Hi Sonya,
We are going to have the site plan to you shortly.
I took a harder look at the sidewalk at Franklin and Entrata - that has a gap. The sidewalk would be
really steep if connected – greater than 10%. That was the reasoning for not connecting them. The
sidewalk along Franklin is connected all of the way through.
The sidewalks adjacent to the public streets were constructed last November – they are all in.