Loading...
Revised Landscape_CZC-L1.5LA-238STATE O F IDA H O LICENS E D LANDS C A P E ARCHITECTRODNEY P . EVAN S JR.L1.5 FEDEX FACILITY 2740 W. FRANKLIN ROAD MERIDIAN, ID CERTIFICATE OF ZONING COMPLIANCE CERTIFICATE OF ZONING COMPLIANCE 19060 LP RE 10/22/19 - - - - - - - - - - - - LANDSCAPE DETAILS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A B C D E F G H J K L M PR E LI MI N A R Y NOT FORC O N S T R U C T I O NDRAWN BY CHECKED BY PROJECT DATE SHEET REVISION/ISSUENO.DATE CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES Call before you dig. Know what's below . R Copyright 2019All rights reserved. Reproduction or use in any form or by any means without written permission of Rodney Evans + Partners, PLLC. is unlawful and subject to criminal prosecution.reandpartners.com + 208-514-3300 + 1014 S. La Pointe, Boise, Idaho 83706LANDSCAPE ARCHITECTURE+ URBAN DESIGN+ LAND PLANNING+ GRAPHIC COMMUNICATION+ PROJECT MANAGEMENTCITY COMMENTS; SITE PLAN REVS1 11/18/19 CONIFEROUS TREE PLANTING4 NOT TO SCALE SOIL LINE ROOT FLARE TO BE AT SOIL LINE. REMOVE DEAD/DAMAGED BRANCHES AND PRUNE TO INTERNATIONAL SOCIETY OF ARBORICULTURE STANDARDS; IMPROPERLY PRUNED TREES (AS DETERMINED BY THE LANDSCAPE ARCHITECT) SHALL BE REMOVED AND REPLACED. DO NOT REMOVE MAIN LEADER!! RUBBER CINCH TIE 2"x 2" WOOD STAKE (LENGTH AS REQUIRED)-DO NOT PENETRATE ROOTBALL. SEE NOTE 1. SET STAKES PARALLEL TO PREVAILING WIND. CONSTRUCT 2" EARTH BERM AT EDGE OF ROOTBALL, FILL TREE RING W/ MULCH, AS SPECIFIED. 3" THICK MULCH LAYER, KEEP MULCH 3" AWAY FROM TRUNK. FINISH GRADE PREVAILING WIND DIRECTION COMMERCIAL SLOW RELEASE FERTILIZER TABLETS SIDES OF HOLE ROUGH & UNEVEN BACKFILL WITH APPROVED TOPSOIL AND SOIL AMENDMENTS AS SPECIFIED. BACKFILL IN 6" LIFTS, WATER EACH LAYER, TAMP LIGHTLY AS REQUIRED, BACKFILL SOIL EVEN W/ TOP OF ROOTBALL, DO NOT OVER COMPACT!! SET ROOTBALL ON NATIVE, UNDISTURBED SOIL NOTES: 1.REMOVE BURLAP, TWINE, AND WIRE BASKET FROM TOP 2 3 OF ROOTBALL. REMOVE ALL NAILS, TIES, AND PLASTIC FROM ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO WRAP THE ROOTBALL, IT SHALL BE COMPLETELY REMOVED. ONLY BIODEGRADABLE BURLAP SHALL BE LEFT ON THE BOTTOM OF THE ROOTBALL. 2.THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO ENSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR LENGTH OF WARRANTY PERIOD OR 1 YEAR AFTER SUBSTANTIAL COMPLETION WHICHEVER IS GREATER. ALL STAKING SHALL BE REMOVED AT THE END OF THE WARRANTY PERIOD. 3.IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT BEFORE PROCEEDING. 4.LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT MATERIAL. 5.WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE. 6.WATER TREE TWICE WITHIN THE FIRST 24 HOURS. 7.IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. SHRUB PLANTING1 NOT TO SCALE 1.SHRUB SHALL BEAR SAME RELATIONSHIP TO GRADE AS IT DID IN NURSERY. 2.WATER SHRUB TWICE WITHIN FIRST 24 HOURS. 3.THIN BRANCHES AND FOLIAGE BY 13. 4.DO NOT CUT LEADERS TO RETAIN NATURAL SHRUB SHAPE. 5.FOR CONTAINER GROWN PLANTS THAT ARE ROOTBOUND, SPLIT THE ROOTBALL WITH 3 EQUAL SPACED VERTICAL CUTS. NOTES: REMOVE ANY PLASTIC, BURLAP, NAILS, OR OTHER MATERIALS FROM THE ROOTBALL WHICH MAY LIMIT ROOT GROWTH CONSTRUCT 2" EARTH BERM TO FORM A WATER RETENTION BASIN, FILL BERM WITH MULCH, AS SPECIFIED MULCH, PER PLANS, 3" DEPTH OVER ENTIRE BED. DO NOT COVER CROWNS OF PLANTS PROVIDE COMMERCIAL FERTILIZER TABLETS AND BIOSTIMULANT, AS SPECIFIED, FOR EACH SHRUB BACKFILL WITH APPROVED TOPSOIL AND SOIL AMENDMENTS, AS SPECIFIED. BACKFILL IN 6" LIFTS, WATER EACH LAYER, DO NOT TAMP OR OVER COMPACT. CONSTRUCT 6" MOUND OF TOPSOIL PLANTER BED CUT EDGE (TYPICAL AT TREES IN TURF AREAS)2 NOT TO SCALE APPROVED TOPSOIL AND SOIL AMENDMENTS AS SPECIFIED 3" DEPTH OF MULCH AT PLANTER BEDS FINISH GRADE, PER PLANS STORMWATER POND REVEGETATION REQUIREMENTS GENERAL OVERVIEW THESE REQUIREMENTS OUTLINE THE RECOMMENDED GUIDELINES FOR REVEGETATION OF SIDE-SLOPES, BANKS, AND BOTTOMS ( EXCLUDING SAND INVERT AREAS) OF NEW STORMWATER MANAGEMENT PONDS. THE FIVE MAIN GOALS FOR THE REVEGETATION OF NEW PONDS ARE AESTHETICS, NOXIOUS WEED AND INVASIVE SPECIES MANAGEMENT, FIRE HAZARD REDUCTION, WATER QUALITY AND EROSION CONTROL. GENERAL EARTHWORK ALL WORK SHALL BE LIMITED TO THE AREA REQUIRED FOR CONSTRUCTION. ALL FINISHED GRADES SHALL BE SMOOTH AND ROUNDED TO ENSURE A NATURAL TRANSITION BETWEEN NEW AND EXISTING GRADES. REFER TO GRADING AND DRAINAGE PLANS FOR ADDITIONAL REQUIREMENTS. IF NATURAL TOPSOIL OCCURS AT VARYING DEPTHS ON THE PROJECT SITE. THE TOPSOIL SHOULD BE EXCAVATED AND STOCKPILED AT DESIGNATED STORAGE AREAS PRIOR TO THE PROPOSED GRADING OPERATIONS. SITE ASSESSMENT CONTRACTOR SHALL ASSESS THE EXISTING SOIL CONDITIONS TO IDENTIFY ANY BARRIERS TO A SUCCESSFUL ESTABLISHMENT OF THE DESIRED SPECIES DUE TO CONDITIONS AT THE SITE. IF VISUAL ASSESSMENT OF SOIL INDICATES ANY UNUSUAL SOIL CONDITIONS, THE CONTRACTOR SHALL HAVE THREE (3) SOIL TESTS PERFORMED BY A QUALIFIED SOIL ANALYSIS LABORATORY. THESE RESULTS WILL DIRECT THE PREPARATION OF THE SOIL FOR THE REVEGETATION ACTIVITIES. CONTRACTOR SHALL ALSO ASSESS THE EXISTING HYDROLOGICAL CONDITIONS IF ANY AND THE PROPOSED TOPOGRAPHY OF THE PROPOSED POND. TOPSOIL REQUIREMENTS AND PREPARATION REUSE EXISTING TOPSOIL STOCKPILED ON THE SITE. SUPPLEMENT WITH IMPORTED TOPSOIL WHEN QUANTITIES ARE INSUFFICIENT. TOPSOIL REQUIREMENTS: ASTM D 5268, PH RANGE OF 5.5 TO 7, FOUR PERCENT ORGANIC MATERIAL MINIMUM, FREE OF STONES 1/2 INCH OR LARGER IN ANY DIMENSION, AND OTHER EXTRANEOUS MATERIALS HARMFUL TO PLANT GROWTH. TOPSOIL SOURCE: STRIP EXISTING TOPSOIL FROM ALL AREAS OF THE SITE TO BE DISTURBED. TOPSOIL SHALL BE FERTILE, FRIABLE, NATURAL LOAM, SURFACE SOIL, REASONABLY FREE OF SUBSOIL, CLAY LUMPS, BRUSH, WEEDS AND OTHER LITTER, AND FREE OF ROOTS, STUMPS, ORGANIC MATTER LARGER THAN 2 INCHES IN ANY DIMENSION, AND OTHER EXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT GROWTH. TOPSOIL SHALL BE SCREENED TO ACHIEVE THIS REQUIREMENT. CONTRACTOR SHALL HAVE (3) TOPSOIL SAMPLES TESTS PERFORMED BY A QUALIFIED SOIL ANALYSIS LABORATORY. REPRESENTATIVE SAMPLES SHALL BE TESTED FOR ACIDITY, FERTILITY AND GENERAL TEXTURE BY A QUALIFIED SOIL ANALYSIS LABORATORY AND COPIES OF THE TESTING AGENCY'S FINDINGS AND RECOMMENDATIONS SHALL BE FURNISHED TO THE LANDSCAPE ARCHITECT'S REPRESENTATIVE BY THE CONTRACTOR. ALL TOPSOIL SHALL BE AMENDED TO ACHIEVE SPECIFIED PH AND ORGANIC REQUIREMENTS. RE-TEST TOPSOIL PRIOR TO FINAL COMPLETION TO ENSURE REQUIREMENTS HAVE BEEN MET. NO TOPSOIL SHALL BE PLACED WHILE IN A FROZEN OR MUDDY CONDITION. PLACE TOPSOIL IN AREAS WHERE REQUIRED TO OBTAIN THICKNESS AS SCHEDULED. PLACE TOPSOIL DURING DRY WEATHER. PROVIDE ADDITIONAL IMPORTED TOPSOIL REQUIRED TO BRING SURFACE TO PROPOSED FINISH GRADE, AS REQUIRED COMPACTED TOPSOIL THICKNESS AT THE FOLLOWING AREAS: GRASSES AND FORBS: 6 INCHES MINIMUM FINE GRADE TOPSOIL TO SMOOTH, EVEN SURFACE WITH LOOSE, UNIFORMLY FINE TEXTURE. REMOVE RIDGES AND FILL DEPRESSIONS, AS REQUIRED TO MEET FINISH GRADES. TOPSOIL STOCKPILE LOCATIONS TO BE COVERED COORDINATE WITH EROSION AND SEDIMENT CONTROL PLAN. ALL GRAVEL, SUBBASE, AND OTHER IMPORTED FILL MATERIALS OTHER THAN TOPSOIL SHALL ONLY BE STOCKPILED IN PROPOSED IMPERVIOUS AREAS. NO GRAVEL OR ROCK MATERIALS SHALL BE STOCKPILED OR TEMPORARILY PLACED IN PROPOSED LANDSCAPE AREAS TO PREVENT LANDSCAPE AREAS FROM BEING CONTAMINATED WITH ROCK MATERIALS. CONTRACTOR SHALL SUBMIT A DETAILED STOCKPILE PLAN TO LANDSCAPE ARCHITECT AND OWNER FOR APPROVAL PRIOR TO ANY EARTHWORK OPERATIONS. TOPSOIL DISTRIBUTION ONCE THE GENERAL EARTHWORK IS COMPLETE AND ROUGH GRADING HAS BEEN ACCOMPLISHED, THE TOPSOIL SHOULD BE REDISTRIBUTED OVER THE AREA TO MINIMUM DEPTHS AS SPECIFIED. WHERE NEEDED, SLOPES SHOULD BE GRADED WITH SERRATION TO HOLD TOPSOIL ADEQUATELY. TOPSOIL SHOULD BE SPREAD AND LIGHTLY COMPACTED UTILIZING A SMALL CLEATED TRACTOR MOVING PERPENDICULAR TO THE CONTOURS OR ANOTHER METHOD WITH EQUAL CAPABILITY. IT IS OUR RECOMMENDATION THAT ANY NECESSARY MECHANICAL MEANS OF EROSION CONTROL BE IN PLACE PRIOR TO BEGINNING SITE DISTURBANCE. ONCE TOPSOIL HAS BEEN DISTRIBUTED AND GRADED, REVEGETATION SEEDING SHALL FOLLOW IMMEDIATELY. IN ORDER TO ELIMINATE SURFACE CRUSTING AND TO FACILITATE BETTER ROOT PENETRATION, THE SURFACE SHOULD BE SCARIFIED PRIOR TO SEEDING. COMPOST ADDITION TO THE TOPSOIL COMPOST ADDITION RATES WILL BE DEPENDENT ON THE QUALITIES OF THE COMPOST AND THE QUALITIES OF THE TOPSOIL. COMPOST APPLICATION RATES SHALL BE DETERMINED BY CONSULTATION WITH A QUALIFIED RECLAMATION SPECIALIST, AGRICULTURAL PROFESSIONAL OR A REPRESENTATIVE OF THE COMPOST PRODUCER. CONTRACTOR SHALL HAVE ONE (1) SAMPLE OF THE COMPOST TESTED BY A QUALIFIED SOIL ANALYSIS LABORATORY. IF APPLYING COMPOST, LOOSEN SURFACE SOIL TO A DEPTH OF AT LEAST 6 INCHES. PROVIDE WEED ABATEMENT PROCEDURE. APPLY SOIL AMENDMENTS ACCORDING TO PLANTING SOIL MIX PROPORTIONS AND MIX THOROUGHLY INTO TOP 6 INCHES OF SOIL. TILL SOIL TO A HOMOGENEOUS MIXTURE OF FINE TEXTURE. APPLY SOIL AMENDMENTS DIRECTLY TO SURFACE SOIL BEFORE LOOSENING. PROBLEMATIC SOIL CONDITIONS SITE INVESTIGATION AND TOPSOIL ANALYSIS MAY INDICATE THE NEED FOR REMEDIATION OF PROBLEMATIC SOIL CONDITIONS SUCH AS COMPACTION OR NUTRIENT EXCESSES OR DEFICIENCIES. WEED ABATEMENT ALL AREAS TO BE PLANTED OR SEEDED SHALL HAVE WEED ABATEMENT OPERATIONS PERFORMED ON THEM PRIOR TO PLANTING OR SEEDING. CONTRACTOR SHALL SPRAY ALL EXPOSED WEEDS WITH ROUND-UP (CONTACT HERBICIDE) OR APPROVED EQUAL. DO NOT WATER FOR AT LEAST SEVEN (7) DAYS. REMOVE EXPOSED WEEDS FROM THE SITE. CONTRACTOR SHALL OPERATE THE AUTOMATIC IRRIGATION SYSTEM FOR A PERIOD OF FOURTEEN (14) DAYS. AT CONCLUSION OF THIS WATERING PERIOD, DISCONTINUE WATERING FOR THREE TO FIVE (3-5) DAYS. APPLY SECOND APPLICATION OF ROUND-UP TO ALL EXPOSED WEEDS. APPLY IN STRICT CONFORMANCE WITH MANUFACTURER'S SPECIFICATIONS AND INSTRUCTIONS. DO NOT WATER FOR AT LEAST SEVEN (7) DAYS. REMOVE WEEDS FROM THE SITE. IF ANY EVIDENCE OF WEED GERMINATION EXISTS AFTER TWO (2) APPLICATIONS, CONTRACTOR SHALL BE DIRECTED TO PERFORM A THIRD APPLICATION. AT THE TIME OF PLANTING AND SEEDING, ALL PLANTING AREAS SHALL BE WEED FREE. SEEDING THE FOLLOWING INFORMATION PROVIDES MATERIAL AND EXECUTION FOR SEEDING. NUTRI BASE MULCH MATERIAL NUTRI BASE FROM QUATTRO ENVIRONMENTAL, AN ORGANIC SOIL AMENDMENT AND PROTEIN-RICH NUTRITIOUS FIBER MULCH . APPLY AT THE RATE OF 2000 LBS. PER ACRE. ORGANIC SOIL AMENDMENT GROW NUTRIBOOST FROM QUATTRO ENVIRONMENTAL (OR APPROVED EQUAL) APPLIED AT 5 GALLONS PER ACRE. TACKIFIER MULCH TACKIFIER SOIL STABILIZER - ECOLOGY CONTROLS M-BINDER. TACKIFIER APPLIED AT THE RATE OF 80 LBS. PER ACRE. GRANITE SEED 1697 WEST 2100 NORTH P.O. BOX 177 LEHI, UTAH 84043 1-800-768-4433 (OR APPROVED EQUAL) COMMON NAME ALKALI SACATON BLUE WILDRYE GREAT BASIN WILDRYE IDAHO FESCUE NEEDLE-AND-THREAD SLENDER WHEATGRASS SQUIRRELTAIL WESTERN WHEATGRASS TOTAL BOTANICAL NAME Sporobolus airoides Elymus glaucus Leymus cinereus Festuca idahoensis Hesperostipa comata Elymus trachycaulus Elymus elymoides Pascopyrum smithii POUNDS PER LIVE SEED PER ACRE 0.1 2.9 2.0 0.6 0.2 3.3 3.7 3.6 15.4 PERCENT OF PURE LIVE SEED IN MIX 9 15 10 10 1 20 20 15 100 COMMON NAME ALKALI BULRUSH BALTIC RUSH HARDSTEM BULRUSH OLNEY THREESQUARE SOFTSTEM BULRUSH TOTAL BOTANICAL NAME Bolboschoenus maritimus Juncus balticus Schoenoplectus acutus var. acutus Schoenoplectus americanus Schoenoplectus tabernaemontani POUNDS PER LIVE SEED PER ACRE 2.4 0.1 2.6 4.4 1.4 10.9 PERCENT OF PURE LIVE SEED IN MIX 10 25 25 20 20 100 ZONE 1 - UPLAND SEED MIX FOR CLAY OR SILT-CLAY SOILS ZONE 2 - WETLAND SEED MIX FOR PERENNIALLY FLOODED AREAS DRILL SEEDING DRILL SEEDING IS RECOMMENDED IN THE UPLAND AREAS WITH SLOPES LESS THAN 3:1. SEED DEPOSITION SHOULD BE CALIBRATED TO A DEPTH OF 0.25 TO 0.5 INCH. FULL SIZE OR COMPACT RANGELAND DRILLS ARE RECOMMENDED. DEPENDING ON SIZE, DRILLS CAN BE PULLED BY TRACTOR OR ALL-TERRAIN VEHICLE. DRILL SEEDING SHOULD FOLLOW CONTOURS IN TOPOGRAPHY TO MINIMIZE EROSION POTENTIAL. CONTRACTOR'S OPTION TO DRILL SEED OR HYDROSEED UPLAND AREAS. HYDROSEEDING MIX SPECIFIED SEED AND ORGANIC SOIL AMENDMENT IN WATER PER MANUFACTURER'S RECOMMENDATIONS. APPLY SEEDED SLURRY EVENLY IN TWO INTERSECTION DIRECTIONS. DO NOT HYDROSEED AREA IN EXCESS OF THAT WHICH CAN BE MULCHED ON SAME DAY. KEEP OFF ROADS, WALKS, STRUCTURES AND AREAS NOT TO BE SEEDED. CLEAN UP THESE AREAS. AFTER HYDROSEEDING IN UPLAND AREAS, TRACK IN SEED USING A CLEATED CRAWLER WITH TRACK MARKS PERPENDICULAR TO THE SLOPE. AFTER TRACKED, MULCH SLOPE WITH 2000 LBS. PER ACRE OF FERTILE-FIBER MULCH MATERIAL AND 80 LBS. PER ACRE OF TACKIFIER. AFTER HYDROSEEDING IN WETLAND AREAS, DO NOT TRACK IN SEED USING A CLEATED CRAWLER. AFTER SEEDING, MULCH AREA WITH 2000 LBS. PER ACRE OF FERTILE-FIBER MULCH MATERIAL AND 80 LBS. PER ACRE OF TACKIFIER. SEEDING TIME THE OPTIMAL SEEDING TIME SHALL BE IN FALL, BETWEEN MID SEPTEMBER AND MID OCTOBER. IF SEEDING IS APPLIED TOO EARLY OR TOO LATE AND PROPER GERMINATION IS NOT REALIZED PRIOR TO FALL DORMANCY, THEN RESEEDING SHALL BE APPLIED IN EARLY SPRING, AS SOON AS SOIL IS WORKABLE (NOT MUDDY) BETWEEN MARCH AND MID MAY. THIS PLANTING TIME PROVIDES THE OPTIMUM WEATHER CONDITIONS FOR SEED GERMINATION AND SEEDLING SURVIVAL RATE. SEEDING AFTER NOVEMBER 20, 'DORMANT SEEDING' INSURES THAT THE SEED DOES NOT GERMINATE PRIOR TO FREEZING WINTER TEMPERATURES AND SEED SHOULD BE IN PLACE FOR THE EARLY SPRING RAINS. TEMPORARY SUPPLEMENTAL IRRIGATION THE CONTRACTOR SHALL PROVIDE SUPPLEMENTAL IRRIGATION IN SITUATIONS WHERE IMMEDIATE VEGETATION ESTABLISHMENT IS DESIRED, SUCH AS HIGHLY VISIBLE SITES OR EROSION PRONE AREAS OR WHERE IT MAY BE NECESSARY FOR SEEDLING ESTABLISHMENT. SEEDED AREAS SHOULD BE IRRIGATED USING OVERHEAD SPRAY OR ROTOR IN-GROUND SPRINKLER IRRIGATION SYSTEM. IT IS RECOMMENDED THAT, IF USED, THE IRRIGATION BE CONTINUED FOR AT LEAST TWO (2) SEASONS. SEE IRRIGATION PLANS. GENERAL MAINTENANCE AND MONITORING THE CONTRACTOR SHALL MAINTAIN THE SITE FOLLOWING REVEGETATION FOR THE PERIOD OF TWO (2) YEARS. THIS INCLUDES REMOVAL OF VOLUNTEER TREES AND SHRUBS, LITTER CONTROL, WEED CONTROL AND MOWING OF TALL GRASSES AT THE DISCRETION OF ACHD STAFF. MOWING SHOULD ONLY BE PERFORMED WHERE FORBS, SHRUBS AND TREES ARE NOT PLANTED. SITES SHALL BE VISITED EVERY TWO (2) WEEKS FOR MONITORING AND ASSESSING THE SEEDING SUCCESS. VISUAL ASSESSMENT BY TRAINED PERSONNEL SHOULD OCCUR SEVERAL TIMES OVER THE THE NEXT TWO (2) GROWING SEASONS FOLLOWING THE REVEGETATION PROJECT. VISUAL ASSESSMENTS SHALL INCLUDE ESTIMATIONS OF VEGETATIVE COVER AND ESTABLISHMENT, VEGETATION SPECIES COMPOSITION, SOIL CONDITIONS AND HYDROLOGICAL CONDITIONS. VISUAL ASSESSMENT WILL IDENTIFY PROBLEM AREAS WHERE REVEGETATION AND SITE PREPARATION EFFORTS WILL BE REQUIRED. SITES SHOULD BE MONITORED FOR PRESENCE OF NOXIOUS WEEDS AND INVASIVE SPECIES. REAPPLY HERBICIDE AS NEEDED FOLLOWING MANUFACTURER'S GUIDELINES AND MAINTENANCE PERSONNEL EXPERTISE. OTHER POST-MONITIORING METHODS THAT SHOULD BE COMBINED WITH VISUAL ASSESSMENT SHALL INCLUDE LINE-POINT INTERCEPT TRANSECTS THAT QUANTIFY REVEGETATION PROGRESS OVER TIME. RESEEDING EFFORTS SHALL FOLLOW THE SPECIFIED SEED MIXES FOR THE PROJECT AS NOTED ABOVE. DECIDUOUS TREE PLANTING3 NOT TO SCALE SOIL LINE ROOT FLARE TO BE AT SOIL LINE NOTES: 1.REMOVE BURLAP, TWINE, AND WIRE BASKET FROM TOP 2 3 OF ROOTBALL. REMOVE ALL NAILS, TIES, AND PLASTIC FROM ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO WRAP THE ROOTBALL, IT SHALL BE COMPLETELY REMOVED. ONLY BIODEGRADABLE BURLAP SHALL BE LEFT ON THE BOTTOM OF THE ROOTBALL. 2.THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO ENSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR LENGTH OF WARRANTY PERIOD OR 1 YEAR AFTER SUBSTANTIAL COMPLETION WHICHEVER IS GREATER. ALL STAKING SHALL BE REMOVED AT THE END OF THE WARRANTY PERIOD. 3.IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT BEFORE PROCEEDING. 4.LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT MATERIAL. 5.WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE. 6.WATER TREE TWICE WITHIN THE FIRST 24 HOURS. 7.IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. 8.FOR TREES LOCATED WITHIN ROADSIDE PLANTERS LESS THAN 8'-0" IN WIDTH, PROVIDE TREE ROOT BARRIER (DEEPROOT #24-2 OR APPROVED EQUAL). LOCATE ROOT BARRIER AT BACK OF CURB AND EDGE OF SIDEWALK. ALL TREE INSTALLATIONS SHALL CONFORM TO ALL AGENCY APPROVAL REQUIREMENTS, CONTRACTOR SHALL VERIFY PRIOR TO ANY INSTALLATIONS. REMOVE DEAD/DAMAGED BRANCHES AND PRUNE TO INTERNATIONAL SOCIETY OF ARBORICULTURE STANDARDS; IMPROPERLY PRUNED TREES (AS DETERMINED BY THE LANDSCAPE ARCHITECT) SHALL BE REMOVED AND REPLACED. DO NOT REMOVE MAIN LEADER!! RUBBER CINCH TIE 2"x 2" WOOD STAKE (LENGTH AS REQUIRED)-DO NOT PENETRATE ROOTBALL. SEE NOTE 1. SET STAKES PARALLEL TO PREVAILING WIND. REMOVE TREE WRAP TRUNK PROTECTION, AFTER INSTALLATION CONSTRUCT 2" EARTH BERM AT EDGE OF ROOTBALL, FILL TREE RING W/ MULCH, AS SPECIFIED. 3" THICK MULCH LAYER, KEEP MULCH 3" AWAY FROM TRUNK. FINISH GRADE PREVAILING WIND DIRECTION COMMERCIAL SLOW RELEASE FERTILIZER TABLETS SIDES OF HOLE ROUGH & UNEVEN BACKFILL WITH APPROVED TOPSOIL AND SOIL AMENDMENTS AS SPECIFIED. BACKFILL IN 6" LIFTS, WATER EACH LAYER, TAMP LIGHTLY AS REQUIRED, BACKFILL SOIL EVEN W/ TOP OF ROOTBALL, DO NOT OVER COMPACT!! SET ROOTBALL ON NATIVE, UNDISTURBED SOIL