Revised Landscape_CZC-L1.5LA-238STATE O F IDA
H
O
LICENS
E
D
LANDS C A P E ARCHITECTRODNEY P . EVAN
S
JR.L1.5
FEDEX FACILITY
2740 W. FRANKLIN ROAD
MERIDIAN, ID
CERTIFICATE OF ZONING COMPLIANCE
CERTIFICATE OF ZONING COMPLIANCE
19060
LP RE
10/22/19
-
-
-
-
-
-
-
-
-
-
-
-
LANDSCAPE DETAILS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
A
B
C
D
E
F
G
H
J
K
L
M
PR
E
LI
MI
N
A
R
Y
NOT FORC O N S T R U C T I O NDRAWN BY CHECKED BY
PROJECT
DATE
SHEET
REVISION/ISSUENO.DATE
CALL 2 BUSINESS DAYS
IN ADVANCE BEFORE
YOU DIG, GRADE, OR
EXCAVATE FOR THE
MARKING OF
UNDERGROUND
MEMBER UTILITIES
Call before you dig.
Know what's below .
R
Copyright 2019All rights reserved. Reproduction or use in any form or by any means without written permission of Rodney Evans + Partners, PLLC. is unlawful and subject to criminal prosecution.reandpartners.com + 208-514-3300 + 1014 S. La Pointe, Boise, Idaho 83706LANDSCAPE ARCHITECTURE+ URBAN DESIGN+ LAND PLANNING+ GRAPHIC COMMUNICATION+ PROJECT MANAGEMENTCITY COMMENTS; SITE PLAN REVS1 11/18/19
CONIFEROUS TREE PLANTING4 NOT TO SCALE
SOIL LINE
ROOT FLARE TO BE AT SOIL LINE.
REMOVE DEAD/DAMAGED BRANCHES AND
PRUNE TO INTERNATIONAL SOCIETY OF
ARBORICULTURE STANDARDS; IMPROPERLY
PRUNED TREES (AS DETERMINED BY THE
LANDSCAPE ARCHITECT) SHALL BE REMOVED
AND REPLACED. DO NOT REMOVE MAIN
LEADER!!
RUBBER CINCH TIE
2"x 2" WOOD STAKE (LENGTH AS
REQUIRED)-DO NOT PENETRATE ROOTBALL.
SEE NOTE 1. SET STAKES PARALLEL TO
PREVAILING WIND.
CONSTRUCT 2" EARTH BERM AT EDGE OF
ROOTBALL, FILL TREE RING W/ MULCH, AS
SPECIFIED.
3" THICK MULCH LAYER, KEEP MULCH 3" AWAY
FROM TRUNK.
FINISH GRADE
PREVAILING WIND DIRECTION
COMMERCIAL SLOW RELEASE FERTILIZER
TABLETS
SIDES OF HOLE ROUGH & UNEVEN
BACKFILL WITH APPROVED TOPSOIL AND
SOIL AMENDMENTS AS SPECIFIED.
BACKFILL IN 6" LIFTS, WATER EACH LAYER,
TAMP LIGHTLY AS REQUIRED, BACKFILL
SOIL EVEN W/ TOP OF ROOTBALL,
DO NOT OVER COMPACT!!
SET ROOTBALL ON NATIVE, UNDISTURBED
SOIL
NOTES:
1.REMOVE BURLAP, TWINE, AND WIRE BASKET FROM TOP 2 3 OF ROOTBALL. REMOVE ALL NAILS, TIES, AND PLASTIC FROM
ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO WRAP THE ROOTBALL, IT SHALL BE COMPLETELY REMOVED. ONLY
BIODEGRADABLE BURLAP SHALL BE LEFT ON THE BOTTOM OF THE ROOTBALL.
2.THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO ENSURE
THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR LENGTH OF WARRANTY PERIOD OR 1 YEAR
AFTER SUBSTANTIAL COMPLETION WHICHEVER IS GREATER. ALL STAKING SHALL BE REMOVED AT THE END OF THE
WARRANTY PERIOD.
3.IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE
ARCHITECT BEFORE PROCEEDING.
4.LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT
MATERIAL.
5.WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING
METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE.
6.WATER TREE TWICE WITHIN THE FIRST 24 HOURS.
7.IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY.
SHRUB PLANTING1 NOT TO SCALE
1.SHRUB SHALL BEAR SAME RELATIONSHIP TO GRADE AS IT DID IN NURSERY.
2.WATER SHRUB TWICE WITHIN FIRST 24 HOURS.
3.THIN BRANCHES AND FOLIAGE BY 13.
4.DO NOT CUT LEADERS TO RETAIN NATURAL SHRUB SHAPE.
5.FOR CONTAINER GROWN PLANTS THAT ARE ROOTBOUND, SPLIT THE ROOTBALL WITH 3 EQUAL SPACED
VERTICAL CUTS.
NOTES:
REMOVE ANY PLASTIC, BURLAP, NAILS, OR OTHER
MATERIALS FROM THE ROOTBALL WHICH MAY LIMIT
ROOT GROWTH
CONSTRUCT 2" EARTH BERM TO FORM A WATER
RETENTION BASIN, FILL BERM WITH MULCH, AS
SPECIFIED
MULCH, PER PLANS, 3" DEPTH OVER ENTIRE BED. DO
NOT COVER CROWNS OF PLANTS
PROVIDE COMMERCIAL FERTILIZER TABLETS AND
BIOSTIMULANT, AS SPECIFIED, FOR EACH SHRUB
BACKFILL WITH APPROVED TOPSOIL AND SOIL
AMENDMENTS, AS SPECIFIED. BACKFILL IN 6" LIFTS,
WATER EACH LAYER, DO NOT TAMP OR OVER
COMPACT.
CONSTRUCT 6" MOUND OF TOPSOIL
PLANTER BED CUT EDGE
(TYPICAL AT TREES IN TURF AREAS)2 NOT TO SCALE
APPROVED TOPSOIL AND SOIL
AMENDMENTS AS SPECIFIED
3" DEPTH OF MULCH AT PLANTER
BEDS
FINISH GRADE,
PER PLANS
STORMWATER POND
REVEGETATION REQUIREMENTS
GENERAL OVERVIEW
THESE REQUIREMENTS OUTLINE THE RECOMMENDED GUIDELINES FOR REVEGETATION OF SIDE-SLOPES, BANKS, AND BOTTOMS
( EXCLUDING SAND INVERT AREAS) OF NEW STORMWATER MANAGEMENT PONDS. THE FIVE MAIN GOALS FOR THE REVEGETATION OF
NEW PONDS ARE AESTHETICS, NOXIOUS WEED AND INVASIVE SPECIES MANAGEMENT, FIRE HAZARD REDUCTION, WATER QUALITY
AND EROSION CONTROL.
GENERAL EARTHWORK
ALL WORK SHALL BE LIMITED TO THE AREA REQUIRED FOR CONSTRUCTION. ALL FINISHED GRADES SHALL BE SMOOTH AND
ROUNDED TO ENSURE A NATURAL TRANSITION BETWEEN NEW AND EXISTING GRADES. REFER TO GRADING AND DRAINAGE PLANS
FOR ADDITIONAL REQUIREMENTS. IF NATURAL TOPSOIL OCCURS AT VARYING DEPTHS ON THE PROJECT SITE. THE TOPSOIL SHOULD
BE EXCAVATED AND STOCKPILED AT DESIGNATED STORAGE AREAS PRIOR TO THE PROPOSED GRADING OPERATIONS.
SITE ASSESSMENT
CONTRACTOR SHALL ASSESS THE EXISTING SOIL CONDITIONS TO IDENTIFY ANY BARRIERS TO A SUCCESSFUL ESTABLISHMENT
OF THE DESIRED SPECIES DUE TO CONDITIONS AT THE SITE. IF VISUAL ASSESSMENT OF SOIL INDICATES ANY UNUSUAL SOIL
CONDITIONS, THE CONTRACTOR SHALL HAVE THREE (3) SOIL TESTS PERFORMED BY A QUALIFIED SOIL ANALYSIS LABORATORY.
THESE RESULTS WILL DIRECT THE PREPARATION OF THE SOIL FOR THE REVEGETATION ACTIVITIES.
CONTRACTOR SHALL ALSO ASSESS THE EXISTING HYDROLOGICAL CONDITIONS IF ANY AND THE PROPOSED TOPOGRAPHY OF
THE PROPOSED POND.
TOPSOIL REQUIREMENTS AND PREPARATION
REUSE EXISTING TOPSOIL STOCKPILED ON THE SITE. SUPPLEMENT WITH IMPORTED TOPSOIL WHEN QUANTITIES ARE
INSUFFICIENT. TOPSOIL REQUIREMENTS: ASTM D 5268, PH RANGE OF 5.5 TO 7, FOUR PERCENT ORGANIC MATERIAL MINIMUM, FREE
OF STONES 1/2 INCH OR LARGER IN ANY DIMENSION, AND OTHER EXTRANEOUS MATERIALS HARMFUL TO PLANT GROWTH.
TOPSOIL SOURCE: STRIP EXISTING TOPSOIL FROM ALL AREAS OF THE SITE TO BE DISTURBED. TOPSOIL SHALL BE FERTILE,
FRIABLE, NATURAL LOAM, SURFACE SOIL, REASONABLY FREE OF SUBSOIL, CLAY LUMPS, BRUSH, WEEDS AND OTHER LITTER, AND
FREE OF ROOTS, STUMPS, ORGANIC MATTER LARGER THAN 2 INCHES IN ANY DIMENSION, AND OTHER EXTRANEOUS OR TOXIC
MATTER HARMFUL TO PLANT GROWTH. TOPSOIL SHALL BE SCREENED TO ACHIEVE THIS REQUIREMENT.
CONTRACTOR SHALL HAVE (3) TOPSOIL SAMPLES TESTS PERFORMED BY A QUALIFIED SOIL ANALYSIS LABORATORY.
REPRESENTATIVE SAMPLES SHALL BE TESTED FOR ACIDITY, FERTILITY AND GENERAL TEXTURE BY A QUALIFIED SOIL ANALYSIS
LABORATORY AND COPIES OF THE TESTING AGENCY'S FINDINGS AND RECOMMENDATIONS SHALL BE FURNISHED TO THE LANDSCAPE
ARCHITECT'S REPRESENTATIVE BY THE CONTRACTOR. ALL TOPSOIL SHALL BE AMENDED TO ACHIEVE SPECIFIED PH AND ORGANIC
REQUIREMENTS. RE-TEST TOPSOIL PRIOR TO FINAL COMPLETION TO ENSURE REQUIREMENTS HAVE BEEN MET. NO TOPSOIL SHALL
BE PLACED WHILE IN A FROZEN OR MUDDY CONDITION.
PLACE TOPSOIL IN AREAS WHERE REQUIRED TO OBTAIN THICKNESS AS SCHEDULED. PLACE TOPSOIL DURING DRY WEATHER.
PROVIDE ADDITIONAL IMPORTED TOPSOIL REQUIRED TO BRING SURFACE TO PROPOSED FINISH GRADE, AS REQUIRED
COMPACTED TOPSOIL THICKNESS AT THE FOLLOWING AREAS:
GRASSES AND FORBS: 6 INCHES MINIMUM
FINE GRADE TOPSOIL TO SMOOTH, EVEN SURFACE WITH LOOSE, UNIFORMLY FINE TEXTURE. REMOVE RIDGES AND FILL
DEPRESSIONS, AS REQUIRED TO MEET FINISH GRADES.
TOPSOIL STOCKPILE LOCATIONS TO BE COVERED COORDINATE WITH EROSION AND SEDIMENT CONTROL PLAN.
ALL GRAVEL, SUBBASE, AND OTHER IMPORTED FILL MATERIALS OTHER THAN TOPSOIL SHALL ONLY BE STOCKPILED IN
PROPOSED IMPERVIOUS AREAS. NO GRAVEL OR ROCK MATERIALS SHALL BE STOCKPILED OR TEMPORARILY PLACED IN PROPOSED
LANDSCAPE AREAS TO PREVENT LANDSCAPE AREAS FROM BEING CONTAMINATED WITH ROCK MATERIALS. CONTRACTOR SHALL
SUBMIT A DETAILED STOCKPILE PLAN TO LANDSCAPE ARCHITECT AND OWNER FOR APPROVAL PRIOR TO ANY EARTHWORK
OPERATIONS.
TOPSOIL DISTRIBUTION
ONCE THE GENERAL EARTHWORK IS COMPLETE AND ROUGH GRADING HAS BEEN ACCOMPLISHED, THE TOPSOIL SHOULD BE
REDISTRIBUTED OVER THE AREA TO MINIMUM DEPTHS AS SPECIFIED. WHERE NEEDED, SLOPES SHOULD BE GRADED WITH
SERRATION TO HOLD TOPSOIL ADEQUATELY. TOPSOIL SHOULD BE SPREAD AND LIGHTLY COMPACTED UTILIZING A SMALL CLEATED
TRACTOR MOVING PERPENDICULAR TO THE CONTOURS OR ANOTHER METHOD WITH EQUAL CAPABILITY. IT IS OUR RECOMMENDATION
THAT ANY NECESSARY MECHANICAL MEANS OF EROSION CONTROL BE IN PLACE PRIOR TO BEGINNING SITE DISTURBANCE.
ONCE TOPSOIL HAS BEEN DISTRIBUTED AND GRADED, REVEGETATION SEEDING SHALL FOLLOW IMMEDIATELY. IN ORDER TO
ELIMINATE SURFACE CRUSTING AND TO FACILITATE BETTER ROOT PENETRATION, THE SURFACE SHOULD BE SCARIFIED PRIOR TO
SEEDING.
COMPOST ADDITION TO THE TOPSOIL
COMPOST ADDITION RATES WILL BE DEPENDENT ON THE QUALITIES OF THE COMPOST AND THE QUALITIES OF THE TOPSOIL.
COMPOST APPLICATION RATES SHALL BE DETERMINED BY CONSULTATION WITH A QUALIFIED RECLAMATION SPECIALIST,
AGRICULTURAL PROFESSIONAL OR A REPRESENTATIVE OF THE COMPOST PRODUCER. CONTRACTOR SHALL HAVE ONE (1) SAMPLE
OF THE COMPOST TESTED BY A QUALIFIED SOIL ANALYSIS LABORATORY.
IF APPLYING COMPOST, LOOSEN SURFACE SOIL TO A DEPTH OF AT LEAST 6 INCHES. PROVIDE WEED ABATEMENT PROCEDURE.
APPLY SOIL AMENDMENTS ACCORDING TO PLANTING SOIL MIX PROPORTIONS AND MIX THOROUGHLY INTO TOP 6 INCHES OF SOIL.
TILL SOIL TO A HOMOGENEOUS MIXTURE OF FINE TEXTURE. APPLY SOIL AMENDMENTS DIRECTLY TO SURFACE SOIL BEFORE
LOOSENING.
PROBLEMATIC SOIL CONDITIONS
SITE INVESTIGATION AND TOPSOIL ANALYSIS MAY INDICATE THE NEED FOR REMEDIATION OF PROBLEMATIC SOIL CONDITIONS
SUCH AS COMPACTION OR NUTRIENT EXCESSES OR DEFICIENCIES.
WEED ABATEMENT
ALL AREAS TO BE PLANTED OR SEEDED SHALL HAVE WEED ABATEMENT OPERATIONS PERFORMED ON THEM PRIOR TO
PLANTING OR SEEDING.
CONTRACTOR SHALL SPRAY ALL EXPOSED WEEDS WITH ROUND-UP (CONTACT HERBICIDE) OR APPROVED EQUAL. DO NOT WATER
FOR AT LEAST SEVEN (7) DAYS. REMOVE EXPOSED WEEDS FROM THE SITE. CONTRACTOR SHALL OPERATE THE AUTOMATIC
IRRIGATION SYSTEM FOR A PERIOD OF FOURTEEN (14) DAYS. AT CONCLUSION OF THIS WATERING PERIOD, DISCONTINUE WATERING
FOR THREE TO FIVE (3-5) DAYS. APPLY SECOND APPLICATION OF ROUND-UP TO ALL EXPOSED WEEDS. APPLY IN STRICT
CONFORMANCE WITH MANUFACTURER'S SPECIFICATIONS AND INSTRUCTIONS. DO NOT WATER FOR AT LEAST SEVEN (7) DAYS.
REMOVE WEEDS FROM THE SITE. IF ANY EVIDENCE OF WEED GERMINATION EXISTS AFTER TWO (2) APPLICATIONS, CONTRACTOR
SHALL BE DIRECTED TO PERFORM A THIRD APPLICATION. AT THE TIME OF PLANTING AND SEEDING, ALL PLANTING AREAS SHALL BE
WEED FREE.
SEEDING
THE FOLLOWING INFORMATION PROVIDES MATERIAL AND EXECUTION FOR SEEDING.
NUTRI BASE MULCH MATERIAL
NUTRI BASE FROM QUATTRO ENVIRONMENTAL, AN ORGANIC SOIL AMENDMENT AND PROTEIN-RICH NUTRITIOUS FIBER MULCH .
APPLY AT THE RATE OF 2000 LBS. PER ACRE.
ORGANIC SOIL AMENDMENT
GROW NUTRIBOOST FROM QUATTRO ENVIRONMENTAL (OR APPROVED EQUAL) APPLIED AT 5 GALLONS PER ACRE.
TACKIFIER
MULCH TACKIFIER SOIL STABILIZER - ECOLOGY CONTROLS M-BINDER. TACKIFIER APPLIED AT THE RATE OF 80 LBS. PER ACRE.
GRANITE SEED
1697 WEST 2100 NORTH
P.O. BOX 177
LEHI, UTAH 84043
1-800-768-4433
(OR APPROVED EQUAL)
COMMON NAME
ALKALI SACATON
BLUE WILDRYE
GREAT BASIN WILDRYE
IDAHO FESCUE
NEEDLE-AND-THREAD
SLENDER WHEATGRASS
SQUIRRELTAIL
WESTERN WHEATGRASS
TOTAL
BOTANICAL NAME
Sporobolus airoides
Elymus glaucus
Leymus cinereus
Festuca idahoensis
Hesperostipa comata
Elymus trachycaulus
Elymus elymoides
Pascopyrum smithii
POUNDS PER LIVE
SEED PER ACRE
0.1
2.9
2.0
0.6
0.2
3.3
3.7
3.6
15.4
PERCENT OF
PURE LIVE
SEED IN MIX
9
15
10
10
1
20
20
15
100
COMMON NAME
ALKALI BULRUSH
BALTIC RUSH
HARDSTEM BULRUSH
OLNEY THREESQUARE
SOFTSTEM BULRUSH
TOTAL
BOTANICAL NAME
Bolboschoenus maritimus
Juncus balticus
Schoenoplectus acutus var. acutus
Schoenoplectus americanus
Schoenoplectus tabernaemontani
POUNDS PER LIVE
SEED PER ACRE
2.4
0.1
2.6
4.4
1.4
10.9
PERCENT OF
PURE LIVE
SEED IN MIX
10
25
25
20
20
100
ZONE 1 - UPLAND SEED MIX FOR CLAY OR SILT-CLAY SOILS
ZONE 2 - WETLAND SEED MIX FOR PERENNIALLY FLOODED AREAS
DRILL SEEDING
DRILL SEEDING IS RECOMMENDED IN THE UPLAND AREAS WITH SLOPES LESS THAN 3:1.
SEED DEPOSITION SHOULD BE CALIBRATED TO A DEPTH OF 0.25 TO 0.5 INCH. FULL SIZE OR COMPACT RANGELAND DRILLS ARE
RECOMMENDED. DEPENDING ON SIZE, DRILLS CAN BE PULLED BY TRACTOR OR ALL-TERRAIN VEHICLE. DRILL SEEDING SHOULD
FOLLOW CONTOURS IN TOPOGRAPHY TO MINIMIZE EROSION POTENTIAL. CONTRACTOR'S OPTION TO DRILL SEED OR HYDROSEED
UPLAND AREAS.
HYDROSEEDING
MIX SPECIFIED SEED AND ORGANIC SOIL AMENDMENT IN WATER PER MANUFACTURER'S RECOMMENDATIONS. APPLY
SEEDED SLURRY EVENLY IN TWO INTERSECTION DIRECTIONS. DO NOT HYDROSEED AREA IN EXCESS OF THAT WHICH CAN BE
MULCHED ON SAME DAY. KEEP OFF ROADS, WALKS, STRUCTURES AND AREAS NOT TO BE SEEDED. CLEAN UP THESE AREAS.
AFTER HYDROSEEDING IN UPLAND AREAS, TRACK IN SEED USING A CLEATED CRAWLER WITH TRACK MARKS PERPENDICULAR TO
THE SLOPE. AFTER TRACKED, MULCH SLOPE WITH 2000 LBS. PER ACRE OF FERTILE-FIBER MULCH MATERIAL AND 80 LBS. PER
ACRE OF TACKIFIER.
AFTER HYDROSEEDING IN WETLAND AREAS, DO NOT TRACK IN SEED USING A CLEATED CRAWLER. AFTER SEEDING, MULCH AREA
WITH 2000 LBS. PER ACRE OF FERTILE-FIBER MULCH MATERIAL AND 80 LBS. PER ACRE OF TACKIFIER.
SEEDING TIME
THE OPTIMAL SEEDING TIME SHALL BE IN FALL, BETWEEN MID SEPTEMBER AND MID OCTOBER. IF SEEDING IS APPLIED TOO
EARLY OR TOO LATE AND PROPER GERMINATION IS NOT REALIZED PRIOR TO FALL DORMANCY, THEN RESEEDING SHALL BE
APPLIED IN EARLY SPRING, AS SOON AS SOIL IS WORKABLE (NOT MUDDY) BETWEEN MARCH AND MID MAY. THIS PLANTING TIME
PROVIDES THE OPTIMUM WEATHER CONDITIONS FOR SEED GERMINATION AND SEEDLING SURVIVAL RATE. SEEDING AFTER
NOVEMBER 20, 'DORMANT SEEDING' INSURES THAT THE SEED DOES NOT GERMINATE PRIOR TO FREEZING WINTER
TEMPERATURES AND SEED SHOULD BE IN PLACE FOR THE EARLY SPRING RAINS.
TEMPORARY SUPPLEMENTAL IRRIGATION
THE CONTRACTOR SHALL PROVIDE SUPPLEMENTAL IRRIGATION IN SITUATIONS WHERE IMMEDIATE VEGETATION
ESTABLISHMENT IS DESIRED, SUCH AS HIGHLY VISIBLE SITES OR EROSION PRONE AREAS OR WHERE IT MAY BE NECESSARY FOR
SEEDLING ESTABLISHMENT.
SEEDED AREAS SHOULD BE IRRIGATED USING OVERHEAD SPRAY OR ROTOR IN-GROUND SPRINKLER IRRIGATION SYSTEM. IT IS
RECOMMENDED THAT, IF USED, THE IRRIGATION BE CONTINUED FOR AT LEAST TWO (2) SEASONS. SEE IRRIGATION PLANS.
GENERAL MAINTENANCE AND MONITORING
THE CONTRACTOR SHALL MAINTAIN THE SITE FOLLOWING REVEGETATION FOR THE PERIOD OF TWO (2) YEARS. THIS
INCLUDES REMOVAL OF VOLUNTEER TREES AND SHRUBS, LITTER CONTROL, WEED CONTROL AND MOWING OF TALL GRASSES AT
THE DISCRETION OF ACHD STAFF. MOWING SHOULD ONLY BE PERFORMED WHERE FORBS, SHRUBS AND TREES ARE NOT
PLANTED.
SITES SHALL BE VISITED EVERY TWO (2) WEEKS FOR MONITORING AND ASSESSING THE SEEDING SUCCESS. VISUAL
ASSESSMENT BY TRAINED PERSONNEL SHOULD OCCUR SEVERAL TIMES OVER THE THE NEXT TWO (2) GROWING SEASONS
FOLLOWING THE REVEGETATION PROJECT. VISUAL ASSESSMENTS SHALL INCLUDE ESTIMATIONS OF VEGETATIVE COVER AND
ESTABLISHMENT, VEGETATION SPECIES COMPOSITION, SOIL CONDITIONS AND HYDROLOGICAL CONDITIONS. VISUAL ASSESSMENT
WILL IDENTIFY PROBLEM AREAS WHERE REVEGETATION AND SITE PREPARATION EFFORTS WILL BE REQUIRED. SITES SHOULD BE
MONITORED FOR PRESENCE OF NOXIOUS WEEDS AND INVASIVE SPECIES. REAPPLY HERBICIDE AS NEEDED FOLLOWING
MANUFACTURER'S GUIDELINES AND MAINTENANCE PERSONNEL EXPERTISE. OTHER POST-MONITIORING METHODS THAT SHOULD
BE COMBINED WITH VISUAL ASSESSMENT SHALL INCLUDE LINE-POINT INTERCEPT TRANSECTS THAT QUANTIFY REVEGETATION
PROGRESS OVER TIME.
RESEEDING EFFORTS SHALL FOLLOW THE SPECIFIED SEED MIXES FOR THE PROJECT AS NOTED ABOVE.
DECIDUOUS TREE PLANTING3 NOT TO SCALE
SOIL LINE
ROOT FLARE TO BE AT SOIL LINE
NOTES:
1.REMOVE BURLAP, TWINE, AND WIRE BASKET FROM TOP 2 3 OF ROOTBALL. REMOVE ALL NAILS, TIES, AND PLASTIC FROM
ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO WRAP THE ROOTBALL, IT SHALL BE COMPLETELY REMOVED. ONLY
BIODEGRADABLE BURLAP SHALL BE LEFT ON THE BOTTOM OF THE ROOTBALL.
2.THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO ENSURE
THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR LENGTH OF WARRANTY PERIOD OR 1 YEAR
AFTER SUBSTANTIAL COMPLETION WHICHEVER IS GREATER. ALL STAKING SHALL BE REMOVED AT THE END OF THE
WARRANTY PERIOD.
3.IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE
ARCHITECT BEFORE PROCEEDING.
4.LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT
MATERIAL.
5.WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING
METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE.
6.WATER TREE TWICE WITHIN THE FIRST 24 HOURS.
7.IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY.
8.FOR TREES LOCATED WITHIN ROADSIDE PLANTERS LESS THAN 8'-0" IN WIDTH, PROVIDE TREE ROOT BARRIER (DEEPROOT
#24-2 OR APPROVED EQUAL). LOCATE ROOT BARRIER AT BACK OF CURB AND EDGE OF SIDEWALK. ALL TREE INSTALLATIONS
SHALL CONFORM TO ALL AGENCY APPROVAL REQUIREMENTS, CONTRACTOR SHALL VERIFY PRIOR TO ANY INSTALLATIONS.
REMOVE DEAD/DAMAGED BRANCHES AND
PRUNE TO INTERNATIONAL SOCIETY OF
ARBORICULTURE STANDARDS; IMPROPERLY
PRUNED TREES (AS DETERMINED BY THE
LANDSCAPE ARCHITECT) SHALL BE REMOVED
AND REPLACED. DO NOT REMOVE MAIN
LEADER!!
RUBBER CINCH TIE
2"x 2" WOOD STAKE (LENGTH AS
REQUIRED)-DO NOT PENETRATE ROOTBALL.
SEE NOTE 1. SET STAKES PARALLEL TO
PREVAILING WIND.
REMOVE TREE WRAP TRUNK PROTECTION,
AFTER INSTALLATION
CONSTRUCT 2" EARTH BERM AT EDGE OF
ROOTBALL, FILL TREE RING W/ MULCH, AS
SPECIFIED.
3" THICK MULCH LAYER, KEEP MULCH 3" AWAY
FROM TRUNK.
FINISH GRADE
PREVAILING WIND DIRECTION
COMMERCIAL SLOW RELEASE FERTILIZER
TABLETS
SIDES OF HOLE ROUGH & UNEVEN
BACKFILL WITH APPROVED TOPSOIL AND
SOIL AMENDMENTS AS SPECIFIED.
BACKFILL IN 6" LIFTS, WATER EACH LAYER,
TAMP LIGHTLY AS REQUIRED, BACKFILL
SOIL EVEN W/ TOP OF ROOTBALL,
DO NOT OVER COMPACT!!
SET ROOTBALL ON NATIVE, UNDISTURBED
SOIL