Loading...
200304 2300 Everest AR Landscape Plan 19-1545ADA ADA EXISTING TREE CANOPY RESTRICTS NEW TREE PLANTING HERE EXISTING LANDSCAPE TO REMAIN, TYP 2300 WEST EVEREST LANE EXISTING TREE TO REMAIN (TYP) 111 SF LANDSCAPING AREA COLUMNAR TREE DUE TO SPACE RESTRICTION FROM LIGHT POLE PROPERTY LINE PROPERTY LINE PROPE R T Y L I N E PROPERTY L I N E PROPERTY LINEPROPERTY LINE9'3"12'6'6'10' 1.REGULATIONS & STANDARDS 1.1.All contractor work shall be conducted in accordance with ISPWC (Idaho Standard Public Works Construction), 2019; and City of Meridian, ID codes, standards and state and local regulations. 2.EXISTING CONDITIONS 2.1.All utilities shall be located prior to construction and protected. Any damage to structures, utilities or concrete will be replaced at contractor's expense. 2.2.The site has many existing improvements such as underground utilities, curb and gutter, light poles and sidewalks. 2.3.See Engineer's plans for information about existing features. 2.3.1.Refer to civil plans for all existing and/or proposed drainage pipes & locations, utilities. Protect all drainage at all times, protect all utilities at all times. 3.GRADING & SITE PREPARATION 3.1.Prepare finish grades for planting by grubbing and removing weeds. If necessary apply Round-Up (or equivalent herbicide), using a certified applicator. Remove rocks and other materials over 2". 3.2.All gravel overprep to be removed and disposed of off site. 3.3.Finish grade to be smooth transition to allow for entire site to be a natural flowing space. 3.4.Fine grade lawn areas to elevations set by Engineer's plans with positive drainage away from structures. 3.5.Refer to Engineer's plans for grading information & for all drainage pipes and locations. Protect and retain drainage at all times. 3.6.No pooling or standing water will be accepted per industry standards. 4.SOILS 4.2.Lawn areas shall receive 12" min depth of screened topsoil. 4.3.Reuse of existing topsoil that has been stockpiled on site is permitted if: 4.3.1.Topsoil is tested and analyzed to ensure a proper growing medium. Provide additional amendments as determined by soil tests. 4.3.2.Topsoil is to be loose, friable sandy loam that is clean and free of toxic materials, noxious weeds, weed seeds, rocks, grass or other foreign materials. 4.3.3.Topsoil shall have a ph of 6.5 to 8.0. 4.3.4.If on site topsoil does not meet these minimum standards contractor is responsible for providing approved imported topsoil or improving onsite topsoil per the approval of the project manager. 4.4.If imported topsoil is used it must be from a local source and be screened free of any debris or foreign matter. Topsoil must not contain rocks, sticks, lumps, or toxic matter and has a pH of 6.5-8.0. 4.5.Smooth, compact, and fine grade topsoil in lawn areas to smooth and uniform grade .5" below adjacent surfaces. 4.6.Amend all new plantings with 2 parts topsoil, 1 part compost. 5.LAWN AREAS 5.1.Lay sod to form a solid mass with offset, tightly fitted joints on even grades. 5.5.Any existing lawn that is damaged shall be replaced with sodded lawn of the same type of existing lawn. 5.6.Provide tree rings with a minimum 3' diameter around all trees located in lawn, mulch type & installation/application to match all other planter beds. 6.PLANTS 6.8.All plant material shall be installed per industry standards. 6.5.All plant material shall meet or exceed the minimum federal standards as regulated by ANSI z60.1, American Standard for Nursery Stock. Plants not meeting these standards for quality, or plants determined to be unhealthy by Owner's representative, will be rejected. 6.6.All Ball and Burlap trees to be installed per Balled and Burlapped planting detail. All shrubs to be installed per detail. 6.7.Trees and shrubs over 30" shall not be planted within clear vision triangles. 6.8.Fertilize all trees and shrubs with 'Agriform' planting tablets or approved equal. Apply per manufacturers recommendations. 7.IRRIGATION 7.1.Retrofit existing to provide adequate water to new plantings. 7.2.Irrigation system shall be built to the following specifications: 7.2.1.Adhere to city codes when connecting to city water. 7.2.2.All irrigation material to be new with manufacturers' warranty fully intact. 7.2.3.Install outdoor rated controller in specified location on plan, in a lock box with 2 keys. Coordinate with project manager and general contractor on exact location. 7.2.3.1.Controller to have On/Off rain switch or rain shut off device that does not alter program. 7.2.4.2-wire system to be installed per manufacturers recommendations. follow all recommended grounding and wire splice recommendations. 7.2.5.All remote control valves (including master control valve) to have flow control device. 7.2.6.Irrigation system piping to be minimum class 200 PVC or approved equal, sleeves to be double the size of pipes located within, all wires to be contained in separate sleeves 1-1/2" dia min. 7.2.6.1.All pipe above 3" caliper to be gasketed, with approved joint restraints at all 45, TEE, ELL, 22, 11. 7.2.7.Use common trenching where possible.. 7.2.8.All PVC located under hardscapes to be schedule 40 PVC with same req's as above. 7.2.9.All wires to be Paige wire 7350 or 7351 direct bury wire at a minimum of 12" below finished grade. 7.2.10.Connect mainline to point of connection in approximate location shown on plan. 7.2.11.Contractor is responsible complying with all codes and paying all permits necessary. 7.2.12.Sprinkler heads shall have matched precipitation within each control circuit. Velocities shall not exceed 5 feet per second. 7.2.13.All drip irrigation to be buried 2" below finished grade. 7.2.14.Water schedule to be provided at a min of 80% evapotranspiration as determined by the local ET. 7.2.15.Install all irrigation per irrigation drawings. utilize material specified or approved equal. 7.3.Contractor shall confirm the static water pressure at least five days before construction begins and to contact the landscape architect in writing if the pressure is below 80 psi. 7.4.If any discrepancies are found, then local codes shall prevail. 8.CONTRACTOR RESPONSIBILITIES 8.1.Estimated quantities are shown for general reference only. Contractor shall be responsible for all quantity estimates. 8.2.All plant material and workmanship shall be guaranteed for a period of one year beginning at the date of Acceptance by Owner. Replace all dead or unhealthy plant material immediately with same type and size at no cost to Owner. 8.3.Landscape contractor to turn in as built drawings at the end of project. Substantial completion will not be granted until 2 copies @ 1"=20' scale are turned in and approved by owner's representative. 9.In the event of a discrepancy, notify the General Contractor. LANDSCAPE NOTES: LANDSCAPE REQUIREMENTS CODE REQUIREMENTS PER CITY CODE PARKING LOT: 1 TREE IN NEW REFORMATTED PLANTER ISLAND REQUIRED & PROVIDED NO ADDITIONAL NEW TREES REQUIRED PER CURRENT TREE COUNT ON SITE These documents are the property of Stack Rock Group and are not to be copied, reproduced, distributed, either directly or indirectly, used for another project or any purpose whatsoever without express and written permission of Stack Rock Group.JOB NO: DATE: DRAWN BY: CHECKED BY: # DRAWING TITLE SHEET NUMBER jb jb 12.16.2019 19-1545 D e s c r i p t i o nDATEMRK REVISIONSG:\Shared drives\Stack Rock Group\Work\2019\01-Projects\19-1545 2300 W. Everest\03-CAD\3.01-City Submittals\19-1545 L100 AR Landscape Plan.dwg2300 W EVEREST LN PARKING MODMERIDIAN, IDAHO1 ABCDEFGH2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 STACK ROCK GROUP - CITY REVIEW SETWILLET C HOWARD, PLA OFFICE: (208) 345.0500 EMAIL: WILL@STACKROCKGROUP.COM www.STACKROCKGROUP.COM THE GRAPHICS AND DESIGNS O N T H I S S H E E T A R E DEL IVERABL ES TH AT RE MAI N AT AL L TI M E S PR OPE R T Y O F S T A C K R O C K G R O U P , I N C . REPRODUCTION OR REUSE OF T H I S P R O D U C T C O N T A I N E D H E R E I N I S P R O H I B I T E D W I T H O U T T H E W R I T T E N C O N S E N T O F S T A C K R O C K G R O U P , I N C . ©2019 STACK ROCK GROUP, INC. LANDSCAPE ARCHITECTURE & MASTER PLANNING (208) 345-0500 404 S 8th St. #154 Boise, ID 83702 StackRockGroup.com PRELIMINARY NOT FOR CONSTRUCTION 03.03.20 L100 LANDSCAPE PLAN 0 SCALE: feet204060 1" = 20'NORTH LANDSCAPE PLAN: TREES BOTANICAL / COMMON NAME CONT CAL QTY REMARKS Carpinus betulus `Franz Fontaine` / Franz Fontaine Hornbeam B&B 2"1 45`H x 12`W PLANT SCHEDULE