Loading...
Elevation12345GLAZING ASSCHEDULED, TYPSPANDRAL GLASS,TYPBUILDING ELEVATIONS AND WINDOW SCHEDULEEM-A-4001BJRESEIGHB99% BID SET12/XX/19KEY NOTESGENERAL NOTES1.HEAVY SOLID LINE INDICATES NEW WORK TO BEINSTALLED.2.REFER TO CIVIL SHEETS FOR ADDITIONALINFORMATION.3.SEE THIS SHEET FOR WINDOWS AND WINDOWSCHEDULE.4.SEE SHEET A-3001 FOR WINDOW DETAILS.NEW ALUMINUM WINDOW SYSTEM. MATCH EXISTINGWINDOW SYSTEM ON SOUTH SIDE OF BUILDING. SEEDETAILS SHEET A-3001EXISTING STAIR SYSTEM TO REMAIN AND BEPROTECTEDEXISTING VEHICLE RAMP TO REMAIN.EXISTING FENCE TO REMAIN AND BE PROTECTED.EXISTING WINDOW SYSTEM TO REMAIN AND BEPROTECTED.X12345REVDESCRIPTIONDATEBOISEFACILITIESENGINEERINGPROJECT COORD:ENG. COORD:OWNER:DRAWN BY:LID:TOOL ETI:TOOL MICAP:NOTETHIS DOCUMENT IS THE PROPERTY OF MICRON TECHNOLOGY, INC.AND CONTAINS CONFIDENTIAL INFORMATION THAT IS PROTECTED BYA CONFIDENTIALITY OR NON DISCLOSURE AGREEMENT EXECUTED BYTHE RECIPIENT, AND STATE AND FEDERAL LAW. UNAUTHORIZEDDISCLOSURE MAY RESULT IN CIVIL OR CRIMINAL LIABILITY.ISSUED FOR CONSTRUCTIONSIGNATUREREVISIONSHEETPROJECT / WO:DOCUMENTPROJECTC39982CRUCIAL EXTERIOR MODIFICATIONS - FINISHED GOODS TO R&D SUPPORT SSCHELLERPCHRISTENSENJFIESELMANAPPROVED FOR CONSTRUCTION(APPROVER)(DATE)NOT FORCONSTRUCTION2SOUTH ELEVATIONSCALE: 1/8" = 1'-0"A-XXXX121111532221WINDOW TYPENTS