Loading...
Construction Drawings79689253571519204186814101213227261222113132421112281911181025175241642315322142211320122412331617OHP T TOETOE TOE TOE TOE TOE TOE TOE TOE TOE TOETOETOE TOE TOE TOE TOE TOE TOE TOE TOE TO E TOETO E EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EPEGEGEG EG EG EG EG EG EG EG EG EG EG EGEGEGEGEGEGEGEGEGEGEGEG EG EG EG EG EG EG EG EG EG TBTBTBTBTBTB TB TB TB TB TB TB TB TB TB TB TB TB TB TB TB TB TB TB TB TB TB TB TB TB TBTBTBTBTBTB TB TB TB TB TB TB TB TB TB TB TB TB TB TBTB TB TB TB TB TB TB TB TB TB TB TB TB TB TB TB TB TB TB TB TB TB TB TBTBTBTB TOE TOETOETOETO E TOE TOE TOE TOE TOE TOE TOE TOETBTBTBTBTBTBTBTB TB TB TB TB TB TB TB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBW W W W W W W W EGEGEG EG EGEGEGEGEGEGEGEGEGEGTB TB TB TB TB TB TB TB TB TB TB TB TB TB TB TB TB TOETOETOETOETOETOEEGEG EG EG EG TB TBTBTBTBTB TB EGEG EG EGEG EG EGEG EG EGEG EG TB TB TB TBTBTBTBTB TB TB TBTBTBTBHY D HY DHY DSS HY DEE THY DG TOETOEEPEPEPEPEPEPEP EPEPEPXXTBTBTBTOETOETBTBTBTBGT T GGTBTBEP TBTBTBTBTBTBTBTOETBTBTBTBTBTBTBTBTBTBTBTBTBEPEPEPEPEPEPEPEPEPEP EPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEP EP EP EP EP EPTBTBTB OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPS S S S S S S S S S S S SD SD M M M M M M SD SD M M S S S SD S IRR IRR IRR IRR IRRIRRIRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR SS BLOCK 1BLOCK 3W. BROYHILL ST S. CHESMAN AVEW. NORWICH STREET W. LYRA STREETS. SOLARIS AVES. SOLARIS AVEBLOCK 1BLOCK 2BLOCK 2BLOCK 2BLOCK 5BLOCK 4S. MERIDIAN ROAD / HIGHWAY 69W. HARRIS STREET FUTURE PHASEFUTURE PHASEFUTURE PHASE W. HANIKEN ST OVERALL SITE/UTILITY PLANC2.012/12/201916970NECI L SEDFOO HADIETATS PROF E S SI ONAL ENGINEERM.ENNIROCGRA H AMPREPARED FOR:© REV. NO.DESCRIPTION DATE CSW PROJECT NO.DRAWING DATE804 W. RICHMOND STREET BOISE, ID 83706 cgraham@cswengineering.com (208) 946-3874 STAPLETON SUBDIVISION NO. 1 IMPROVEMENTS PLANS 18014STAPLETON LLC4824 W FAIRVIEW AVEBOISE, ID 83705 IRRIGATION PROFILES / DETAILSC7.212/12/201916970NECI L SEDFOO HADIETATS PROF E S SI ONAL ENGINEERM.ENNIROCGRA H AMPREPARED FOR:© REV. NO.DESCRIPTION DATE CSW PROJECT NO.DRAWING DATE804 W. RICHMOND STREET BOISE, ID 83706 cgraham@cswengineering.com (208) 946-3874 STAPLETON SUBDIVISION NO. 1 IMPROVEMENTS PLANS 18014STAPLETON LLC4824 W FAIRVIEW AVEBOISE, ID 83705GRAVITY IRRIGATION LINE 2 PROFILESTA. 9+50 TO 16+00SECTION A-A1C7.2INTAKE/SCREEN BOX DETAILPROFILE VIEWAAPLAN VIEW IRRIGATION DETAILSC7.312/12/2019PROFILE VIEW1C7.3PRESSURE IRRIGATION PUMP STATION DETAILPUMP STATION NOTESPLAN VIEWV-250 FILTERV-250 FILTEROPERATING DATA16970NECI L SEDFOO HADIETATS PROF E S SI ONAL ENGINEERM.ENNIROCGRA H AMPREPARED FOR:© REV. NO.DESCRIPTION DATE CSW PROJECT NO.DRAWING DATE804 W. RICHMOND STREET BOISE, ID 83706 cgraham@cswengineering.com (208) 946-3874 STAPLETON SUBDIVISION NO. 1 IMPROVEMENTS PLANS 18014STAPLETON LLC4824 W FAIRVIEW AVEBOISE, ID 83705