could be relocated and expanded at
a new facility in the area across from the new Pathways Middle School.
19
Capital Projects
2017-2027
High School Academy
As the district's student enroll-
ment grows,so will the number of
students who would benefit from an
at-risk high school program. Cur- -
rently,the district's three academies
serve approximately 525 students,
with a total high school enrollmentof 10,301. With approximately 0,00
5 percent of the student popula-
tion being appropriate for these
programs,and with high school
enrollment projected to increase by �.-.-
more than 4,000 students,their will
be enough qualifying students to fill -
an additional high school academy Central Academy opened
in the next 10 years. in Fall 2004
Star Elementary Cafeteria
Star Elementary's cafeteria/gymnasium was built in 1959,when enrollment at the school was considerably lower than it
is today. While past classrooms additions to Star has increased the number of students the school can accomodate,the
gymnasium/kitchen has not been updated to serve the increase in students. Currently a separate building from the main
classroom structure,conceptual plans,if built,would make the gymnasium/cafeteria a part of the main campus,expand
the facility,and update the design and functionality of the kitchen.
Idaho Fine Arts Academy
Idaho Fine Arts Academy has the potential to double its current enrollment from 200 to 400 students. To expand this edu-
cational opportunity and also expand needed high school capacity,the school would be relocated to the property owned by
the district to the west of the District
Service Center. Using revenue from
the sale of the school's current build-
ing,the new location would make the
school more accessible to a greater
number of students by locating it �
centrally and also by utilizing the bus
shuttle system that currently trans-
ports students to Renaissance High 4
School. '
Idaho Fine Arts Academy
20
Apendix:
Future School Sites
WEST ADA SCHOOL DISTRICT
JANUARY2016
aQ
OrY
Zz,
Creek Rd
eacon Light Rd
D9
co
of 19 Feather R 44
d �4
1
15
14 ,ml-
47 49 17 12
E State St
Sta HWY 44 C' 11 M
Mace
anne
E
(L
Castle
JS HWY P 96 x Joplin fay 3 0
D3
D7 of 2 w
33 22
Mcmill n 1 2 T
c
21 39 3 18 :9
9 43 10 fm
D6 D2 6 50 Irene
.jR 2 s ck R
vv 41 lorthview
111OWb k �,-2
Ln 2 ,
Cher If o, i ie2w We c S
x
5 30 31 29 8 o ?,ese",e
era eo
Franklin Rd 28 --14tv P,\1 of 65
ngsq
36 47 m j ke
D10 0 0
Ov 1E nd Rd
D1 32
Lamont 35 L L ns
Fo 52 ar2.. &r
0
Victor)Rd_ "i,:. Rd Ider Vict ry o 2
Narr a 46
co <
Fan d
o [D4 y Rd I Amity R
ena'
E
Amity D I +
45
20 Desert "'ka
Lai aH el 24 Gowen d mh' Orr st
23 ake Hazel Rd
7 9
G", W Coll bia Rd
olumbla Rd
af
Hu I:bard Rd W H bbard Rd
(5
—De(r Fla+R Deer Flat'R
d I J
o Bc se
9 4th 3t
W Kun Rd m Kuna A fe CA
ee
o
King Rd King Rd
Bowmont
Kuna-Mora Rd
LL
21
• � . • ' • - • 1 . 1 •
' • - -• • • •- • - •, a••I ol m rm WAII • I •
e
S z ,
-
ot:
�t
�js i�c ��ria
07 Yi col • r cci:r 7lk
,� .�k. a • �• i J�
i+ys . r •�,. aw 'h° 1
1
/ ka51-
loo
1 � � yWN
1 t.- l ��
. - - ..
F �
it
�� ` _(,pax .���. - `• � � �'r``t! _ _
r � �
S
�,`i--t. fir,.h: '�t'�f} -. - <.ux. }�+,, _ •
•r
.
?�
•-1"��Y � -'=ia' ;t�ra a 'T-.1'�1 1 x :rr - �,
ik
1-84
• � �j. u myµ fiV.'.= ram.. 1 l�8 L...S. ,
-y - xaa
-50
• 1111-250
251-500
wl� {�Cflfh�a'L�8�1Z� tl- y'�yy
A.F-�-
500
v -
F,
'Y
Aar
aw
107
43
42
�
-� lsk�) rid L$ML r rr
w ;O1 �IA.
sk.
jr
r-:�' .—__ 6�".0....-t''"dv��l llytC :i' ca r�'[x �✓ 1'R
vil
�
•x -G �14t'df.'.
C�L`1A32
xLtx-s ,..
�.. :J 1
� s rho
-
G
LTG
h Y�
.. Aram'
' ;' S a ''-r•�L , 11 �1
} �t as
04
1; ':�� tea.:.���.Jc< � ✓, eSg Cf-r hqz: !G.r`- :+rMl�.�' _
�fml7 G3C7 r�u�ruwn
10YEAR
11-25
.� ` �€`C, 'j - ,J r� rr ✓tea=
-50•
1 1 ,��/.
Apendix:
Elementary School Projection
11/18/2016 Predicted Elementary Attendance
A B C D E F G H I J K L
1 83 179 0 0 403 0 0 85 0 268
I- Beacon Light
2 0 0 0 309 0 28 103 76 14 269 44
Floating Feather
N_
3 268 351 12 326 0 92 143 137_' 230 263
w
State St.
Multiplier
4 93 253 0 11 0 32 218 0 394 0 Es students 1
0 %completed 1
#of classes 6
5 0 0 0 0 8 202 133 102 131 64 0 96 0
21 Chinden
6 5 552 221 53 672 349 179 157 0 233
t243
21 163 McMillan
7 0 74 271 42 515 495 348 8 89 130
326
i-tick
� 178 4
8 139 222 co N 422 250 221
r N 216 291 Fairview
9 58 26 303 231 233 184 8 4M44
277
0 52 Franklyn
10
4 124 45 279 6 127 78 122
13 0 9 0 01 32 59 overland
in w 331 p
11 15 30 83 279 in 145 0
115
Victory
18 12 204 16
12 9 v
u 225 0 Amity v
Y
u
13 m 28 13 6 25 21 N 338 507
Lake Hazel Lake Hazel
4 26
14 c c 0 120 787 0
m > ti
BC y Columbia
'o
15 u lu > d 21
0 0
Hubbard Rd J v N
25
Apendix:
Middle School Projection
Predicted Middle School Attendance
A B C D E F G H I J K L
1 t / 879 1 1 1 1 134
Beacon
2 1 1 I 0 Light
Floating
3 0
State
4 1 6L92 i
5 0
5 s
Chinden
6 2 5 275 109 325 372 187 226 188 90 66
McMillan
107
7 0 37 25 473 240 325 151 196 209 184
44 ustick
67 65 28
8 O O 73 147 172 64
136 130 120 125 Fairview
't 86
36 01 129 133 92 * 102
22 Franklin
10 O 2 62 25 112 0 90 25 64
5 O O 9 0 ai 19 42 overland
11 20 8 1 44 1 149 191 92 89 92
Victory
co
8 13 O 0 15 50
12 6 56 27
204 123 0 Amity
13 12 5 2 9 49 If 204
Lake Hazel W 152
7
14 67
Columbia lu
Y `
15 m o J e IY e
J V
talc. Oct-16 Capacity Excess Balanced
1727 1276 1000 727 1302 students �
Heritiage 1280 1277 1000 280 1302 %completed 1
1209 890 1000 209 1302 #of classes 3
Lewis&Clark 1246 1131 1000 246 1302
Lowell Scott 1025 1035 1000 25 1302
Meridian 1468 1024 1250 218 1628
Sawtooth 1287 1063 1000 287 1302
Star 1776 1000 776 1302
1030 791 1000 30 1302
12048 8487 9250 12048
26
Apendix:
High School Projection
11/18/2016 Predicted HS attendance
A B C D E F G H I J K L
1 55 0 0 0 161 250 0 0 0 0 0 178
Beacon
2 0 449 0 203 1 0 28 62.6 0 296 0 Light
Floating
d
3 17 76 6 163 58 *0 350 109 187 136
ii1 State St.
4 0 131 0 0 13 0 374 0 257 0
5 51 32 0 5 151 129 90 26 67 0 45
Chinden
6 37 442 10 217 329 260 135 94
McMillan
7 130 2 312 291 384 190 226 256 253
11 Ustick
8 0 95 111 8314139 91
62 190 224 Fairview
9 0 9 231 142 104 93 108 111
rn 161 Franklin
10 6 83 21 128 0 69 25 44 57
0 0 2 O 27 39 Overland
Centenn 2189
11 16 59 186 234 123 0
Eagle 3755 215 T victory
Merid 3412 8 16 40 M
12 0 84 283 0
Mt.Vi 2892 254 100 Amity
Rocky 2976
13 3 15 59 263 185 113 227
Lake Hazel
7'
0 0 0 1 27
14 101 34 446
New C 0 Columbia C ° d
O
15 New N 0 a a = a a
e
y u a� o f
m J J W F t1 N
A B C D E F G H 1 J K L
TOTAL 15,224 - 227*5 = 14089
School Capacity Calc (-227) Oct-16 Balanced HS students 1
Centennial 1,900 2,189 1,962 1,824 2,760 %completed 1
Eagle 1,800 3,755 3,528 2,330 2,614 #of classes 4
Meridian 2,400 3,412 3,185 1,651 3,486
Mtn.View 1,800 2,892 2,665 2,298 2,614
Rocky Mtn. 1,800 2,976 2,749 2,330 2,614
9,700 15,224 14,089 10,433 14,089
Over Capacity 57% 45.2%
27
Apendix:
Bond History
Meridian Joint School District No. 2
Bond Issues
(requires a 213 majority)
AS OF 613012016
BONDS PAYOFF PRINCIPAL AMOUNT
DATE AMOUNT PERCENT PROJECTS OUTSTANDING DATE OUTSTANDING
Dec-57 $ 8D5,000 73_BO% * Meridian Elementary Paid
* Mary McPherson Elementary
* Eagle Elementary
* Ustick Elementary
May-59 $ 8D7,655 69.40% * Meridian High School Paid
* Additions to Eagle Jr High
* Remodel current high school to
Jr High
May-71 $ 1,865,00D 84.16% * Lowell Scott Middle School Paid
* McMillan Elementary
* Addition to Mary McPherson
Nov-73 $ 3,235,349 73.47% * Meridian High School Paid
Oct-75 $ 4,500,DOD 68.67% * Star Elementary Paid
* Ridgewood Elementary
* Summerwind Elementary
* Classroom Addition, Music,
* and drama @ Meridian High
May-79 $ 12,000,000 71.18% * Eagle Hills Elementary Paid
* Linder Elementary
* Silver Sage Elementary
* Frontier Elementary
* Lake Hazel Middle
* Vocational Addition to MHS
* Library Additions @ Eagle
* Ustick, Mary McPherson,
* Meridian Elementary Schools
Nov-82 $ 9,ODo,DOD 65.38% Failed Paid
Meridian Joint School District No. 2
Bond Issues
(requires a 213 majority)
AS OF 6I30i2016
BONDS PAYOFF PRINCIPALAMOUNT
DATE AMOUNT PERCENT PROJECTS OUTSTANDING DATE OUTSTANDING
Oct-83 $ 9,750,000 54.46% Failed Paid
May-85 $ 7,500,DOD 68.59% ' Centennial High School Paid
Dec-86 15,8150,000 54.99% Failed Paid
Oct 90 $ 11,885,000 68.07% ' Chief Joseph Elementary Paid
' Pioneer Elementary
MHS locker rooms
Additions to 4 elementary schools
Sep 93 $ 32,3DO,DOD 71 56% ' Eagle High School Refunded in 1998 07130116 1,r.,-65,000.00
' Eagle Middle School
Mar-95 $ 27.400,000 53.18% Failed
Sep-95 $ 14,7DO,DOD 64.52% Failed
May-96 $ 20.900,000 73.770/. ' Seven Oaks Elementary Refunded in 1998 07130f16
Chaparral Elementary
' Spalding Elementary
' Cecil D_Andrus
Sep-98 $ 26,995,000 82.450/6 * River Valley Elementary Refunded in 2014 02/15/24 12,670,000.00
' Peregnne Elementary
* Lewis&Clark Middle School
' Remodel/Addition @ Eagle Elem.
' Kitchen Additions @ Meridian,
p ' Mary McPherson,and Ustick
20
Apendix:
Bond History
Meridian Joint School District No. 2
Band Issues
(requires a 213 majority)
AS OF 613012016
BONDS PAYOFF PRINCIPALAMOUNT
DATE AMOUNT PERCENT PROJECTS OUTSTANDING DATE OUTSTANDING
Sep-OD $ 45,300,DOD 87.D6% * Mountain View High School Refunded in 2014 0211920
* Ponderosa Elementary
* Remodel/Additions at Star Elem.,
Seven Oaks Elem.,Ridgewood Elem.,
Summerwind Elem.,Lake Hazel Elem.,
Lowell Scott Middle, Eagle Academy,
Meridian High School
* Technology Updates
* Site Acquisition
Sep-02 $ 57,200,DOD 83.37% * Sawtooth Middle School Refunded in 2010 07130f22 23,265,000.00
* Discovery Elementary
* Pepper Ridge Elementary
* Hunter Elementary
* Bus Facility
" Meridian Academy Classroom Building
" Central Academy
" Site Acquisition
" Centennial High School Auditorium
* Parking lot expansion,Lake Hazel&
Ridgewood Elementary Schools
Playground and grounds upgrade at six
elementary schools
" Ustick Elementary expansion&remodel
Meridian Joint School District No.2
bond Issues
(requires a 2f3 majority)
AS OF 613012016
BONDS PAYOFF PRINCIPAL AMOUNT
DATE AMOUNT PERCENT PROJECTS OUTSTANDING DATE OUTSTANDING
Sep-05 $ 139,8DD,000 72.22%* Rocky Mountain High School Refunded in 2012 0811SI24 78,550,6(1U.00
" Heritage Middle School
* Pathways Middle School
* Gallileo K-8 School
* Prospect Elementary
" Desert Sage Elementary
" Paramount Elementary
" Expand School Facility Space at MHS
" Make Improvements to Older Schools
" Sienna Elementary
" Site Acquisition
Aug-14 $ 104,ODO,000 62.78% * Failed
Mar-15 $ 96,OD0,0OD 71.64% * Victory Middle School 08115134 85,830,006.00
Star Middle School
Hillsdale Elementary
Meridian High School Remodel/Expansion
Site Acquisition
29