ITD Cooperative Agreement Addendum Lighting Project No. A0-21(858) US 20/26, SH16 to Linder Road ADDENDUM TO COOPERATIVE AGREEMENT (Illumination/Lighting) PROJECT NO , A021(858) U820/265 SH16 TO LINDER RD KEY NO* 21858 PARTIES THIS ADDENDUM is made and entered into this 4th day of February 2020 , by and between the IDAHO TRANSPORTATION DEPARTMENT, hereafter called the State, and the CITY OF MERIDIAN, hereafter called the City. PURPOSE This Addendum will modify the Cooperative Agreement entered into on the 24"' day of September, 2019, (hereinafter "Agreement") between the same parties . The parties agree to the following revision: A . The exhibits referred to in the original agreement are replaced with the attached plans marked Exhibit A. Be All other terms and conditions previously agreed to and set forth in the Agreement shall remain in full force and effect. EXECUTION This Addendum is executed for the State by its District Engineer, and executed for the City by the Mayor, attested to by the City Clerk, with the imprinted corporate seal of the City of Meridian. IDAHO TRANSPORTATION DEPARTMENT District Engineer j �P., ED AUGUST E CITY OF MERIDIAN CA) 2 Pity of g IDIAN I erk SEAL M or obert E , t9n sR a (SE ) rrFRvr the TUEPaJ�� By regular/special meeting on hm :21858 Coop Illum Addendum.docx Addendum to Cooperative Agreement Key No. 21858 Page I RESOLUTION WHEREAS, the Idaho Transportation Department, hereafter called the State, has submitted an addendum to the agreement stating obligations of the State and the City of Meridian, hereafter called the City, for ownership and maintenance of illumination on US20/26, SH16 to Linder Rd; and WHEREAS, the State is responsible for obtaining compliance with laws, standards and procedural policies in the development, construction and maintenance of improvements made to the Federal -aid Highway System when there is federal participation in the costs; and NOW, THEREFORE, BE IT RESOLVED : 1 . That the Addendum to the Agreement for Federal -aid Highway Project A021 (858) is hereby approved. 2 . That the Mayor and the City Clerk are hereby authorized to execute the Agreement on behalf of the City. 3 . That duly certified copies of the Resolution shall be furnished to the Idaho Transportation Department, CERTIFICATION I hereby certify that the above is a true copy of a Resolution passed at a Kular, duly called special (X-out non- applicable term) meetin of the City Council, City of Meridian, Id o F brua 4th , 2020 QED AUGUST (Seal) Z �ity or City rk C�►' ` E IDIAN W s� SEAL a� of the TR'EP�J�4� it Addendum to Cooperative Agreement Key No. 21858 Page 2 i i, Paradigm of Idaho, Inc. Owners Rep Services �rELE 12/9/2019 Project: Meridian Idaho Costco Public Roads Improvements Scope # 1 Design Issuance # 4 General Description: Additional Lighting per City of Meridian Issuance No. Plan Sheet Revisions Sheet Sheet Rev Number Description 18 1 Quantity Updates 254 2 Additional Lighting 255 2 Additional Lighting 256 2 Additional Lighting 257 2 Additional Lighting 258 2 Additional Lighting 259 2 Additional Lighting 260 2 Additional Lighting 261 2 Additional Lighting 262 2 Additional Lighting 263 2 Additional Lighting 264 2 Additional Lighting Specification Revisions Item No./Page No. Description EXH I BIT A Meridian City Council Meeting Agenda February 4,2020— Page 165 of 298 ITEM NO. ITEM UNIT TOTAL ITEM NO. ITEM UNIT TOTAL 615-492A CURB&GUTTER TYPE 2 FT 2344 675-010A DIRECTED SURVEYING OFFICE COMPUTATIONS CA 1 615-651A TRAFFIC SEPARATOR TYPE 1 FT 1265 675-015A DIRECTED SURVEYING CREW CA I 616-010A SIGNS TY B SF 246 S501-30A SP SOUND WALL POSTS FT 2960 616-D50A BRKAWY STL SIGN POST TY E LB 1656 S501-30B SP SOUND WALL DRILLED SHAFTS FT 1320 616-080A REINSTALL SIGNS EACH 18 S501-35A SP SOUND WALL PANELS SY 2050 617-045A DELINEATOR TY 9 EACH 282 S501-35B SP ANTI-GRAFFITI COATING SY 4280 621-D10A SEEDING ACRE 11 5610-05A REM&RESET FENCE FT 1524 621-015A MULCHING ACRE 11 S900-50A WATER POLLUTION AND EROSION CONTROL CA 1 621-025A MULCH ANCHORING(TACKIFIER) ACRE it S900-50B DIRECTED TRAFFIC CONTROL CA 1 626-010A TEMPORARY TRAFFIC CONTROL SIGNS SF 1450 S901-05A SP DETECTABLE WARNING SURFACE EACH 7 626-040A BARRICADE TY 3 EACH 1 S901-05B SP ABANDON WELL EACH 1 626-050A DRUMS EACH 220 S901-05C SP BUILDING REMOVAL&SITE CLEANUP EACH 2 O N 626-093A TEMPORARY PAVEMENT MARKING-WATERBORNE FT 31000 5901-05D SP SAND WINDOW EACH 145 `a 626-100A MISC TEMPORARY TRAF CdNT ITEMS CA 1 S901-05F SP JUNCTION BOX TYPE S-45T WITH RISER EACH 80 0 626 105A TRAF CNTL MAINTENANCE HR 500 5901-05G SP GLUE DOWN TUBULAR MARKERS-PERM EACH 36 626-111A TEMPORARY RIGID RAISED PAVEMENT MARKERS EACH 346 5901-051 SP STREET LIGHT JUNCTION BOX TYPE S-40 EACH 67 o EACH 54 1 626-112A FLOOD LIGHTS HR 540 S901-05L SP STREET LIGHT 626-115A PORTABLE CHANGEABLE MESSAGE SIGN(PCMS) LS i S904-05A SP TRAFFIC SIGNAL INSTALLATION-BLACK CAT ROAD LS 1 0 m 626 116A TEMPORARY CONCRETE BARRIER FT 13900 S904-05B SP TRAFFIC SIGNAL INSTALLATION-TREE FARM WAY LS 1 626-118A TEMPORARY CRASH CUSHION EACH 10 S904-OSC SP TRAFFIC SIGNAL INSTALLATION-TEN MILE ROAD LS 1 N 626-120A FLAGGER CONTROL HR 1000 S904-05D SP TRAFFIC SIGNAL INSTALLATION-LONG LAKE WAY LS 1 V 626-135A WEIGHTED BASE TUBULAR MARKERS EACH 300 S904-05F SP TEMPORARY TRAFFIC SIGNAL ADJUSTMENTS LS 1 630-020A TRANSVERSE,WORD,SYMBOL,ARROW PAV MKG—WATERBORNE SF 5815 S911-05B SP BIORETENTION SWALE FT 153 630-020B TRANSVERSE,WORD,SYMBOL,ARROW PAV MKG—PREFORMED THERMOPLASTIC SF 480 S911-05C SP STREET LIGHT CONDUIT FT 13415 ti 630-025A LONGITUDINAL UbINAL PAV MKG-WATERBORNE FT 163060 S911-05E SP TRENCHING INSIDE THE ROADWAY PRISM FT 773 0 630-025B LONGITUDINAL PAV MKG PREFORMED THERMO FT 2532 5911-06B SP INSTALL 2-2"RPC CONDUIT(ACHD) FT 16020 634-005A MAILBOX EACH 8 S911-06C SP INSTALL 12-FIBER CABLE(ACHD) FT 16410 N 9 640-015A SUBGRADE SEPARATION GEOTEXTILE-TYPE II SY 85917 S911-06D SP INSTALL 1-2"RPC CONDUIT FOR FUTURE USE(MERIDIAN) FT 13405 r 675-005A SURVEY LS 1 Z629-05A MOBILIZATIONLS1 0 p Vi O ml W N M O O U I NOTE 1. CONTINGENCY ALLOWANCE(CA)ITEMS .N SHOWN ARE ANTICIPATORY AND WILL BE EXCLUDED FROM CONTRACTOR'S BID PRICE IN W O O C O N ORIGINAL STORED AT:ITD,District 3 S�ONAL s AREVISION TO BID SET. 8150 Chinden �5 (� APPROVED BYE. REED Boulevard, ��4 \GENS Boise,ID REVISIONS DESIGNED SCALES SHOWN PROJECT NO. TOTAL PROJECT SUMMARY E]t lish N NO. DATE BY DESCRIPTION A,BAILEY KITTELSON g 4263 N DESIGN CHECKED ARE FOR 11"X i7" 04 11/7/2014 JGM aoomorvnL Roaowav L1GhrrNo E.REED PRINTS ONLY p & ASSOCIATES COUNTY ADA dl DETAILED CADD FILE NAME ��` �C? IOI S CAPITOL BOULEVARD,SUITE 600 A021(858) US 20/26, SH-16 TO LINDER ROAD KEY NUMBER v T 0 D.GREGORY 21858 SUM.dw �1858 q E OF � DRAWING CHECKED DRAWING DATE BOISE,ID 83702 E.REED SEPTEMBER 2019 P 208.33&2683 F 208,338.2685 SHEET 1$ OF 293 S l�/AN - TIIL LGND SURV OM SUM TYP REM PLAN RD7L GRVE IRPL SWPP SIGN MARK 5GNL IIlM 56WL 77 Meridian City Council Meeting Agenda February 4,2020— Page 166 of 298 GENERAL NOTES LIGHT POLE SCHEDULE CONDUCTOR SCHEDULE ACCEPTABLE LUMINAIRE FIXTURES 5901-05F TYPE"s 45TOWITO'H RISER 1. ALL SPARE CONDUIT SHALL INCLUDE PULL WIRE.OPEN ENDS ARM AUTOBAHN 1 EA STA 559+98,72'RT WILL BE PLUGGED OR CAPPED. SERVICE CIRCUIT MOUNTING �1 SPARE WITH PULL WIRE O ATB2 I EA STA 560+01,72'RT 2. INTERRUPTION TO ACHD'S FIBER OPTIC NETWORK SHALL POLE ID STATION OFFSET ID ID HEIGHT(FT) LENGTH _60BLEDE70_R3 4K 5K 1 EA STA 561+98,81'RT ONLY BE PERMITTED A5 WEEKEND WORK. DISRUPTION SHALL (FT) O 244 THWN 1 EA STA 562+01,81'RT OR 1 EA STA 563+98,60,RT 53301C 562+51 64'RT BC 1 40 24 OCCUR NO EARLIER THAN FRIDAY AT IOPM AND SHALL BE 444 THWN 1 EA STA 567+98,60'RT 1 EA STA 564+01,60'RT RETURNED TO SERVICE NO LATER THAN MONQAY AT 5AM.THE CONTRACTOR SHALL PROVIDE A MINIMUM TWO(2)WEEK 53302C 564+11 64'R O NAVION 1 EA STA 568+01,64'RTT BC 1 40 20 NOTICE PRIOR TO START OF ANY WORK THAT MAY IMPACT LIGHT POLE SCHEDULE LEGEND NAV-AF-03-D-UNV-T3R-1200 5901 05J SP STREET LIGHT JUNCTION B( ACHD'S NETWORK FOR REVIEW. DEPENDING ON THE IMPACT 53303C 565+71 65'RT BC 1 40 20 BC=BLACK CAT RD SERVICE 1 EA STA 1 EA STA 561+56 +98,863 1'RT TO THE DISTRICT OR PARTNERING AGENCIES,ACHD RESERVES , 'RT 53304C 567+31 65'RT BC 1 40 2Q TF=TREE FARM WAY SERVICE 1 EA STA 562+51,6 622' RT THE RIGHT TO MODIFY THE REQUESTED DATES FOR THE TM =TEN MILE RD SERVICE 1 EA STA 564+11,62' RT SCHEDULED OUTAGE.CONTACT BRIAN FROBERG AT(208) 53305C 568+91 65'RT BC 1 40 20 LL LONG LAKE WAY SERVICE 1 EA STA 565+71,62'RT 941-9132 OR BRIAN THIES AT 20$ 484-3926 TO SCHEDULE 1 EA STA 567+31,62'RT ( 1 = EAST CIRCUIT 1 EA STA 568+91,62'RT WORK. 2=WEST CIRCUIT S901-05L SP STREET LIGHT 3. FIBER TERMINATION WORK INCIDENTAL TO ITEM 5911-06C, 5 EA SEE LIGHT POLE SCHEDULE INSTALL 12 FIBER CABLE. 5911-d5C SP STREET LIGHT CONDUIT I Y I 122 LF STA 559+50,62'RT TO i STA 560+72,63'RT 126 LF STA 564+98,+72 81'RT 631 TO I i 53 LF STA 561+98,81'RT TO RT 562+5 62' ' Q 160 LF STA 562+51 62'RT TO U` STA 564+11' RT 62'RT oP (.p--� _ ' 160 LF STA 564+11 62' RT TO SEE TRAFFIC SIGNAL PLANS -___� i" L -J STA 565+71;62'RT ' 160 LF STA 565+71 62'RT TO I i FOR SIGNAL DETAILS -- STA 567+31,62'RT o • 'I 160 LF STA 567+31,62'RT TO 4 STA 568+91,62'RT +I i k i lx- ----- r---xr - - -x- - - - -x- 3 59LF STA 568+91,62'RTTO 'ii _ _ STA 569+50,62' RT �rx`-�m- -x- --gyp-%- - S[3'- �-� 7 _ _ X _ _ _x_pp-- -x Lr_ -- --7p _- u al T fir' "Fi Z" - - - - - --- LLO n US 20/26' G -o- G G -�-� �� = 5911-068 (P INSTALL 2-2"RPC CONDUIT Q �._ 6V+DO-EP- -- O .`i--EP-----EP-----EP-----EP---- -EPA -- -�tP-�6J+nn - --EP- ----EP-----EP-----EP-----EP-----EP- ----EP--- --EP- - ---EP- (ACHD) m - m 50 LF STA 559+50,72e RT TO 5911-06B - p SEE SHT 265 FOR ITS LU CAL&SQL 2 S911-05C STA 560+00,72'RT Z - 7M-T - S911-p6B 199 LF STA 560+00, 72 RT TO 5911-06D 5901-05F TERMINATION DETAILS r f r D STA 561+99, 79' RT 5911-06B 5911-06C S901-05F S9d1 05F to 241 LF STA 561+99,79'RT TO U -.-- -.- T 5911 45C 2 - 5911 46C 5911 06D 6' STA 564+Qp,61'RT - - - r-- I 400 LF STA 564+00,61 RT TO 5901-05F - 5911-06B S911-06D + S911-06D -• 8+00 61'RT - - - _-ij s= =t-=__-_�. _`P__=` --- --- FP - -- _ - == -___ 0 150 LF STA 568+00,61'RT To - - -_- '• _ `�"- -------- - ----- -- -------- - STA 569+50,60'RT SP INSTALL 12-FIBER CABLE S901-05J 3 - ------------RTd----- S911-05C 1 5911 068 5901 45J " 5901-051 3o"Gi 30"Gi 5901-05J R ...�30_i--- 5901-053 3C1"ul _ 30 lff-- -- 50 LF STA 559+50,72'RT TO 560+00 72'RT o STA 1 S911 06C 5941-05L A 2 5901-05L A 2 S901-05L A 2 �- 5901-05L A 2 -�°� - 199 LF STA 560+04,72 RT TO 1 5911-05C S911-06D 201 LF STA 561+99, 79'RT TO 5901-05J STA 564+00 61'RT I l 5911-05C 1 591105C 2 I 5911-05C 2 2 A $941-p5L I 400 LF STA 564+00;61'RT TO STA 568+00,61'RT € 5901-05] 2 S911-05C 150 LF STA 568+00,61'RT TO l l I I STA 569+50,60'RT SP INSTALL 1-2" RPC CONDUIT TYPICAL ITS JUNCTION BOX INSTALLATION S911-p6B 2-2"RPC CONDUIT (MERIDIAN) GENERAL NOTES (CONY,) 1-12 FIBER CABLE 50 LF STA 559+50 72'RT TO 4. LUMINAIRE POLES AND MAST ARMS TO BE INSTALLED IN -T Sa5-T 1-SPARE W/PULL WIRE STA 560+00,72'RT ACCORDANCE WITH ACHD STANDARD DRAWING TS-1106. 791 [MEiPMAN) OF W/RTSER (ACHD) LEGEND 199 LF STA 561+99, 72' RT TO 5. ALL LUMINAIRES TO BE INSTALLED ON ACHD TYPE"C' (AMD) 201 LF STA 561+99, 79'RT TO © JUNCTION BOX 545-T WITH RISER STA 564+00,61'RT FOUNDATIONS WITH BREAK-AWAY COUPLINGS IN 400 LF STA 564+00,61'RT70 ACCORDANCE WITH ACHD STANDARD DRAWING TS-1110, 5911-06D 1-2"RPC CONDUIT STREET LIGHT JUNCTION BOX-540 STA 568+00,61,RT 6. SEE DEMOLMON PLANS FOR EXISTING LUMINAIRE REMOVAL NOTES W/PULL WIRE -------- NEW INTERCONNECT CONDUIT 150 LF STA 568+00,61'RT TO PAY ITEMS. 1. ALL THREE ITS CONDUIT RUNS CAN SHARE THE SAME FOR FUTURE USE STA 569+50,60' RT 7. ILLUMINATION WAS DESIGNED FOR THE SOUTH SIDE OF U5 TRENCH. (CITY OF MERIDIAN) ------- NEW STREET LIGHT CONDUIT 20/26.STREET LIGHTING FOR NORTH SIDE TO BE DESIGNED 2. ALL SPARE CONDUIT TO INCLUDE PULL WIRE. LUMINAIRE POLE WITH LED LUMINAIRE BY OTHERS IN THE FUTURE. 3. CITY OF MERIDIAN AND ACHD WILL HAVE SEPARATE 545-T W/RISER JUNCTION BOXES FOR ITS ORF4N INFRASTRUCTURE. AT ITD,District 3 g�ONAL ov AREVISION TO BID SET REVISION APPROVED BY E. REED 4. LABEL ACHD J-BOX LID WITH "ACHD"STEEL LABEL 1/8" 40 0 40 80 815E Chinden ��,5Q APPROVED BY E. REED. TALC_,WELDED ON&PAINTED GREEN. Boulevard,ID Q� \GIN Scale: 1" = 80' N NO. DATE BY DESCRIPTION J.MARKOSLAN GALES HOWN Ertgl ish 14263 N DESIGN CHECKED ARE FOR 11"X 17" i i 11/5/20191 ]GM ADDITIONAL ROADWAY LIGHTING PRINTS ONLY COUNTY A 11/8/2019 JGM UPDATED ROADWAY LIGHTING WIRING DETAILED E.REED CADD FILE NAME X & ASSOCIATES / ADA 101 S CAPITOL BOULEVARD,SUITE 600 A021(858) US 20/26, SH-16 TO LINDER ROAD KEY NUMBER �, qTE 10P DRAWING CHECKED MARKOSIAN 21858 DRAWING DATE ILLM.dw BOISE,ID 83702 21858 9i�FS BAN E.REED SEPTEMBER 2019 P 208.338.2683 F 208.338.2685 SHEET 254 OF 293 t -•-. T1TL LGN� SURV TpM SUM TYP REM PLAN DTL GRDE ]RPL SWPP SIGN MARK SGNL FLLM SL]WL TC Meridian City Council Meeting Agenda February 4,2020- Page 167 of 298 GENERAL NOTES LIGHT POLE SCHEDULE CONDUCTOR SCHEDULE ACCEPTABLE LUMINAIRE FIXTURES 59D1-05F TYPE S-4STOWITH RISER N 13OX 1. ALL SPARE CONDUIT SHALL INCLUDE PULL WIRE.OPEN ENDS ARM AUTOBAHN 1 EA STA 571+99,60'RT WILL BE PLUGGED OR CAPPED. SERVICE CIRCUIT MOUNTING O1 SPARE WITH PULL WIRE O ATB2 606LEDE70 1 EA STA 572+01,60'RT 2. INTERRUPTION TO ACHD'S FIBER OPTIC NETWORK SHALL POLE ID STATION OFFSET LENGTH _ _R3_4K_5K 1 EA STA 575+99 60'RT ID ID HEIGHT(FT) (FT) O 1 EA STA 576+01,60'RT ONLY BE PERMITTED AS WEEKEND WORK. DISRUPTION SHALL 2 2-#4 THWN OR OCCUR NO EARLIER THAN FRIDAY AT 10PM AND SHALL BE 53306C 570+51 64'RT BC 1 40 20 O 4-#4 THWN S901-05J SP STREET LIGHT JUNCTION Bc RETURNED TO SERVICE NO LATER THAN MONDAY AT SAM.THE NAVION 1 EA STA 570+51,62'RT CONTRACTOR SHALL PROVIDE A MINIMUM TWO(2)WEEK 53307C 572+11 64'RT BC 1 40 20 LIGHT POLE SCHEDULE LEGEND NAV-AF-03-D-UNV-T3R-1200 1 EA STA 572+11,62'RT NOTICE PRIOR TO START OF ANY WORK THAT MAY IMPACT 1 EA STA 573+71, 62'RT ACHD'S NETWORK FOR REVIEW. DEPENDING ON THE IMPACT 53308C 573+71 64'RT BC 1 40 20 BC= BLACK CAT RD SERVICE 1 EA STA 576+910, 62'RT TO THE DISTRICT OR PARTNERING AGENCIES,ACHD RESERVES 53309C 575+31 64' RT TF 2 40 20 TF=TREE FARM WAY SERVICE 1 EA STA 578+51,62'RT THE RIGHT TO MODIFY THE REQUESTED DATES FOR THE TM=TEN MILE RD SERVICE SCHEDULED OUTAGE.CONTACT BRIAN FROBERG AT(208) 53310C 576+91 64'RT TF 2 40 20 ILL= LONG LAKE WAY SERVICE S901 O5L SP STREET LIGHT 941-9132 OR BRIAN THIES AT(208)484-3926 TO SCHEDULE 1 = EAST CIRCUIT 6 EA SEE LIGHT POLE SCHEDULE WORK. L 53311C 1 578+51 1 65'RT TF 2 40 20 2=WEST CIRCUIT 3. FIBER TERMINATION WORK INCIDENTAL TO ITEM S911-06C, 5911-05C SP STREET LIGHT CONDUIT INSTALL 12 FIBER CABLE. 101 LF STA 569+50,62'RT TO STA 570+511 64'RT r F I 160 LF STA 570+51,64'RT TO I °L STA 572+11,64'RT 160 LF STA 572+11,64'RT TO I I STA 573+71,64'RT 160 LF STA 573+71,64' RT TO STA 575+31,64' w RT i 160 LF STA 575+31,64'RT TO I STA 576+911 64'RT 160 LF STA 576+91,64'RT TO STA 578+51,64'RT € m 101 LF STA 578+51,64'RT TO I I � i `� STA 579+50,65'RT a - - - -x-- - -x -x- - - - jjjI � I I ^�G 3 5911-06B SP INSTALL 2-2"RPC CONDUIT US ZO GV� I �n (ACHD) Ln .�.. -- - G ---I � ref -® IUD- _-_-.fir, C� 250 LF STA 569+50 60'RT TO - - -P-----EP-----EP EP-- EP- --- -EP- - ---EP-----EP-----EP-- ---EP r- tr- - - --EP- -- EP-- ---EP-----EP---"---EP EP------fP- - - --fP N STA 572+00, 60'RT q F- 570+00 575+00 z 400 LF STA 572+00,60' RT TO cn w rn 350 LF STA 576+00,60'RT TO Z -- 5911-06B 5911-06B CAL&SQL STA 579+50,60'RT _j S911-06C S911-06C S911-06B S911-05C 2 v1 S911-06D _� 5901-05F 1 T- S911-06D 7` _- T T_,_ __.��___ S911-06C SP INSTALL 12-FIBER CABLE 59D1 05F T 5911-06C , _. T -T (ACHD) Q S9l 1-06D + __`-___ E ,L=__== _-__LL 250 LF STA 569+50,60'PT TO STA 572+00,60'RT o I 400 LF STA 572+00,60'RT TO ° STA 576+00,60'RT �, __------- --------- ----------_----- ----- - --- - -- - 350 LF + 0 � ci -mac -"--------., --- _-------- . -- - - - --------- __ -- --- - -� �__. .- i F STA 579+501,60' RTT ------ --------- ------ -_ .. r- 11 5901-053 �� �'Gi S901-05J ,i - "e - S901-053 --3 "GI 5901-O5J - - R S901-053 -�- -{� S901-05L A -a S901-05L A 2 S901-05L A 2 S901-05L A 2 G/ 5901-05L A 2 S911 p6D SP INSTALL 1-2"RPC CONDUIT I I 2 5911-O5C (MERIDIAN) ��•• 5911 OSC 2 5911 05C 2 5911-05C 2 1 5911-05C 5911-O5C 2 2 A S901-05J 250 LF STA 569+50,60' RT TO STA 572+00,60'RT S901-05L I 400 LF STA 572+00,60'RT TO STA 576+00,60'RT 350 LF STA 575+00,60'RT TO I I STA 579+50, 60' RT GENERAL NOTES (CONT.) TYPICAL ITS JUNCTION BOX INSTALLATION S911-06B 2-2"RPC CONDUIT - 1-12 FIBER CABLE 4. LUMINAIRE POLES AND MAST ARMS TO BE INSTALLED IN 545-7 $4s-T 1-SPARE W/PULL WIRE ACCORDANCE WITH ACHD STANDARD DRAWING TS-1106. tarrn� wlutsLR (ACHD) LEGEND 5. ALL LUMINAIRES TO BE INSTALLED ON ACHD TYPE"C" Rt °1 FOUNDATIONS WITH BREAK-AWAY COUPLINGS IN Mc ° "� 0 JUNCTION BOX-S45-T WITH RISER " ACCORDANCE WITH ACHD STANDARD DRAWING TS-1110. S911 06D 1-2"RPC CONDUIT STREET LIGHT JUNCTION BOX-S40 6. SEE DEMOLITION PLANS FOR EXISTING LUMINAIRE REMOVAL NOTES W/PULL WIRE -------- NEW INTERCONNECT CONDUIT PAY ITEMS. 1, ALL THREE ITS CONDUIT RUNS CAN SHARE THE SAME FOR FUTURE USE 7. ILLUMINATION WAS DESIGNED FOR THE SOUTH SIDE OF US TRENCH. (CITY OF MERIDIAN) ------- NEW STREET LIGHT CONDUIT 20/26. STREET LIGHTING FOR NORTH SIDE TO BE DESIGNED 2, ALL SPARE CONDUIT TO INCLUDE PULL WIRE. LUMINAIRE POLE WITH LED LUMINAIRE BY OTHERS IN THE FUTURE. 3, CITY OF MERIDIAN AND ACHD WILL HAVE SEPARATE S45-T W/RISER JUNCTION BOXES FOR ITS OR N AT INFRASTRUCTURE. ITD,District 3 �SS�O L REVISION TO BID SET REVISION APPROVED BY E. REED 4. LABEL ACHD]-BOX LID WITH"ACHD"STEEL LABEL 1/8" Boulevard, 0 QQ� GEMS 1 APPROVED BY E. REED. 2 TALL,WELDED ON &PAINTED GREEN. 4 0 40 80 8150 Chinden 5cafe: 1"=8p' Boise,ID SCALES OWN English 1 3 N NO. DATE BY DESCRIPTION J.MARKOSIAN n DESIGN CHECKED ARE FOR 11"X 17" w I 11/5/2019 )GM ADDITIONAL ROADWAY LIGHTING COUNTY E.REED PRINTS ONLY p & ASSOCIATES 6>11`�'��so 1]J8/2(319 JGM UPDATED ROADWAY LIGHTING WIRING ADA DETAILED CADD FILE NAME 101 5 CAPITOL BOULEVARD,SUITE 600 A021(858) US 20/26, SH-16 TO LINDER ROAD KEY NUMBER v 9TS ,pP Q z DRAWING CHECKED J.MARKOSIAN DRAWING DATE ILLM.dw BOISE,ID 63702 21858 q/f9Fs BAN E.REED SEPTEMBER 2019 P 208.33$.2fi63 F 208.33$.26$5 SHEET 255 OF 293 (.,,.. . T1TL LGND SURV TaM SUM Tl'p PLAN RDTL GRDE IRPL SWPp SIGN MARK SGNL ILLM SDWL 7C Meridian City Council Meeting Agenda February 4,2020- Page 168 of 298 GENERAL NOTES S90 -05F SP JUN ON FOX LIGHT POLE SCHEDULE CONDUCTOR SCHEDULE ACCEPTABLE LUMINAIRE FIXTURES TYPE S-45T WITH RISER 1. ALL SPARE CONDUIT SHALL INCLUDE PULL WIRE.OPEN ENDS 1 EA 5TA 579+99,60' SERVICE CIRCUIT MOUNTING SPARE WITH PULL WIRE RT WILL BE PLUGGED OR CAPPED. ARM O O AUTOBAHN 1 EA STA 580+01,60'RT POLE ID STATION OFFSET LENGTH 1 A ATB2_60BLEDE70_R3_4K_5K 1 EA STA 583+99,73'RT 2. INTERRUPTION TO ACHD'S FIBER OPTIC NETWORK SHALL ID ID HEIGHT(FT) (� I EA STA 584+01,73'RT ONLY BE PERMITTED AS WEEKEND WORK.DISRUPTION SHALL O 244 THWN 1 EA STA 587+27,79'RT OCCUR NO EARLIER THAN FRIDAY AT 10PM AND SHALL BE OR 1 EA STA 587+29,79'RT 53312C 580+11 65'RT TF 2 40 20 O 444 THWN 1 EA STA 588+12,70'RT RETURNED TO SERVICE NO LATER THAN MONQAY AT SAM.THE NAVION 1 EA STA 588+14,70'RT CONTRACTOR SHALL PROVIDE A MINIMUM TWO(2)WEEK 53313C 581+71 69'RT TF 2 40 20 LIGHT POLE SCHEDULE LEGEND NAV-AF-03-D-UNV-T3R-1200 5901 05J SP STREET LIGHT JUNCTION B( NOTICE PRIOR TO START OF ANY WORK THAT MAY IMPACT TYPE S-40 ACHD'S NETWORK FOR REVIEW. DEPENDING ON THE IMPACT 53314C 583+36 73'RT TF 2 40 20 BC= BLACK CAT RD SERVICE 1 EA STA 580+11,62'RT TO THE DISTRICT OR PARTNERING AGENCIES,ACHD RESERVES 1 EA STA 581+71,66'RT THE RIGHT TO MODIFY THE REQUESTED DATES FOR THE 53315C 584+91 74'RT TF 2 40 20 TF=TREE FARM WAY SERVICE 1 EA STA 583+33,74'RT TM =TEN MILE RD SERVICE REMDVAL OF EXISTING SPARE ITS 1 EA STA 584+88,74'RT SCHEDULED OUTAGE.CONTACT BRIAN FROBERG AT(208) O 1 EA STA 585+48,74'RT 941-9132 OR BRIAN THIES AT 208 484-3926 TO SCHEDULE 53316C 586+51 74'RT TF 2 40 20 ILL LONG LAKE WAY SERVICE 1 CONDUIT AND ASSOCIATED 1 EA STA 587+19,79'RT ( 1 =EAST CIRCUIT JUNCTION BOXES INCIDENTAL TO 1 EA STA 583+13,72'RT WORK, 2=WEST CIRCUIT EXCAVATION,ITEM 206-005A. 5901-45L SP STREET LIGHT 3. FIBER TERMINATION WORK INCIDENTAL TO ITEM S911-06C, - 5 EA SEE LIGHT POLE SCHEDULE INSTALL 12 FIBER CABLE. •L 5911-05C SP STREET LIGHT CONDUIT - -x- --- - i 61 LF STA 579+50,62'RT TO I ---------- - ~--- I �+ QI ' STA 580+11 62' V-- RT II n i I 160 LF STA 580+11,62'RT TO Q n I I STA 581+71,67'RT W o ct� I ' J+ II r ' 161 LF STA 581+71 67'RT TO Wig i i STA 583+32,74'RT -- 156 LF STA 583+32,74'RT TO STA 584+88,74'RT __= - ' -, ° Ir- _ I 160 LF STA 584+88 74'RT TO 7-------- eD RETAIN AND PROTECT --r •' II R� I STA 586+48'74'RT I r # ��I it `- - -ED- ----ED-- - - - II 77LF STA 586+48,74'RTTO - EXISTING SPLICE VAULT- S911-06C ti s --- STA 587+25 79'RT R as"c as"cl ----ar"�i I --- a�"G' R �8'Di------48` 25 LF STA 587+19,79'RT TO o SEE TRAFFIC SIGNAL PLANS SEE SHT 265 FOR ITS - STA 587+19,54'RT rr TERMINATION DETAILS - 3 88 LF STA 587+25,79'RT TO +I �_C FOR SIGNAL DETAILS y STA 588+13,72'RT -- -QP [�P _ ^� _ D��- _ - -� - "1 137 LF STA 588+13 72'RT TO EP-----EP--- -EP-----EP-----•EP--- -EP-----EP- ---PUS 20/2 EP-- - - -EP--- INTERCEPT EXISTING SPARE CONDUIT- �-� G G - ~��---� �S STA 589+50,62'RT " F S$O+QO 5$5+0�- RUNS WITH PROPOSED CONDUIT ( 5901-05] SPARE CONDUIT 1 z S911-06B SP INSTALL 2-2"RPC CONDUIT - (ACHD) (ACHD&MERIDIAN). l S911-06C rn 51 LF STA 579+50 60'RT TO z W REMOVE EXISTING ITS JUNCTION BOX. _ -_ STA 580+00`60'RT I I- �.•� 2 5911-05C y 400 LF STA 580+00'60'RT TO J= 5901-05F 11 5911-06B _ - _ _ _ s STA 584+00,72'RT V S91i O6C 2 S911-05C ti S901-05F o0 328 LF STA 584+00,72'RT TO T T 5911-066 - S911-05C 3 - m STA 587+28,72'RT Q 5911-06D ? _ _7 - -T S901-05F S911-06C + 17 LF STA 587+28,72'RT TO T T STA 587+13 55'RT _ -FP S911-06De-_ e�o _ {_ ---- - -- _ =+__- __ = 65 LF STA 587+2$,72'RT TO -- _ -- -=- _ - _-�. _ , , STA 588+13 60'RT ern __ _ , R�I i rz"rl ..- � - - 137 LF STA 588+13,60 RT TO & 60'RT STA 58 LL 12-FIBER CABLE S901-053 -x-----x --- =_xW== �_�__-__ ----W--- - -x 5911-06B = I S 5J S911-06C _ � 9Qi-0 SP INSTALL/ --- - 5901-05] - - - 5901-05L S901-05L A 2 - S9i1-06C i �l !!i' i i i i (ACHD) + S901-05L A 2 - I 1 a 51 LF STA 579+50 60'RT TO I S901-05L A 2 5901-05] 5901-05J �°�, S911-06D i ` ; I 5911-06B I STA 580+00,60'RT I 5901-05] I F S911-06C I 400 LF STA 580+00,60'RT TO li: I i i RT 5911-05C 2 5911-05C 2 5911-05C 2 5911-05C 2 2 S91 f 05C 72' ` I I II r I I I S911-06D STA 584+00328 LF STA 584+00,72'RT TO S901-05F i'I i' i r I STA 587+28,72'RT S911-05C 2 130 LF STA 587+28,72'RT TO I 5901-05J a•.e,. ,, II r , STA 587+22,42'LT 2 A 5901-05L R III r r 85 LF STA 587+28,72'RT TO + as '" II r i f I ' I STA 588+13 60'RT ��•' I� r I ! 1 137 LF STA 588+13,60'RT TO GENERAL NOTES (CONY.) TYPICAL ITS JUNCTION BOX INSTALLATION s911-o66 2-2"RPC CONDUIT STA 589+50,60'RT 1-12 FIBER CABLE LEGEND S91f-06D SP INSTALL 1-2"RPC CONDUIT 4. LUMINAIRE POLES AND MAST ARMS TO BE INSTALLED IN S45-T S45-T 1-SPARE W/PULL WIRE (MERIDIAN) wIRISER JUNCTION BOX-545-T WITH RISER i ACCORDANCE WITH ACHD STANDARD DRAWING TS-1106. icm DE v+IrusER (ACHD) 51 LF STA 579+50,60 RT TO 5. ALL LUMINAIRES TO BE INSTALLED ON ACHD TYPE"C" MERIDIAN �Ac"oI STREET LIGHT JUNCTION BOX-S40 STA 580+00,60'RT I 400 LF STA 580+00,60'RT TO FOUNDATIONS WITH BREAK AWAY COUPLINGS IN ------- NEW INTERCONNECT CONDUIT STA 584+00,72'RT y ACCORDANCE WITH ACHD STANDARD DRAWING TS-1110. 5911 06D 1-2"RPC CONDUIT 328 LF STA 584+00,72'RT TO NOTES ------- NEW STREET LIGHT CONDUIT STA 587+28,72'RT 6. SEE DEMOLITION PLANS FOR EXISTING LUMINAIRE REMOVAL W/PULL WIRE 130 LF STA 587+28,72'RT TO PAY ITEMS. 1. ALL THREE ITS CONDUIT RUNS CAN SHARE THE SAME FOR FUTURE USE STA 587+22,42' LT 7. ILLUMINATION WAS DESIGNED FOR THE SOUTH SIDE OF US TRENCH. (CITY OF MERIDIAN) LUMINAIRE POLE WITH LED LUMINAIRE 85 LF STA 587+281 72'RT TO STA 588+13 60'RT - 20/26. STREET LIGHTING FOR NORTH SIDE TO BE DESIGNED 2. ALL SPARE CONDUIT TO INCLUDE PULL WIRE. -�- EXISTING ACHD FIBER AND CONDUIT 137 LF STA 588+13,60'RT TO BY OTHERS IN THE FUTURE. 3. CITY OF MERIDIAN AND ACHD WILL HAVE SEPARATE STA 589+50,60'RT 545-T W/RISER JUNCTION BOXES FOR ITS 0 N g�ONAL INFRASTRUCTURE. AT ITD,District 3 REVISION TO BID SET REVISION APPROVED BY E. REED 4. LABEL ACHD J-BOX LID WITH "ACHD"STEEL LABEL 1/8" 40 0 40 80 8150 CAinden l��CiS � Q y APPROVED BY E. REED, Boulevard O \G SE ti I TALL,WELDED ON&PAINTED GREEN. � Q 4 Scale: 1" =80' Boise,ID n E1Zgllsh N NO. DATE BY DESCRIPTION I.MARKOSIAN CALES HOWN 1 263 i ARE FOR 11"X 17" 11/5/2019 ]GM ADDITIONAL ROADWAY LIGHTING DESIGN CHECKED PRINTS ONLY COUNTY z a 11/8/2019 JGM UPDATED ROADWAY LIGHTING WIRING E.REED p & ASSOCIATES DETAILED CADD FILE NAME I0I S A021(858) US 2Q/26, SH-16 TO CINDER ROAD KEY NUMBER ADa �3q/Z•�•/o3. P�o CAPITOL BOULEVARD,SUITE 600OF z DRAWING CHECKED MARKOSIAN DRAWING DATE ILLM.dw BOISE,ID 83702 21858 9/�FS'> MA E,REED SEPTEMBER 2019 P 208.338.2683 F 208.338.2685 SHEET 256 OF 293 rOf Q,0 1,4 TITL LGND SURv TOM SU M TYP REM PLAN RDTL GRDE IRPL SYJpP SIGN K SG L ILLM SbWL T( Meridian City Council Meeting Agenda February 4,2020- Page 169 of 298 GENERAL NOTES LIGHT POLE SCHEDULE CONDUCTOR SCHEDULE ACCEPTABLE LUMINAIRE FIXTURES 5901 D5F TYPES 4455T WIITH RISER I. ALL SPARE CONDUIT SHALL INCLUDE PULL WIRE. OPEN ENDS ARM AUTOBAHN 1 EA STA 591+99,60'RT WILL BE PLUGGED OR CAPPED. SERVICE CIRCUIT MOUNTING O1 SPARE WITH PULL WIRE O 1 EA STA 592+01,60'RT 2. INTERRUPTION TO ACHD'S FIBER OPTIC NETWORK SHALL POLE ID STATION OFFSET ATB2_60BLEDE70_R3_4K ID ID HEIGHT(FT) 5K LENGTH 1 EA STA 595+99,60'RT ONLY BE PERMITTED AS WEEKEND WORK.DISRUPTION SHALL (FT) O 2-#4 THWN OR 1 EA STA 596+01,66' RT OCCUR NO EARLIER THAN FRIDAY AT 10PM AND SHALL BE 53317C 589+71 64'RT TF 1 40 20 5901-05J SP STREET LIGHT JUNCTION Bc RETURNED TO SERVICE NO LATER THAN MONDAY AT 5AM.THE O 4-#4 THWN NAVION 1 EA STA 589+71 62'RT CONTRACTOR SHALL PROVIDE A MINIMUM TWO(2)WEEK 53318C 591+31 64'RT TF 1 40 20 NAV-AF-03-D-UNV-T3R-1200 1 EA STA 591+31'Al"RT NOTICE PRIOR TO START OF ANY WORK THAT MAY IMPACT LIGHT POLE SCHEDULE LEGEND 1 EA STA 592+91,62'RT ACHD'S NETWORK FOR REVIEW. DEPENDING ON THE IMPACT 53319C 592+91 64'RT TF 1 40 20 1 EA STA BC= BLACK CAT RD SERVICE 1 EA STA 596+51,69'RT TO THE DISTRICT OR PARTNERING AGENCIES,ACHD RESERVES 53320C 594+51 64'RT TF 1 40 20 TF=TREE FARM WAY SERVICE 1 EA STA 597+711 73'RT THE RIGHT TO MODIFY THE REQUESTED DATES FOR THE TM =TEN MILE RD SERVICE REMOVAL OF EXISTING SPARE ITS 1 EA STA 599+31,76'RT SCHEDULED OUTAGE.CONTACT BRI08)48 FROBE-3926 G SC EDU 53321C 596+11 71'RT TF 1 40 20 LL= LONG LAKE WAY SERVICE � CONDUIT AND ASSOCIATED 941-9132 OR$RIAN TRIES AT(208)484-3926 TO SCHEDULE 1 = EAST CIRCUIT JUNCTION BOXES INCIDENTAL TO 5901-05L SP STREET LIGHT WORK. 53322C 597+71 75'RT TF 1 40 20 2=WEST CIRCUIT EXCAVATION, ITEM 206-005A. 7 EA SEE LIGHT POLE SCHEDULE 3. FIBER TERMINATION WORK INCIDENTAL TO ITEM S911-06C, INSTALL 12 FIBER CABLE. 53323C 599+31 78'RT TF 1 40 20 5911-05C SP STREET LIGHT CONDUIT 21 LF STA 589+50,62'RT TO STA 589+71,62'RT 160 LF STA 589+71,62'RT TO --� _ STA 591+31 62'RT ---x- --X----J Lx-- x---- -K--.---x--- - - - J �- ---z- 160 LF STA 592+91,62'RT TO 4"PI `4"PI 4"PI �--- 4'PI �d �"��-0 4"pl ¢"pl " _ �4"�WI 4'PI =4"PI 4"PI 4"PE A 4"PI 4'Pi~ 4'PI STA 592+91 62'RT 160 LF STA 592+91,62' RT TO STA 594+51 62'RT 160 LF STA 594+51,'62'RT TO STA 596+11,69'RT 160 LF STA 596+11,69'RT TO STA 597+71 73'RT 160 LF STA 597+71 73 RT TO ------------------------------------- ----------a----- GI -----------------4g---------- GI ----------------_ -Gf_�--- -----------______!8"GJ_-------4&Iil _------4 STA 599+31�76'RT ! 0 21 LF STA 599+31,76'RT TO Ln+ -- ----- -----F� -- v - STA 599+50,76'RT C CP�C� P C C OP C OF rnn SPARE CONDUIT 1 - -- ---- t,{�- -- � -gym- --r=-grr--= -_ r.= _G_-US 20'26-G G c G G G G � = 5911-06B SP INSTALL 2-2"RPC CONDUIT C n//�� ----EP--__ r_ (ACHD) 590+00 595+00 -EP-----EP-----EP-----EP-- -Ep- ----EP-_-- --E Z m In - - m 250 LF STA 589+50,60'RT TO z _ _ _ - - _ CAL&SQL 400 LF SST TA 592+00,60'RT TO .F V, STA 596+00,66'RT Y _ 5911-06B T T a Lrl 350 LF STA 596+00,66' RT TO 5901-05F 5911-06C FO STA 599+50, 72'RT Q 5911-06D S901-05F _ _ Fd 5911 06C 5 11-USC 2 % _=�_- -_�� Ln __-___��___�e-_-- P-_��, -- EP e --r�----- -_ Q INSTALL 12-FIBER CABLE fr EP 5911 46D 5911-06C (ACHD)SP �z- -� EP- 1R"GI -8"Gi -1; ".G .__ "+sl_ 8." _...--- - fl'.Gl.__ -_].P�"SzL_ g"�_- 1R'r,I - '�- 250 LF STA 589+50,60'RTTO " " n STA 592 DD 60'RT - ------- __._ 400 LF STA 592+DO 60'RT TO 5901-053 S901-053 S901-051 S901-053 STA 596+00,66'RT S901-05L A 2 S901-05L A 2 S901-05L A 2 S901-05L A 2 5941-05J 5901-053 350 LF STA 596+00,66'RT TO IS901-05L A 2 S901-05L A 2 STA 599+50,72'RT I 5911-D6D i 5911-05C 2 5911-45C 2 5911-05C 2 5911-05C Z S911-05C 2 5911-05C 2 SP INSTALL 1-2"RPC CONDUIT I S901-053 I (MERIDIAN) 2 A S901-05L 250 LF STA 589+50,60' RT TO STA 592+00,60'RT 400 LF STA 592+00,60'RT TO TYPICAL ITS JUNCTION BOX INSTALLATION I STA 596+00,66'RT GENERAL NOTES (CONY.) 5911-06B 2-2"RPC CONDUIT 35D LF STA 596+00,66'RT TO 1-I2 FIBER CABLE LEGEND STA 599+50,72'RT 4. LUMINAIRE POLES AND MAST ARMS TO BE INSTALLED IN S95-T sas_T 1-SPARE W/PULL WIRE r- JUNCTION BOX S45-T WITH RISER i ACCORDANCE WITH ACHD STANDARD DRAWING TS-1106. wcmroF w�wsER (ACHD) 5. ALL LUMINAIRES TO BE INSTALLED ON ACHD TYPE"C" MERI❑IAN (ACH❑I STREET LIGHT JUNCTION BOX-S40 FOUNDATIONS WITH BREAK-AWAY COUPLINGS IN ------- NEW INTERCONNECT CONDUIT ACCORDANCE WITH ACHD STANDARD DRAWING TS-1110. NOTES S911-06D 1-2"RPC CONDUIT ------- NEW STREET LIGHT CONDUIT 6. SEE DEMOLITION PLANS FOR EXISTING LUMINAIRE REMOVAL W/PULL WIRE PAY ITEMS. 1. ALL THREE ITS CONDUIT RUNS CAN SHARE THE SAME FOR FUTURE USE 7. ILLUMINATION WAS DESIGNED FOR THE SOUTH SIDE OF US TRENCH. (CITY OF MERIDIAN) LUMINAIRE POLE WITH LED LUMINAIRE 20/26.STREET LIGHTING FOR NORTH SIDE TO BE DESIGNED 2. ALL SPARE CONDUIT TO INCLUDE PULL WIRE. -- EXISTING ACHD FIBER AND CONDUIT BY OTHERS IN THE FUTURE. 3. CITY OF MERIDIAN AND ACHD WILL HAVE SEPARATE 545-T W/RISER JUNCTION BOXES FOR ITS 0 N INFRASTRUCTURE. AT ITD,District 3 s�ONA� REVISION TO BID SET REVISION APPROVED BY E. REED 4. LABEL ACHD J-BOX LID WITH"ACHD"STEEL LABEL 1/8" 40 0 40 $0 8150 Chinden S E_N$ 1 APPROVED BY E. REED. 2 TALL WELDED ON&PAINTED GREEN. Boulevard, QO� \G q� f Scale, 1"=80' Boise,ID N NO. DATE BY DESCRIPTION J.MARKO5IAN CALES OWN S X 17" English 4263 N DESIGN CHECKED ARE FOR Il" COUNTY I 11/5/2419 JGM ADDITIONAL ROADWAY LIGHTING E,REED PRINTS ONLY & ASSOCIATES ADA z z 11/8/2419 JGM UPDATED ROADWAY LIGHTING WIRING DETAILED CARD FILE NAME 1<nl A021($'$$) US 20/26 SH-16 TO CINDER ROAD KEY NUMBER �, qT COF DRAWING CHECKED 3.MARKOS[AN DRA 21858 WING DATE ILLM.dw B015EID CAPITOL8 0BOULEVARD,SUITE 600 21658 A14 E.REED SEPTEMBER 2419 P 208.338.2683 F 208.338.2685 SHEET 257 OF 293 FOP, ,2­ TTTL LGN❑ SURV TOM SUM TYP REM PLAN ROTC GR❑E lRPL PP SIGN MARK SGNL ILLM 5❑WL 7( Meridian City Council Meeting Agenda February 4,2020- Page 170 of 298 GENERAL NOTES LIGHT POLE SCHEDULE CONDUCTOR SCHEDULE ACCEPTABLE LUMINAIRE FIXTURES 5901-05F SP JUNCTION BOX TYPE S-45T WITH RISER 1, ALL SPARE CONDUIT SHALL INCLUDE PULL WIRE. OPEN ENDS AUTOBAHN 1 EA STA 599+99,73'RT WILL BE PLUGGED OR CAPPED. SERVICE CIRCUIT MOUNTING ARM O SPARE WITH PULL WIRE Q AT62 60BLEDE70_R3 4K_5K 1 EA STA 600+01,73'RT POLE ID STATION OFFSET LENGTH 1 EA STA 603+99,71'RT 2. INTERRUPTION TO ACHD'S FIBER OPTIC NETWORK SHALL ID ID HEIGHT(FT) (FT) (� 244 THWN 1 EA STA 604+01,71'RT ONLY BE PERMITTED AS WEEKEND WORK. DISRUPTION SHALL �/ OR 1 EA STA 607+49,73'RT OCCUR NO EARLIER THAN FRiDAY AT fOPM AND SHALL BE 53324C 600+91 77'RT TF 1 40 20 1 EA STA 607+51,73'RT RETURNED TO SERVICE NO LATER THAN MONDAY AT SAM.THE O 4#4 THWN 1 EA STA 608+ ,62'RT NAVIDN 1 EA STA 608+7070,62'RT CONTRACTOR SHALL PROVIDE A MINIMUM TWO(2)WEEK 53325C 602+93 68'RT TM 2 40 20 NAV-AF-03-D-UNV-T3R-IZ00 NOTICE PRIOR TO START OF ANY WORK THAT MAY IMPACT LIGHT POLE SCHEDULE LEGEND ACHD'S NETWORK FOR REVIEW. DEPENDING ON THE IMPACT 53326C 604+11 73'RT TM 2 40 20 5901-05] SP STREET LIGHT]UNCTION BC BC= BLACK CAT RD SERVICE 1 EA STA 600+91,75'RT TO THE DISTRICT OR PARTNERING AGENCIES,ACHD RESERVES TF=TREE FARM WAY SERVICE 1 EA STA 602+93,66' RT THE RIGHT TO MODIFY THE REQUESTED DATES FOR THE 53327C 605+71 74'RT TM 2 40 20 TM =TEN MILE RD SERVICE REMOVAL OF EXISTING SPARE ITS 1 EA STA 604+ ,73'RT 1 EA STA 645+688,74'RT SCHEDULED OUTAGE.CONTACT BRIAN FROBERG AT(208) 53328C 607+31 75'RT TM 2 40 20 ILL= LONG LAKE WAY SERVICE 1 CONDUIT AND ASSOCIATED 1 EA STA 607+28,75'RT 941-9132 OR BRIAN THIES AT(208)484-3926 TO SCHEDULE 1 = EAST CIRCUIT JUNCTION BOXES INCIDENTAL TO 1 EA STA 608+88,65'RT WORK. 53329C 608+91 65 RT TM 2 40 20 2 =WEST CIRCUIT EXCAVATION,ITEM 206-005A. 3. FIBER TERMINATION WORK INCIDENTAL TO ITEM S911-06C, 5941-D5L SP STREET LIGHT INSTALL 12 FIBER CABLE, 6 EA SEE LIGHT POLE SCHEDULE 5911-05C SP STREET LIGHT CONDUIT -x- --- v max- -x- - - -x-_ _ xx-----x- - - - , 141LF STA 600+91,75'RTTO r" - J o � STA 60D+91,75'RT I� it 202 LF STA 600+91 75'RT TO �i STA 602+93;66'RT �� II 115 LF STA I 602+93,66'RT TO a II ii a I STA 604+08,7T RT j' II 160 LF STA 604+08,73'RT TO ii ii STA 605+68,74'RT i -- -----7j7G77:�=�__ -------- ------�--- ___- -0.-------------------------- n ii 160 LF STA 607+28STA `75'RT74'RT TO ------- a-- ----- 48 GT----- � .. ___________________ ________________ �� ;� 160 LF STA 607+28,75'RT TO ------ ----------- - ---------------- ii a 3 62 LF STA 608+88l STA 608+88,Il RT TO Ln r� COP C OP C OP - � 0 C OP C GP C C n C P C aPC GrP C C C r. STA 609+50,71'RT G_ -G---- G---- G SPARE CONDUIT- 1 -- - ---� G G G uP G GP G (�� �oI�C _ „__.___t,P�o� C r�P dp C`� _ 591i-066 SP INSTALL 2-2"RPC CONDUIT ..� P --EP-----EP-----EP-----EP EP--- EP--- EP-----EP-----EP---- P----- rP--- H 600+00 EP -EP EP F 605+00 x (ACHD) °4 LU S911-05C 2 5901-05F - 50 LF STA 599+50, 73' RT TO Z 5911-068 L Y S911- 66$ STA 640+00,73'RT 5911-ObC 5911-05C 2 _ 5911-06B 2 S911-05C 5911-06C - n 400 LF STA 604+00,73'RT TO 2 �- =T T _ S901-05F = =- - _- S911-a5C 2 --- - - =T--� 57A 604+00,71'RT V FO 5911-06D S911-06C - 5911-06D o 350 LF STA 604+00 71'RT TO FO 5911-05C 1 S911-06D 5901-05F J S91i-0bB + 5911-06C _ 119 LF SETA 607+50,73'RIF TO "' STA 60$+69 62'RT 5911-06D __�_ Q 81 LF STA 608+69,62'RT TO -All:L-=�___- _�4s __��.��: _ - - -==�_ � -_ __ - ��= `P =_ E'> -- --�-- - - STA 609+50,69'RT S9i1 ObC SP INSTALL 12-FIBER CABLE "GI „18" f 7g GI 8 GI 18"GI GI 18' AB"GI 46"GE 48 GI (ACHD) o S901-05J S901-05L A 2 S901-05L A 2 S901-05J S901-05L A Z S901-05L A 2 � �/� 5901-05] 5901-05] 5901-053 50 LF STA 599+50,73 RT TO r 5901-05L A STA 600+00,73' 400 LF RT STA 600+00,73'RT TO S911-05C 2 I I S901-053 STA 604+00,71'RT tj 2 A S901-05L I 350 LF STA 604+00,71'RT TO W I STA 607+50,73'RT F I 119 LF STA 607+50,73'RT TO I STA 608+69,62'RT 2 S911-05C � 81 LF STA 608+69,62'RT TO STA 609+50,69' RT TYPICAL ITS JUNCTION BOX INSTALLATION sy11 a66 2-2"RPC CONDUIT LEGEND 5911 06D SP INSTALL 1-2"RPC CONDUIT GENERAL NOTES (CONT.) 1-12 FIBER CABLE � JUNCTION BOX-S45-T WITH RISER (MERIDIAN) 4. LUMINAIRE POLES AND MAST ARMS TO BE INSTALLED IN W RISER s'�-T 1-SPARE W/PULL WIRE 0 STREET LIGHT JUNCTION BOX-S40 50 LF STA 599+50,73'RT TO ACCORDANCE WITH ACHD STANDARD DRAWING TS-1106. (my (ACHD) STA 600+00,73'RT 5. ALL LUMINAIRES TO BE INSTALLED ON ACHD TYPE"C" HERIDIAN) ------- NEW INTERCONNECT CONDUIT 400 LF STA 600+00,73'RT TO FOUNDATIONS WITH BREAK-AWAY COUPLINGS IN STA 604+00 71'RT NEW STREET LIGHT CONDUIT 350 LF STA 604+00,'71'RT TO - ACCORDANCE WITH ACHD STANDARD DRAWING TS-1110. S911-06D 1-2"RPC CONDUIT STA 607+50,73'RT 6. SEE DEMOLITION PLANS FOR EXISTING LUMINAIRE REMOVAL NOTES W/PULL WIRE 119 LF STA 607+50,73'RT TO PAY ITEMS, 1. ALL THREE ITS CONDUIT RUNS CAN SHARE THE SAME FOR FUTURE USE LUMINAIRE POLE WITH LED LUMINAIRE STA 608+69,62'RT 81 LF STA 6D$+69,62'RT TO 7. ILLUMINATION WAS DESIGNED FOR THE SOUTH SIDE OF US TRENCH. (CITY OF MERIDIAN) EXISTING ACHD FIBER AND CONDUIT STA 609+50,69'RT 20/26. STREET LIGHTING FOR NORTH SIDE TO BE DESIGNED 2. ALL SPARE CONDUIT TO INCLUDE PULL WIRE. BY OTHERS IN THE FUTURE. 3. CITY OF MERIDIAN AND ACHD WILL HAVE SEPARATE S45-T W/RISER JUNCTION BOXES FOR ITS O N INFRASTRUCTURE. AT ITD,District 3 5�0NAL REVISION TO BID SET REVISION APPROVED BY E. REED 4. LABEL ACHD J-BOX LIb WITH"ACHD"STEEL LABEL 1/8" 40 0 40 80 8150 Chinden �F,S 1~NSQ� A APPROVED BY E. REED. Boulevard, TALL,WELDED ON&PAINTED GREEN, Q Scale: 1"=80' Boise,ID � ].MARK05IAN CALES OWN English 1 263 N NO. DATE BY DESCRIPTION N DESIGN CHECKED ARE FOR 11"X 17" COUNTY 11/5/2019 JGM ADDITIONAL ROADWAY LIGHTING E,REED PRINTS ONLY p & ASSOCIATES qpq J Tqf O : 11/8/2019 JGM UPDATED ROADWAY LIGHTING WIRING DETAILED CARD FILE NAME �'9 ' P� J.MARKOSIAN 21858 iLLM.dw 101 S CAPITOL BOULEVARD,SUITE 600 A�Zl($58) US 2��26, SH-16 TO CINDER ROAD KEY NUMBER 21858 z A=DRAVWINGECKED I DRAWING DATE BOISE,ID 83702 DES 1<V01(�� tL E.REED SEPTEMBER 2019 P 208.338.2683 F 208.338.2685 SHEET 258 OF 293 ni' uac1,xP-,! T1TL LGNO SURV 70M SUM TYP REM PLAN ROTC GROE IRPL S1NPP SIGN MARK 5GNL ILINi SDWL T( Meridian City Council Meeting Agenda February 4,2020- Page 171 of 298 GENERAL NOTES LIGHT POLE SCHEDULE CONDUCTOR SCHEDULE ACCEPTABLE LUMINAIRE FIXTURES 203-125C REM MISC ITEMS 1. ALL SPARE CONDUIT SHALL INCLUDE PULL WIRE.OPEN ENDS ACHD FIBER WILL BE PLUGGED OR CAPPED. ARM O O AUTOBAHN 487 LF STA 614+63 69'RT TO 2. INTERRUPTION TO ACHD'S FIBER OPTIC NETWORK SHALL POLE ID STATION OFFSET SERVICE CIRCUIT MOUNTING SPARE WITH PULL WIRE A LENGTH 1 ATB2 60BLEDE70_R3_4K_5K STA 619+50,28'RT ONLY BE PERMITTED AS WEEKEND WORK. DISRUPTION SHALL ID ID HEIGHT(FT) (FT) O 2-#4 THWN OR 5901-05F SP JUNCTION BOX TYPE OCCUR NO EARLIER THAN FRIDAY AT 10PM AND SHALL BE 53330C 610+51 74'RT TM 2 40 20 O 1 EA STA 611 9+9`,"73 RRISER RETURNED TO SERVICE NO LATER THAN MONDAY AT SAM.THE 3 4 #4 THWN NAVION l EA STA 612+01,73'RT CONTRACTOR SHALL PROVIDE A MINIMUM TWO(2)WEEK 53331C 612+12 74'RT TM 2 40 20 NAV-AF-03-D-UNV-T3R-1200 l EA STA 613+59,75'RT NOTICE PRIOR TO START OF ANY WORK THAT MAY IMPACT LIGHT POLE SCHEDULE LEGEND l EA STA 613+61,75'RT ACHD'S NETWORK FOR REVIEW. DEPENDING ON THE IMPACT 53332C 615+32 65'RT TM 1 40 20 1 EA STA 614+82,89'RT BC=BLACK CAT RD SERVICE 1 EA STA 614+82,91'RT TO THE DISTRICT OR PARTNERING AGENCIES,ACHD RESERVES TF=TREE FARM WAY SERVICE 1 EA STA 615+99,60'RT THE RIGHT TO MODIFY THE REQUESTED DATES FOR THE 53333C 616+92 65'RT TM 1 40 20 1 EA STA 616+01,b0'RT 53334C 618+52 65,RT TM 1 40 20 ILL LONG LAKE WAY SERVICE REMOVAL OF EXISTING SPARE ITS SCHEDULED OUTAGE.CONTACT BRIAN FROBERG AT(208) TM TEN MILE SERVICE 5901 05J SP.STREET LIGHT JUNCTION BC = W 941-9132 OR BRIAN THIES AT(208)484-3926 TO SCHEDULE I = EAST CIRCUIT CONDUIT AND ASSOCIATED 1 EA STA 610+48,74' O RT 1 EA STA 612+09,74'RT WORK. 2=WEST CIRCUIT JUNCTION BOXES INCIDENTAL TO 1 EA STA 613+63,76'RT 3. FIBER TERMINATION WORK INCIDENTAL TO ITEM S911-06C, EXCAVATION,ITEM 206-005A. 1 EA STA 614+86,91'RT 1 EA STA 615+32,62'RT INSTALL 12 FIBER CABLE, PRIOR TO REMOVING CONDUIT, 1 EA STA 616+92,62'RT 0 2 CONTRACTOR TO PULL EXISTING 1 EA STA 618+52,62,RT I FIBER FROM ALL TERMINATION I 5901-05L SP STREET LIGHT F W c PANELS,CONDUIT AND]UNCTION I 5 EA SEE LIGHT POLE SCHEDULE I f I BOXES AND RETURN TO ACHD FOR I l OP OP OP OP GP DP--t 5911-05C 5P STREET LIGHT CONDUIT I SALVAGE.REMOVAL OF CONDUIT I 98 LF STA 609+50,74'RT TO I I I AND ASSOCIATED JUNCTION BOXES STA 610+48,74' 610+48, RT c INCIDENTAL TO THIS WORK. l 161 LF STA 74'RT TO I 1 STA 612+09,74'RT 154 LF STA 612+09,74'RT TO v, I STA 613+63,76'RT SEE TRAFFIC SIGNAL PLANS I 123 LF STA 613+63,76'RT TO FOR SIGNAL DETAILS STA 614+86,91'RT o I I 3 46 LF STA 614+86,91'RT TO n P p p p y STA 615+32,62'RT �n -------- C C C C C - SEE SHT 268 FOR ITS- ---- ------- -�-_--__� g___-_-- ------- ------- ,. __ -_- A� 160 LF STA 615+32 62'RT TO - � nP G C°G C oP op OP DP U. OP C� op n STA b1b+92'62'RT TERMINATION DETAILS US 20/26 G G r; G rr G c 160 LF STA 616+92 62'RT TO SPARE CONDUIT 1 -EP-- --EP-------EP-- -- -- - r^ - --' 'i It IV' El- - EP-----EP-----EP-----EP-----EP-----EP=----EP-----EP---- `r 61�Tuu SPARE CONDUIT I Z 98 LF STA 618+52 STA ,62,RT TO 615+00 PI Pf P[ PI PI PI PI '""' 5911 066 2 203-125C rn STA 619+50,62,RT LU 5911-06C S901-05F 203-125C 2 a .F �! 591.1-06B SP INSTALL 2-2"RPC CONDUIT - 8"SD S911-06D 2 S911-05C 5901-05] (ACHD) S911-06B S911-06B rn V r T 7 T 7 � 5911-05C 2 5911-05C 2 ,� 250 LF SfA 609+50 72'RT TO ISO S911-06C FO S901-05F T S911-06B _r T S901-05F T 5911 06C T �p STA 612+00;73'RT Q 5911 06D 5911-06C 0� 5911-06D + 160 LF STA 612+00,73'RT TO Z 5911 06D = M-==_fie= __�_e_=___FR _=£e==�___ ___ e �e=_ 0 122 LF STA 613+60�75'RT TO STA 614+82;90'RT " - r ' '------'-- --- 82 90'RT TO -- _- --, 5901-051 � n 118 LF STA + , STA 616+00,60'RT 1B"G S901-05L A 2 1 B"GI 1 GI_ 350 LF STA 616+00,60'RT TO 48"G 4 G T- 48"GI 1 GI �GI GI - - - - - - - - - - - r - -x- - - - -Y - - -x- - - - -� - 5TA619+50 60'RT S901-05L A 2 S901-05L A 2 l S901-053 II S911-06B 5901-05J S901-053 S901-051 e i �• `, x S911-06C -_ x- - --x-- -- - 5901-05L A 2 - - - - - -- -"T - - - -x _ _ . 591l-06C (ACHD)ALL 12-FIBER CABLE II 5911-06D I 250 LF STA 609+50,72'RT TO S911-05C 2 S911-05C 2 S I, f i S911-05C 2 2 S911-05C STA 612+00,73'RT 2 S911-05C W h I S911-05C 2 160 LF STA 612+00,73'RT TO Z J �' �i i i .I, S9d1-053 STA 613+60,75�RT LU S901-05F 2 A S901-05L I 122 LF STA 613+60,75 RT TO STA 614+82 90'RT II ~ II I I 182 LF STA 614+82,90'RT TO I S I I III I STA 616+00,60'RT 2-2��RPC CONDUIT TYPICAL ITS JUNCTION BOX INSTALLATION S911-066 LEGEND 350 LF STA 61 + 0,60 RT TO GENERAL NOTES (CONY.} STA 619+50,60'RT - 1-12 FIBER CABLE i- JUNCTION BOX-S45-T WITH RISER S91I-06D SP INSTALL 1-2"RPC CONDUIT 4. LUMINAIRE POLES AND MAST ARMS TO BE INSTALLED IN 545-T S45-L611-06D 1-SPARE W/PULL WIRE (MERIDIAN) W/RISER 0 STREET LIGHT JUNCTION BOX-S40ACCORDANCE WITH ACHD STANDARD DRAWING TS-1106. (CM OF (ACHD) 250 LF STA 609+50,72'RT TO 5. ALL LUMINAIRES TO BE INSTALLED ON ACHD TYPE"C" MERIDIAN tA�D ------- NEW INTERCONNECT CONDUIT STA 612+00,73'RT 160 LF STA 612+00,73'RT TO FOUNDATIONS WITH BREAK-AWAY COUPLINGS IN NEW STREET LIGHT CONDUIT STA 613+60,75'RT ACCORDANCE WITH ACHD STANDARD DRAWING TS-i110. NQTES S9 1-2"RPC CONDUIT 122 LF STA b14+8;90'RT TO 6. SEE DEMOLITION PLANS FOR EXISTING LUMINAIRE REMOVAL W/PULL WIRE ---] C LUMINAIRE POLE WITH LED LUMINAIRE 182 LF STA 614+82,90'RT TO PAY ITEMS. 1, ALL THREE ITS CONDUIT RUNS CAN SHARE THE SAME FOR FUTURE USE STA 616+00,60'RT 7, ILLUMINATION WAS DESIGNED FOR THE SOUTH SIDE OF US TRENCH. (CITY OF MERIDIAN) 350 LF STA 616+00,60'RT TO - 20/26.STREET LIGHTING FOR NORTH SIDE TO BE DESIGNED 2. ALL SPARE CONDUIT TO INCLUDE PULL WIRE. EXISTING ACHD FIBER AND CONDUIT STA 619+50,60'RT 8Y OTHERS IN THE FUTURE, 3. CITY OF MERIDIAN AND ACHD WILL HAVE SEPARATE S45-T W/RISER JUNCTION BOXES FOR ITS 0 N INFRASTRUCTURE. AT en cJ50 ChindITD,District 3 g10NAL REVISION TO BID SET A REVISION APPROVED BY E. REED 40 0 40 80 81 4. LABEL ACHD J-BOX LID WITH"ACHD"STEEL LABEL 1/8" SN ¢ 1 APPROVED BY E. REED. 2 Boulevard, O \G TALL,WELDED ON&PAINTED GREEN. Q- 4 Scale: 1" _$0' BDise,ID � N NO. DATE BY DESCRIPTION J.MARKOSIAN CALES HOWN English 1 3 DESIGN CHECKED ARE FOR 11"X 17" COUNTY r 11/5/2019 JGM ADDITIONAL ROADWAY LIGHTING E REED PRINTS ONLY p & ASSOCIATES z il/8/2019 JGM UPDATED ROADWAY LIGHTING WIRING DETAILED CADD FILE NAME ADA 101 S CAPITOL BOULEVARD,SUITE 600 A021(SSS) US 20/26, SH-16 TO LINDER ROAD KEY NUMBER 1 Q z DRAWING CHECKED J.MARKOSIAN DRAWING DATE ILLM.dw BOISE,ID B3702 21858 9i��S EAN ZZ E.REED SEPTEMBEA 2019, F 208.338.2683 F 208.338.2685 SHEET 259 OF 293 TM LGND SURV TOM 5VM TYP REM PLAN RDTL GRDE IRPL SWPP 55GN MARK SGNL IL1NI SDWL TC Meridian City Council Meeting Agenda February 4,2020- Page 172 of 298 GENERAL NOTES LIGHT POLE SCHEDULE CONDUCTOR SCHEDULE ACCEPTABLE LUMINAIRE FIXTURES 203-125C REM MISC ITEMS I. ALL SPARE CONDUIT SHALL INCLUDE PULL WIRE. OPEN ENDS ACHD FIBER WILL BE PLUGGED OR CAPPED. AUTOBAHN 1000 LF STA 619+50,28'RT TO POLEID STATION OFFSET SERVICE CIRCUIT MOUNTING ARM LENGTH O SPARE WITH PULL WIRE O ATB2_60BLEDE70_R3_4K_5K STA 629+50,30'RT 2. INTERRUPTION TO ACHD'S FIBER OPTIC NETWORK SHALL ID ID HEIGHT(FT) ONLY BE PERMITTED AS WEEKEND WORK. DISRUPTION SHALL (F O2 244 THWN OR 5901-05F SP JUNCTION BOX OCCUR NO EARLIER THAN FRIDAY AT 10PM AND SHALL BE 53335C 620+12 65' RT TM 1 40 20 TYPE S-45T WITH RISER RETURNED TO SERVICE NO LATER THAN MONDAY AT 5AM.THE O 444 THWN NAVION 1 EA STA 619+99,60'RT CONTRACTOR SHALL PROVIDE A MINIMUM TWO(2)WEEK 53336C 621+72 65'RT TM 1 40 20 1 EA STA 620+01,60'RT NOTICE PRIOR TO START OF ANY WORK THAT MAY IMPACT LIGHT POLE SCHEDULE LEGEND NAV-AF-03-0-UNV-T3R-1240 1 EA STA 623+99,60'RT ACHD'S NETWORK FOR REVIEW. DEPENDING ON THE IMPACT 53337C 623+32 65'RT TM 1 40 20 1 EA STA 624+01,60'RT BC=BLACK CAT RD SERVICE 1 EA STA 627+99,60'RT TO THE DISTRICT OR PARTNERING AGENCIES,ACHD RESERVES TF=TREE FARM WAY SERVICE 1 EA STA 628+01,60'RT THE RIGHT TO MODIFY THE REQUESTED DATES FOR THE 53338C 624+92 65'RT TM 1 40 20 TM =TEN MILE RD SERVICE SCHEDULED OUTAGE.CONTACT BRIAN FROBERG AT(208) LL=LONG LAKE WAY SERVICE PRIOR TO REMOVING CONDUIT, 5901-05J. SP STREET LIGHT JUNCTION BC 53339C 625+52 64'RT TM 1 40 20 941-9132 OR BRIAN THIES AT(208)484-3926 TO SCHEDULE 1 = EAST CIRCUIT 2 CONTRACTOR TO PULL EXISTING 1 EA STA 620+12,62'RT WORK. FIBER FROM ALL TERMINATION 1 EA STA 621+72,62'RT 53340C 628+12 64'RT LL 2 40 20 2=WEST CIRCUIT 1 EA STA 623+32,62'RT 3. FIBER TERMINATION WORK INCIDENTAL TO ITEM S911-06C, PANELS,CONDUIT AND JUNCTION 1 EA STA 624+92'62'RT INSTALL 12 FIBER CABLE. BOXES AND RETURN TO ACHD FOR 1 EA STA 626+52,62'RT SALVAGE. REMOVAL OF CONDUIT 1 EA STA 628+12,62'RT AND ASSOCIATED JUNCTION BOXES 5901-05L SP STREET LIGHT INCIDENTAL TO THIS WORK. 6 EA SEE LIGHT POLE SCHEDULE II 5911 05C SP STREET LIGHT CONDUIT I 62 LF STA 619+50,62'RT TO STA 620+12,62'RT 160 LF STA 620+12,62'RT TO STA 621+72,62'RT 160 LF STA 621+72 62'RT TO STA 623+32,62'RT i CD- 160 LF STA 623+32 62'24+92, TO 62'RT C C C C C C C C C C in C C C C C y 160 LF STA 624+92,62'RT TO + �w____ _________--------------- __==_= ___-___ -� STA 626+52,62'RT - C^ c,^ op OP OF OP a5 op op Cp�• or c? -0 T-cP ---�-�r��-. r-) 160 LF STA 626+52 62'RT TO gp_G 620+00 ~--G--~'FP- --� --G- G _pP_-- G- G G G G US �O'L� G G G G G G G STA 628+12�62'RT EP----- EP _ _--pL ____PI P Pl t'i r '-CP I�-__ _r- �� -�--EP--- ESP __ EP-----Ea-----EP- STA 629+50;62'RT 1Q- PI 203-125C 2 - - 625+00 P1 -- ---- z 138 LF STA 628+12 62'RT TO Lo 5911-06B m f° Z S911-06C - - - - .- 5911-06b 'F CNL S L n 5911-06B SP INSTALL 2-2"RPC CONDUIT 5911-06B 5911-068 1 S911-05C ? (ACHD) S901-05F S911-06B rn 5911-06C � • 5901-05F S911-06C i 59D1-05F S911-06C w 50 LF STA 619+50 60'RT TO Q - 5911-06D S911-06D _ D + STA 620+00,60'RT EP-= _-- _ -=--- -_ ==- `E-----��-.A -- - ----- --- -Fy_�--- _-- =��---- xN �_� _ E fie= ��-5911- _o 06 400 LF STA 620+00,60'RT TO • , STA 624+00 60'RT 400 LF STA 624+00,60'RT TO - " "GI IA'rl STA 628+00 60'RT - B Gi _ 150 LF STA 628+00 60'RT TO STA 629+50,60 RT xx- - 5901-05] ii 5401-05] - - - - - - S901-05J S901-053 S901-053 ii-I I S901-05J -_X-- - - -- 5901-05L A 2 r- - ----x S901-05L A 2 - -X- ---- S901-05L A 2 -----"--- 5901-05L A 2 k- - - - -x- - 5901-05L �� i x l 5911-06C SP INSTALL 12-FIBER CABLE 5401-05L A 2 (ACHD) S911-05C 2 I 5911 05C 2 S911-05C 2 S911-05C 2 5911 05C 2 ; I I 2 S911-05C 50 LF STA 619+50,60'RT TO STA 620+00,60'RT 400 LF STA 620+00,60'RT TO 1 I STA 624+00, 60'RT 400 LF STA 624+00,60'RT TO I STA 628+00,60'RT 150 LF STA 628+00,60'RT TO TYPICAL ITS]UNCTIONaVVJMS�ER ON L B 2-2"RPC CONDUIT LEGEND STA 629+50,60'RT GENERAL NOTES (CONT.) 1-12 FIBER CABLE « JUNCTION BOX-S45-T WITH RISER 5911-OfiD SP INSTALL 1-2 RPC CONDUIT 4. LUMINAIRE POLES AND MAST ARMS TO BE INSTALLED IN 1-SPARE W/PULL WIRE MERidIAN ACCORDANCE WITH ACHD STANDARD DRAWING TS-1106. (ACHD} STREET LIGHT JUNCTION BOX 540 ( ) 5. ALL LUMINAIRES TO BE INSTALLED ON ACHD TYPE"C„ 7i=L ---___- NEW INTERCONNECT CONDUIT 50 LF STA 620+00,60'RT TO FOUNDATIONS WITH BREAK-AWAY COUPLINGS IN 400 LF STA 620+00,60'RT TO ACCORDANCE WITH ACHD STANDARD DRAWING TS-1110, 1-2"RPC CONDUIT ------- NEW STREET LIGHT CONDUIT STA 624+00, 60'RT NOTES 400 LF STA 624+00,60'RT TO C 6. SEE DEMOLITION PLANS FOR EXISTING LUMINAIRE REMOVAL W/PULL WIRE STA 628+00 60'RT PAY ITEMS. 1. ALL THREE ITS CONDUIT RUNS CAN SHARE THE SAME FOR FUTURE USE LUMINAIRE POLE WITH LED LUMINAIRE 150 LF STA 628+001,60'RT TO 7. ILLUMINATION WAS DESIGNED FOR THE SOUTH SIDE OF US TRENCH. (CITY OF MERIDIAN) STA 629+50,60'RT - 20/26. STREET LIGHTING FOR NORTH SIDE TO BE DESIGNED 2. ALL SPARE CONDUIT TO INCLUDE PULL WIRE. EXISTING ACHD FIBER AND CONDUIT U BY OTHERS IN THE FUTURE. 3. CITY OF MERIDIAN AND ACHD WILL HAVE SEPARATE S45-T W/RISER JUNCTION BOXES FOR ITS o "147T_�D, INFRASTRUCTURE. AT SXONA� REVISION TO BID SET A REVISION APPROVED BY E. REED 4. LABEL ACHD J-BOX LID WITH "ACHD"STEEL LABEL 1/8" 40 0 40 80 8150 Chinden l��s GSNS vuQN APPROVED BY E. REED. TALL,WELDED ON&PAINTED GREEN. Boulevard, QO FQ Scale: 1"=SO' Boise,ID N N0. DATE BY DESCRIPTION J.MARKOSIAN E FORLES 1"X 1 Ertgl ish i ARE FOR 11"X 17" w i 11/5/2019 ]GM ADDI1TsJNAL ROADWAY LIGHTING DESIGN CHECKED COUNTY E.REED PRINTS ONLY & ASSOCIATES ADA s,1Z•q �/��0 z 11/8/2019 ]GM UPDATED ROADWAY LIGHTING WIRING DETAILED CADD FILE NAME J.MARKOSIAN 21858 ILLM.dw 1015 CAPITOL BOULEVARD,SUITE 600 A021(858) US 20/26, SH-16 TO CINDER ROAD KEY NUMBER 21858 OF DRAWING CHECKED DRAWING DATE BOISE,ID 83702 til�C- VAN R� E.REED SEPTEMBER 2019 P 208,336.2683 F 20$.338.2655 SHEET 260 OF 293 TITL LGND SURV TOM SUMM TYP REM PLAN RDTL GRpE IRPL SMWPP SIGN MARK SGNL SDWL 7 Meridian City Council Meeting Agenda February 4,2020- Page 173 of 298 GENERAL NOTES LIGHT POLE SCHEDULE CONDUCTOR SCHEDULE ACCEPTABLE LUMINAIRE FIXTURES C2_03-125CD REM MISC ITEMS 1. ALL SPARE CONDUIT SHALL INCLUDE PULL WIRE.OPEN ENDS ACHD FIBER WILL BE PLUGGED OR CAPPED. ARM AUTOBAHN 1000 LF STA 629+50,30' TO RT POLE ID STATION OFFSET SERVICE CIRCUIT MOUNTING LENGTH O SPARE WITH PULL WIRE O ATB2_60BLEDE70_R3 4K 5K STA 639+50,45' 2. INTERRUPTION TO ACHD'S FIBER OPTIC NETWORK SHALL ID ID HEIGHT(FT) ONLY BE PERMITTED AS WEEKEND WORK.DISRUPTION SHALL (FT) O2 244 THWN OR 5901-05F SP JUNCTION BOX OCCUR NO EARLIER THAN FRIDAY AT 10PM AND SHALL BE 53341C 629+72 64'RT LL 2 40 20 TYPE S-45T WITH RISER RETURNED TO SERVICE NO LATER THAN MONDAY AT SAM.THE O 4-#4 THWN NAVION 1 EA STA 631+99,60'RT CONTRACTOR SHALL PROVIDE A MINIMUM TWO(2)WEEK 53342C 631+32 64'RT LL 2 40 20 1 EA STA 632+01,60'RT NOTICE PRIOR TO START OF ANY WORK THAT MAY IMPACT ILIGHT POLE SCHEDULE LEGEND NAV-AF-03-D-UNV-T3R-1200 1 EA STA 636+00,70'RT ACHD'S NETWORK FOR REVIEW. DEPENDING ON THE IMPACT 53343C 632+92 65'RT LL 2 40 20 BC= BLACK CAT RD SERVICE 1 EA STA 636+02,70'RT TO THE DISTRICT OR PARTNERING AGENCIES,ACHD RESERVES 53344C 634+52 65'RT LL 2 40 20 TF=TREE FARM WAY SERVICE 5901-05J SP STREET LIGHT JUNCTION B( THE RIGHT TO MODIFY THE REQUESTED DATES FOR THE TM =TEN MILE RD SERVICE 1 EA STA 629+72,62'R7 SCHEDULED OUTAGE.CONTACT BRIAN FROBERG AT(208) 53345C 636+12 72'RT LL 2 40 20 LL= LONG LAKE WAY SERVICE O PRIOR TO REMOVING CONDUIT, 1 EA STA 631+32,62'RT 941-9132 OR BRIAN THIES AT(208)484-3926 TO SCHEDULE 1 = EAST CIRCUIT 2 CONTRACTOR TO PULL EXISTING 1 EA STA 632+92,62'RT WORK. 53346C 637+72 74'RT LL 2 40 20 2=WEST CIRCUIT FIBER FROM ALL TERMINATION 1 EA 1 EA STA 636+09TA ,62'RT 72'RT 3. FIBER TERMINATION WORK INCIDENTAL TO ITEM S911-06C, IPANELS,CONDUIT AND]UNCTION 1 EA STA 637+69,74'RT INSTALL 12 FIBER CABLE. 53347C 639+32 74'RT LL 2 40 20 BOXES AND RETURN TO ACHD FOR 1 EA STA 639+29,74'RT SALVAGE. REMOVAL OF CONDUIT AND ASSOCIATED JUNCTION BOXES 5901-05L SP STREET LIGHT f INCIDENTAL TO THIS WORK. 7 EA SEE LIGHT POLE SCHEDULE 5911-05C SP STREET LIGHT CONDUIT • 22 LF STA 629+50,62'RT TO « _I STA 629+72,62'RT 160 LF STA 629+72,62'RT TO STA 631+32 62'RT '} --' .•--- .k ---.---- .- --_, --- ___4 a .f-----___`a----_-_ -- ---_, -' �_- - -- _ _ �_�`� ---a--`-_" - 160 LF STA 631+32 62'RT TO STA 632+92 62'RT a -« -� - �Dom==C 160 LF STA 632+92;62'RT TO ~ --� _ - - ,�'G�-C�Y e ~ STA 634+52,62'RT CD I- C c c c c c c C C C P --�- P •P 3 157 LF STA 634+52 62'RT TO +I`(1r T _24ZL_=-=�217.GL --====J4"Gl-------Za'�=_ � � __�_-=__ ___===- i Gr==== - �_�=== 4 Gr=====__ > STA 636+09,72'RT 0) DR T T T -T fi"-------T T T T T T T T 160 LF STA b36+09'72'RT t0 p^ c "'} •� ___,. __ Ep „EP--- --EPT==� P=--- - 160 LF STA 637+69STA `74'RT TO t0 ! G F G - Pt G Pi G PI r' PI r' P1G PF' P� �T _EP_�L � �J LOIL��Pt F� f i frli� - s p, `� m -5�-- &�a+OD P- ---EP-- ---EP ----£P-----EP-----EP-----Ep 203-125C 2 -EP J-- 635+�� z STA 639+29,74'RT , rn 21 LF STA 639+29, 74'RT TO V) o CAL&SQL m STA 639+50, 74'RT LU = 5911-06B 5911-066 F _ _ - _ J 2 5911-05C S911-D66 SP INSTALL 2 2"RPC CONDUIT _ ACHD U S911-06C S901-05F S911-06C 5901-05F r 5911-06B S'911-05C (ACHD) Q S911-06D • S911-06D -06C + 250 LF STA 629+50 60'RT TO - - - - 911 cn STA 632+00`60'RT -E- _=P_ r�'-.�ter_ _ _ - '-_- EPA___ �E -_--F2.-_==�FP �.� a .Z 9 O - - - - ------------ -- -- _ _ _- 11=06D- - 401 LF STA 632+00,60'RT TO ' --` STA 636+01,70'RT • -"�'---*-"-*-- -*--- - �=�-- s=---;� - 349 LF STA 636+01,70 RT TO -- _ .._._. STA 639+50,70'RT -- r 5901-051 _ 5901-05J _ _____--- S901-05J _ __ _ S9D1-O5J � 5911 06C SP INSTALL 12-FIBER CABLE 5941-05L A 5901-05L A - 5901-05L A 2 S901 05L A 2 i 5901-05L A 2 --EP _- EP S901-05L A 2 EP _ (ACHD) ----- 590105] -EP __-_E ____-E S901-05J -- -- P-----E 250 LF STA 629+50,60'RT TO 5911-05C 2 5911-05C 2 5911 45C 2 5911 05C 2 STA 632+00,60'RT 5911-05C 2 S911-05C 2 401 LF STA 632+00,60'RT TO 5901-05J I 349 LF STA 636+01,70'RT TO W 2 A 5901-05L STA 639+50,70'RT � r, I 5911-06D 5P INSTALL 1-2"RPC CONDUIT ° GENERAL NOTES CONT. TYPICAL ITS ]UNCTION BOX INSTALLATION S911-06B 2-2"RPC CONDUIT LEGEND (MERIDIAN) 1-12 FIBER CABLE ' JUNCTION BOX-S45-T WITH RISER 250 LF STA 629+50 60'RT TO 4. LUMINAIRE POLES AND MAST ARMS TO BE INSTALLED IN w 4SS-T w 55-T 1-SPARE W/PULL WIRE STREET LIGHT]UNCTION BOX-S40 STA 632+00,60'RT ACCORDANCE WITH ACHD STANDARD DRAWING TS-1106, (clrraE (ACHD) 401 LF STA 632+00,60 RT TO 5, ALL LUMINAIRES TO BE INSTALLED ON ACHD TYPE"C" " 1°ION (n«DI 349 LF STA 636+01;70'RT TO � -------- NEW INTERCONNECT CONDUIT STA 639+50,70'RT FOUNDATIONS WITH BREAK-AWAY COUPLINGS IN " ACCORDANCE WITH ACHD STANDARD DRAWING TS-1110. 5911-06b 1-2"RPC CONDUIT `------ NEW STREET LIGHT CONDUIT 6. SEE DEMOLITION PLANS FOR EXISTING LUMINAIRE REMOVAL NOTES W/PULL WIRE PAY ITEMS. 1, ALL THREE ITS CONDUIT RUNS CAN SHARE THE SAME FOR FUTURE USE LUMINAIRE POLE WITH LED LUMINAIRE 7. ILLUMINATION WAS DESIGNED FOR THE SOUTH SIDE OF US TRENCH. (CITY OF MERIDIAN) EXISTING ACHD FIBER AND CONDUIT 20/26.STREET LIGHTING FOR NORTH SIDE TO BE DESIGNED 2. ALL SPARE CONDUIT TO INCLUDE PULL WIRE. BY OTHERS IN THE FUTURE. 3. CITY OF MERIDIAN AND ACHD WILL HAVE SEPARATE S45-T W/RISER JUNCTION BOXES FOR ITS O N INFRASTRUCTURE. AT ITD,District 3 SQNAL REVISION TO BId SET REVISION APPROVED BY E. REED 4, LABEL ACHD J-BOX LID WITH"ACHD"STEEL LABEL 1/8" 40 0 40 $0 8150 Chinden ENS~y APPROVED BY E. REED. Boulevard, O \G F TALL,WELDED ON&PAINTED GREEN. Q O Scale: 1"=80' Boise,ID NO. DATE BY DESCRIPTION J.MARKOSIAN CALFS OWN S Engl zsh DESIGN CHECKED ARE FOR li"X 17" COUNTY x 11/5/2019 JGM ADDITIONAL ROADWAY LIGHTING E.REED PRINTS ONLY p & ASSOCIATES ADA h•� a 11/8/2019 JGM UPDATED ROADWAY LIGHTING WIRING DETAILED CADD FILE NAME y 101 S CAPITOL BOULEVARD,SUITE 600 A021(858) US 20/26, SH-16 TO LINDER ROAD KEY NUMBER v 2,1. OF DRAWING CHECKED MARKDSIAN 21858 DRAWING DATE ILLM.dw BOISE,ID 83702 21858 �/��S�AN E.REED SEPTEMBER 2019 P 208.338.2683 F 208,338.2685 SHEET 261 OF 293 lGND SUR O SU NP REM PLN+I RD7L GRDE IRPL $WPP SIGN NL ILLM SDW 7C Meridian City Council Meeting Agenda February 4,2020- Page 174 of 298 GENERAL NOTES LIGHT POLE SCHEDULE CONDUCTOR SCHEDULE ACCEPTABLE LUMINAIRE FIXTURES 203-125C REM MISC ITEMS I. ALL SPARE CONDUIT SHALL INCLUDE PULL WIRE.OPEN ENDS ACHD FIBER WILL BE PLUGGED OR CAPPED. ARM AUTOBAHN 1000 LF STA 639+50 45'R7 TO POLE ID STATION OFFSET SERVICE CIRCUIT MOUNTING LENGTH O SPARE WITH PULL WIRE O ATB2_60BLEDE7D_R3_4K_5K STA 649+50,30'RTC 2. INTERRUPTION TO ACHD'S FIBER OPTIC NETWORK SHALL ID ID HEIGHT(FT) ONLY BE PERMITTED AS WEEKEND WORK. DISRUPTION SHALL (F O2 244 THWN 5901 05F SP JUNCTION BOX OCCUR NO EARLIER THAN FRIDAY AT 14PM AND SHALL BE 53348C 642+51 64'RT LL 1 40 20 OR TYPE 1 EA STA 64 +02 0+0 WITH RISER RETURNED TO SERVICE NO LATER THAN MONDAY AT 5AM.THE O 444 THWN ,72'RT NAVION 1 EA STA 640+02,72'RT CONTRACTOR SHALL PROVIDE A MINIMUM TWO(2)WEEK 53349C 644+11 64'RT LL 1 40 20 1 EA STA 641+62,68'RT NOTICE PRIOR TO START OF ANY WORK THAT MAY IMPACT LIGHT POLE SCHEDULE LEGEND NAV-AF 03-D-UNV-T3R-1200 1 EA STA 644+01,60'RT ACHD'S NETWORK FOR REVIEW. DEPENDING ON THE IMPACT 53350C 645+71 64'RT LL 1 40 20 1 EA STA 648+01,60'RT TO THE DISTRICT OR PARTNERING AGENCIES,ACHD RESERVES BC= BLACK CAT RD SERVICE 590f-05] SP STREET LIGHT]UNCTION B( 53538C 647+31 64'RT LL 1 40 20 TF=TREE FARM WAY SERVICE 1 EA STA 640+54,79' RT THE RIGHT TO MODIFY THE REQUESTED DATES FOR THE TM =TEN MILE RD SERVICE 1 EA STA 641+57,74'RT SCHEDULED OUTAGE.CONTACT BRIAN FROBERG AT(208) 53539C 648+91 64'RT LL 1 40 20 LL= LONG LAKE WAY SERVICE O PRIOR TO REMOVING CONDUIT, 1 EA STA 642+51,62'RT 941-9132 OR BRIAN THIES AT(208)484-3926 TO SCHEDULE 1 =EAST CIRCUIT 2 CONTRACTOR TO PULL EXISTING 1 EA STA 644+11,62'RT WORK. 2 =WEST CIRCUIT FIBER FROM ALL TERMINATION I EA STA EA STA 647+31, T 62'RT 3, FIBER TERMINATION WORK INCIDENTAL TO ITEM S911-06C, PANELS,CONDUIT AND]UNCTION 1 EA STA 648+91,62'RT INSTALL 12 FIBER CABLE, BOXES AND RETURN TO ACHD FOR I SALVAGE. REMOVAL OF CONDUIT 5901-45L SP STREET LIGHT AND ASSOCIATED]UNCTION BOXES 5 EA SEE LIGHT POLE SCHEDULE INCIDENTAL TO THIS WORK. 5911-05C SP STREET LIGHT CONDUIT 4 II II III I 104 LF STA 639+50, 30''Gl STA 64'RT TO 4[LI III i III � � ••I- r II III `-~ " r� 103 LF STA 640+54,79'RT TO a I I 30'GI 8 m aEl STA 641+57,74'R Iq,,XS I r I 94 LF STA 641+5,74' RT TO SEE TRAFFIC SIGNAL PLANS_ -�'P G • Is G • p c' 62 P 160 LF STA b42+51 62'RT TO C C C C C C C-ate FOR SIGNAL DETAILS --------------------- Y - - -rA-v---------- C- --- --- STA 544+11,62'RT ------ i_ - -_-__L____ _ ______ S__--___�______-- ------- ------- ----- 160 LF STA 644+11 62'RT TO . . . STA 645+7 62'RT � __ ___ ~ ri � G��G G 3 160 LF STA 645+71,62'RT TO -- G ��G y STA 647+31,62'RT Ch T P- SEE SHT 268 FOR ITS -I 160 LF STA 647+31 62'RT TO rn � RI-..-�-_G- - - - -- -- - - -- - e �^7� � pr"� 2.-. r T f7 STA 648+91,62'RT tip TERMINATION DETAILS _ US 20/26 2E y Q . -�: s+'- w w ti w 59 LF STA 648+91,62'RT TO '< 5911-06B 5911-46C 203-125C 2 645+00 { - - - - - - 5911-06C z STA 649+50,6T RT 5911-066 w S911-06C 5911-468 CAL&SQL 5911-066 SP INSTALL 2-2"RPC CONDUIT _ _ _ _ 2 S911-05C _Z 59f1-06D f ' ?.F y (ACHD) 5911 fl6C S901-05F ru m U S901-05F T T S901-05F T 5911-06B T T T � 51 LF STA 639+50,62 RT TO m STA 640+01, 72 RT QIt - - • + 59 LF STA 640+01,72'RT TO E_P ` -_-=f�= -E_P__ __EP_ -�-_---- _---- -==-- '� =1 p_ _-EP= _- F_ -- �F STA 640+60 86 RT 161 LF STA + 1,72 RT TO ---- --- STA 641+62,68'RT 239 LF STA 641+62,68'RT TO __ STA 644*Ol,fi0'RT 5901-053 z ..�.. - - - f 400 LF STA 644 Ol,50'RT TO I I ` S9DI-05F 5901-05] 5901-05] S901 05] 5901-051 STA 648+01,60'RT -F� - 5911-05C 2 Y 1 S901-053 0 S901-05L A 2 5901-05L A 2 5901-05L A 2 S901-05L A 2 149 LF STA 648+O1,60'RT TO I_ STA 649+50,60'RT 5911-06B „ r!`I s`1 S911-05C 2 5911-05C 2 S911-05C 2 5911-05C 2 5911-05C 2 I W I 17 r I lI , I 5911-06C I I I I fr r l +t I I 5911-06C SP INSTALL 12-FIBER CABLE I S911-06D I I frr ('r' iy 11 (ACHD) 5401-05] + I xl o + I z 11 a 2 A S901-05L 51 LF STA 639+50,62'RT TO "� ; r STA 640+01,72'RT I I I r+ r I IQ I r r 59 LF STA 640+01,72'RT TO r r+ r J u I r I STA 640+60,86 RT 161 LF STA 640+01,72'RT TO TYPICAL ITS JUNCTION BOX INSTALLATION 591f-066 2-2" RPC CONDUIT LEGEND STA 641+62,68'RT GENERAL NOTES (CONT.) f-12 FIBER CABLE 239 LF STA 641+62,68'RT TO 4. LUMINAIRE POLES AND MAST ARMS TO BE INSTALLED IN 595-T S45-T 1-SPARE W/PULL WIRE ]UNCTION BOX-545-T WITH RISER STA 644+01,601 RT W/RISER wIRlsErt STREET'LIGHT]UNCTION BOX-540 400 LF STA 644+01,60 RT TO ACCORDANCE WITH ACHD STANDARD DRAWING TS-1106. (cm of (ACHD) STA 648+01,60'RT 5. ALL LUMINAIRES TO BE INSTALLED ON ACHD TYPE"C„ MERI°�„' cac lD} -______ NEW INTERCONNECT CONDUIT 149 LF STA 649+50,60'R7 601 RT TO FOUNDATIONS WITH BREAK-AWAY COUPLINGS IN ACCORDANCE WITH ACHD STANDARD DRAWING T5-1110. S911-06D 1-2" RPC CONDUIT - NEW STREET LIGHT CONDUIT - - 6. SEE DEMOLITION PLANS FOR EXISTING LUMINAIRE REMOVAL NOTES S911-06D SP INSTALL 1-2"RPC CONDUIT W/PULL WIRE LUMINAIRE POLE WITH LED LUMINAIRE (MERIDIAN) PAY ITEMS. 1. ALL THREE ITS CONDUIT RUNS CAN SHARE THE SAME FOR FUTURE USE 7. ILLUMINATION WAS DESIGNED FOR THE SOUTH SIDE OF US TRENCH. (CITY OF MERIDIAN) 51 LF STA 639+50,62'RT TO 20/26. STREET LIGHTING FOR NORTH SIDE TO BE DESIGNED 2. ALL SPARE CONDUIT TO INCLUDE PULL WIRE. EXISTING ACHD FIBER AND CONDUIT STA 640+01,72'RT 59 LF STA 640+01,72'RT TO BY OTHERS IN THE FUTURE. 3. CITY OF MERIDIAN AND ACHD WILL HAVE SEPARATE S45-T W/RISER]UNCTION BOXES FOR ITS O N INFRASTRUCTURE. AT ITD,District 3 c&IONAL REVISION TO Bib SET REVISION APPROVED BY E. REED 4. LABEL ACHD]-BOX LID WITH "ACHD"STEEL LABEL 1/8" 44 0 40 80 8150 Chinden 5 ENSQ 1 APPROVED BY E. REED. 2 TALL,WELDED ON&PAINTED GREEN. Boulevard, Scale: 1" =80' Boise,ID ry NO. DATE BY DESCRIPTION ].MARKOSIAN CALES OWN Erzglish l �t7 N DESIGN CHECKED ARE FOR 11"X 17" COUNTY dd 11/5/2019 ]GM ADD17i0NAL ROADWAY LIGHTING E. REEp PRINTS ONLY & ASSOCIATES ADA �'f z 11/8/2019 ]GM UPDATED ROADWAY LIGHTING WIRING W DETAILED CADD FILE NAME INN 101 S CAPITOL BOULEVARD,SUITE 600 A021(858) US 2Q/26, SH-16 TO CINDER ROAD KEY NUMBER V 9T� 1 P Q Z DRAWING CHECKED 1. DRAWING 21858 DRAWING DATE ILLM.dw BOISE,ID 83702 21858 gif'ESAN LL E.REED SEPTEMBER 2019 P 208.338.26$3 F 206.338.2685 SHEET 262 OF 293 FPF Cv-f,. . -nTL LGND SURV TOM SUM TYP REM PLAN RDTL GADE IRPL SWOP SIGN RK SGNL ILLM SDWL TC Meridian City Council Meeting Agenda February 4,2020- Page 175 of 298 GENERAL NOTES LIGHT POLE SCHEDULE CONDUCTOR SCHEDULE ACCEPTABLE LUMINAIRE FIXTURES 203-125C REM MISC ITEMS 1. ALL SPARE CONDUIT SHALL INCLUDE PULL WIRE.OPEN ENDS ACHD FIBER WILL BE PLUGGED OR CAPPED. SERVICE CIRCUIT MOUNTING ARM TO O SPARE WITH PULL WIRE O AUTOBAHN 1000 LF STA 649+50,30'R AT62_64BLEDE70_R3_4K_5K STA 659+50,59'RTT, 2. INTERRUPTION TO ACHD'S FIBER OPTIC NETWORK SHALL POLE ID STATION OFFSET ID ID HEIGHT(FT) LENGTH ONLY BE PERMITTED AS WEEKEND WORK. DISRUPTION SHALL (F O2 244 THWN OR S901-05F SP JUNCTION BOX OCCUR NO EARLIER THAN FRIDAY AT 10PM AND SHALL BE 53540C 650+51 64'RT LL 1 40 20 TYPE S-45T WITH RISER RETURNED TO SERVICE NO LATER THAN MONDAY AT SAM.THE O 4-#4 THWN 1 EA STA 652+01,60'RT CONTRACTOR SHALL PROVIDE A MINIMUM TWO(2)WEEK 53541C 652+11 64'RT LL 1 40 20 NAVION 1 EA STA 656+01,60'RT NOTICE PRIOR TO START OF ANY WORK THAT MAY IMPACT LIGHT POLE SCHEDULE LEGEND NAV-AF-03-D-UNV-T3R-12pp 1 EA STA 659+32,60'RT ACHD'S NETWORK FOR REVIEW. DEPENDING ON THE IMPACT BC= BLACK CAT RD SERVICE 5901-p5J SP STREET LIGHT JUNCTION B( TO THE DISTRICT OR PARTNERING AGENCIES,ACHD RESERVES TF=TREE FARM WAY SERVICE 1 EA STA 650+51,62'RT THE RIGHT TO MODIFY THE REQUESTED DATES FOR THE TM =TEN MILE RD SERVICE i EA STA 652+11,62'RT SCHEDULED OUTAGE.CONTACT BRIAN FROBERG AT(208) LL=LONG LAKE WAY SERVICE PRIOR TO REMOVING CONDUIT, 941-9132 OR BRIAN THIES AT(208)484-3926 TO SCHEDULE 1 = EAST CIRCUIT O CONTRACTOR TO PULL EXISTING Sgpl p5L SP STREET LIGHT WORK. 2=WEST CIRCUIT FIBER FROM ALL TERMINATION 2 EA SEE LIGHT POLE SCHEDULE 3. FIBER TERMINATION WORK INCIDENTAL TO ITEM 5911-06C, PANELS,CONDUIT AND JUNCTION INSTALL 12 FIBER CABLE, BOXES AND RETURN TO ACHD FOR SALVAGE.REMOVAL OF CONDUIT S911-05C SP STREET LIGHT CONDUIT AND ASSOCIATED JUNCTION BOXES I 101 LF STA 649+50,62'RT TO INCIDENTAL TO THIS WORK. 164 LF STA 650+51;62'RT TO STA 652+11,62'RT 5911 06B SP INSTALL 2-2"RPC CONDUIT IR (ACHD) G G G- G G G G c G & 1 P 251 LF STA 649+50 60'RT TO p C `p f°— -- -- P— �-I- - P�----'--'--P P��P ter-P P r � �� � ������-"".—."r , ------------------_._---------�_ -----------------------------� £ r 400 LIF STA 652+01,60'RT TO { . �---------------------- ---J---- ' - 31 LF ST 656+01,64'RT In -- - 3 STA6+01 60'RT TO + "---EP--__-fP y 659+32,60'RT T— C 2�] 2+'} -- r�-`Ep---_--EP- 4 n 18 LF STA 659+50 60'RTTO PI US L0'L6 I� PI P� Pi i F: w n STA b59+54;60'R7 w w w K w ? W w w ` w w 655+00 � 650+00 203-125C 2 z 5911-06C SP INSTALL 12-FIBER CABLE m CAL&5�L _ -- — - (MERIDIAN) Z ` 5901-05F D 51 LF STA 649+50,60'RT TO z S9D1 05F 5g11-06D - �911-00136C — - > STA 652+01,60'RT 400 LF STA 652+01 60'RT TO V T-— T 1 T T T 5911-06C r T T , m T T 5901-05F T Tr r STA 656+01;60'RT - - - FO - — C 331 18 LF STA STA 659+32;6001 0'RT TO = = P fP____ -- -------- --- E� P-_____ FQ 0 Ln --- - --=�=-----tee £'__--^- �� + F STA 659 32,60 RTTO . . STA 659+50,60'RT _ . S901-053 — S901-053 �^'-- �a S911-06B 1 S901-05L A 2 i S901-05L A 2 0 5911-06C °N f nlI 5911-05C 2 5911-05C I I i I GENERAL NOTES (CONY.} TYPICAL ITS JUNCTION BOX INSTALLATION 5911-06B 2-2"RPC CONDUIT LEGEND 1-12 FIBER CABLE JUNCTION BOX-S45-T WITH RISER 4. LUMINAIRE POLES AND MAST ARMS TO BE INSTALLED IN 545 T $45-T 1-SPARE W/PULL WIRE i ACCORDANCE WITH ACHD STANDARD DRAWING TS-1106. w OF w/RrsLR (ACHD) STREET LIGHT JUNCTION BOX-540 MERIDIAN) (ACHD)i 5. ALL LUMINAIRES TO BE INSTALLED ON ACHD TYPE"C" - NEW INTERCONNECT CONDUIT FOUNDATIONS WITH BREAK-AWAY COUPLINGS IN ------- NEW STREET LIGHT CONDUIT ACCORDANCE WITH ACHD STANDARD DRAWING TS-1110. NOTES S911-06D 1-2"RPC CONDUIT 6. SEE DEMOLITION PLANS FOR EXISTING LUMINAIRE REMOVAL W/PULL WIRE �3C LUMINAIRE POLE WITH LED LUMINAIRE PAY ITEMS. 1. ALL THREE ITS CONDUIT RUNS CAN SHARE THE SAME FOR FUTURE USE 7. ILLUMINATION WAS DESIGNED FOR THE SOUTH SIDE OF US TRENCH. (CITY OF MERIDIAN) —_ EXISTING ACHD FIBER AND CONDUIT 20/26.STREET LIGHTING FOR NORTH SIDE TO BE DESIGNED 2. ALL SPARE CONDUIT TO INCLUDE PULL WIRE. BY OTHERS IN THE FUTURE. 3. CITY OF MERIDIAN AND ACHD WILL HAVE SEPARATE S45-T W/RISER JUNCTION BOXES FOR ITS 0 N INFRASTRUCTURE. AT TTD,District 3 REVISION TO BID SET Q REVISION APPROVED BY E. REED 40 0 40 80 8150 Chinden F.S vY4 4. LABEL ACHD J BOX LID WITH "ACHD"STEEL LABEL 1/8" GINS 1 APPROVED BY E. REED. 2 TALL,WELDED ON&PAINTED GREEN, Boulevard, O FQ Scale: 1"=80' Boise,ID It '44English 14263 h J.MARKOSIAN CALES HOWN a N ND, DATE 8Y DESCRIPTION i ARE FOR I1"X 17" N DESIGN CHECKED COUNTY I 11/5/2019 JGM ADDITIONAL ROADWAY LIGHTING E.REFD PRINTS ONLY p & ASSOCIATES ADA Y z 11/8/2019 JGM UPDATED ROADWAY LIGHTING WIRING DETAILED CADD FILE NAME q P A021(858) US 20/26, SH-I6 TO CINDER ROAD KEY NUMBER v 101 S CAPITOL BOULEVARD,SUITE 600 TE 1 DRAWING CHECKED MARKOSTAN DRAWING DATE 21858 ILLM.dw BOISE,ID B3702 21858 E.REED SEPTEMBER 2019 P 208.338.2683 F 208.338.2685 SHEET 263 OF 293 . "R x� TIT GND SUR OM Sl1M TYP REM PLAN RDTL GRDE IRPL SWPP $IGN MARK SGNL SLLM SDW Tf Meridian City Council Meeting Agenda February 4,2020- Page 176 of 298 GENERAL NOTES 203-125C REM MISC ITEMS I. ALL SPARE CONDUIT SHALL INCLUDE PULL WIRE.OPEN ENDS CONDUCTOR SCHEDULE ACHD FIBER 654 LF STA 659+50,59'RT TO WILL BE PLUGGED OR CAPPED.2. INTERRUPTION TO ACHD'S FIBER OPTIC NETWORK SHALL O SPARE WITH PULL WIRE STA 660+38 1 60'W 133 LF STA 666+04,64'RT TO ONLY BE PERMITTED AS WEEKEND WORK.DISRUPTION SHALL Yf STA 665+98,69'LT STA 665+98,69'LT TO OCCUR NO EARLIER THAN FRIDAY AT 10 133 LF PM AND SHALL BE STA 667+31,85'LT RETURNED TO SERVICE NO LATER THAN MONDAY AT SAM.THE CONTRACTOR SHALL PROVIDE A MINIMUM TWO(2)WEEK 5901-05F SP JUNCTION BOX NOTICE PRIOR TO START OF ANY WORK THAT MAY IMPACT TYPE S-45T WITH RISER ACHD'S NETWORK FOR REVIEW. DEPENDING ON THE IMPACT i EA STA 664+32,65'RT TO THE DISTRICT OR PARTNERING AGENCIES,ACHD RESERVES 1 EA STA 666+13,82'RT THE RIGHT TO MODIFY THE REQUESTED DATES FOR THE SCHEDULED OUTAGE.CONTACT BRIAN FROBERG AT(208) PRIOR TO REMOVING CONDUIT, 5911-066 SP INSTALL 2-2"RPC CONDUIT 941-9132 OR BRIAN THIES AT(208)484-3926 TO SCHEDULE O CONTRACTOR TO PULL EXISTING (ACHD) WORK. FIBER FROM ALL TERMINATION 482 LF STA 659+50,65'RT TO 3. FIBER TERMINATION WORK INCIDENTAL TO ITEM S911-06C, PANELS,CONDUIT AND JUNCTION STA 664+32,65'RT INSTALL 12 FIBER CABLE, BOXES AND RETURN TO ACHD FOR 174 LF STA 664+32,65'RT TO f SALVAGE.REMOVAL OF CONDUIT STA 666+06,76'RT 1 AND ASSOCIATED JUNCTION BOXES I a i 5911 06C SP INSTALL 12-FIBER CABLE INCIDENTAL TO THIS WORK. (ACHD) 't 482 LF STA 659+50 65'RT TO 1k d IJ , STA 664+32'65'RT 2 i 203-125C Q I i III 1 174 LF STA 664+32,65'RT TO a STA 666+06 76'RT ` G G G G G a—° G G G c G G I G G G G— 146 LF STA 666+06,76'RT TO P m—P p P P n m P P P —4 P P P P , f _ ---------- STA 665+97,70'LT - �- - ----=- ------C------------------------------------------------------------- ----- i ------ 137 LF STA b55+97r 70'LT TO i n�..__�-� -- - C C ----- r,�------ ------ ------- -----_-_: -.= I_-cam oP o�-.--oT-: T tr� o — ` - _r c STA 667+34,93'LT - ---- = = - i O Ei P- --EP---- -EA-----EP-__-- -'----__ _---_------------------------------------- _------------- \�� ----EP— T �....�"` IP9 £A-----EP---- -EP-----EP- ----EP--."`--EP--- --EP-- -- -FP-----EP---- -Ep I .}. I S911-06C (YI—- PI P'- P1 Pk PI- P1 PI Pk Pk Pk US 20 r2GV wk w I � w w w w ,v w w w J I lJ w w w 66Q+00 665+00 0 1 � � C\L&S\L LLI :--EP-��-�* 1 0 / Z ---EP---5911PO6B M1 4_FP-__ - -EP- - - - -EP- EP-----EP- - 5901-05F ---EP S911-06B i o �--_`�r----T y - - -----EP-----EP--- EP(} T TT T - r T 5911 06C T T T T T 5911-06C T ' �!P. _ FO } CONNECT TO EXISTING ITS JUNCTION BOX ---------�------------ ----------------------------- FO _'---- ' ---- ----�- -- ---- - -------~---------- -- o \5 AND INSTALL NEW 12 FIBER IN EXISTING ..� • ♦ -______-J--- _-a ___a____J____J_--------J_-� -'��-ss--.-----:----------- - --- ---rc----------;-- ,--r----.-----.---- , ----.- �I;---- t�� ik it CONDUIT TO SIGNAL CONTROLLER CABINET -i f - ~`----'- ON THE NORTHEAST CORNER OF US20-26/ LINDER RD INTERSECTION.TERMINATE NEW 12 FIBER IN CABINET. I � OIL C ro G/ ~ w I \ Z F--1 TYPICAL IT JUNCTION �� � J GENERAL NOTES (CONT.) S U CTION BOX INSTALLATIONC B 2-2 RPC CONDUIT LEGEND 1-12 FIBER CABLE 4. LUMINAIRE POLES AND MAST ARMS TO BE INSTALLED IN S45T 545-Ti-SPARE W/PULL WIRE C+ JUNCTION BOX-S45-T WITH RISER ACCORDANCE WITH ACHD STANDARD DRAWING TS-1106. 4iiwcm of w�RISER (ACHD) 5. ALL LUMINAIRES TO BE INSTALLED ON ACHD TYPE"C" MDU AN) {AaaDt STREET LIGHT JUNCTION BOX-S44 FOUNDATIONS WITH BREAK-AWAY COUPLINGS IN ------ NEW INTERCONNECT CONDUIT ACCORDANCE WITH ACHD STANDARD DRAWING TS-1110. NOTES 1-2"RPC CONDUIT EXISTING ACHD FIBER AND CONDUIT 6. SEE DEMOLITION PLANS FOR EXISTING LUMINAIRE REMOVAL W/PULL WIRE PAY ITEMS. 1. ALL THREE ITS CONDUIT RUNS CAN SHARE THE SAME FOR FUTURE USE 7. ILLUMINATION WAS DESIGNED FOR THE SOUTH SIDE OF US TRENCH. (CITY OF MERIDIAN) - 20/26. STREET LIGHTING FOR NORTH SIDE TO BE DESIGNED 2. ALL SPARE CONDUIT TO INCLUDE PULL WIRE. BY OTHERS IN THE FUTURE. 3. CITY OF MERIDIAN AND ACHD WILL HAVE SEPARATE S45 T W/RISER JUNCTION BOXES FOR ITS 0 N AT ITE District 3 INFRASTRUCTURE. c�10 1; QINCLUSIONS/REVISIONS 4. LABEL ACHD 3-BOX LID WITH"ACHD"STEEL LABEL 1/8" 40 0 40 80 8 50Bou Chinden O��S\C+SNS�u�y 1 TO CONSTRUCTION SET. TALL,WELDED ON&PAINTED GREEN, SCBIC: 1"=80' Boise,ID _ a 1.MARKOSIAN GALES OWN English 4263 NO. DATE BY DESCRIPTION ARE FOR 11"X 17" COUNTY n DESIGN CHECKED 11/5/2019 7GM ADDITIONAL ROADWAY LIGHTING PRINTS DETAILED E REED CADD FILE NAMELY & ASSOCIATES ADA 017,101 wJ. 101 S CAPITOL BOULEVARD,SUITE 600 A021(858) US 20/26, SH-16 TO CINDER ROAD KEY NUMBER 9T� �p DRAWING CHECKED MARKOSIAN DRAWING DATE ILLM.dw BOISE,ID 83702 21858 q�'l�cs�/pN E.REEp SEPTEMBER 2014 P 208.338.2683 F 208.338.2685 SHEET 264 OF 293 LGND SURV TOM SUM TYP REM PL4N RDTL GRDE IRPL 5 PP SIGN MARK SGNL fLLM SDWL T{ Meridian City Council Meeting Agenda February 4,2020- Page 177 of 298 Mayor Robert E Simison E IDIAN.-=� City Council Members Treg Bernt Joe Borton Public Works i U A H U Luke Cavener Brad Hoaglun Department Jessica Perreault Liz Strader TO: Mayor Robert E. Simison Members of the City Council FROM: Al Christy, Transportation and Utility Coordinator DATE: 112412020 SUBJECT: ADDENDUM TO COOPERATIVE AGREEMENT FOR ILLUMINATION/LIGHTING PROJECT NO.A021(858) US20/26, SH16 TO LINDER ROAD REQUESTED COUNCIL DATE: 2/4/2020 I. RECOMMENDED ACTION A. Move to: 1. Approve the attached Addendum with the Idaho Transportation Department ("ITD") 2. Authorize the Mayor to sign the agreement II. DEPARTMENT CONTACT PERSONS Al Christy, Transportation and Utility Coordinator 208-489-0352 Warren Stewart, City Engineer 208-489-0350 Dale Bolthouse, Director of Public Works 208-985-1257 III. DESCRIPTION A. Background ITD has entered into an agreement with Costco Wholesale Corporation to widen US20/26 ("Chinden Boulevard") from SH16 to Linder Road. This project will widen Chinden Boulevard to four travel lanes. An additional future project will widen Chinden Boulevard to six travel lanes. Meridian City Counciflft&rd�lfcenda February 4,2020— Page 178 of 298 Pursuant to Section 6 of the Meridian Design Standards, development is required to install streetlights along public roads. The City will own and maintain the streetlights once they are installed. The Agreement was originally signed by the City Council on September 24,2019. B. Proposed Project Forty seven (47) additional streetlights will be installed on Chinden Boulevard as part of the project. IV. IMPACT A. Strategic Impact: This project is aligned with the Public Works objective of being opportunistic in planning for growth and infrastructure needs. B. Fiscal Impact: The City Council approved a budget amendment on November 26, 2019 for $423,375 to install the streetlights. V. ALTERNATIVES VI. TIME CONSTRAINTS Construction on this project started in November 2019. City approval of this agreement is required for the installation of streetlights in this project. VII. LIST OF ATTACHMENTS A. Addendum to Cooperative Agreement between ITD and the City for installation and maintenance of forty-seven(47) additional streetlights. 4 Approved for Council Agenda: f z z Meridian City Council r#,'fti Y,,(Anda February 4,2020— Page 179 of 298