17103 L1.5 CZC DETAILS-1 APPROVED SAORIGINAL SURVEY ON FILE AT FOX LAND SURVEYS, INC.
0_
rn
0
N
a
rn
Q
T
LL
c
0
m
u
m
m
m
0
T
0
Q
rn
N
0
c
U
N
U
0
a
L
c
E
L
sz
C,
Q
U
3
m
0
U
L
m
0
0
N
U
L
t1
WHEN PRESENT: BUD
POINT (A MINOR
ROOT FLARE/GOLLAR (SWELLING AT
CROOK IN THE TRUNK
SOIL LINE WHERE STEM TISSUE
JUST ABOVE THE
TRANSITIONS INTO ROOT TISSUE) TO
SOIL LINE) TO BE
APPROXIMATELY I /2"
BE AT SOIL LINE.
ABOVE THE SOIL
ROOT PROBE
LINE
SOIL LINE
4
_
N
r
HIGHEST ROOT SHALL
BE 2" MAXIMUM
BELOW 501L LINE.
UTILIZE SOIL/ROOT
PROBE AROUND
TRUNK (APPROX 1"-2"
AWAY FROM TRUNK)
TO ATE HIGHEST
ROOTS.0
n n /
oil
PREVAILING WIND
DIRECTION
REMOVE DEAD/DAMAGED BRANCHES
AND PRUNE TO INTERNATIONAL
SOCIETY OF ARBORICULTURE
STANDARDS; IMPROPERLY PRUNED
TREES (AS DETERMINED BY THE
LANDSCAPE ARCHITECT) SHALL BE
REMOVED AND REPLACED. DO NOT
REMOVE MAIN LEADER!!
RUBBER CINCH TIE
2"x 2" WOOD STAKE (LENGTH A5
REQUIRED) -DO NOT PENETRATE
ROOTBALL. SEE NOTE I. SET STAKES
PARALLEL TO PREVAILING WIND.
REMOVE TREE WRAP TRUNK
PROTECTION, AFTER INSTALLATION
CONSTRUCT 2" EARTH BERM AT EDGE
OF FOOTBALL, FILL TREE RING W/
MULCH, AS SPECIFIED.
3" THICK MULCH LAYER, KEEP MULCH
3" AWAY FROM TRUNK
REMOVE BURLAP,
TWINE, AND WIRE FINISH GRADE
BASKET FROM TOP
OF ROOTBALL, W�` \\//\\//\\// /\\//\\/� \ COMMERCIAL SLOW RELEASE
REMOVE ALL NAILS, Q w / FERTILIZER TABLETS
TIES, AND PLASTIC N
/ — SIDES OF HOLE ROUGH 4 UNEVEN
FROM ROOTBALL. IFSYNTHETICBURLAP IS
T
UTILIZED TO WRAP III BAGKFILL WITH APPROVED TOPSOIL
I I I 13 11 1 I I I I AND SOIL AMENDMENTS AS
THE FOOTBALL, IT --III III— —III SHALL BE SPECIFIED. BAGKFILL IN 6" LIFTS,
" COMPLETELY WIDTH WIDTH WIDTH WIDTH WIDTH WATER EACH LAYER, TAMP
REMOVED. ONLY OF BALL OF BALL OF BALL OF BALL OF BALL LIGHTLY AS REQUIRED, BAGKFILL
BIODEGRADABLE 5' MIN. DIA. SOIL EVEN W/ TOP OF ROOTBALL,
BURLAP SHALL BE TREE RING DO NOT OVER COMPAGTII
LEFT ON THE BOTTOM OF THE ROOTBALL. SET FOOTBALL ON NATIVE,
NOTES: UNDISTURBED SOIL
I. THE 5TAKIN6 OF TREES 15 TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR 15
RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED 5TRA16HT AND THAT THEY REMAIN STRAIGHT
FOR LENGTH OF WARRANTY PERIOD OR I YEAR AFTER SUBSTANTIAL COMPLETION WHICHEVER IS GREATER.
ALL 5TAKIN6 SHALL BE REMOVED AT THE END OF THE WARRANTY PERIOD.
2. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR 15 TO NOTIFY
THE LANDSCAPE ARCHITECT BEFORE PROGEEDIN6.
3. LANDSCAPE CONTRACTOR 15 TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION
OF PLANT MATERIAL.
4. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR
FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT
SL I PPA&E.
5. WATER TREE TWIGE WITHIN THE FIRST 24 HOURS.
6. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LAN05GAPE
ARCHITECT IMMEDIATELY.
-7. FOR TREES LOCATED WITHIN ROADSIDE PLANTERS LESS THAN 5'-0" IN WIDTH, PROVIDE TREE ROOT
BARRIER (DEEPROOT #24-2 OR APPROVED EQUAL). LOCATE ROOT BARRIER AT BACK OF CURB AND
EDGE OF SIDEWALK. ALL TREE INSTALLATIONS SHALL CONFORM TO ALL A&ENGY APPROVAL
REQUIREMENTS, CONTRACTOR SHALL VERIFY PRIOR TO ANY INSTALLATIONS.
DECIDUOUS TREE PLANTING
WHEN PRESENT: BUD
POINT (A MINOR
ROOT FLARE/COLLAR (SWELLING AT
CROOK IN THE TRUNK
SOIL LINE WHERE STEM TISSUE
JUST ABOVE THE
SOIL LINE) TO BE
TRANSITIONS INTO ROOT TISSUE) TO
APPROXIMATELY I y2"
BE AT 501L LINE.
s
ABOVE THE 501L
ROOT PROBE r'
L J{���`�y
LINE!
SOIL LINE
?lRINC
NOT TO SGALE
KEEP GROUND LINE SAME AS NURSERY LINE
REMOVE ANY PLASTIC, BURLAP, NAILS, OR
OTHER MATERIALS FROM THE ROOTBALL
WHIGH MAY LIMIT ROOT GROWTH
CONSTRUCT 2" EARTH BERM TO FORM A
WATER RETENTION BASIN, FILL BERM WITH
MULCH, A5 SPECIFIED
MULCH, PER PLANS, 3" DEPTH OVER ENTIRE
BED. DO NOT COVER GROWN5 OF PLANTS
PROVIDE DEWITT PRO 5 WEED BARRIER
FABRIC OR APPROVED EQUAL
PROVIDE COMMERCIAL FERTILIZER TABLETS
AND 13105TIMULANT, AS SPECIFIED, FOR EACH
SHRUB
BAGKFILL WITH APPROVED TOP501L AND
501L AMENDMENTS, AS SPECIFIED. BAGKFILL
IN 6" LIFTS, WATER EACH LAYER, DO NOT
TAMP OR OVER COMPACT.
1y V I C. CONSTRUCT 6" MOUND OF TOPSOIL
1. WATER SHRUB TWIGE WITHIN FIRST 24 HOURS.
2. APPLY SPECIFIED PRE -EMERGENT PER MANUFACTURER'S RECOMMENDATIONS TO ALL
6ROUNDGOVER BEDS.
SHRUB PLANTING
Wo
PREVAILING WIND
DIRECTION SE
REMOVE DEAD/DAMAGED BRANCHES
AND PRUNE TO INTERNATIONAL
50GIETY OF ARBORICULTURE
'r�' STANDARDS; IMPROPERLY PRUNED
TREES (A5 DETERMINED BY THE
"xJ ' LANDSCAPE ARCHITECT) SHALL BE
r �f
H16HE5T ROOT SHALL ��� �y, REMOVED AND REPLACED. DO NOT
BE 2" MAXIMUM q!422 REMOVE MAIN LEADERII
BELOW 501L LINE. ,tif`�
UTILIZE 501L/ROOT - EK�1"i :� RUBBER CINCH TIE
PROBE AROUND '' ' ; T
n n 71s oB h`�J{�< ` C u u
TRUNK (APPROX I -2 \,. _„ � „ � �'` 2 x 2 WOOD STAKE (LENGTH AS
�,IJ �c �_ ,� s�
i; / Pam'
AWAY FROM TRUNK) � ��, REQUIRED) -DO NOT PENETRATE
TO LOCATE HIGHEST �„�1 �c ROOTBALL. SEE NOTE I. SET STAKES
ROOTS. ! J' `p Q PARALLEL TO PREVAILING WIND.
REMOVE TREE WRAP TRUNK
PROTECTION, AFTER INSTALLATION
REMOVE BURLAP �. '
�,'M"n;=��% CONSTRUCT 2" EARTH BERM AT EDGE
TWINE, AND WIRE V'"lrr� j�; ? �, �-
�/°�,9.< OF FOOTBALL, FILL TREE RING W/
BASKET FROM TOP
MULCH, AS SPECIFIED.
OF ROOTBALL, w w w�g
REMOVE ALL NAILS, 0 w 0 czi `�> THICK MULCH LAYER, KEEP MULCH
TIES, AND PLASTIC N w o � Q '�� 3" AWAY FROM TRUNK.
FROM ROOTBALL. IF a w N Q�
5YNTHETIG BURLAP 15 o FINISH GRADE
UTILIZED TO WRAP
THE ROOTBALL, IT —/ACOMMERCIAL SLOW RELEASE
SHALL BE Q w VAAAAA//AA VA//AA / //A//A//A FERTILIZER TABLETS
COMPLETELY N - _/ \\jam\j/ = j\\ j\
//V/ V// / — SIDES OF HOLE ROUGH 8 UNEVEN
REMOVED. ONLY III VA/
BIODEGRADABLE �. A/V / —� BAGKFILL WITH APPROVED TOP501L
BURLAP SHALL BE - —III— AND SOIL AMENDMENTS AS
LEFT ON THE BOTTOM
OF THE ROOTBALL. III „ III SPECIFIED. BAGKFILL IN 6 LIFTS,
WIDTH WIDTH WIDTH WIDTH WIDTH WATER EACH LAYER, TAMP
OF BALL OF BALL OF BALL OF BALL OF BALL L16HTLY AS REQUIRED, BAGKFILL
SOIL EVEN W/ TOP OF ROOTBALL,
5' MIN. DIA. TREE RING DO NOT OVER GOMPAGTII
SET ROOTBALL ON NATIVE,
NOTES: UNDISTURBED 501L
I. THE STAKING OF TREES 15 TO BE THE GONTRAGTOR'5 OPTION; HOWEVER, THE CONTRACTOR 15 RESPONSIBLE TO
INSURE THAT ALL TREES ARE PLANTED 5TRA16HT AND THAT THEY REMAIN 5TRA16HT FOR LENGTH OF
WARRANTY PERIOD OR I YEAR AFTER SUBSTANTIAL COMPLETION WHIGH EVER 15 GREATER. ALL 5TAKIN6
SHALL BE REMOVED AT THE END OF THE WARRANTY PERIOD.
2. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR 15 TO NOTIFY THE
LAN05GAPE ARCHITECT BEFORE PROGEEDIN6.
3. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF
PLANT MATERIAL.
4. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE
E16HT TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE.
5. WATER TREE TWIGE WITHIN THE FIRST 24 HOURS.
6. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT
IMMEDIATELY.
rt")N�C TREE PLANTING
NOT ,A_E
A = LENGTH, A5 SPECIFIED
OR PER PLANT SCHEDULE
B = 55% OF 'A'
FINISH GRADE PER PLANS
EDGING, PER PLANS AND DETAILS
6ROUNDGOVER PLANTING PER PLANTING
PLAN
MULCH, PER PLANS, 3" DEPTH OVER
ENTIRE BED. DO NOT COVER GROWNS OF
PLANTS
SPLIT ALL ROOT BOUND ROOTS WITH 3
EQUAL SPACED VERTICAL GUTS.
TILL SOIL TO A DEPTH OF 12", BAGKFILL
WITH APPROVED TOPSOIL AND 501L
AMENDMENTS, AS SPECIFIED.
DEWITT PRO 5 WEED BARRIER FABRIC
OR APPROVED EQUAL
NOTES: SUB6RADE
I. ALL 6ROUNDGOVER PLANTS TO BE PLANTED ON CENTER AND IN A TRIAN6ULAR
PATTERN.
2. APPLY SPECIFIED PRE -EMERGENT PER MANUFACTURER'S RECOMMENDATIONS TO ALL
6ROUNDGOVER BEDS.
PERENNIAL & GROUNDCOVER
PLANTING- FO 5GAL E
EXTRUDED CONCRET
F I N I5H GRADE, PER
PLANS
4"x 5" EXTRUDED
CONCRETE EDGING
APPROVED TOP501L
AND 501L
AMENDMENTS AS
SPECIFIED
COMPACTED
5UB6RADE
E
EDGING F0 -GALE
-
h' I ti Ut— MULL H Pt I
FER BEDS
APPROVED TOPSOIL AND 501L
AMENDMENTS AS SPECIFIED
FINISH 6RADE,� "'—"'
PER PLANS GUT EDGE
PLANTER BED CUT EDGE
8" DIAMETER
=R, AS SPECIFIED,
PER PLANS
GTED 5UB6RADE
WIRED
,lULGH, AS
IED
II AL5
NOTES:
I. NOTIFY LANDSCAPE ARCHITECT WHEN PLAGIN6 BOULDERS FOR APPROVAL.
2. PLACE BOULDERS PRIOR TO INSTALLATION OF IRRIGATION.
3. GLEAN BOULDERS OF DIRT AND L005E DEBRIS.
4. WHEN PLAGIN6 BOULDERS, BURY 4 TO � OF BOULDER BELOW FINISH GRADE.
5. DO NOT SCAR OR DAMAGE BOULDERS.
6. WHEN GROUPING BOULDERS, DISTRIBUTE SIZES EVENLY (I.E., IN A GROUP OF ((q),
(2) WILL BE LARGE, (2) WILL BE MEDIUM, AND (2) WILL BE SMALL).
BOULDER INSTALLATION IN
SHRUB / PERENNIAL BED "A
BOULDER
'DIAMETER
., AS SPEGIFIEE
DER PLANS
fED 5UB6RADE
RED
"APE PER
SHRUB
30" - 60" DIAMETER
BOULDER, AS 5PEG I F I EI
BURY 1/2 OF BOULDER
BELOW TOP OF
FLATWORK (PLACE
FLATTER SIDE ON TOP)
LOCATE PER PLANS
CONCRETE FLATWORK
PER PLANS
AGGREGATE BASE AS
SPECIFIED
BOULDER IN FLATWORK \ COMPACTED 51JB6RADI
AS REQUIRED
NOTES:
I. NOTIFY LANDSCAPE ARCHITECT WHEN PLAGIN6 BOULDERS FOR APPROVAL.
2. PLACE BOULDERS PRIOR TO INSTALLATION OF IRRIGATION SYSTEM.
3. GLEAN ALL BOULDERS OF DIRT AND L005E DEBRIS.
4. WHEN PLAGIN6 BOULDERS, BURY j TO � OF BOULDER BELOW FINISH GRADE.
5. DO NOT 56AR OR DAMAGE BOULDERS.
6. WHEN GROUPING BOULDERS, DISTRIBUTE SIZES EVENLY (I.E., IN A GROUP OF (6),
(2) WILL BE LARGE, (2) WILL BE MEDIUM, AND (2) WILL BE SMALL).
-i BOULDER INSTALLATION IN
(TYPICAL AT TREES IN TURF AREAS) NOT TO SCALE U CONCTRETE FLATWORK `C;T : _-
M
C1 a Lu C' W to
W_
GOW~LLzl-
` yOp't000
o\\ 3WmLLO1~
H � t�f7W= '(>>
r/V I m42-4acm
ND 0 3LU
o w
ajzYyxj 'L
V
o N
OE C U r
O C
'v'' o /N^^ `n�
u N 'U N W W O,
�rEmc -0LoM 3o
.L Eci E - N co `M; (0
N O O❑ C O r, N L 'O
ac�U c �co0
Ol (0 0 0 0 Q7 I
W U .OL+-+0- �mN O
a u amo �0 a z
UJ W ('-J �L co
Wm
. . . . .. 3a corms
0
E
O
co
T O
W
C co
O
m
O
0
+ cu
co
in O
a00
13
O
c L
'
(L 0
N m
� m
a
O
d
c
Q
a
3
'O
W
O
0]
m
CO
CV
CV
Lu w
cV NQ
az
Z�
ZWQ
CONSULTANT STAMP
a o00000
oo°0000* ZO�Zl Oo
000ti� toco
ED
o O H �o
d) o
0
000G des � � o0000
�ooOOOOO000000000000°� °o
ARCHITECT STAMP
co
J
L
L
% L
J 2 —
L
�
0
0—
O
v(D(D=
Q
�0oo
U
`Lu
V/
_
w
z
J Q L
�UL�
J
REVISIONS
NO.
REMARKS
1
CITY COMMENTS
2
CITY COMMENTS
5
ASI
CHECKED
JB
DATE
03/27/2018
DRAWN
LP
JOB NO.
17103
SHEET NUMBER
L1.5
U
N
U
W
U-
0
0
L