Project/File: Graycliff Estates Subdivision/MPP19-0027/ H-2019-0129
This is a development agreement modification and preliminary plat application to
allow for the development of 200 single family building lots, 2 multi-family lots, 15
common lots, 1 well lot and 3 common driveway lots on 52.46 acres.
Lead Agency: City of Meridian
Site address: SW of Harris Street between Meridian and Linder Road
Staff Approval: XXXX, 2019 Vicinity Map
Applicant: Star Development, Inc. U
P.O. Box 518 -. -
Li
Meridian, Idaho 83680
Representative: Becky McKay
Engineering Solutions, LLP H�
9 9 i � �
1029 N. Rosario Street, Suite 100
Meridian, Idaho 83642
Staff Contact: Paige Bankhead PROJECT SITE
Phone: 387-6293 .. n
E-mail: Pbankhead(ab_achdidaho.org
A. Findings of Fact
1. Description of Application: The applicant is requesting approval of a development agreement
modification and preliminary plat application to allow for the development of 200 single family building
lots, 2 multi-family lots for the future development of 248 units, 15 common lots, 1 well lot and 3
common driveway lots on 52.46 acres. The final layout and development of the 2 multi-family lots is
not proposed at this time.
The property is zoned Medium Density Residential (R-8) and High Density Residential (R-40) and is
consistent with the City of Meridian's Comprehensive Plan that designates this area as Medium and
High Density Residential.
2. Description of Adjacent Surrounding Area:
Direction I Land Use Zoning
North Medium-Low Density Residential R-4
South Rural Urban Transition Ada Count RUT
East Rural Urban Transition Ada Count RUT
West Medium-Low Density Residential R-4
3. Site History: ACHD previously reviewed this site as an annexation, rezone, and preliminary plat
application for 119 single family building lots, 1 multi-family lot, 9 common lots, and 1 well lot on
1 DRAFT - Graycliff Estates Subdivision/
MPP19-0027/ H-2019-0129
52.46 acres in August 2015. The requirements of this staff report differ from those of the prior
action due to the modification to the development application.
4. Adjacent Development: The following developments are pending or underway in the vicinity of
the site:
• Revolution Ridge Subdivision, consisting of 64 single-family residential lots and 5 common
lots on 19.7-acres is located directly north of the site and was approved by the ACHD
Commission on March 26, 2014.
• Biltmore Estates Subdivision, consisting of 159 single-family residential lots and 12 common
lots on 56.19 acres is located northeast of the site and was approved by the ACHD
Commission on April 23, 2014.
• Brundage Estates Subdivision, consisting of 366 single family building lots, 20 common lots,
and 1 additional lot on 136.63 acres is located west of the site and was approved by the ACHD
on May 6, 2016.
• Stapleton Subdivision consisting of 212 single family building lots and 1 multi-family lot with
28 units on 38 acres located to the east of the site and was approved by ACHD on February
19, 2019.
5. Transit: Transit services are not available to serve this site.
6. Gas Pipeline: The Williams falls within the proposed development. Coordination with the owner of
the pipeline prior to final design is recommended to insure that their requirements are met. ACHD
requires written approval from the owner of the pipeline prior to plan acceptance if public street
improvements are proposed or required within the pipeline easement.
7. New Center Lane Miles: The proposed development includes 1.65 centerline miles of new public
road.
8. Impact Fees: There will be an impact fee that is assessed and due prior to issuance of any building
permits. The assessed impact fee will be based on the impact fee ordinance that is in effect at that
time.
9. Capital Improvements Plan (CIP)/ Integrated Five Year Work Plan (IFYWP):
• Amity Road is listed in the CIP to be widened to 5-lanes from Meridian Road to Locust Grove
Road between 2026 and 2030.
• Victory Road is listed in the CIP to be widened to 3-lanes from Linder Road to Meridian Road
between 2026 and 2030.
• Victory Road is listed in the CIP to be widened to 3-lanes from Meridian Road to Locust Grove
Road between 2026 and 2030.
• The intersection of Meridian Road and Amity Road is listed in the CIP to be widened to 6-
lanes on the north leg, 6-lanes on the south, 6-lanes east, and 5-lanes on the west leg, and
signalized between 2026 and 2030.
B. Traffic Findings for Consideration
1. Trip Generation: This development is estimated to generate 3,343 vehicle trips per day; 312
vehicle trips per hour in the PM peak hour, based on the traffic impact study.
2. Traffic Impact Study
C.R. Engineering, Inc. prepared a traffic impact study for the proposed Graycliff Subdivision. Below
is an executive summary of the findings as presented by C.R. Engineering, Inc. The following
executive summary is not the opinion of ACHD staff and is attached. ACHD has reviewed the
submitted traffic impact study for consistency with ACHD policies and practices, and may have
2 DRAFT - Graycliff Estates Subdivision/
MPP19-0027/ H-2019-0129
additional requirements beyond what is noted in the summary. ITD has also reviewed the TIS and
provided comments to the City.
a. Condition of Area Roadways
Traffic Count is based on Vehicles per hour(VPH)
Functional PM Peak PM Peak
Roadway Frontage Classification Hour Hour Level
Traffic Count of Service
*Meridian Road 0-feet Principal 1,726 N/A
Arterial
Victory Road 0-feet Minor Arterial 353 Better than
"E„
***Kentucky Way 0-feet Collector 103 Better than
"D„
***Harris Street 286-feet Collector 17 Better than
"D„
Linder Road 0-feet Minor Arterial 373 Better than
"E„
*Acceptable level of service for a two-lane minor arterial is "E" (575 VPH).
*Acceptable level of service for a two-lane collector is "D" (425 VPH).
**ACHD does not set level of service thresholds for State Highways.
*** ACHD does not currently have traffic counts for these roads. Traffic counts were provided by
the traffic study.
b. Average Daily Traffic Count (VDT)
Average daily traffic counts are based on ACHD's most current traffic counts unless otherwise specified.
• The average daily traffic count for Victory Road west of SH-69 (Meridian Road) was 6,269
on 4/17/2019 as reported by the traffic study.
• The average daily traffic count for Linder Road south of Amity Road was 3,884 on
10/16/2018.
• The average daily traffic count for Kentucky Way south of Victory Road was 1,782 on
6/4/2019 as reported by the traffic study.
• The average daily traffic count for Harris Street west Meridian Road was 528 on 6/4/2019 as
reported by the traffic study.
• The average daily traffic count for SH-69 (Meridian Road) south of Victory Road was 32,372
on 03/15/2018.
C. Findings for Consideration
1. South Meridian Transportation Plan
The South Meridian Transportation Plan (SMTP) is a long-range planning tool used to identify
future roadway, intersection, and corridor needs in the South Meridian Area. Providing a
framework for future roadway improvements based on the land use designations. The plan was
created in collaboration with the City of Meridian and was adopted by the ACHD Commission in
September of 2009. The SMTP recommends the extension of Harris Street west to Linder Road
and Kentucky Way south to Amity Road.
2. SH-69/Harris Street Intersection
3 DRAFT - Graycliff Estates Subdivision/
MPP19-0027/ H-2019-0129
ITD has issued a comment letter to the City of Meridian regarding improvements to SH-69. Their
letter requires that Harris Street be restricted to left-in/right-in/right-out as part of this application
and the intersection may be signalized in the future based on the findings and recommends an
ongoing corridor study. ACHD has been planning for signalization of the intersection and has
required road trust deposits from area developments to allow for signalization of the intersection
when warranted.
The estimated signal costs for this intersection are $250,000. Developments on the south side of
Harris Street, west of SH-69 are responsible for one-half of the overall cost; and developments on
both sides of Rumpel Lane on the east side of SH-69, are responsible for one-half the overall
cost. Developments will be required to contribute their proportionate share of these costs, based
on trips generated from their site. If there are not sufficient funds for the cost of the signal, at the
time a signal is warranted, the development that warrants the signal will be required to pay for the
improvements; with reimbursement occurring as other developments move forward and pay their
share.
If/when ITD requires the applicant to install a signal, the applicant will need to obtain plan
approval and a permit from ITD for installation of the signal and enter into a signal agreement with
ACHD. Although the applicant may be fronting the cost of the signal, the signal agreement will
allocate the proportional share of the signal installation with the applicant ultimately contributing
12.5% ($31,250) of the cost with another 12.5% coming from an approved subdivision to the west
(Brundage) and 25% coming from Stapleton located east of the site; and the final 50% coming
from development located on the east side o SH-69. The signal agreement will include a
reimbursement mechanism to allow the applicant to be reimbursed for a portion of the signal costs
as they are collected from the future developments.
The applicant will be required to provide a road trust to ACHD for their share of the signal prior to
signature of the first final plat that takes access to Harris Street.
3. Harris Street
a. Existing Conditions: Harris Street is improved with 2-travel lanes, vertical curb, gutter, 8-foot
planter strip and 5-foot wide detached sidewalk abutting the site. There is 26 to 50-feet of right-
of-way for Harris Street(25-feet from centerline)due to Harris Street curving to the south. Harris
Street stubs at the site's north property line.
b. Policy:
Collector Street Policy: District policy 7206.2.1 states that the developer is responsible for
improving all collector frontages adjacent to the site or internal to the development as required
below, regardless of whether access is taken to all of the adjacent streets.
Master Street Map and Typologies Policy: District policy 7206.5 states that if the collector
street is designated with a typology on the Master Street Map, that typology shall be considered
for the required street improvements. If there is no typology listed in the Master Street Map,
then standard street sections shall serve as the default.
Street Section and Right-of-Way Policy: District policy 7206.5.2 states that the standard
right-of-way width for collector streets shall typically be 50 to 70-feet, depending on the location
and width of the sidewalk and the location and use of the roadway. The right-of-way width may
be reduced, with District approval, if the sidewalk is located within an easement; in which case
the District will require a minimum right-of-way width that extends 2-feet behind the back-of-
curb on each side.
The standard street section shall be 46-feet (back-of-curb to back-of-curb). This width typically
accommodates a single travel lane in each direction, a continuous center left-turn lane, and bike
lanes.
4 DRAFT - Graycliff Estates Subdivision/
MPP19-0027/ H-2019-0129
Residential Collector Policy: District policy 7206.5.2 states that the standard street section
for a collector in a residential area shall be 36-feet (back-of-curb to back-of-curb). The District
will consider a 33-foot or 29-foot street section with written fire department approval and taking
into consideration the needs of the adjacent land use, the projected volumes, the need for
bicycle lanes, and on-street parking.
Sidewalk Policy: District policy 7206.5.6 requires a concrete sidewalks at least 5-feet wide to
be constructed on both sides of all collector streets. A parkway strip at least 6-feet wide between
the back-of-curb and street edge of the sidewalk is required to provide increased safety and
protection of pedestrians. Consult the District's planter width policy if trees are to be placed
within the parkway strip. Sidewalks constructed next to the back-of-curb shall be a minimum of
7-feet wide.
Detached sidewalks are encouraged and should be parallel to the adjacent roadway.
Meandering sidewalks are discouraged.
A permanent right-of-way easement shall be provided if public sidewalks are placed outside of
the dedicated right-of-way. The easement shall encompass the entire area between the right-
of-way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located
wholly within the public right-of-way or wholly within an easement.
Minor Improvements Policy: District Policy 7203.3 states that minor improvements to existing
streets adjacent to a proposed development may be required. These improvements are to
correct deficiencies or replace deteriorated facilities. Included are sidewalk construction or
replacement; curb and gutter construction or replacement; replacement of unused driveways
with curb, gutter and sidewalk; installation or reconstruction of pedestrian ramps; pavement
repairs; signs; traffic control devices; and other similar items.
ACHD Master Street Map: ACHD Policy Section 3111.1 requires the Master Street Map
(MSM) guide the right-of-way acquisition, collector street requirements, and specific roadway
features required through development. This segment of Harris Street is designated in the MSM
as a Residential Collector with 2-lanes and on-street bike lanes, a 36-foot street section within
54-feet of right-of-way.
c. Applicant Proposal: The applicant has proposed to extend Harris Street from its current
terminus at the site's northeast property line into the site as a 36-foot wide residential collector
roadway with vertical curb, gutter, and an 8-foot wide planter strip within 50-feet of right-of-way.
5-foot wide detached concrete sidewalk is proposed outside of right-of-way.
Staff Comments/Recommendations: The applicant's proposal for the street section meets
District policy and should be approved, as proposed. For detached sidewalks, the right-of-way
may extend to 2-feet behind the back-of-curb and sidewalks should be in a permanent right-of-
way easement. Sidewalks shall either be located wholly within the public right-of-way or wholly
within an easement. The easements should extend at least 2-feet as measured behind the
back edge of the sidewalk.
Harris Street is under a no cut moratorium until January of 2023. A letter of approval from the
ACHD pavement moratorium committee will be required prior to any pavement cuts to this
roadway.
4. Oakbriar Way
a. Existing Conditions: There are no collector roadways within the site.
b. Policy:
Collector Street Policy: District policy 7206.2.1 states that the developer is responsible for
improving all collector frontages adjacent to the site or internal to the development as required
below, regardless of whether access is taken to all of the adjacent streets.
5 DRAFT - Graycliff Estates Subdivision/
MPP19-0027/ H-2019-0129
Master Street Map and Typologies Policy: District policy 7206.5 states that if the collector
street is designated with a typology on the Master Street Map, that typology shall be considered
for the required street improvements. If there is no typology listed in the Master Street Map,
then standard street sections shall serve as the default.
Street Section and Right-of-Way Policy: District policy 7206.5.2 states that the standard
right-of-way width for collector streets shall typically be 50 to 70-feet, depending on the location
and width of the sidewalk and the location and use of the roadway. The right-of-way width may
be reduced, with District approval, if the sidewalk is located within an easement; in which case
the District will require a minimum right-of-way width that extends 2-feet behind the back-of-
curb on each side.
The standard street section shall be 46-feet (back-of-curb to back-of-curb). This width typically
accommodates a single travel lane in each direction, a continuous center left-turn lane, and bike
lanes.
Residential Collector Policy: District policy 7206.5.2 states that the standard street section
for a collector in a residential area shall be 36-feet (back-of-curb to back-of-curb). The District
will consider a 33-foot or 29-foot street section with written fire department approval and taking
into consideration the needs of the adjacent land use, the projected volumes, the need for
bicycle lanes, and on-street parking.
Sidewalk Policy: District policy 7206.5.6 requires a concrete sidewalks at least 5-feet wide to
be constructed on both sides of all collector streets. A parkway strip at least 6-feet wide between
the back-of-curb and street edge of the sidewalk is required to provide increased safety and
protection of pedestrians. Consult the District's planter width policy if trees are to be placed
within the parkway strip. Sidewalks constructed next to the back-of-curb shall be a minimum of
7-feet wide.
Detached sidewalks are encouraged and should be parallel to the adjacent roadway.
Meandering sidewalks are discouraged.
A permanent right-of-way easement shall be provided if public sidewalks are placed outside of
the dedicated right-of-way. The easement shall encompass the entire area between the right-
of-way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located
wholly within the public right-of-way or wholly within an easement.
ACHD Master Street Map: ACHD Policy Section 3111.1 requires the Master Street Map
(MSM) guide the right-of-way acquisition, collector street requirements, and specific roadway
features required through development. This segment of Oakbriar Way is designated in the
MSM as a Residential Collector typology as depicted in the Livable Street Design Guide
recommends a 2-lane roadway with bike lanes and on street parking, a 36-foot street section
within 54-feet of right-of-way.
c. Applicant Proposal: The applicant has proposed to construct Oakbriar Way south from Harris
Street at the half mile. The applicant has proposed construct Oakbriar Way on an adjacent
parcel located directly west of the site. The parcel west of the site is owned by the applicant.
The applicant has proposed to construct Oakbriar Way as a 36-foot wide residential collector
roadway with vertical curb, gutter and 8-foot wide planter strips within 50-feet of right-of-way.
5-foot detached concrete sidewalks are proposed outside of right-of-way.
Staff Comments/Recommendations: The applicant's proposal to construct Oakbriar Way to
the south from Harris Street at the half mile is consistent with ACHD's MSM and should be
approved, as proposed. If the property to the west is not owned by the applicant, the applicant
should obtain approval from the property owner to construct the proposed Oakbriar Way.
6 DRAFT - Graycliff Estates Subdivision/
MPP19-0027/ H-2019-0129
The applicant should be required to install a sign at the temporary terminus of Oakbriar Way
which states, "THIS IS A DESIGNATED COLLECTOR ROADWAY. THIS STREET WILL BE
EXTENDED AND WIDENED IN THE FUTURE."
For detached sidewalks, the right-of-way may extend to 2-feet behind the back-of-curb and
sidewalks should be in a permanent right-of-way easement. Sidewalks shall either be located
wholly within the public right-of-way or wholly within an easement. The easements should
extend at least 2-feet as measured behind the back edge of the sidewalk.
The applicant's proposal to terminate Oakbriar Way at Wilton Woods Street should be
approved, as proposed, to provide a better alignment for the collector between the two houses
to the south as development occurs. The applicant should be required to dedicate 40-feet of
right-of-way at Wilton Woods Street transitioning to 10-feet of right-of-way at the south
property line, and dedicate right-of-way continuing back into the site to total 40-feet to the
south property line of the site, as noted in the conceptual figure below. 5-foot wide detached
concrete sidewalk should be constructed at this time within an easement abutting the right-of-
way that extends 2-feet as measured behind the back edge of the sidewalk. The applicant
should be required to provide a road trust deposit in the amount of$33,500 to ACHD for the
construction of vertical curb, gutter and 4-feet of pavement.
7 DRAFT - Graycliff Estates Subdivision/
MPP19-0027/ H-2019-0129
144 NI 29 5
15 28 6
I
f w 27 `7
W W�LTON WOODS S' g�
I i i
H �
26 9
it Yi 2
40-feet m U I
25 10
3
24 BLOCK6 11LC
�sl �
= l� i a 4
�23 :rl
�3
LU
22 73
I� ¢ 6
21 14
10-feet 7
m I ,—
+.F`x714 — t 20 / 15
ti
3 19 16
I li 9
i 111 _
I a 10 '18� "17
I I
I W
11 —14 W.LS
Ij s 14
y 12
M
cc
co — f BLOCK
"15^ 18 17 18
13
C
� � I
EMSTING GRAVITY IRRIGATION EASEMENT
I
I I
I
I
Right-of-way dedication for the MSM Collector, Oakbriar Way.
8 DRAFT - Graycliff Estates Subdivision/
MPP19-0027/ H-2019-0129
- � 5
i
4
I
Proposed Oakbriar Way
MSM Collector
,R
MSM Collector conceptual alignment.
5. Internal Local Streets
a. Existing Conditions: There are no local streets within the site.
b. Policy:
9 DRAFT - Graycliff Estates Subdivision/
MPP19-0027/ H-2019-0129
Local Roadway Policy: District Policy 7207.2.1 states that the developer is responsible for
improving all local street frontages adjacent to the site regardless of whether or not access is
taken to all of the adjacent streets.
Street Section and Right-of-Way Policy: District Policy 7207.5 states that right-of-way widths
for all local streets shall generally not be less than 47-feet wide and that the standard street
section shall be 33-feet (back-of-curb to back-of-curb).
Standard Urban Local Street-33-foot Street Section and Right-of-way Policy: District
Policy 7207.5.2 states that the standard street section shall be 33-feet (back-of-curb to back-of-
curb)for developments with any buildable lot that is less than 1 acre in size. This street section
shall include curb, gutter, and minimum 5-foot wide concrete sidewalks on both sides and shall
typically be constructed within 47-feet of right-of-way.
Sidewalk Policy: District Policy 7207.5.7 states that five-foot wide concrete sidewalk is
required on both sides of all local street, except those in rural developments with net densities
of one dwelling unit per 1.0 acre or less, or in hillside conditions where there is no direct lot
frontage, in which case a sidewalk shall be constructed along one side of the street. Some local
jurisdictions may require wider sidewalks.
The sidewalk may be placed next to the back-of-curb. Where feasible, a parkway strip at least
8-feet wide between the back-of-curb and the street edge of the sidewalk is recommended to
provide increased safety and protection of pedestrians and to allow for the planting of trees in
accordance with the District's Tree Planting Policy. If no trees are to be planted in the parkway
strip, the applicant may submit a request to the District, with justification, to reduce the width of
the parkway strip.
Detached sidewalks are encouraged and should be parallel to the adjacent roadway.
Meandering sidewalks are discouraged.
A permanent right-of-way easement shall be provided if public sidewalks are placed outside of
the dedicated right-of-way. The easement shall encompass the entire area between the right-
of-way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located
wholly within the public right-of-way or wholly within an easement.
Landscape Medians Policy: District policy 7207.5.16 states that landscape medians are
permissible where adequate pavement width is provided on each side of the median to
accommodate the travel lanes and where the following is provided:
• The median is platted as right-of-way owned by ACHD.
• The width of an island near an intersection is 12-feet maximum for a minimum distance of
150-feet. Beyond the 150-feet, the island may increase to a maximum width of 30-feet.
• At an intersection that is signalized or is to be signalized in the future, the median width
shall be reduced to accommodate the necessary turn lane storage and tapers.
• The Developer or Homeowners Association shall apply for a license agreement if
landscaping is to be placed within these medians.
• The license agreement shall contain the District's requirements of the developer including,
but not limited to, a "hold harmless" clause; requirements for maintenance by the
developer; liability insurance requirements; and restrictions.
• Vertical curbs are required around the perimeter of any raised median. Gutters shall slope
away from the curb to prevent ponding.
c. Applicant's Proposal: The applicant has proposed to construct the entry portion of Graycliff
Way as a 50-foot wide street section with a 12-foot wide center landscape island, two 21-foot
wide travel lanes with curb, gutter and an 8-foot wide planter strip with a 5-foot wide detached
concrete sidewalk within 75-feet of right-of-way. The applicant has proposed to construct the
10 DRAFT - Graycliff Estates Subdivision/
MPP19-0027/ H-2019-0129
remaining local streets as a 33-foot wide local street sections with rolled curb, gutter, 8-foot wide
planter strips with 5-foot wide detached concrete sidewalk within 60-feet of right-of-way.
d. Staff Comments/Recommendations: The applicant's proposal to construct the entry roadway
and all other internal local streets meets District policy and should be approved, as proposed.
The center landscape island should and platted as right-of-way owned by ACHD. The applicant
or homeowner's association should enter into a license agreement with ACHD for any
landscaping proposed to be located within the center landscape island.
The applicant's proposal for all other internal local streets meets District policy and should be
approved, as proposed.
For detached sidewalks, the right-of-way may extend to 2-feet behind the back-of-curb and
sidewalks may be placed in a permanent right-of-way easement. Sidewalks shall either be
located wholly within the public right-of-way or wholly within an easement. The easements
combined with the right-of-way total should total at least 2-feet as measured behind the back
edge of the sidewalk.
6. Roadway Offsets
a. Existing Conditions: There are no roadways within the site.
b. Policy:
Collector Offset Policy: District policy 7206.4.5, states that the preferred spacing for a new
local street intersecting a collector roadway to align or offset a minimum of 330-feet from any
other street (measured centerline to centerline).
Local Offset Policy: District policy 7207.4.2, requires local roadways intersecting other local
roadways to align or provide a minimum offset of 125-feet from any other street (measured
centerline to centerline).
c. Applicant's Proposal: The applicant has proposed to construct one local street, Graycliff Way,
to intersect Harris Street, located approximately 460-feet west of Kentucky Way. The applicant
has proposed one local street, Wilton Woods Street, to intersect Oakbriar Way, located
approximately 670-feet south of Harris Street. The applicant has also proposed several local
street intersections in the development.
d. Staff Comments/Recommendations: The applicant's proposal meets District Policy and
should be approved, as proposed.
7. Stub Streets
a. Existing Conditions: There is one stub street to the site, Harris Street, located at the northeast
property line.
b. Policy:
Stub Street Policy: District policy 7206.2.4 (collector) and 7207.2.4 (local) states that stub
streets will be required to provide circulation or to provide access to adjoining properties. Stub
streets will conform with the requirements described in Section 7206.2.5.4 (collector) and
7207.2.5.4 (local), except a temporary cul-de-sac will not be required if the stub street has a
length no greater than 150-feet. A sign shall be installed at the terminus of the stub street
stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE."or"THIS IS A DESIGNATED
COLLECTOR ROADWAY. THIS STREET WILL BE EXTENDED AND WIDENDED IN THE
FUTURE."
In addition, stub streets must meet the following conditions:
• A stub street shall be designed to slope towards the nearest street intersection within the
proposed development and drain surface water towards that intersection; unless an
alternative storm drain system is approved by the District.
11 DRAFT - Graycliff Estates Subdivision/
MPP19-0027/ H-2019-0129
• The District may require appropriate covenants guaranteeing that the stub street will
remain free of obstructions.
Temporary Dead End Streets Policy: District policy 7206.2.4 (collector) and 7207.2.4 (local)
requires that the design and construction for cul-de-sac streets shall apply to temporary dead
end streets. The temporary cul-de-sac shall be paved and shall be the dimensional
requirements of a standard cul-de-sac. The developer shall grant a temporary turnaround
easement to the District for those portions of the cul-de-sac which extend beyond the dedicated
street right-of-way. In the instance where a temporary easement extends onto a buildable lot,
the entire lot shall be encumbered by the easement and identified on the plat as a non-buildable
lot until the street is extended.
c. Applicant Proposal: The applicant has proposed to construct one stub street to the east, Lyra
Street, located approximately 120-feet north of the south property line.
The applicant has proposed to construct one stub street to the west, Harris Street, located
approximately 330-feet south of the north property line.
The applicant has proposed to construct one stub street to the south, Bear Claw Avenue,
located approximately 475-feet west of the east property line.
d. Staff Comments/Recommendations: The applicant's proposal meets District policy and
should be approved, as proposed, except for the proposed stub street for Lyra Street. As part
of ACHD's 2019 action on Stapleton Subdivision located directly east of this site, a stub street
to this parcel was not required due to concerns regarding traffic volumes allowed by ACHD on
a local street if there is connectivity between the developments. The applicant should be
required to remove the stub street for Lyra Street. If the City of Meridian requires emergency
access between this site and parcels to the east, then the emergency access should be in place
with gates or bollards, as determined by the Fire Department.
The applicant should be required to install a sign at the terminus of Harris Street which states
that, "THIS IS A DESIGNATED COLLECTOR ROADWAY. THIS STREET WILL BE
EXTENDED AND WIDENDED IN THE FUTURE."
The applicant should be required to install a sign at the terminus of Bear Claw Avenue which
states that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE."
8. Traffic Calming
a. Speed Control and Traffic Calming Policy (Collectors): District policy 7206.3.8 states that
collector street should be designed to discourage speeds above 35 MPH, and in a residential
area collector streets should be designed to discourage speeds above 30 MPH. The design of
collector street systems should discourage excessive speeds by using passive design elements.
If the design or layout of a development is anticipated to necessitate future traffic calming
implementation by the District, then the District will require changes to the layout and/or the
addition of passive design elements such as horizontal curves, bulb-outs, chokers, etc. The
District will also consider texture changes to the roadway surface (i.e. stamped concrete) as a
passive design element. These alternative methods may require a maintenance and/or license
agreement.
Speed Control and Traffic Calming Policy (Local): District policy 7207.3.7 states that the
design of local street systems should discourage excessive speeds by using passive design
elements. If the design or layout of a development is anticipated to necessitate future traffic
calming implementation by the District, then the District will require changes to the layout and/or
the addition of passive design elements such as horizontal curves, bulb-outs, chokers, etc. The
District will also consider texture changes to the roadway surface (i.e. stamped concrete) as a
passive design element. These alternative methods may require a maintenance and/or license
agreement.
12 DRAFT - Graycliff Estates Subdivision/
MPP19-0027/ H-2019-0129
b. Staff Comments/Recommendations: The applicants are proposing to construct Colditz
Avenue and Lyra Street to be greater than 750-feet in length. These roadways will need to be
redesigned to reduce the length of the roadways or to include passive design elements. Speed
humps/bumps and valley gutter will not be accepted as traffic calming. The applicant should be
required to submit a revised preliminary plat showing the redesigned roadways for review and
approval prior to ACHD's signature on the first final plat.
9. Future Multi-Family Development
The development includes 4.7 and 6.02 acre lots which are proposed to be a future multi-family
development. To provide access to the future multi-family site the applicant has proposed to
construct a 45-foot wide driveway onto Harris Street that aligns with Kentucky Way and two 25-
foot wide emergency access only driveways onto Wilton Woods Street and Ametrine Avenue.
Staff recommends approval of the emergency driveway locations as they meet District policy.
Both driveways should be paved their full width at least 30-feet into the site beyond the edge of
pavement of Wilton Woods Street and Ametrine Avenue. The driveway access location for the
future multi-family site should be approved as proposed, but should be limited to a maximum
width of 36-feet and constructed as a curb-return type driveway, per District policy 7206.4.6.
10. Bridge Crossings
The District will require that the applicant submit the bridge plans for any crossings for review and
approval prior to the pre-construction meeting and final plat approval. Note: all plan submittals for
bridges or pipe crossings of irrigation facilities should be submitted to ACHD for review no later
than December 15th for construction in the following year prior to irrigation season.
11. Tree Planters
Tree Planter Policy: Tree Planter Policy: The District's Tree Planter Policy prohibits all trees in
planters less than 8-feet in width without the installation of root barriers. Class II trees may be
allowed in planters with a minimum width of 8-feet, and Class I and Class III trees may be allowed
in planters with a minimum width of 10-feet.
12. Landscaping
Landscaping Policy: A license agreement is required for all landscaping proposed within ACHD
right-of-way or easement areas. Trees shall be located no closer than 10-feet from all public storm
drain facilities. Landscaping should be designed to eliminate site obstructions in the vision triangle
at intersections. District Policy 5104.3.1 requires a 40-foot vision triangle and a 3-foot height
restriction on all landscaping located at an uncontrolled intersection and a 50-foot offset from stop
signs. Landscape plans are required with the submittal of civil plans and must meet all District
requirements prior to signature of the final plat and/or approval of the civil plans.
13. Other Access
Harris Street and Oakbriar Way are classified as collector roadways. Other than the access
specifically approved with this application, direct lot access is prohibited to these roadways and
should be noted on the final plat.
D. Site Specific Conditions of Approval
1. If/when ITD requires the applicant to install a signal, the applicant will need to obtain plan
approval and a permit from ITD for installation of the signal and enter into a signal agreement with
ACHD. Although the applicant may be fronting the cost of the signal, the signal agreement will
allocate the proportional share of the signal installation with the applicant ultimately contributing
12.5% of the cost with another 12.5% coming from the approved subdivision to the west
(Brundage) and 25% coming from approved subdivisions to the east (Stapleton); and the final
50% coming from development located on the east side of SH-69. The signal agreement will
13 DRAFT - Graycliff Estates Subdivision/
MPP19-0027/ H-2019-0129
include a reimbursement mechanism to allow the applicant to be reimbursed for a portion of the
signal costs as they are collected from the future developments.
The applicant shall provide a road trust deposit to ACHD in the amount of$31,500 prior to
signature of the first final plat that takes access to Harris Street.
2. Extend Harris Street line into the site and stub to the west property line, 330-feet south of the
north property line, as proposed.
3. Construct Harris Street as a 36-foot wide residential collector roadway with vertical curb, gutter,
and an 8-foot wide planter strip within 50-feet of right-of-way with 5-foot wide detached concrete
sidewalks outside of right-of-way, as proposed. Extend the dedicated right-of-way 2-feet behind
the back of sidewalk or 2-feet behind the back of curb and provide a permanent easement for the
detached sidewalk located outside of the dedicated right-of-way.
4. Install a sign at the terminus of Harris Street which states that, "THIS IS A DESIGNATED
COLLECTOR ROADWAY. THIS STREET WILL BE EXTENDED AND WIDENED IN THE
FUTURE."
5. Construct Oakbriar Way to the south from Harris Street at the half mile and terminate it at Wilton
Woods Street, as proposed.
6. Construct Oakbriar Way as a 36-foot wide residential collector roadway street section with vertical
curb, gutter, 8-foot wide planter strips within 50-feet of right-of-way and 5-foot detached sidewalks
outside of right-of-way, as proposed. Extend the dedicated right-of-way 2-feet behind the back of
sidewalk, or 2-feet behind the back of curb and provide a permanent easement for the detached
sidewalk located outside of the dedicated right-of-way.
7. Install a sign at the temporary terminus of Oakbriar Way which states that, "THIS IS A
DESIGNATED COLLECTOR ROADWAY. THIS STREET WILL BE EXTENDED AND WIDENED
IN THE FUTURE."
8. Dedicate 40-feet of right-of-way at Wilton Woods Street transitioning to 10-feet of right-of-way at
the south property line, and dedicate right-of-way continuing back into the site to total 40-feet to
the south property line of the site.
9. Construct a 5-foot wide detached concrete sidewalk located within an easement abutting the right-
of-way south of Wilton Woods Street abutting the site. The easement should extend a total of 2-
feet as measured behind the back edge of the sidewalk.
10. The applicant should be required to provide a road trust deposit in the amount of$33,500 to
ACHD for the construction of vertical curb, gutter, and 4-feet of pavement south of Wilton Woods
Street abutting the site.
11. Construct one local street, Graycliff Way, to intersect Harris Street, 460-feet west of Kentucky
Way, as proposed.
12. Construct the entry portion of Graycliff Way as a 50-foot wide street section with a 12-foot wide
center landscape island, two 21-foot wide travel lanes with vertical curb, gutter, an 8-foot wide
planter strip and 5-foot wide detached concrete sidewalks within 75-feet of right-of-way, as
proposed. Extend the dedicated right-of-way 2-feet behind the back of sidewalk, or 2-feet behind
the back of curb and provide a permanent easement for the detached sidewalk located outside of
the dedicated right-of-way. Dedicate the island as right-of-way owned by ACHD. Enter into a
license agreement with ACHD for any landscaping proposed to be located within the center
landscape island.
13. Construct all other internal local streets as 33-foot wide street sections with rolled curb, gutter, an
8-foot wide planter strip and 5-foot wide detached concrete sidewalks and dedicate at least 47-
14 DRAFT - Graycliff Estates Subdivision/
MPP19-0027/ H-2019-0129
feet of right-of-way, as proposed. The right-of-way may extend to 2-feet behind the back of
sidewalk or the applicant may reduce the right-of-way to 2-feet behind the back of curb and
provide a permanent easement for the detached sidewalk located outside of the dedicated right-
of-way.
14. Construct on local street, Graycliff Way, to intersect Harris Street located 460-feet west of
Kentucky Way, as proposed.
15. Construct one local street, Wilton Woods Street, to intersect Oakbriar Way located 670-feet south
of Harris Street, as proposed.
16. Construct one local street to the south, Bear Claw Avenue, and stub the street 475-feet west of
the east property line, as proposed. Install a sign at the terminus of the stub street which states
that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE."
17. Remove the stub street that is proposed for Lyra Street, or if emergency access is required by the
City between this site and the parcels to the west, then the emergency access should be in place
with gates or bollards, as determined by the Meridian Fire Department.
18. Redesign Colditz Avenue and Lyra Street to reduce the length of the roadways or to include
passive design elements and submit a revised preliminary plat showing the redesigned roadways
for review and approval prior to ACHD's signature on the first final plat. Speed humps/bumps and
valley gutter will not be accepted as traffic calming.
19. To provide access to the future multi-family site, construct a maximum 36-foot wide curb return
type driveway that aligns with Kentucky Way onto Harris Street and construct two 25-foot wide
emergency access only driveways onto Wilton Woods Way and Ametrine Avenue. Pave the
driveways their full width at least 30-feet into the site beyond the edge of pavement of Harris
Street, Wilton Woods Way and Ametrine Avenue.
20. Replace any broken or deteriorated portions of curb, gutter, and sidewalk on Harris Street
abutting the site.
21. Harris Street and Oakbriar Way are classified as collector roadways and other than access
approved with this application, direct lot access is prohibited to these roadways and shall be noted
on the final plat.
22. Submit bridge plans for any crossings for review and approval prior to the pre-construction
meeting and final plat approval. Note: all plan submittals for bridges or pipe crossings of irrigation
facilities should be submitted to ACHD for review no later than December 151h for construction in
the following year prior to irrigation season.
23. Harris Street is under a pavement moratorium until January of 2023. A letter of approval from the
ACHD pavement moratorium committee will be required prior to any pavement cut for this
roadway.
24. Submit civil plans to ACHD Development Services for review and approval. The impact fee
assessment will not be released until the civil plans are approved by ACHD.
25. Payment of impacts fees are due prior to issuance of a building permit.
26. Comply with all Standard Conditions of Approval.
E. Standard Conditions of Approval
1. All proposed irrigation facilities shall be located outside of the ACHD right-of-way (including all
easements). Any existing irrigation facilities shall be relocated outside of the ACHD right-of-way
(including all easements).
15 DRAFT - Graycliff Estates Subdivision/
MPP19-0027/ H-2019-0129
2. Private Utilities including sewer or water systems are prohibited from being located within the ACHD
right-of-way.
3. In accordance with District policy, 7203.3, the applicant may be required to update any existing non-
compliant pedestrian improvements abutting the site to meet current Americans with Disabilities Act
(ADA) requirements. The applicant's engineer should provide documentation of ADA compliance
to District Development Review staff for review.
4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the
construction of the proposed development. Contact Construction Services at 387-6280 (with file
number) for details.
5. A license agreement and compliance with the District's Tree Planter policy is required for all
landscaping proposed within ACHD right-of-way or easement areas.
6. All utility relocation costs associated with improving street frontages abutting the site shall be borne
by the developer.
7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The
applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant
shall be required to call DIGLINE (1-811-342-1585) at least two full business days prior to breaking
ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190
in the event any ACHD conduits (spare or filled)are compromised during any phase of construction.
8. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by
the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details.
9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC Standards
and approved supplements, Construction Services procedures and all applicable ACHD Standards
unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and
certify all improvement plans.
10. Construction, use and property development shall be in conformance with all applicable
requirements of ACHD prior to District approval for occupancy.
11. No change in the terms and conditions of this approval shall be valid unless they are in writing and
signed by the applicant or the applicant's authorized representative and an authorized
representative of ACHD. The burden shall be upon the applicant to obtain written confirmation of
any change from ACHD.
12. If the site plan or use should change in the future, ACHD Planning Review will review the site plan
and may require additional improvements to the transportation system at that time. Any change in
the planned use of the property which is the subject of this application, shall require the applicant
to comply with ACHD Policy and Standard Conditions of Approval in place at that time unless a
waiver/variance of the requirements or other legal relief is granted by the ACHD Commission.
F. Conclusions of Law
1. The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval
are satisfied.
2. ACHD requirements are intended to assure that the proposed use/development will not place an
undue burden on the existing vehicular transportation system within the vicinity impacted by the
proposed development.
G. Attachments
16 DRAFT - Graycliff Estates Subdivision/
MPP19-0027/ H-2019-0129
1. Vicinity Map
2. Site Plan
3. Utility Coordinating Council
4. Development Process Checklist
5. Request for Reconsideration Guidelines
17 DRAFT - Graycliff Estates Subdivision/
MPP19-0027/ H-2019-0129
VICINITY MAP
FFF�RM
W VIMORr ROAD
Li
LI
PROJECT SITE
GRAYGLIFF SUBDIVISION
LIW.AMITY RDAD
18 DRAFT - Graycliff Estates Subdivision/
MPP19-0027/ H-2019-0129
rtr A _
41
till
ilfl �a•bw- .. Mix
fir iPs �f� IF'I li���� VION
``R D
•
"Mal
fr
�. a
Milo
i �F ��E. •YI��I�. I I. !9!I
Ada County Utility Coordinating Council
Developer/Local Improvement District
Right of Way Improvements Guideline Request
Purpose: To develop the necessary avenue for proper notification to utilities of local highway and
road improvements, to help the utilities in budgeting and to clarify the already existing process.
1) Notification: Within five (5)working days upon notification of required right of way improvements
by Highway entities, developers shall provide written notification to the affected utility owners and
the Ada County Utility Coordinating Council (UCC). Notification shall include but not be limited to,
project limits, scope of roadway improvements/project, anticipated construction dates, and any
portions critical to the right of way improvements and coordination of utilities.
2) Plan Review: The developer shall provide the highway entities and all utility owners with
preliminary project plans and schedule a plan review conference. Depending on the scale of
utility improvements, a plan review conference may not be necessary, as determined by the utility
owners. Conference notification shall also be sent to the UCC. During the review meeting the
developer shall notify utilities of the status of right of way/easement acquisition necessary for their
project. At the plan review conference each company shall have the right to appeal, adjust and/or
negotiate with the developer on its own behalf. Each utility shall provide the developer with a letter
of review indicating the costs and time required for relocation of its facilities. Said letter of review
is to be provided within thirty calendar days after the date of the plan review conference.
3) Revisions: The developer is responsible to provide utilities with any revisions to preliminary
plans. Utilities may request an updated plan review meeting if revisions are made in the
preliminary plans which affect the utility relocation requirements. Utilities shall have thirty days
after receiving the revisions to review and comment thereon.
4) Final Notification: The developer will provide highway entities, utility owners and the UCC with
final notification of its intent to proceed with right of way improvements and include the anticipated
date work will commence. This notification shall indicate that the work to be performed shall be
pursuant to final approved plans by the highway entity. The developer shall schedule a
preconstruction meeting prior to right of way improvements. Utility relocation activity shall be
completed within the times established during the preconstruction meeting, unless otherwise
agreed upon.
Notification to the Ada County UCC can be sent to:50 S. Cole Rd. Boise 83707, or Visit iducc.com
for e-mail notification information.
20 DRAFT - Graycliff Estates Subdivision/
MPP19-0027/ H-2019-0129
Development Process Checklist
Items Completed to Date:
®Submit a development application to a City or to Ada County
®The City or the County will transmit the development application to ACHD
®The ACHD Planning Review Section will receive the development application to review
®The Planning Review Section will do one of the following:
❑Send a "No Review" letter to the applicant stating that there are no site specific conditions of approval at
this time.
®Write a Staff Level report analyzing the impacts of the development on the transportation system and
evaluating the proposal for its conformance to District Policy.
❑Write a Commission Level report analyzing the impacts of the development on the transportation system
and evaluating the proposal for its conformance to District Policy.
Items to be completed by Applicant:
❑For ALL development applications, including those receiving a "No Review" letter:
• The applicant should submit one set of engineered plans directly to ACHD for review by the Development
Review Section for plan review and assessment of impact fees. (Note: if there are no site improvements
required by ACHD,then architectural plans may be submitted for purposes of impact fee assessment.)
• The applicant is required to get a permit from Construction Services(ACHD)for ANY work in the right-of-way,
including, but not limited to, driveway approaches, street improvements and utility cuts.
❑Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval.
DID YOU REMEMBER:
Construction(Non-Subdivisions)
❑ Driveway or Property Approach(s)
• Submit a "Driveway Approach Request"form to ACHD Construction (for approval by Development Services & Traffic
Services). There is a one week turnaround for this approval.
❑Working in the ACHD Right-of-Way
• Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit
Application"to ACHD Construction—Permits along with:
a) Traffic Control Plan
b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you
are placing>600 sf of concrete or asphalt.
Construction(Subdivisions)
❑ Sediment&Erosion Submittal
• At least one week prior to setting up a Pre-Construction Meeting an Erosion&Sediment Control Narrative&Plan,done
by a Certified Plan Designer, must be turned into ACHD Construction to be reviewed and approved by the ACHD
Stormwater Section.
❑ Idaho Power Company
• Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being
scheduled.
❑ Final Approval from Development Services is required prior to scheduling a Pre-Con.
21 DRAFT - Graycliff Estates Subdivision/
MPP19-0027/ H-2019-0129
Request for Appeal of Staff Decision
1. Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of
the final decision made by the Development Services Manager when it is alleged that the
Development Services Manager did not properly apply this section 7101.6, did not consider all of
the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily
and capriciously in the interpretation or enforcement of the ACHD Policy Manual.
a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged
the applicant for the processing of appeals, to cover administrative costs.
b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary
and Clerk of the District, which must be filed within ten (10)working days from the date of
the decision that is the subject of the appeal. The notice of appeal shall refer to the
decision being appealed, identify the appellant by name, address and telephone number
and state the grounds for the appeal. The grounds shall include a written summary of the
provisions of the policy relevant to the appeal and/or the facts and law relied upon and
shall include a written argument in support of the appeal. The Commission shall not
consider a notice of appeal that does not comply with the provisions of this subsection.
c. Time to Reply: The Development Services Manager shall have ten (10) working days
from the date of the filing of the notice of appeal to reply to the notice of the appeal, and
may during such time meet with the appellant to discuss the matter, and may also consider
and/or modify the decision that is being appealed. A copy of the reply and any
modifications to the decision being appealed will be provided to the appellant prior to the
Commission hearing on the appeal.
d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal
will be noticed and scheduled on the Commission agenda at a regular meeting to be held
within thirty (30) days following the delivery to the appellant of the Development Services
Manager's reply to the notice of appeal. A copy of the decision being appealed, the notice
of appeal and the reply shall be delivered to the Commission at least one (1) week prior
to the hearing.
e. Action by Commission: Following the hearing, the Commission shall either affirm or
reverse, in whole or part, or otherwise modify, amend or supplement the decision being
appealed, as such action is adequately supported by the law and evidence presented at
the hearing.
22 DRAFT - Graycliff Estates Subdivision/
MPP19-0027/ H-2019-0129
Request for Reconsideration of Commission Action
1. Request for Reconsideration of Commission Action: A Commissioner, a member of ACHD
staff or any other person objecting to any final action taken by the Commission may request
reconsideration of that action, provided the request is not for a reconsideration of an action
previously requested to be reconsidered, an action whose provisions have been partly and
materially carried out, or an action that has created a contractual relationship with third parties.
a. Only a Commission member who voted with the prevailing side can move for
reconsideration, but the motion may be seconded by any Commissioner and is voted on
by all Commissioners present.
If a motion to reconsider is made and seconded it is subject to a motion to postpone to a
certain time.
b. The request must be in writing and delivered to the Secretary of the Highway District no
later than 11:00 a.m. 2 days prior to the Commission's next scheduled regular meeting
following the meeting at which the action to be reconsidered was taken. Upon receipt of
the request, the Secretary shall cause the same to be placed on the agenda for that next
scheduled regular Commission meeting.
c. The request for reconsideration must be supported by written documentation setting forth
new facts and information not presented at the earlier meeting, or a changed situation that
has developed since the taking of the earlier vote, or information establishing an error of
fact or law in the earlier action. The request may also be supported by oral testimony at
the meeting.
d. If a motion to reconsider passes, the effect is the original matter is in the exact position it
occupied the moment before it was voted on originally. It will normally be returned to
ACHD staff for further review. The Commission may set the date of the meeting at which
the matter is to be returned. The Commission shall only take action on the original matter
at a meeting where the agenda notice so provides.
e. At the meeting where the original matter is again on the agenda for Commission action,
interested persons and ACHD staff may present such written and oral testimony as the
President of the Commission determines to be appropriate, and the Commission may take
any action the majority of the Commission deems advisable.
f. If a motion to reconsider passes, the applicant may be charged a reasonable fee, to cover
administrative costs, as established by the Commission.
23 DRAFT - Graycliff Estates Subdivision/
MPP19-0027/ H-2019-0129
ENGG1MMW LVC Traffic Impact Study
Graycliff Subdivision-Meridian, Idaho
EXECUTIVE SUMMARY
CR Engineering_ Inc_ has been retained to prepare a traffic impact study (TIS) for the proposed Graycliff
Subdivision located west of Meridian Road(SH 69) south of the Hams Street and Kentucky Way intersection in
Meridian,Idaho,as show in Figure 1.1.The scope of this TIS was determined through coordination with the Idaho
Transportation Department(PID) and the Ada County Highway District(ACHD)_
The TIS evaluates the potential traffic impacts resulting from background traffic growth, off-site developments in
the area, and the proposed development, and identifies improvements to mitigate the impacts if needed_ Traffic
impacts were evaluated under weekday AM and PM peak hours traffic conditions. Table 1 summarizes the
improvements needed to mitigate the traffic impacts for the following analysis years traffic conditions-
■ 2018/2019 Existing traffic
■ 2026 Build-out year background traffic
■ 2026 Build-out year total traffic
1.0 Proposed Development
1.1 At full build-out, Graycliff Subdivision is estimated to include 200 single-family duelling units and 248
multifamily dwelling units_ The expected build-out year is 2026 but may change depending the market
conditions.
1.2 Based on the procedures outlined in the Trip Generation Handbook 3'Edition and the Trip Generation
Manual, 10'h Edition, both published by the Institute of Transportation Engineers (ITE), the proposed
development is estimated to generate approximately 3,343 trips per weekday with 236 trips during the AM
peak hour and 312 trips during the PM peak hour_
■ Based on the proposed land use and ITE methodologies, the development is not expected to retain
interually-captured trips within the site_No trip reduction for internal capture trips was assumed_
■ The development is not expected to generate pass-by trips based on ITE pass-by rates for the proposed
land use.No pass-by trips were assumed in the analysis.
■ All trips generated by the development were assumed to be made by personal or commercial vehicles_
1.3 The estimated site traffic distribution patters are:
■ 65%north of the site
■ 15%west of the site
■ 15%east of the site
■ 5% south of the site
1.4 Graycliff Subdivision is planning to extend Harris Street and construct a new.roadway (Redwater Avenue)
along the site frontages for site access:
■ The proposed Hams Street extension and Redivater Avenue generally matches ti{7th the mid-mile
collector streets in the area as envisioned in ACHD Master Street Map
■ The proposed access locations on Harris Street extension and Redi ater Avenue generally meet ACHD
spacing requirements on a collector street
■ The proposed site access intersections are not expected to require turn lanes based on ACHD's turn-lane
guidelines
■ The proposed site access intersections are expected to meet minimum operational thresholds
1.5 All proposed internal local streets within the site are expected to carry less than 1,000 vehicles per day.
August 2a19
24 DRAFT - Graycliff Estates Subdivision/
MPP19-0027/ H-2019-0129
ENWrM IhE Traffic Impact Study
Graycliff Subdivision-Meridian, Idaho
Table 1—Intersection Impr o%-Pine als Summary
2026 Build-Out Year
201&2019
Intersection Existing Background Total
Kentucky Wv
None beyondprior
and done 31 left-turn lapel
B
Rd ituprovemeuts
Victoryt
Victory Rd
and _ _:___ 3 thry lanes an Meridian Rai; SE right-turnlane
Meridian Rd dual SS left-taro lanes
Harris StlRumpel Ln Signal,3 thru lanes on None beyond prior
3 and
Meridian Rd llerldian Rd ;,,mraemernts
Amity Rd None beyond prior
04 and None 3 lhru lanes on Aeridian Rd
Meridian Rd improvements
Harris St
and =_ Nine None
Kentucky W
Harris St Unagnalized
and ik't na
T-in
Graycliff WY
tersection
1 Intersection meets minimum operational thresholds without turn lane
2 overall intersection t;lc ratio slightly exceeds 0.90 during All peak hour
2.0 Improvements Needed to Mitigate 201812019 Existing Traffic
2.1 With 2018/2019 existing traffic, all study area roadway segments meet ACHD's level of service planning
threshold with the existing lane configuration_ No roadway capacity improvements are needed to mitigate
existing traffic conditions.
2.2 With 2018/2019 existing traffic,all study area intersections meet minimum operational thresholds analyzed
with the existing intersection control and lane configurations, with the exception of one intersection. The
intersection and recommended improvements are-
■ Victory Road and Meridian Road intersection
• No intersection improvements are recommended to mitigate existing traffic
o The intersection is expected to operate with an overall volume to capacity (v/c) ratio of 0.92
during the AM peak hour,which slightly exceeds LTD's and ACHD's 0.90 threshold
■ The orverall intersection v/c ratio was estimated based on the Highway Capacity Manual
HCM) 2000 methodologies, which assumes a lost time per phase as the sum of the yellow
plus all-red intervals_Per ACHD policy,the lost tiure is three(3)seconds per phase. Using a
lost time of three seconds per phase,the overall intersection v/c ratio is 0_90 in the AM peak
hour-
* All lane groups are expected to operate with a v/c ratio of 0.94 or less during the peak hours,
which exceed ITD's 0.90 threshold but is within ACHD's I.00 threshold
• According to the ACHD 2016 Capital Improvement Plan(CIF),there are no projects prograrnmed at
the intersection
2.3 None of the study area intersections require tum lanes based on LTD's or ACHD's turn-lane guidelines with
existing traffic conditions_
August 2019
25 DRAFT - Graycliff Estates Subdivision/
MPP19-0027/ H-2019-0129
NG R�YG INN Traffic Impact Study
Graycliff Subdivision-Meridian, Idaho
3.0 Improvements Needed to Mitigate 2026 Background Traffic
3.1_ With 2026 background traffic, one study area roadway segment is expected to exceed ACHD's level of
service planning threshold with the existing lane configuration. The roadway segment and improvements
recommended to mitigate 2026 background traffic:
■ Victory Road west of Meridian Road
• Widen to three lanes
u According to ACHD 2016 Capital Improvement Plan(CIP),Victory Road is programmed to be
widened from two to three lanes from Linder Road to Locust Grove Road between years ?026
and 2030
3.2. With 2026 background traffic, three study area intersections are expected to exceed minimum operational
thresholds analyzed with the existing intersection control and lane configurations_ The intersections and
improvements recommended to mitigate the 2026 background traffic impacts are:
■ Victory Road and Meridian Road.intersection
• Three through lanes on northbound and southbound approaches
• One additional southbound left-turn lane
These improvements are needed by 2021 when approximately 145 additional dwelling units and
approximately 244,000 square feet of commercial are constructed within the off-site
developments in the area, which is equivalent to approximately 370 off-site generated trips
entering the intersection in the AM peak hour, or 310 off-site generated trips entering the
intersection in the PM peak hour_This is also equivalent to the off-site developments collectively
generating 6,580 weekday daily trips, 620 AM peak hour trips,or 530 PM peak hour trips
■ Harris StreevRumpel Lane and Meridian Road intersection
• Traffic signal
• Three through lanes on northbound and southbound approaches
* ACED is working with the developers iu the area to administer a Road Trust Fund to fund the
signal improvements at the Hams Street.-RurnpeI Lane and Meridian Road intersection
o Traffic signal warrant analysis should be conducted as off-site developments in the area are
developed
• The intersection is expected to exceed minimum operational thresholds and meet warrants for a traffic
signal by 2024 when approximately 530,additional dwelling units within the off-site developments
in the area are developed and occupied beyond those existing at this time, which is equivalent to
approximately 4,800 trips per day, 380 trips in the M peak hour,or 500 trips in the PM peak hour
• TTD is currently conducting a study on the 5H 69 corridor to develop roadway and intersection
improvements along the corridor. The traffic signal would be an interim improvement and will be
subject to change depending on the recommendations from the SH 69 corridor study.
• The Harris StreetRumpel Lane and Meridian Road intersection is expected to meet minimum
operational thresholds as a signalized intersection wYth the existing lanes. However, three through
lanes are needed on the Meridian Road approaches at the Victory Road and Amity Road intersections_
Therefore, three through lanes are recommended on the Meridian Road approaches at the Harris
Street intersection to provide three continuous lanes on Meridian Road between Victory Road and
Amity Road_
■ Amity Road and Meridian Road(SH 69)intersection
• Three through lanes on northbound and southbound approaches
• According to ACED 2016 CIP, the Amity Road and Meridian Road intersection is programmed to
be widened with dual left-tum lanes and two through lanes on the Amity Road approaches:and right-
tam lanes on Meridian Road approaches. These improvements are not expected to mitigate 2026
background traffic and are not reconi neri d_
August 2019 3
26 DRAFT - Graycliff Estates Subdivision/
MPP19-0027/ H-2019-0129
ENarM INM Traffic Impact Study
Graycliff Subdivision-Mendian, Idaho
• Improvements are expected to be needed by 2021 traffic growth.Traffic from off-site developments
is expected to have mjun real impact on the timing of the need of these improvements.
3.3. Based on the required intersection improvements,Meridian Road IN111 need to be lVidened to three lanes in
direction from Victory Road to Acuity Road-
3-4- One study area intersection is expected to meet ACHUs turn-lane guidelines with 2026 background traffic:
■ Victory Road and Kentucky Way intersection
• Westbound left-turn lane
o The roadway widening ir. needed by 2021 when approximately 80 dwelling units and 1b0,000
square feet of commercial within the off-site developments are constructed, which is
approximately equivalent to 4,180 weekday daily trips. 390 trips in the AM peak hour, or 330
trips in the PM peak hour
4.0 Improvements Needed to Mitigate 2026 Build-Dart Year Total Traffic
4.1 With 2026 total traffic, all study area roadway segments are expected to meet ACHD's level of service
planning threshold with the existing lane configuration or with the improvements recommended to mitigate
2026 background traffic. No additional roadway improvements are recommended to mitigate 2026 total
traffic impacts.
■ The estimated peak our directional site traffic on the study area roadway segments are:
• Kentucky Way south of Victory Road: AM peak=301/o,PM peak=23%
• Victory Road west of Meridian Road: AM peak=7.1%,PM peak=4.5%
• Hams Street west of Meridian Road: AM peak=43%,PM peak=53%
• Meridian Road:
o North of Victory Road: AM peak=6.7%,PM Peak=5.5%
o North of Harris Street_ AM peak=5.0%,PM Peak=5.2%
o North of Amity Road: AM peak=03%,PM Peak=0.5%
o South of Amity Road. AM peak=0.21/o,PM Peak=0.3%
4.2 With 2026 total traffic, one study area intersection is expected to exceed minir„um operational thresholds
analyzed with the existing intersection control and lane configurations or with the mitigation improvements
for 2026 background traffic_ The intersection and improvements recommended to mitigate the 2026 total
traffic impacts are:
N Victory Road and Meridian Road intersection
• Southbound right-tum lane
o The estimated site traffic at the intersection is approximately 5.6%l•of the total entering traffic in
the AM peak hour and 5.2%in the PM peak hour_
• This improvement is needed by 2025 when approximately 570 additional dwvelling units and
approximately 366,000 square feet of commercial(full build-out of Victory Commons and Victory
and Meridian Plaza developments)are constructed within the off-sate developments in the area,and
380 dwelling units are constructed within the site_ The site traffic contribution is equivalent to
approximately 2,830 weekday daily trips,200 trips in the AM peak hour,or 265 trips in the PM peak
hour_
■ The estimated build-out site traffic as a percentage of the total traffic at other study area intersections are:
• Victory Road and Kentucky Way intersection_ AM peak=9.0%,PM pea k=6.6%
• Hams Street and Meridian Road intersection: AM peak=5.41/o,PM peak=6.2%
• Amity Road and Meridian Road intersection: AM peak=0.8%,PM peak=0.8%
4.3 None of the other study area intersections are expected to need turn lanes based on ACHD's or ITD's tam
lane guidelines beyond the westbound left-tam lane recommended under 2026 background traffic conditions
at the Victory Road and Kentucky Way intersection_
August 2019 4
27 DRAFT - Graycliff Estates Subdivision/
MPP19-0027/ H-2019-0129