Loading...
17103 L1.5 CZC DETAILS-1 APPROVED SAORIGINAL SURVEY ON FILE AT FOX LAND SURVEYS, INC. 0_ rn 0 N a rn Q T LL c 0 m u m m m 0 T 0 Q rn N 0 c U N U 0 a L c E L sz C, Q U 3 m 0 U L m 0 0 N U L t1 WHEN PRESENT: BUD POINT (A MINOR ROOT FLARE/GOLLAR (SWELLING AT CROOK IN THE TRUNK SOIL LINE WHERE STEM TISSUE JUST ABOVE THE TRANSITIONS INTO ROOT TISSUE) TO SOIL LINE) TO BE APPROXIMATELY I /2" BE AT SOIL LINE. ABOVE THE SOIL ROOT PROBE LINE SOIL LINE 4 _ N r HIGHEST ROOT SHALL BE 2" MAXIMUM BELOW 501L LINE. UTILIZE SOIL/ROOT PROBE AROUND TRUNK (APPROX 1"-2" AWAY FROM TRUNK) TO ATE HIGHEST ROOTS.0 n n / oil PREVAILING WIND DIRECTION REMOVE DEAD/DAMAGED BRANCHES AND PRUNE TO INTERNATIONAL SOCIETY OF ARBORICULTURE STANDARDS; IMPROPERLY PRUNED TREES (AS DETERMINED BY THE LANDSCAPE ARCHITECT) SHALL BE REMOVED AND REPLACED. DO NOT REMOVE MAIN LEADER!! RUBBER CINCH TIE 2"x 2" WOOD STAKE (LENGTH A5 REQUIRED) -DO NOT PENETRATE ROOTBALL. SEE NOTE I. SET STAKES PARALLEL TO PREVAILING WIND. REMOVE TREE WRAP TRUNK PROTECTION, AFTER INSTALLATION CONSTRUCT 2" EARTH BERM AT EDGE OF FOOTBALL, FILL TREE RING W/ MULCH, AS SPECIFIED. 3" THICK MULCH LAYER, KEEP MULCH 3" AWAY FROM TRUNK REMOVE BURLAP, TWINE, AND WIRE FINISH GRADE BASKET FROM TOP OF ROOTBALL, W�` \\//\\//\\// /\\//\\/� \ COMMERCIAL SLOW RELEASE REMOVE ALL NAILS, Q w / FERTILIZER TABLETS TIES, AND PLASTIC N / — SIDES OF HOLE ROUGH 4 UNEVEN FROM ROOTBALL. IFSYNTHETICBURLAP IS T UTILIZED TO WRAP III BAGKFILL WITH APPROVED TOPSOIL I I I 13 11 1 I I I I AND SOIL AMENDMENTS AS THE FOOTBALL, IT --III III— —III SHALL BE SPECIFIED. BAGKFILL IN 6" LIFTS, " COMPLETELY WIDTH WIDTH WIDTH WIDTH WIDTH WATER EACH LAYER, TAMP REMOVED. ONLY OF BALL OF BALL OF BALL OF BALL OF BALL LIGHTLY AS REQUIRED, BAGKFILL BIODEGRADABLE 5' MIN. DIA. SOIL EVEN W/ TOP OF ROOTBALL, BURLAP SHALL BE TREE RING DO NOT OVER COMPAGTII LEFT ON THE BOTTOM OF THE ROOTBALL. SET FOOTBALL ON NATIVE, NOTES: UNDISTURBED SOIL I. THE 5TAKIN6 OF TREES 15 TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR 15 RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED 5TRA16HT AND THAT THEY REMAIN STRAIGHT FOR LENGTH OF WARRANTY PERIOD OR I YEAR AFTER SUBSTANTIAL COMPLETION WHICHEVER IS GREATER. ALL 5TAKIN6 SHALL BE REMOVED AT THE END OF THE WARRANTY PERIOD. 2. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR 15 TO NOTIFY THE LANDSCAPE ARCHITECT BEFORE PROGEEDIN6. 3. LANDSCAPE CONTRACTOR 15 TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT MATERIAL. 4. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SL I PPA&E. 5. WATER TREE TWIGE WITHIN THE FIRST 24 HOURS. 6. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LAN05GAPE ARCHITECT IMMEDIATELY. -7. FOR TREES LOCATED WITHIN ROADSIDE PLANTERS LESS THAN 5'-0" IN WIDTH, PROVIDE TREE ROOT BARRIER (DEEPROOT #24-2 OR APPROVED EQUAL). LOCATE ROOT BARRIER AT BACK OF CURB AND EDGE OF SIDEWALK. ALL TREE INSTALLATIONS SHALL CONFORM TO ALL A&ENGY APPROVAL REQUIREMENTS, CONTRACTOR SHALL VERIFY PRIOR TO ANY INSTALLATIONS. DECIDUOUS TREE PLANTING WHEN PRESENT: BUD POINT (A MINOR ROOT FLARE/COLLAR (SWELLING AT CROOK IN THE TRUNK SOIL LINE WHERE STEM TISSUE JUST ABOVE THE SOIL LINE) TO BE TRANSITIONS INTO ROOT TISSUE) TO APPROXIMATELY I y2" BE AT 501L LINE. s ABOVE THE 501L ROOT PROBE r' L J{���`�y LINE! SOIL LINE ?lRINC NOT TO SGALE KEEP GROUND LINE SAME AS NURSERY LINE REMOVE ANY PLASTIC, BURLAP, NAILS, OR OTHER MATERIALS FROM THE ROOTBALL WHIGH MAY LIMIT ROOT GROWTH CONSTRUCT 2" EARTH BERM TO FORM A WATER RETENTION BASIN, FILL BERM WITH MULCH, A5 SPECIFIED MULCH, PER PLANS, 3" DEPTH OVER ENTIRE BED. DO NOT COVER GROWN5 OF PLANTS PROVIDE DEWITT PRO 5 WEED BARRIER FABRIC OR APPROVED EQUAL PROVIDE COMMERCIAL FERTILIZER TABLETS AND 13105TIMULANT, AS SPECIFIED, FOR EACH SHRUB BAGKFILL WITH APPROVED TOP501L AND 501L AMENDMENTS, AS SPECIFIED. BAGKFILL IN 6" LIFTS, WATER EACH LAYER, DO NOT TAMP OR OVER COMPACT. 1y V I C. CONSTRUCT 6" MOUND OF TOPSOIL 1. WATER SHRUB TWIGE WITHIN FIRST 24 HOURS. 2. APPLY SPECIFIED PRE -EMERGENT PER MANUFACTURER'S RECOMMENDATIONS TO ALL 6ROUNDGOVER BEDS. SHRUB PLANTING Wo PREVAILING WIND DIRECTION SE REMOVE DEAD/DAMAGED BRANCHES AND PRUNE TO INTERNATIONAL 50GIETY OF ARBORICULTURE 'r�' STANDARDS; IMPROPERLY PRUNED TREES (A5 DETERMINED BY THE "xJ ' LANDSCAPE ARCHITECT) SHALL BE r �f H16HE5T ROOT SHALL ��� �y, REMOVED AND REPLACED. DO NOT BE 2" MAXIMUM q!422 REMOVE MAIN LEADERII BELOW 501L LINE. ,tif`� UTILIZE 501L/ROOT - EK�1"i :� RUBBER CINCH TIE PROBE AROUND '' ' ; T n n 71s oB h`�J{�< ` C u u TRUNK (APPROX I -2 \,. _„ � „ � �'` 2 x 2 WOOD STAKE (LENGTH AS �,IJ �c �_ ,� s� i; / Pam' AWAY FROM TRUNK) � ��, REQUIRED) -DO NOT PENETRATE TO LOCATE HIGHEST �„�1 �c ROOTBALL. SEE NOTE I. SET STAKES ROOTS. ! J' `p Q PARALLEL TO PREVAILING WIND. REMOVE TREE WRAP TRUNK PROTECTION, AFTER INSTALLATION REMOVE BURLAP �. ' �,'M"n;=��% CONSTRUCT 2" EARTH BERM AT EDGE TWINE, AND WIRE V'"lrr� j�; ? �, �- �/°�,9.< OF FOOTBALL, FILL TREE RING W/ BASKET FROM TOP MULCH, AS SPECIFIED. OF ROOTBALL, w w w�g REMOVE ALL NAILS, 0 w 0 czi `�> THICK MULCH LAYER, KEEP MULCH TIES, AND PLASTIC N w o � Q '�� 3" AWAY FROM TRUNK. FROM ROOTBALL. IF a w N Q� 5YNTHETIG BURLAP 15 o FINISH GRADE UTILIZED TO WRAP THE ROOTBALL, IT —/ACOMMERCIAL SLOW RELEASE SHALL BE Q w VAAAAA//AA VA//AA / //A//A//A FERTILIZER TABLETS COMPLETELY N - _/ \\jam\j/ = j\\ j\ //V/ V// / — SIDES OF HOLE ROUGH 8 UNEVEN REMOVED. ONLY III VA/ BIODEGRADABLE �. A/V / —� BAGKFILL WITH APPROVED TOP501L BURLAP SHALL BE - —III— AND SOIL AMENDMENTS AS LEFT ON THE BOTTOM OF THE ROOTBALL. III „ III SPECIFIED. BAGKFILL IN 6 LIFTS, WIDTH WIDTH WIDTH WIDTH WIDTH WATER EACH LAYER, TAMP OF BALL OF BALL OF BALL OF BALL OF BALL L16HTLY AS REQUIRED, BAGKFILL SOIL EVEN W/ TOP OF ROOTBALL, 5' MIN. DIA. TREE RING DO NOT OVER GOMPAGTII SET ROOTBALL ON NATIVE, NOTES: UNDISTURBED 501L I. THE STAKING OF TREES 15 TO BE THE GONTRAGTOR'5 OPTION; HOWEVER, THE CONTRACTOR 15 RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED 5TRA16HT AND THAT THEY REMAIN 5TRA16HT FOR LENGTH OF WARRANTY PERIOD OR I YEAR AFTER SUBSTANTIAL COMPLETION WHIGH EVER 15 GREATER. ALL 5TAKIN6 SHALL BE REMOVED AT THE END OF THE WARRANTY PERIOD. 2. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR 15 TO NOTIFY THE LAN05GAPE ARCHITECT BEFORE PROGEEDIN6. 3. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT MATERIAL. 4. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE E16HT TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE. 5. WATER TREE TWIGE WITHIN THE FIRST 24 HOURS. 6. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. rt")N�C TREE PLANTING NOT ,A_E A = LENGTH, A5 SPECIFIED OR PER PLANT SCHEDULE B = 55% OF 'A' FINISH GRADE PER PLANS EDGING, PER PLANS AND DETAILS 6ROUNDGOVER PLANTING PER PLANTING PLAN MULCH, PER PLANS, 3" DEPTH OVER ENTIRE BED. DO NOT COVER GROWNS OF PLANTS SPLIT ALL ROOT BOUND ROOTS WITH 3 EQUAL SPACED VERTICAL GUTS. TILL SOIL TO A DEPTH OF 12", BAGKFILL WITH APPROVED TOPSOIL AND 501L AMENDMENTS, AS SPECIFIED. DEWITT PRO 5 WEED BARRIER FABRIC OR APPROVED EQUAL NOTES: SUB6RADE I. ALL 6ROUNDGOVER PLANTS TO BE PLANTED ON CENTER AND IN A TRIAN6ULAR PATTERN. 2. APPLY SPECIFIED PRE -EMERGENT PER MANUFACTURER'S RECOMMENDATIONS TO ALL 6ROUNDGOVER BEDS. PERENNIAL & GROUNDCOVER PLANTING- FO 5GAL E EXTRUDED CONCRET F I N I5H GRADE, PER PLANS 4"x 5" EXTRUDED CONCRETE EDGING APPROVED TOP501L AND 501L AMENDMENTS AS SPECIFIED COMPACTED 5UB6RADE E EDGING F0 -GALE - h' I ti Ut— MULL H Pt I FER BEDS APPROVED TOPSOIL AND 501L AMENDMENTS AS SPECIFIED FINISH 6RADE,� "'—"' PER PLANS GUT EDGE PLANTER BED CUT EDGE 8" DIAMETER =R, AS SPECIFIED, PER PLANS GTED 5UB6RADE WIRED ,lULGH, AS IED II AL5 NOTES: I. NOTIFY LANDSCAPE ARCHITECT WHEN PLAGIN6 BOULDERS FOR APPROVAL. 2. PLACE BOULDERS PRIOR TO INSTALLATION OF IRRIGATION. 3. GLEAN BOULDERS OF DIRT AND L005E DEBRIS. 4. WHEN PLAGIN6 BOULDERS, BURY 4 TO � OF BOULDER BELOW FINISH GRADE. 5. DO NOT SCAR OR DAMAGE BOULDERS. 6. WHEN GROUPING BOULDERS, DISTRIBUTE SIZES EVENLY (I.E., IN A GROUP OF ((q), (2) WILL BE LARGE, (2) WILL BE MEDIUM, AND (2) WILL BE SMALL). BOULDER INSTALLATION IN SHRUB / PERENNIAL BED "A BOULDER 'DIAMETER ., AS SPEGIFIEE DER PLANS fED 5UB6RADE RED "APE PER SHRUB 30" - 60" DIAMETER BOULDER, AS 5PEG I F I EI BURY 1/2 OF BOULDER BELOW TOP OF FLATWORK (PLACE FLATTER SIDE ON TOP) LOCATE PER PLANS CONCRETE FLATWORK PER PLANS AGGREGATE BASE AS SPECIFIED BOULDER IN FLATWORK \ COMPACTED 51JB6RADI AS REQUIRED NOTES: I. NOTIFY LANDSCAPE ARCHITECT WHEN PLAGIN6 BOULDERS FOR APPROVAL. 2. PLACE BOULDERS PRIOR TO INSTALLATION OF IRRIGATION SYSTEM. 3. GLEAN ALL BOULDERS OF DIRT AND L005E DEBRIS. 4. WHEN PLAGIN6 BOULDERS, BURY j TO � OF BOULDER BELOW FINISH GRADE. 5. DO NOT 56AR OR DAMAGE BOULDERS. 6. WHEN GROUPING BOULDERS, DISTRIBUTE SIZES EVENLY (I.E., IN A GROUP OF (6), (2) WILL BE LARGE, (2) WILL BE MEDIUM, AND (2) WILL BE SMALL). -i BOULDER INSTALLATION IN (TYPICAL AT TREES IN TURF AREAS) NOT TO SCALE U CONCTRETE FLATWORK `C;T : _- M C1 a Lu C' W to W_ GOW~LLzl- ` yOp't000 o\\ 3WmLLO1~ H � t�f7W= '(>> r/V I m42-4acm ND 0 3LU o w ajzYyxj 'L V o N OE C U r O C 'v'' o /N^^ `n� u N 'U N W W O, �rEmc -0LoM 3o .L Eci E - N co `M; (0 N O O❑ C O r, N L 'O ac�U c �co0 Ol (0 0 0 0 Q7 I W U .OL+-+0- �mN O a u amo �0 a z UJ W ('-J �L co Wm . . . . .. 3a corms 0 E O co T O W C co O m O 0 + cu co in O a00 13 O c L ' (L 0 N m � m a O d c Q a 3 'O W O 0] m CO CV CV Lu w cV NQ az Z� ZWQ CONSULTANT STAMP a o00000 oo°0000* ZO�Zl Oo 000ti� toco ED o O H �o d) o 0 000G des � � o0000 �ooOOOOO000000000000°� °o ARCHITECT STAMP co J L L % L J 2 — L � 0 0— O v(D(D= Q �0oo U `Lu V/ _ w z J Q L �UL� J REVISIONS NO. REMARKS 1 CITY COMMENTS 2 CITY COMMENTS 5 ASI CHECKED JB DATE 03/27/2018 DRAWN LP JOB NO. 17103 SHEET NUMBER L1.5 U N U W U- 0 0 L