2020-02-11 Parks-Pathways Rev. 02.11.20
Reviewer: Kim Warren / Pathways Project Manager
Planner Assigned: Sonya Allen
Project Name: Allmon Sub File No: H-2019-0135 Date: 2.11.20
The following will be required for development of the proposed project:
CONDITIONS OF APPROVAL - PATHWAYS
1. The project developer shall design and construct multi-use pathways consistent with the location
and specifications set forth in the Meridian Pathways Master Plan Map and Master Pathways
Plan Document Chapter 3). Any proposed adjustments to pathway alignment shall be
coordinated through the Pathways Project Manager.
2. Prior to submittal of the final plat for City Engineer signature, the applicant shall submit a public
access easement for a detached, multi-use pathway along Locust Grove Road to the Planning
Division for Council approval and subsequent recordation. The easement shall be a minimum of
14’ wide (10’ pathway + 2’ shoulder each side). Or any additional width beyond the public ROW
necessary to accommodate the 10’ pathway and 2’ shoulder. Use standard City template for
public access easement. Easement checklist must accompany all easement submittals.
3. Construct multi-use pathways per typical paving section(s) shown in the Meridian Pathways
Master Plan Chapter 3.
4. The owner (or representative association) of the property affected by each public access
easement shall have an ongoing obligation to maintain the multi-use pathway.