Loading...
PZ - Staff Report 2-6 STAFF REPORT C�I w IDIAN -- COMMUNITY DEVELOPMENT DEPARTMENT .►A H O HEARING 2/6/2020 Legend DATE: Iff ProjEot Lacfl-fion TO: Planning&Zoning Commission FROM: Sonya Allen,Associate PlannerAl - 208-884-5533 Bruce Freckleton,Development Services Manager -- 208-887-2211 SUBJECT: H-2019-0129 - Graycliff Estates ; LOCATION: Southwest of W. Harris St. and S. ' Meridian Rd. (Parcel#S 1225418957; SE %4 of Section 25,T.3N.,R.1W.) ; - ----- ----- I. PROJECT DESCRIPTION Modification to the Development Agreement to update the development plan for the site consistent with the proposed preliminary plat and conceptual building elevations; and, Preliminary plat consisting of 202 building lots, 15 common lots and 4 other lots on 52.46 acres of land in the R-8 and R-40 zoning districts II. SUMMARY OF REPORT A. Project Summary Description Details Page Acreage 52.46 Existing/Proposed Zoning R-8 and R-40(existing) Future Land Use Designation Medium Density Residential(MDR)&High Density Residential(HDR) Existing Land Use(s) Agricultural Proposed Land Use(s) Single-family(SFR)&multi-family residential(MFR) Lots(#and type;bldg./common) 202 SFR buildable lots,2 MFR buildable lots, 15 common lots and 4 other(3 common driveway and 1 well)lots Phasing Plan(#of phases) Yes—3 phases(SFR portion) Number of Residential Units(type 200 detached SFR homes;224 MFR apartments of units) Density(gross&net) 4.9(SFR)and 14.18(MFR) Open Space(acres,total 8.97 acres(or 17.1%) [%]/buffer/qualified) Amenities Multi-use pathway,swimming pool,children's play structure Page 1 Description Details I Page Public Amenities:possible neighborhood park and well lot Physical Features(waterways, The Sundall Lateral bisects site and the Tumbler/Carlson hazards,flood plain,hillside) Lateral runs along east boundary Neighborhood meeting date;#of 10/23/19; 8 attendees attendees: History(previous approvals) CPA-08-009(Res. 08-622);AZ-15-012(Ord. 15-1666;DA #2015-112095);PP-15-012(120 building lots);H-2018- 0054[PP(136 building lots),MDA#2018-086664] B. Community Metrics Description Details Page Ada County Highway District • Staff report(yes/no) Not yet • Requires ACHD Commission No Action(yes/no) Access(Arterial/Collectors/State W.Harris St.,collector street Hwy/Local)(Existing and Proposed) Traffic Level of Service Stub Street/Interconnectivity/Cross Stub streets are proposed to the east and south Access Existing Road Network Existing Arterial Sidewalks/ Buffers Proposed Road Improvements Fire Service • Distance to Fire Station 2.1 miles • Fire Response Time 6:00 minutes(under ideal conditions from nearest station- Fire Station#6—CAN'T MEET RESPONSE TIME GOALS • Resource Reliability Current reliability is unknown at this time.The current closest fire station is Station#4 which is 10 minutes away &the reliability is 78%-CAN'T MEET TARGET GOAL of 80%or greater • Risk Identification 1 —current resources would be adequate to supply service • Accessibility Project doesn't meet all required access,road widths and turnarounds;there is only one way in and one way out— therefore,they're limited to 30 building lots until an approved secondary access is constructed. • Special/resource needs Project will not require an aerial device;can meet this need in the required timeframe if a truck company is required. • Water Supply Requires 1,000 gallons per minute for one hour,may be less if buildings are sprinklered. • Other Resources Police Service No comments submitted Wastewater • Distance to Sewer Services Directly adjacent • Sewer Shed South Black Cat Trunk Shed • Estimated Project Sewer 202 SFR building; 15 common;and 4 other lots ERU's • WRRF Declining Balance 13.81 Page 2 Description Details Page • Project Consistent with WW Applicant is requesting to increase the number of SF units Master Plan/Facility Plan from 136 to 202.This has been modeled,is acceptable,and has been allocated. Water • Distance to Water Services Directly adjacent • Pressure Zone 5 • Estimated Project Water 202 SFR building; 15 common;and 4 other lots ERU's • Water Quality None • Project Consistent with Water Yes Master Plan • Impacts/Concerns There are concerns that the development only has one connection to the city water system.This concern will eventually be eliminated by the development to the east and south connecting to Meridian and Amity,creating a dual connection.The water mainlines in Harris Street, South Graycliff Way, South Colditz Way and West Wilton Woods Street must be 12" in order to eliminate the proposed main line in South Oakbriar Way.Also,applicant to provide a water mainline easement to the parcel to the northeast across Williams Pipeline to the future multi- family lots. C. Project Area Maps Future Land Use Map Aerial Map Legend (fLegend 0Pr6peat Lcca-hor - IeiProjeot Lao o-cr Residenfial High D Re sid sigh , sihy fiJke iu m iD en 7s fia t Resident'I L rc Zoning Map Planned Development Map Page 3 WRO Legend 0 Legend 0 Nr sc- Loca 'ar R.8 I Peale°tL-canton 7- City Lirrft R-4 J — Planned Parcels - RUT ' RUT 1 ' R-4 I-L i R-4- `, III. APPLICANT INFORMATION A. Applicant: Star Development,Inc. —PO Box 518, Meridian, ID 83680 B. Owner: Same as Applicant C. Representative: Becky McKay,Engineering Solutions,LLP— 1029 N.Rosario St., Ste. 100,Meridian, ID 83642 IV. NOTICING Planning&Zoning City Council Posting Date Posting Date Notification published in newspaper 1/17/2020 Notification mailed to property owners within 300 feet 1/14/2020 Applicant posted public hearing notice on site 1/27/2020 Nextdoor posting 1/14/2020 V. COMPREHENSIVE PLAN ANALYSIS(Comprehensive Plan) (Note: This project was submitted prior to the new Comprehensive Plan being adopted; therefore, this project will be reviewed under the previous Plan) The Future Land Use Map(FLUM)contained in the Comprehensive Plan designates approximately 30 acres of this site as Medium Density Residential(MDR) and approximately 22.5 acres as High Density Residential(HDR). Page 4 The purpose of the MDR designation is to allow small lots for residential purposes within City limits. Uses may include single-family homes at gross densities of 3 to 8 dwelling units per acre. The purpose of the HDR designation is to allow for the development of multi-family homes in areas where urban services are provided. Residential gross densities should exceed 15 dwelling units per acre. Development might include duplexes, apartment buildings,townhouses and other multi-unit structures. A desirable project would consider the placement of parking areas, fences,berms, and other landscaping features to serve as buffers between neighboring uses. Development need to incorporate high quality architectural design and materials and thoughtful site design that incorporate connectivity with adjacent uses and area pathways, attractive landscaping and individual project identity. The following Comprehensive Plan Policies are applicable to this development: • "Support a variety of residential categories (low-, medium-, medium-high and high-density single-family, multi-family, townhouses, duplexes, apartments, condominiums, etc.) for the purpose of providing the City with a range of affordable housing opportunities." (3.07.01 E) A mix of medium density single-family detached dwellings and high density multi family apartment dwellings are proposed which will contribute to the variety of housing types and lot sizes available in the southern part of the City; staff is unaware how "affordable" the units will be. • "Permit new development only where urban services can be reasonably provided at the time of final approval and development is contiguous to the City."(3.01.01F) City services are available and will be extended by the developer to the proposed lots upon development of the site in accord with UDC 11-3A-21. • "Protect existing residential properties from incompatible land use development on adjacent parcels." (3.06.01F) There are no existing residential properties in close proximity to this site. • "Require common area in all subdivisions."(3.07.02F) The proposed plat depicts a total of 8.97 acres (or 17.1%) of qualified open space in accord with the requirements listed in UDCII-3G-3. • "Develop pathways to connect Meridian with Boise,Nampa,Kuna,and Eagle."(6.01.02C) A segment of the City s multi-use pathway system is designated on the Master Pathways Plan on this site along the Williams Northwest pipeline which will connect to the future pathway in Biltmore Estates Subdivision to the north and eventually be extended to the southeast and connect to pathways in other jurisdictions. • "Review new development for appropriate opportunities to connect local roads and collectors to adjacent properties (stub streets). (3.03.020) The proposed plat depicts an extension of W. Harris Street, a collector street,from the northeast to the west boundary of the site and a north/south collector street along the northern portion of the west boundary of the site. Stub streets are proposed to the south, west and east for future extension and interconnectivity. The proposed development plan is consistent with the vision of the Comprehensive Plan in regard to land use, density,transportation and pedestrian connectivity for this area. Page 5 VI. UNIFIED DEVELOPMENT CODE ANALYSIS(UDC History:A preliminary plat was approved for this property in 2015 consisting of 120 buildable lots. A subsequent preliminary plat was approved in 2018 which decreased buildable lot sizes and increased the number of buildable lots by 16 to 136; this entitlement is still valid. A. Development Agreement(DA)Modification: The applicant requests a modification to the existing development agreement(Inst. #2015- 112095, amended Inst. #2018-086664)to increase the number of single-family residential buildable lots from 136 to 200 and the qualified open space from 8.85 to 8.97 acres; the number of multi-family buildable lots and apartments are proposed to stay the same at 2 and 224 units respectively. The previous gross density of the single-family residential portion was 3.23 units per acre compared to 4.9 units per acre currently proposed;the density of the multi-family portion is the same at 14.18 units per acre. The proposed increase in density is still consistent with that desired in the MDR FLUM designation. The previous development plan included a 1,720 linear foot segment of the City's 10-foot wide multi-use pathway in a linear open space area bisecting the site where the William's Pipeline is located, a children's play structure and yard shuffleboard as amenities. The proposed plan still includes a multi-use pathway and children's play structure but the yard shuffleboard has been removed and a community swimming pool is proposed as an upgraded amenity. The access and interconnectivity proposed to adjacent parcels with the proposed plan is substantially the same as the previous plan. The current provisions of the DA are included in Section VIII.A.1 along with the Applicant's proposed changes in strike-out/underline format. Proposed changes consist of updating the lot counts and open space area and updating Lot and Block numbers consistent with the proposed plat. Staff also recommends a couple of other minor modifications as noted. The existing plat in Section VIII.A.1 should be updated with the proposed plat in Section VIII.A.2 if the MDA is approved by City Council. When approved,the amended DA is required to be signed by the property owner(s)/developer and returned to the City within 6 months of the Council granting the modification. B. Preliminary Plat: The proposed plat consists of 200 single-family residential buildable lots, 2 multi-family buildable lots, 14 common lots, 3 common driveway lots, 1 park lot that may be a portion of a future City neighborhood park and 1 City well lot on 52.46 acres of land in the R-8 (medium density residential) and R-40 (high density residential)zoning districts. Proposed single-family residential lots range in size from 4,200 to 9,600 square feet(s.£)with an average lot size of 4,692 s.f. and a gross density of 4.89 units/acre. The single-family portion of the plat is proposed to develop in 3 phases as shown on the phasing plan on Sheet PP-1 of the plat; the multi-family portion and linear open space where the pipeline easement is located should be depicted as the fourth phase. Staff recommends the boundary of Phase 1 is modified to include the street buffer and sidewalk along W.Harris St. on Lot 29,Block 3. Existing Structures/Site Improvements: There are no existing structures or site improvements on this property. Page 6 Proposed Use Analysis: Single-family detached dwellings are listed as a principal permitted use in the R-8 zoning district; and multi-family developments are listed as a conditional use in the R-40 zoning district per UDC Table 11-2A-2: Allowed Uses, subject to the specific use standards listed in UDC 11-4-3-27. Specific Use Standards (UDC 11-4-3): Single-family residential:None Multi-family residential: The proposed multi-family development is required to comply with the specific use standards listed in UDC (11-4-3-27). The project will be reviewed for consistency with these standards upon submittal of a detailed development plan with a future conditional use permit application. Dimensional Standards (UDC 11-2): R-8 district: (UDC Table 11-2A-6);R-40 district: (UDC Table 11-2A-8) The property sizes and street frontages of the proposed single-family lots and width of street buffers comply with the aforementioned minimum dimensional standards; future development should comply with the minimum building setbacks and maximum building height standards of the applicable district. Subdivision Design and Improvement Standards(UDC 11-6C-3) Development of the subdivision is required to comply with the subdivision design and improvement standards listed in UDC 11-6C-3, including but not limited to streets, common driveways, driveways, and block face. There are three common driveways proposed; such driveways should be constructed in accord with the standards listed in UDC 11-6C-3D. An exhibit should be submitted with the final plat application that depicts the setbacks,fencing,building envelope,and orientation of the lots and structures accessed via the common driveway; if a property abuts a common driveway but has the required minimum street frontage and is taking access via the public street,the driveway should be depicted on the opposite side of the shared property line from the common driveway. Access(UDC 11-3A-3,11-3H-4)• Access is proposed via the extension of W. Harris Street, a collector street, at the northeast corner of the site,which is proposed to stub to the project's west boundary. A collector street is also planned along the northern half of the project's west boundary consistent with the Master Street Map;this street is proposed as an ACHD right-of-way easement with this plat since it is part of the approved preliminary plat for Brundage Estates. The northern portion of the collector street is required to be constructed prior to platting the 101'lot as ACHD Policy Manual only allows 100 homes on one point of public street access. Public stub streets are proposed at the south and east boundaries of the site for future extension and neighborhood interconnectivity. Two(2) driveway connections are proposed between the single-family and multi-family portions of the development for interconnectivity. A driveway should be provided at the east boundary of the multi-family development in alignment with that proposed in the adjacent development to the east(i.e. Stapleton Subdivision) for emergency access; a cross-access easement should be granted to that property and a recorded copy submitted to the City prior to signature on the final plat that contains Lot 28, Block 3. Page 7 Parking(UDC 11-3C): Off-street parking is required to be provided in accord with the standards listed in UDC Table 11- 3C-6 for single-family detached dwellings based on the number of bedrooms per unit.Future development should comply with these standards. Pathways(UDC 11-3A-8): A 10' wide multi-use pathway is proposed within the Williams Northwest Pipeline easement on Lot 27C,Block 3 consistent with the Pathways Master Plan between the single-family and multi- family developments. Construction of the pathway should comply with the standards listed in UDC 11-3A-8. Staff recommends a pedestrian connection is provided to the multi-use pathway within the pipeline easement through the middle of Blocks 2 and 3 in general alignment with S.Redwater Ave. A 14-foot wide recreational pathway easement is required to be provided for the multi-use pathway within Lot 27C,Block 3 and Lot 2C,Block 9. The applicant shall coordinate with Kim Warren,Park's Department(208-888-3579), on the location of the easement.The easement shall be submitted to the Planning Division for approval by the City Council and subsequent recordation,prior to signature on the final plat by the City Engineer. Sidewalks(UDC 11-3A-171: Detached sidewalks are proposed throughout the development in accord with the standards listed in UDC 11-3A-17. Parkways (UDC 11-3A-1 Eight-foot wide parkways are proposed adjacent to all local and collector streets in accord with the standards listed in UDC 11-3A-17. Landscaping(UDC 11-3B): A 20-foot wide street buffer is required adjacent to all collector streets, landscaped per the standards listed in UDC 11-3B-7C; the street buffer in the R-40 district on the multi-family portion of the development is required to be placed in a common lot as set forth in UDC 11- 3B-7C.2a and landscaped in accord with the aforementioned standards. Parkways are required to be constructed in accord with the standards listed in UDC 11-3A-17E and landscaped in accord with the standards listed in UDC 11-3B-7C. The total lineal feet of parkways and required vs.proposed trees should be included in the Landscape Calculations table on the landscape plan. Landscaping is required along all pathways in accord with the standards listed in UDC 11-3B- 12C. Because trees are prohibited within the Williams Northwest Pipeline easement on Lot 27C, Block 3 and Lot 2C,Block 9,the Applicant applied for and received approval of Alternative Compliance to these standards with H-2018-0054. This approval does not expire. Common open space is required to be landscaped in accord with the standards listed in UDC 11- 3G-3E. Because trees are prohibited within the Williams Northwest Pipeline easement on Lot 27C,Block 3 and Lot 2C,Block 9,the Applicant applied for and received approval of Alternative Compliance to these standards with H-2018-0054. This approval does not expire. Qualified Open Space(UDC 11-3 : A minimum of 10%qualified open space meeting the standards listed in UDC 11-3G-3B is required. The Applicant proposes 17.10% (or 8.97 acres) of qualified open space consisting of the following: a 75' x 1,720' linear open space where the William's Pipeline is located, collector street buffers,parkways along internal local streets,internal common areas over 50' x 100' in area and a 1.69 acre common area on the north side of W. Harris St.planned for a possible future Page 8 City neighborhood park(see open space exhibit in Section VIII.D). The proposed qualified open space meets and exceeds the minimum UDC standards. The common area(Lot 2,Block 10)that may be a future City park is intended to be included with common area in adjacent developments(i.e. Biltmore Estates and Brundage Estates) and consolidated for a City neighborhood park; this area is proposed to be graded and improved with sprinklers,trees and grass by the Developer. Qualified Site Amenities (UDC 11-3G1 Based on the area of the proposed plat(52.46 acres), a minimum of 2 qualified site amenities are required to be provided per the standards listed in UDC 11-3G-3C. The Applicant proposes a 1,720 ft. long segment of the City's multi-use pathway system, a children's play structure and swimming pool facility as amenities,which exceed the minimum UDC standards. A detail of the children's play structure should be submitted with the final plat application. Waterways(UDC 11-3A-M- The Sundell Lateral bisects this site. The Applicant's narrative states the Developer proposes to relocate and pipe the facility with 36 inch water class DR51/Class 80 pipe; construction plans have been approved by the Boise Project Board of Control and the Bureau of Reclamation. The Tumbler/Carlson Lateral runs along the east boundary of the site and is proposed to be piped in its historical alignment. Fencing(UDC ll-3A-6,11-3A-�• Fencing abutting pathways and common open lots not entirely visible from a public street is restricted as set forth in UDC 11-3A-7A.7;where open vision fencing is proposed,it must not restrict or impede vision or sight through the fence by more than 20% per UDC 11-1A-1. Six-foot tall vinyl lattice fence is proposed along the rear of building lots adjacent to the pipeline easement on Lot 27C,Block 3 and adjacent to common lots with micro-paths. Six-foot tall vinyl fence is proposed at the back edge of street buffers and adjacent to common areas visible from a public street. Utilities(UDC 11-3A-21): Central sewer is provided to the site by extension of an 8 inch main line from Biltmore Estates subdivision. Water service is available to the site with by extension of a 12 inch water main installed by the City in Harris Street and the connection to Well No. 32 as a secondary source. The project will be served by the pressure irrigation pump station constructed adjacent to the Tumbler Lateral,which also provides pressure irrigation water to Biltmore Estates. Well Lot: The applicant has provided the City with a lease on a parcel of land within Lot 1, Block 9 of the development for a future city well. The well lot shall be created and deeded to the city at the time of final platting. Williams Northwest Pipeline: A 75-foot easement for the Williams Northwest Pipeline Corporation bisects this site. All development within the easement must adhere to the most current standards in the Williams Gas Pipeline Developers' Handbook. Building Elevations(UDC 11-3A-19 I Architectural Standards Manual): Conceptual building elevations were submitted, included in Section VIII.E,that depict 2-story homes in a variety of styles and materials with stone/brick veneer accents. Design review is not required for single-family detached homes. Because the rear and/or sides of homes abutting the collector streets (W.Harris St. and S. Oakbriar Way)on Lots 2-15,Block 1 and Lots 2-13,Block 5 will be highly visible,Staff recommends these elevations incorporate articulation through changes in two or more of Page 9 the following: modulation(e.g.projections,recesses, step-backs,pop-outs),bays,banding, porches,balconies,material types,or other integrated architectural elements to break up monotonous wall planes and roof lines that are visible from the subject public street.Single- story structures are exempt from this requirement. VII. DECISION A. Staff: Staff recommends approval of the requested modification to the Development Agreement with the revisions noted in Section VIII.A; and approval of the preliminary plat with the conditions noted in Section IX.A per the Findings in Section X. VIII. EXHIBITS A. Existing Development Agreement Provisions& Preliminary Plat(dated: 5/8/18) (Applicant's proposed changes shown in strike-out/underline format;staffs recommended changes shown in bold strike-out/underline format) Section 5: CONDITIONS GOVERNING DEVELOPMENT OF SUBJECT PROPERTY: 5.1.Owner/Developer shall develop the Property in accordance with the following special conditions: a. Direct lot access to W. Harris Street and the north/south street along the west boundary, both collector streets,is prohibited in accord with UDC 11-3A-3,except for Lot 229,Block 23 (the multi-family lot)which shall be allowed one access via W. Harris Street. b. Future development of this site shall be generally consistent with the preliminary plat, phasing plan and building elevations for the single-family homes depicted in the revisions noted in the staff report attached to the Findings of Fact and Conclusions of Law herein attached as Exhibit"A". c. A conditional use permit is required to be obtained for the multi-family development in the R-40 zoning district,per UDC Table 11-2A-2. d. A Certificate of Zoning Compliance and Design Review application is required to be submitted for approval of the site design and structures proposed within the multi-family portion of the development; these applications can be submitted concurrently a ter conditional use permit approval is obtained. e. Design and building materials of the future multi-family structures shall be compatible with and include design elements consistent with that of the single-family dwellings and comply with the design standards listed in UDC 11-3A-19 and in the Architectural Standards Manual (or any updated version(s) thereof) in effect at the time of application for Certificate of Zoning Compliance. f. The multi-family development should incorporate high quality architectural design and materials and thoughtful site design to ensure quality of place and incorporation of connectivity with adjacent uses and area pathways, attractive landscaping and individual project identity as set forth in the Comprehensive Plan. g. The rear and/or sides of home elevations that face W. Harris Street and the future north/south collector street along the west boundary of the site shall incorporate articulation through changes in two or more of the following: modulation (e.g. projections, recesses, step-backs,pop-outs),bays,banding,porches,balconies,material types,or other integrated Page 10 architectural elements to break up monotonous wall planes and roof lines that are visible from the public street. Single-story structures are exempt from this requirement. h. A 10-foot wide multi-use pathway shall be constructed within the 75-foot wide Williams Pipeline easement (Lot 327C, Block 2-3 and Lot 2C, Block 9) that runs through this site as depicted on the landscape plan in accord with the Pathways Master Plan. i. The developer shall provide a minimum of 8-."8.97 acres (or 17.1%) of qualified open space within the development as shown on the preliminary plat in accord with the standards listed in UDC 11-3G-3B. j. All development within the 75-foot wide Williams pipeline easement shall adhere to the most current standards contained in the Williams Gas Pipeline Developers' Handbook. k. The 1.7-769 acres included in Lot 4-2C,Block 4-9 shall be dedicated to the City in the future for a City Park.This lot is proposed to be combined with additional land in Biltmore Estates Subdivision to the northwest and the future development to the west on the Centers' property to total a minimum of 7 acres. If City Council determines a public park is not preferred in this development,the 1.7769 acres shall be private open space. 1. Signage is required to be installed on the multi-family portion of the site and information shall be included in the marketing material for the single-family development announcing the future development of apartments on the site. ---- .-._...-- 1-7 1- [ N-1 _ e° r "u'wYdrf°''wPeCi e°1"'mio as�u`°M' s d3 mfm mr,xm�i`m..xewr uzN.ep wNxO tl°P°` f5 ' w — — I� ��l��v°iw+'�.�ngs�sw.w���.,:o •��.��3 • �• °' I i � sxc�s�ro a���� 2 ar� �B °m 2. RU I ,rairx MR ae�mmu s RUT�1—�� DPW NOTE: Existing plan above to be replaced with the new preliminary plat in Exhibit A.2 Page 11 B. Preliminary Plat&Phasing Plan(date: 1/31/20) GBAYCLIFF ESTATES SUBDIVISION PRELIMINARYPV& ERIL]IIAN,IDAHO-2020 w '- MINTY WIP _ _ a 4+ ; FRELI I PV.T N TES PRELI-ARY PLAT]ATP ggg 1... � r A ,P� • \l\ `� b LLu[ II .0 E.rr, LT L I El IT LL _'u • F Y .5:.!:. 1;lS�..'_5r 4...-..a. ; 1� 3€ two P_ Y � a . �. _ _ 177 x •e''^ s A I � a Y `y.,, •••••••••••-••-•� •••••••••-•-••�•_ �'} TTPICPL COLLECTOR STREET SECTIN C `^'T""'Ji .,dom._ ,.n_•m ;q,� ,�I-Li L�aL�EE15EL11Cr, Page 12 C. Landscape Plan (date: 9/6/2019) LANDSCAPE r-A1-r=-AT10XS PLANT_PALETTE .X,mx A it 'N F=11 -4= T� f ELI �. � NOTES ik IPr=\/EL.0FMr=NT DATA G R A Y C L I F F ESTATES SUBDIVISION SEPTEMBER 6 2G19 JENSB MERIDIAN, IDAHO PRELIMINARY PLAT LANDSCAPE PLAN Page 13 LANDSCAPE CALCULATIONS PLANT FAI IITE _3nI _ m � i 2 � = x Y m. �.. h # w � pEvELOPHENT DATA 7�77- -� J....... _. _ ,. .............wo GRAYCLIFF ESTATES SUBDIVISION SEPTEM6ER 6.S419 E'EBELTS MERIDIAN, IDAHO PRELIMINARY PLAT LANDSCAPE PLAN 81LTh10RE EfiiAiE6 NO 2 c H 69T2956E 91]50` H•F li=i - i i arvwEti Illf F�1PMfNfIGH9HPH00H PA9K /� t. N5ti A 0IDW6. E ! ry a - F L) NOTES llJ ¢o w LL aLL Q LU 9 .ue+w y W 1 nm2 1 3 �- �'- t LANHSCAPE � 13 PLAN BLOCKfi tY 14 124 5 af' .....me.. m --- -- MAICMLNE L2 ® KEY MAP Ll Page 14 PLAIIT pA�ETTE / / l rye ' 9r 17 rn l tr MATCHLINE L1 / =r:,' BL SCI(2 4b „i. r fEJ$EELT! UZ7 �TCHLNE W_'1lTCNY199956T_ 3�R ST W YflLT♦ph {`f :: • 2s 9 ' C- 25 l9 c 39u r r a �i rir a T4 \. 29 I1 ]1 9L N5 35 ' L9CK r� LU a 27 x8 W q i,k93 23 12 s Y3 ¢ Z 13 1rY! a H1 �e ,mvr N J 2 LL JLU }❑ lfi _ t } 2 l 9 25 '40 NICK] f Q r•� t 9LOCK6 `� J 9 y W 19 L,,o 17 - xcrwr. 41 I d 9 12 C 15 16 1] g _ 13... - _vu_ �uiu • 9NKK541 r T ry ` `,L3'' I LANDSCAPE L2 KEY MAP tI Y, V 6 Fll[C9E MIILThFAMIU N aW � 9 P G@ZdNN6 r W / F U /8 P 19 r W a g J �4 m f '• I5 to ��n � la a,., ,�,� � �� r ii 1 I wee srvow MAT'1.`NLINL L9 _ v LANDSCAPE_ r MATCHLINE LA — •.. —y-- — \1J ,. - _ 1I r:^ PLAN KEY MAP Page 15 PLANT PALETTE r r r Ems. 1 _t_ ATGNLINE M Lb _ r }}}--- ' {�A# r � * ELT3 x t s 15 \ 1Fr8E �^ncH w3 4 5 6 ] 9 4 1n ww ,r r 1 x cod ¢I� 9 ffi 25 N x3 22 21 QO 19 l8 11 16 � [ UJ V 6W CK] I � �OCKB r.rr. Q Q L UJ J 2 NOTES W J g �r as <6 49 50 5i 5x 1 TMxX F 3 a 5 fi g g j U 4 � w C7 IL _ 0 L3 - LANDSCAPE PLAN L4 KEY MAP PLANT FAL�TTE r eEg (� ^ an H w 1 NBE 7a xx i ii ii r r iu vv xw«im�n,� ® VINYL RI2IVACY FtNCk� w..e..w m — " �I IlII 11-HIIN6/STAKIIW LLJ a Q G LL Lill NR.a RI ANTINs�SF 9f ANYI I„.r 1Tr RRlI—Y6tmr paw I -�hD5G.4PE 'ALGULATIONS a DEVELOPMENT DATA ...................a� PLAN o� L5 Page 16 D. Qualified Open Space Exhibit(date: 10/4/2019) -N• T I 160 75 0 160 m SCALE 13130 w_HARRIS ST. fr / t , i 1 I 1 - TOTAL QUALIFIED OPEN SPACE 8.97 ACRES UUALIHEA 0KN SPACE AREA 7.20 ACRES QUALIFIED PARKWAY AREA 1.77 ACRES DRIVEWAY AREA(E)aUDEO FROM OUALIFIED OPEN SPACE AREA) (U.89 ACRESI PERCENT PROROSEO QIJAUREO OPEN SPACE: 17.10% 169E REQIJIREMNT: 5.25 ACRES [�IJE 1R94tla19 GRAYCLIFF ESTATES SUBDIVISION ENGINEERING ]h+'_mA-FILE TN0. 1om-ppIAh LOCATED IN THE SE 114OF SECTION 25.T.3N„RAE,B.M.MEFUDIAN,ADA OOUNTY,IIJAh10 �� ��� �'� gY loam fGH iMit ALIMSFFM SUITE 109 91EETN" 1011 M6RIhLYA LWtO&3N1Y :"" r�iwi PROPOSED QUALIFIED OPEN SPACE ,may FAtMR a„ Page 17 E. Conceptual Building Elevations I ` Page 18 l I'iilllllllllllllilllulllllllliiillf������f�fiilffl�f��l�gll l I , II ' �� IIIIIIIIIIIIIIIIVI llllllllllllllllflllllllllllllflllllkl��l; ___ ,,IIIIIIIIllllllllll111111111111111111111111111111111111111111 �� ���-, ��:'� f �.illllllllllllVI11111lIIIIIII UIIIIIIIPIIIIIIIIIIVIIIIIIIIIIIIII I I I IIIIIIIIIIIIIIIIIIIIIIIAR�fIlIIIIIIIIAIfII111111RIIIRl11� linI�„uuullf�P�l�f�f��,�l��uou�l4l�lu��„uf��llll IX. CITY/AGENCY COMMENTS & CONDITIONS A. PLANNING DIVISION 1. The existing Development Agreement(Inst. (Inst. #2015-112095, amended Inst. #2018-086664) shall be revised consistent with the modifications noted in Section VIII.A and the updated preliminary plat and phasing plan, landscape plan and conceptual building elevations in Section VIII. 2. The preliminary plat included in Section VIII.A.2, dated 1/31/20, shall be revised as follows: a. Include the Block number(i.e. 9) for Lots 1 and 2C on the north side of W. Harris St. b. The multi-family residential portion of the site(Lots 28-29,Block 3) shall be depicted on the phasing plan as the fourth phase of development. c. A minimum 20-foot wide common lot is required for the street buffer along W. Harris St. on Lot 29,Block 3. d. The boundary of Phase 1 shall include the 20-foot wide street buffer along W. Harris St. on Lot 29,Block 3. e. A 15-foot wide common lot for a pedestrian pathway shall be provided through the middle of Blocks 2 and 3 in general alignment with S.Redwater Ave. A revised plan showing these changes shall be submitted prior to the City Council hearing. 3. The landscape plan included in Section VIII.A.3, dated 9/6/19, shall be revised as follows: a. Revise the lot and block numbers consistent with that shown on the preliminary plat as follows: Block 9 should be 8; Block 8 should be 3;Lot 20,Block 8 should be Lot 27C, Block 3; and Block 10 should be 9. b. A driveway shall be provided at the east boundary of the multi-family portion of the development in alignment with that proposed in the adjacent development to the east(i.e. Stapleton Subdivision)for emergency access only. c. The street buffer on the R-40 zoned multi-family portion of the development is required to be placed in a common lot as set forth in UDC 11-313-7C.2a and landscaped in accord with the standards listed in UDC 11-3B-7C. d. The total lineal feet of parkways shall be included in the Landscape Calculations table for the residential subdivision trees demonstrating compliance with the standards listed in UDC 11-3A-17E and UDC 11-313-7C. e. Fencing abutting pathways and common open lots not entirely visible from a public street is restricted as set forth in UDC 11-3A-7A.7. Where open vision lattice top fencing is proposed and open vision fencing is required,it must not restrict or impede vision or sight through the fence by more than 20%per UDC 11-1A-1 "fence,open vision"; fencing detail(s) shall reflect compliance with this standard. f. The color landscape plan rendering incorrectly calls out 6-foot tall solid vinyl fencing at the rear of building lots adjacent to the pipeline easement on Lot 27C,Block 3 although the fencing symbol in the Plant Palette correctly depicts 6' open vision lattice top vinyl fence.Note: Open vision fencing where required should not restrict or impede vision or sight through thefence by more than 20%per UDC I1-IA-1. Page 19 g. A 15-foot wide common lot containing a minimum 5-foot wide pedestrian pathway with 5-foot wide landscape strips on each side shall be provided through the middle of Blocks 2 and 3 in general alignment with S. Redwater Ave.; landscaping shall be depicted in accord with the standards listed in UDC 11-3B-12C. 4. Future development shall be consistent with the minimum dimensional standards listed in UDC Table 11-2A-6 for the R-8 zoning district and UDC Table 11-2A-8 for the R-40 zoning district as applicable. 5. Off-street parking is required to be provided in accord with the standards listed in UDC Table 11-3C-6 for single-family detached dwellings based on the number of bedrooms per unit. Parking for the multi family development will be reviewed with the subsequent conditional use permit. 6. An exhibit shall be submitted with the final plat application that depicts the setbacks,fencing, building envelope, and orientation of the lots and structures accessed via the common driveway; if a property abuts a common driveway but has the required minimum street frontage and is taking access via the public street,the driveway shall be depicted on the opposite side of the shared property line from the common driveway as set forth in UDC 11- 6C-3D. 7. A detail of the children's play structure shall be submitted with the final plat application. 8. The rear and/or side elevations of homes abutting the collector streets(W. Harris St. and S. Oakbriar Way) on Lots 2-15,Block 1 and Lots 2-13,Block 5 shall incorporate articulation through changes in two or more of the following: modulation(e.g.projections,recesses, step- backs,pop-outs),bays,banding,porches,balconies,material types, or other integrated architectural elements to break up monotonous wall planes and roof lines that are visible from the subject public street. Single-story structures are exempt from this requirement. 9. All development within the Williams Northwest Pipeline easement must adhere to the most current standards in the Williams Gas Pipeline Developers' Handbook. 10. The well lot(Lot 1,Block 9) shall be created and deeded to the city at the time of final platting. 11. A cross-access easement shall be granted to the property east of the proposed multi-family development(i.e. Stapleton Subdivision)for emergency access; a recorded copy of the easement shall be submitted to the City prior to signature on the final plat that contains Lot 28,Block 3. 12. A 14-foot wide recreational pathway easement is required to be provided for the multi-use pathway within Lot 27C,Block 3 and Lot 2C,Block 9. The applicant shall coordinate with Kim Warren,Park's Department(208-888-3579), on the location of the easement. The easement shall be submitted to the Planning Division for approval by the City Council and subsequent recordation,prior to signature on the final plat by the City Engineer. 13. Alternative compliance was previously approved with H-2018-0054 to the standards listed in UDC 11-3B-12C for the landscaping(trees)required adjacent to the multi-use pathway; and to the standards listed in UDC 11-3G-3E.2 for the common open space landscaping(1 deciduous tree per 8,000 square feet of common area)required within the Williams Pipeline easement on Lot 2C,Block 9 and Lot 27C,Block 3. A total of 35 additional trees shall be provided within the development(or within another City park as determined appropriate by the Planning Division and Park's Department)based on the calculations provided. Page 20 14. A Certificate of Zoning Compliance and Design Review application is required to be submitted and approved by the Planning Division for the swimming pool facility prior to submittal of a building permit application for such. B. PUBLIC WORKS 1. Site Specific Conditions of Approval 1.1 There are concerns that the development only has one connection to the city water system. This concern will eventually be eliminated by the development to the east and south connecting to Meridian and Amity, creating a dual connection. The water mainlines in West Harris Street, South Graycliff Way, South Colditz Way and West Wilton Woods Street must be 12" in order to eliminate the proposed main line in South Oakbriar Way. Applicant shall also provide a water mainline easement to the parcel to the northeast across Williams Pipeline to the future multi-family lots. 1.2 Distance between manholes cannot exceed 400'. Distance between manholes on S. Graycliff Way exceeds this requirement. 1.3 Temporary sewer dead ends require either a cleanout or a manhole.Add one of these to the south end of South Bear Claw Ave and east end of W.Lyra St. 2. General Conditions of Approval 2.1 Applicant shall coordinate water and sewer main size and routing with the Public Works Department, and execute standard forms of easements for any mains that are required to provide service outside of a public right-of-way. Minimum cover over sewer mains is three feet, if cover from top of pipe to sub-grade is less than three feet than alternate materials shall be used in conformance of City of Meridian Public Works Departments Standard Specifications. 2.2 Per Meridian City Code(MCC),the applicant shall be responsible to install sewer and water mains to and through this development. Applicant may be eligible for a reimbursement agreement for infrastructure enhancement per MCC 8-6-5. 2.3 The applicant shall provide easement(s) for all public water/sewer mains outside of public right of way(include all water services and hydrants). The easement widths shall be 20-feet wide for a single utility, or 30-feet wide for two. The easements shall not be dedicated via the plat,but rather dedicated outside the plat process using the City of Meridian's standard forms. The easement shall be graphically depicted on the plat for reference purposes. Submit an executed easement(on the form available from Public Works), a legal description prepared by an Idaho Licensed Professional Land Surveyor,which must include the area of the easement(marked EXHIBIT A)and an 81/2"x 11"map with bearings and distances (marked EXHIBIT B) for review. Both exhibits must be sealed, signed and dated by a Professional Land Surveyor. DO NOT RECORD. Add a note to the plat referencing this document. All easements must be submitted,reviewed, and approved prior to development plan approval. 2.4 The City of Meridian requires that pressurized irrigation systems be supplied by a year- round source of water(MCC 12-13-8.3). The applicant should be required to use any existing surface or well water for the primary source. If a surface or well source is not available,a single-point connection to the culinary water system shall be required. If a single-point connection is utilized,the developer will be responsible for the payment of assessments for the common areas prior to prior to receiving development plan approval. Page 21 2.5 All existing structures that are required to be removed shall be prior to signature on the final plat by the City Engineer. Any structures that are allowed to remain shall be subject to evaluation and possible reassignment of street addressing to be in compliance with MCC. 2.6 All irrigation ditches, canals, laterals,or drains, exclusive of natural waterways,intersecting, crossing or laying adjacent and contiguous to the area being subdivided shall be addressed per UDC 11-3A-6. In performing such work,the applicant shall comply with Idaho Code 42-1207 and any other applicable law or regulation. 2.7 Any existing domestic well system within this project shall be removed from domestic service per City Ordinance Section 9-1-4 and 9 4 8 contact the City of Meridian Engineering Department at(208)898-5500 for inspections of disconnection of services. Wells may be used for non-domestic purposes such as landscape irrigation if approved by Idaho Department of Water Resources Contact Robert B.Whitney at(208)334-2190. 2.8 Any existing septic systems within this project shall be removed from service per City Ordinance Section 9-1-4 and 9 4 8. Contact Central District Health for abandonment procedures and inspections(208)375-5211. 2.9 Street signs are to be in place, sanitary sewer and water system shall be approved and activated,road base approved by the Ada County Highway District and the Final Plat for this subdivision shall be recorded,prior to applying for building permits. 2.10 A letter of credit or cash surety in the amount of 110%will be required for all uncompleted fencing,landscaping, amenities, etc.,prior to signature on the final plat. 2.11 All improvements related to public life, safety and health shall be completed prior to occupancy of the structures. Where approved by the City Engineer, an owner may post a performance surety for such improvements in order to obtain City Engineer signature on the final plat as set forth in UDC 11-5C-3B. 2.12 Applicant shall be required to pay Public Works development plan review, and construction inspection fees, as determined during the plan review process,prior to the issuance of a plan approval letter. 2.13 It shall be the responsibility of the applicant to ensure that all development features comply with the Americans with Disabilities Act and the Fair Housing Act. 2.14 Applicant shall be responsible for application and compliance with any Section 404 Permitting that may be required by the Army Corps of Engineers. 2.15 Developer shall coordinate mailbox locations with the Meridian Post Office. 2.16 All grading of the site shall be performed in conformance with MCC 11-12-3H. 2.17 Compaction test results shall be submitted to the Meridian Building Department for all building pads receiving engineered backfill,where footing would sit atop fill material. 2.18 The design engineer shall be required to certify that the street centerline elevations are set a minimum of 3-feet above the highest established peak groundwater elevation. This is to ensure that the bottom elevation of the crawl spaces of homes is at least 1-foot above. 2.19 The applicants design engineer shall be responsible for inspection of all irrigation and/or drainage facility within this project that do not fall under the jurisdiction of an irrigation district or ACHD. The design engineer shall provide certification that the facilities have been installed in accordance with the approved design plans. This certification will be required before a certificate of occupancy is issued for any structures within the project. Page 22 2.20 At the completion of the project,the applicant shall be responsible to submit record drawings per the City of Meridian AutoCAD standards. These record drawings must be received and approved prior to the issuance of a certification of occupancy for any structures within the project. 2.21 A street light plan will need to be included in the civil construction plans. Street light plan requirements are listed in section 6-5 of the Improvement Standards for Street Lighting.A copy of the standards can be found at http://www.meridiancity.org/public_works.aspx?id=272. 2.22 The City of Meridian requires that the owner post to the City a performance surety in the amount of 125%of the total construction cost for all incomplete sewer,water and reuse infrastructure prior to final plat signature. This surety will be verified by a line item cost estimate provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond. Applicant must file an application for surety,which can be found on the Community Development Department website. Please contact Land Development Service for more information at 887-2211. 2.23 The City of Meridian requires that the owner post to the City a warranty surety in the amount of 20%of the total construction cost for all completed sewer,water and reuse infrastructure for duration of two years. This surety will be verified by a line item cost estimate provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond. Applicant must file an application for surety,which can be found on the Community Development Department website. Please contact Land Development Service for more information at 887-2211. C. FIRE DEPARTMENT https:llweblink.meridiancity.orglWebLinkIDocView.aspx?id=179993&dbid=0&repo=MeridianC hty D. POLICE DEPARTMENT No comments were received. E. PARK'S DEPARTMENT No comments were received. F. COMMUNITY PLANNING ASSOCIATION OF SOUTHWEST IDAHO(COMPASS) https:llweblink.meridiancioy.orglWebLinkIDocView.aspx?id=180781&dbid=0&repo=MeridianC hty G. BOISE PROJECT BOARD OF CONTROL https:llweblink.meridiancioy.orglWebLinkIDocView.aspx?id=180700&dbid=0&repo=MeridianC i &cr--1 H. CENTRAL DISTRICT HEALTH DEPARTMENT https:llweblink.meridiancioy.ory WWebLinkIDocView.aspx?id=180512&dbid=0&repo=MeridianC Lty Page 23 I. DEPARTMENT OF ENVIRONMENTAL QUALITY(DEQ) https://weblink.meridianciV.ory/WebLink/DocView.aspx?id=180403&dbid=0&repo=MeridianC J. ADA COUNTY HIGHWAY DISTRICT(ACHD) Comments have not yet been received. X. FINDINGS A. Preliminary Plat Findings: In consideration of a preliminary plat,combined preliminary and final plat, or short plat, the decision-making body shall make the following findings: 1. The plat is in conformance with the Comprehensive Plan; Staff finds that the proposed plat with Staff s recommendations is in substantial compliance with the adopted Comprehensive Plan in regard to land use, density, transportation, and pedestrian connectivity. Please see Comprehensive Plan Policies in, Section V of this report for more information. 2. Public services are available or can be made available and are adequate to accommodate the proposed development; Staff finds that public services will be provided to the subject property upon development.(See Exhibit B of the Staff Report for more details from public service providers.) 3. The plat is in conformance with scheduled public improvements in accord with the City's capital improvement program; Because City water and sewer and any other utilities will be provided by the development at their own cost, Staff finds that the subdivision will not require the expenditure of capital improvement funds. 4. There is public financial capability of supporting services for the proposed development; Staff finds there is public financial capability of supporting services for the proposed development based upon comments from the public service providers(i.e.,Police,Fire,ACHD, etc.). (See Section Mfor more information) 5. The development will not be detrimental to the public health, safety or general welfare; and, Staff is not aware of any health, safety,or environmental problems associated with the platting of this property. ACHD considers road safety issues in their analysis. 6. The development preserves significant natural, scenic or historic features. Staff is unaware of any significant natural, scenic or historic features that exist on this site that require preserving. Page 24