Loading...
Photometry Plan 012820 APPROVEDMAX SPILL 60" - ABOVE GRADE AT PROPERTY LINE MAX SPILL 60" ABOVE GRADE (TOP OF 6' BERM) IN FRONT OF 6' FENCE ON BERM, 25' FROM PROPERTY LINE MAX SPILL 60" ABOVE GRADE (TOP OF 6' BERM) IN FRONT OF 6' FENCE ON BERM +0 0 +0 0 +0 0 +0 0 +0 0 +0 0 +0.1 1 1 '0. 1) +1.3 +1. +0.7 +0,1 1.4 I '0. 1) +1.4 +1. E +0.8 +0.7 +1. + +0.8 +0.1 0.8 P5 +0.6 +1. 01 7 � +0.6 +1. +1.4 +1.2 +1.4 +0. +0.8 +1.3 +1.4 +2 +0 1 07 +0.1 +0.3 +0.7 + 1 +1.,3 +� +0.1 +0.1 +0.1 +1 1 +3,3 +2,4 +� +0.1 +0.0 +0.1 +jpDj3E0 #-ib7 + +01 P +0.0 +0.1.9 +3 6 +2 7 + I+0 1 +0.0 +0.1 +1 1 +4 2 +3 4 +3 I+0,1 +0.0 +0.1 +1 +4 1 +3 3 +3 E, +0,1 +0.0 +0.1 + +t9 #3d 9 +3 +0 1 +0.0 +0.1P3.4 +3 6 +3 0 +3 +0 1 +0.0 +0.1 11.4 +4 3 +3 6 Em +0,1 +0.0 +0.1 1,0 +4,0 +3,3 +3,1 I+0.1 +0.0 +0.1 + 8#3d 7 +2 +0 1 +0.0 +0.1 P3 3 +3 5 +2,7 +2 E +0 1 +0.0 +0.1 20 40 +3 2 +3,1 +0.1 +0.0 +0.1 31 +3.7 +3,0 +3,1 1+01 +0.0 +0.1 + ALe+ J30+2 3 2 0 +0 1 +0.0 +�@ +3 7 +3,4 +2,4 E,l +0.1 +0.0 +0.1 +2 8 +3,3 +2 7 + +0.1 H1/2,4,6,8,1 +0.0 +0.1 +1.7 +2 9 +2 6 +0 1 +0.0 I +0.1 +2 4 +3 B3+ .8 +0 1 +0.1 +2 8 +4 2 +2 +0,1 P LE #34 +0.0 +0.1 P4 +5 4 +0.1 +0.0 +0.1 +3 6 +4 + +0 1 +0.0 +0.0 +2 8 + 1 +o'1 Q3:.. .� +0.0 +0.1 +1.8 +2 4 I+0'jTAP BOX +0.0 +0.1 +l. � +2' 3 +0.0 +0.1 +2 4 +3 +2 +o o +0.0 +0.1 +2 9 +4+2 +o 1 POLE # +0.0 +0.2 2 +5 4 +0,1 P4 +0.0 +0.17+j3 4 +46 +2I+0.1 63++0.1 2 9 +3 9 (53 I+0 1 +0. +0.1 +2,0 +2,8 +2 +0.0 +0. +0.1 +0.1 +0. +0.0 +0.3 +0.9 +1.8 +1.8 +0 o +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 MAX SPILL 60" - ABOVE GRADE AT PROPERTY LINE MAX SPILL 60" ABOVE GRADE ACROSS STREET + +0. + + + +0. +0. +0. +0. + + + + + + 1, _+ + + 0.1 0 0.1 0.1 0.0 1 1 1 1 0.4 .2 0.2 0.6 0. 0.5 0.5 0.8 0.5 1 0 1 1 +O,i ud U."7 +0.= 0.=+0.1uj 0"i-+0.f +0.=+0.1 'U., U.f-t.=+0.=+0.1 U., - 0,= 0,1-+0. +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0. ao.1 +0.6 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0. go.1 +0.5 +0,1 0 +0,1 +o o SITE LIGHTING PLAN to SCALE: 1" = 60'-0" +0.0 +0 0 +0 0 +0.0 L MAX SPILL 60" ABOVE GRADE ACROSS STREET +0,0 1 MAX SPILL 60" +0,0 ABOVE GRADE AT PROPERTY LINE+, ,, ®+ ST _, Rq p��S MAX SPILL 60" ABOVE GRADE 25' FROM PROPERTY LINE 1 0 1 '0 1 0 1 1 0 1 1 0 1 0 1 0 1 +0,1 +0 1 +0 0 +0 0 +0 0 +o' 0 +0 0 +0.0 - - - +0.0 0.1 0.1 +0 0 +0.1 +0.1 +0.2 +0.2 0.2 0.1 0.1 0.0 0.0 0.0 +0.0 +0 1 + 0.1 + 0.2 + 0.4 + 0.5 + 0.4 + 0.2 + 0.1 + 0.1 + 0.0 + 0.0 + 0.0 - - - +0.1 +0.3 +0. 1,OL�.8#3 +1 8 P2 .9 +0.4 +0.3 +0.3 +0.1 +0.0 01 +2.2 +3.3 �36.7 +3.5 +3.3 +2.1 1 +0.8 +0.3 +0.0 +0 1 +2.4 +2.5 +3.0 +3.4 +3.0 +2.5 +2.2 +16 +0.9 +0.4D +0.1 FACILITY KIOSK 1 +2.9 +3.3 +3.6 +3.8 +3.5 +3.0 +2.5 +16 +0.7 +0 +0.1 ®:0 +0.1 + ■ ■ ■ +8 10 +0.3 +0.0 ° ° 3 1+3 2 g7 1 +� 5. 1 412. 90 1 +21.1 °° 1 1 1+2 8?9 � e 4 +3'0'° +17 4 +0. 3 .1 +0.0 +�7. +2 1831 +14 +1 +0.3 +0.0 +0 1 3 1+ 8 02 27.1 0 7. 2 1+2 7. 7 t& Q 3 4 .1 1 I • 1 30041 1 01 I I(* 1 1 8 i 1 d 1 i ■ 130 14 112 0.2 0.1 0.0 +0,1 1+6. 1. +7.71 8 +7 00 1+7.1 f7.2 8 +7.8 1 +4. . ° +1 0 +0.2 r0.1 +0.0 +0 1 °+2.1 +2.1 1 +1158 +1 F' 1+1 6 ° + I + °+ +0.1 r0.1 +0.0 1 1 1 1 ° 1 ° 1 ° ° ° Cr_1 1 .Qo +0,1 1 +2. j +1 7 1 +113 +1 g 111,2 1161 ° 2.31 3. Q o° 8 +0.1 0.0 +0.0 +0.1 �? +2.2 4 +1 5 +1 Y 0 1 4 +1 5 4 +2. p +3.0 +310 +0.2 0.1 +0.0 +0 1 +2.2 4 +11 +1 3 +1 8 E +# (�� 1 �-=0.2 0.1 +0.0 �+23 P 1 +0 1 +2.4 L+1,7+1 +2.0 +18 +2.0 +2.4 +3 3.3 +0.2 r0.0 +0.0 0,1 +3.1 +3.1 +3.0 +3.0 +3.4 +3.5 +3.6 +4.3 +3.9 +0.1 r0.0 +0.0 �3. 3. +3. 3. 3. 3. 3. 4. +3.8 +0.0 0.0 +0.0 d 1 MAX SPILL 60" +4.2 +4.3 +4.4 +4.1 +3.7 +3.4 +3.3 +3.7 3. +0.1 0.1 +0.0 ABOVE GRADE 01 ACROSS STREET +4 + OL + +3 +3 +POLE .6 + 3 P2 0. +0.0 0,1 +4 + + + +3 +2 7 +3.3 3. +0.2 r0. +0.0 (3 -5 6 3-4"C.O. B X +01 +3.9 + . +4.1 +3.6 +3.2 +2+2.9 3. +. r0 +0.0+01 &7+2. +2 +2. +2+2 +3 +2+2. +21 +0.1 .0 +0.0 '11\ +0.1 + + + rya +z L. +� +� + + + o o +o VERIFY EXACT O5 LOCATION r1TH TELEPHON +0.8 +0.8 +0.8 +0.8 +0.8 +0.8 +0.6 +0.4 +0.2 +0.0 +0.0 +0. C COMPANY +0 1 to +0.0 +0.0 +0 0 +0.0 +0.0 - - - - - - - - - +00 +0 o Q +0.0 +0.0 +0 0 to +0.0 ©POLE #37 +0.0 14 P4 74 P4 5 +o0 '4.t lt3 '3-t -jt-�+3-7 +4t! +3-�7 It t +0.0 +0.0 +0 1 +0 1 +0.1 +0.1 +0 0 to +0.0 +o o +0.0 +0.0 +0 0 to to +0.0 +0 0 +0.0 --- -- -- -- +0.0 +o o +o o +0.0 +0.0 +0 0 U0 to +o o +o o +0.0 +0.0 +0 0 ° +o o +o o +0.0 +o 0 +0.0 0 +0.0 +0.0 +0.0 +0.0 0,0 0.0 +01 10,2 +0.2 +0,1 +0,1 +0.0 ++0.00,0 0 0 +0 0 +0, 0 +0, 0 +0.0 +0, 0 +0.0 +0.0 +0.0 FIXTURE DESCRIPTION OCOOPER GALLEON GLEON-AF-08-LED-EI-5MQ-BZ, 445W TYPE 5 DISTRIBUTION. FIBERGLASS POLE 36'-6" ABOVE GRADE, WITH 2'-6" BASE. COOPER GALLEON GLEON-AF-08-LED-El-SL4-HSS-BZ, 445W P1 TYPE 3 DISTRIBUTION. FIBERGLASS POLE 36'-6" ABOVE GRADE, WITH 2'-6" BASE. COOPER GALLEON GLEON-AF-06-LED-El-T2-BZ, 333W P2 TYPE 2 DISTRIBUTION. FIBERGLASS POLE 36'-6" ABOVE GRADE, WITH 2'-6" BASE. COOPER GALLEON GLEON-AF-04-LED-El-SL4-HSS-BZ, 225W P3 TYPE 4 DISTRIBUTION. FIBERGLASS POLE 25'-0" ABOVE GRADE, WITH 2'-6" BASE. COOPER GALLEON GLEON-AF-04-LED-El-SL2-HSS-BZ, 225W P4 TYPE 2 DISTRIBUTION. FIBERGLASS POLE 25'-0" ABOVE GRADE, WITH 2'-6" BASE. COOPER GALLEON GLEON-AF-02-LED-El-T4W-BZ, 1 13W P5 TYPE 4 DISTRIBUTION. FIBERGLASS POLE 25'-0" ABOVE GRADE, WITH 2'-6" BASE. COOPER GALLEON GLEON-AF-02-LED-El-SL3-HSS-BZ, 1 13W P6 TYPE 3 DISTRIBUTION. FIBERGLASS POLE 25'-0" ABOVE GRADE, WITH 2'-6" BASE. COOPER GALLEON GLEON-AF-01-LED-El-SL2-HSS-BZ, 59W P7 TYPE 2 DISTRIBUTION. FIBERGLASS POLE 15'-0" ABOVE GRADE, WITH 2'-6" BASE. DSXW2 LED 40K 30C 1000 T2M, 109W LED, OLITHONIA 20' MOUNTING HEIGHT 61 LITHONIA DSXW2 LED 40K 30C 700 T4FT, 71 W LED, 20' MOUNTING HEIGHT 62 LITHONIA DSXW2 LED 40K 20C 350 T4M, 25W LED, 20' MOUNTING HEIGHT LITHONIA DSXW2 LED 40K 30C 350 T2S, 36W LED, 63 20' MOUNTING HEIGHT 96W LED, SURFACE SYMETRIC DOWN LIGHT, FLAT LENS, GA 18' MOUNTING HEIGHT SITE PLAN NOTES: �1 SECONDARY SERVICE LATERAL. VERIFY EXACT ROUTING PRIOR TO BID. SEE ONE LINE DIAGRAM. COORDINATE WITH THE POWER COMPANY FOR ALL REQUIREMENTS FOR CONNECTION OF THE TRANSFORMER. SEE NOTE O O2 TRANSFORMER IS PROVIDED BY POWER CO. E.C. SHALL COORDINATE WITH POWER COMPANY FOR ALL INSTALLATION OF TRANSFORMER & ITS CONNECTION. PROVIDE GUARD POSTS, TRANSFORMER PAD, ETC. AS REQUIRED. MEET ALL POWER COMPANY REQUIREMENTS, INCLUDE ALL CHARGES IN BID. O3 UTILITY METERING. INSTALL ALL METERING EQUIPMENT SUPPLY BY POWER CO. AS REQUIRED. ® PRIMARY CONDUITS AND TRENCHING ARE PROVIDED BY G.C. / E.C. VERIFY EXACT LOCATION AND REQUIREMENT WITH THE UTILITY COMPANY PRIOR TO BID. OBTAIN ALL CHARGES PRIOR TO BID, INCLUDE IN BID. SEE CIVIL DRAWINGS FOR EXACT LOCATION. PROVIDE 6" BED OF CLEAN SAND FOR PRIMARY CONDUIT. COVER WITH 12" OF CLEAN SAND. COVER WITH CABLE WARNING TAPE AND BACKFILL. PROVIDE HEAVY DUTY TRAFFIC RATED COVERPLATE FOR PULL BOXES. O PROVIDE AND INSTALL TELEPHONE TERMINAL BOARD AS DIRECTED BY THE TELEPHONE COMPANY. ALLOW (1) - 4' X 8' X 3/4" EXTERIOR PLYWOOD BOARD WITH (2) COATS VARNISH FOR BIDDING. THREE (3) 4" SCHEDULE 40 ENTRANCE CONDUITS AT A DEPTH OF 36" MIN. FROM THE TELEPHONE BOARD TO THE THE TELEPHONE COMPANY TERMINATION POINT, A PULL WIRE MUST BE PLACED IN ALL TELEPHONE CONDUITS FOR PROOFING AND PULLING PURPOSES. ALSO PLACE A STAKE AT THE END OF ALL TELEPHONE ENTRANCE CONDUITS. VERIFY EXACT LOCATION AND REQUIREMENTS PRIOR TO BID. SEE SHEET "E-4" FOR THE TELEPHONE BOARD LOCATION. PROVIDE A #6 COPPER GROUND WIRE FROM TELEPHONE BOARD TO BUILDING GROUNDING SYSTEM. © GENERAL & ELECTRICAL CONTRACTORS SHALL COORDINATE WITH, POWER & TELEPHONE COMPANIES TO BRING THE POWER & TELEPHONE SERVICES TO THE BUILDING. O E.C. TO PROVIDE J-BOX(ES) FOR GAS STATION CONDUITS AS REQUIRED FOR EVERY 250' OR AFTER (2) 90 DEGREES BENDS. SEAL ALL CONDUITS PER CODE. SEE ARCHITECTURAL & CIVIL DRAWINGS FOR ROUTING. ® TYPICAL FUEL FACILITY TRANSFORMER LOCATION. G.C. AND E.C. SHALL VERIFY REQUIREMENTS AND LOCATION WITH ARCHITECT. E.C. SHALL COORDINATE WITH POWER COMPANY FOR ALL INSTALLATION OF TRANSFORMER & ITS CONNECTION. PROVIDE GUARD POST, TRANSFORMER TRENCHING, PRIMARY CONDUIT, ETC. AS REQUIRED. MEET ALL POWER COMPANY REQUIREMENTS, INCLUDE ALL CHARGES IN BID. O E.C. TO PROVIDE COPPERWELD 5/8" 0 X 10' LONG GROUND ROD AT THE LIGHT POLE TYP. BOND GROUND WIRES TO GROUND ROD. 10 POLE MANUFACTURER TO PROVIDE POLE ID ON THE HANDHOLE COVER. LABEL POLE NUMBER AND CIRCUIT NUMBER PER PLAN. EXAMPLE: POLE#1, H2/54,56. 2"X4" LABEL. 1 /4" HIGH ENGRAVED LETTERS. COVER SHALL BE SECURED WITH TAMPER -PROOF SCREWS. E.C. TO VERIFY CIRCUIT NUMBERS PER PLAN AND ENSURE THE CORRECT INSTALLATION OF LABEL / COVER FOR EACH POLE. 11 E.C. TO SEAL UNDERGROUND CONDUITS WITHIN 10' OF ENTERING GROUND ON BOTH ENDS. SEAL POLE AND ASSOCIATED J-BOX. PROVIDE EXPLOSION -PROOF -RATED J-BOX AND OTHER ELECTRICAL DEVICES NEAR FUELING FACILITY. REFER TO NEC ARTICLE 514. 1� DRIVEWAY FIXTURE ON SEPARATE CIRCUIT CONTROL GROUP. 445W LED P,P1 333W LED P2 225W LED P3,P4 113W LED P5,P6 59W LED P7 36'-6" P,P1,P2 25'-0" P3,P4,P5,P6 15'-0" P7 FIBERGLASS LIGHT POLE #12 GROUND WIRE TO JNCTION & INLINE FUSES TO FIXTURES HAND HOLE/COVER POLE #XX 10 IIII �HX/XX,XX 3'-6" IIII IIII IIII 2'-9' TOTAL OVERLAP IIII JOINT 1-1/2" BELOW TOP OF BASE IIII III '•° III .a .°. CONCRETE BASE III a III 2,-6„ III ° HEAVY DUTY CONCRETE IIII FINISH GRADE ACCESS BOX IIII „ - -1 IIII ." O9 5/8"0 & 10' 36" MINIMUM COPPERWELD GROUND ROD IIII a ELECTRICAL CONDUIT FOR ---� ° GROUNDING CONDUCTOR ° ' °d ° a ELECTRICAL CONDUIT(S). ALUMINUM TUBE EMBEDDED QUANTITY AS REQUIRED IN CONCRETE BASE I 2'-0" DIA. NOTE: PROVIDE CONCRETE J-BOX AS REQUIRED. THIS DETAIL IS FOR ELECTRICAL CONDUITS ROUTING ONLY. SEE STRUCTURAL DRAWINGS SO.2 FOR DETAILS. POLE DETAIL SCALE: NTS 0 N 0 N 0 Q Z Q D Q Z 0 w CC i O N OCT Of w m w O z w Q w o I o_ Ln I 0 z W U z w w L� W CC U w F- U OC a w J 0 �z Z W �w w 0 0� U Z w O ZO Do w cn Z =)w w� m � Q� 0 z� w gw U ~ 0 0 �0 w� 0 � Q �w a wz 0Q� z0 FA-0 u N LLJ o 0 o o iz 2 J 0 W p W 0 Q = N N m rn rn o 0 \_ \ \ \ cV O O > Lo O Q V_ LLo o W OOC'') 00 Q O O O I Lo �Of4C � P4 �CC\2 z .."t z w W E-�z O1_4zO .. C0�Dwx co U) f24 Is ��I •