Loading...
PZ - Site PlansVICINITY MAPNNOT TO SCALELOCAL MAPSITENNOT TO SCALEAPPLICANT:Know what'sbelow.CALLbefore you dig.CALL AT LEAST TWO WORKINGDAYS BEFORE YOU DIGUSANorthDIG ALERTHANDICAP REQUIREMENTS:FACILITY IS UNMANNED AND NOT FOR HUMANHABITATION, HANDICAP ACCESSREQUIREMENT(S) DO NOT APPLYSITE PARCEL NUMBER:R5430250200JURISDICTION:CITY OF MERIDIANSITE ADDRESS:LOT 2, BLK 01, SECTION 3N1E8, MADDEN SUBZONING:LEGAL DESCRIPTION:COUNTY:ADA COUNTYI-L (LIGHT INDUSTRIAL)EXISTING USE:NEW USE:UNMANNED TELECOMMUNICATIONS FACILITY1668 EAST FRANKLIN ROADMERIDIAN, ID 83642SITE ACQUISITION:T-1TITLESHEETDRIVING DIRECTIONS1.DEPART SE INTERNATIONAL WAY TOWARD SE MALLARD WAY2.TURN LEFT ONTO SE HARMONY RD3.TURN RIGHT TO STAY ON SE HARMONY RD4.BEAR RIGHT ONTO SE SUNNYSIDE RD5.TAKE RAMP LEFT FOR I-205 N / VETERANS MEMORIAL HWY6.AT EXIT 22, TAKE RAMP RIGHT FOR I-84 EAST / US-30 EAST TOWARD THEDALLES7.ENTERING IDAHO8.AT EXIT 44, TAKE RAMP RIGHT FOR ID-69 SOUTH TOWARD KUNA9.TURN LEFT ONTO S MERIDIAN RD10.KEEP RIGHT TO STAY ON S MERIDIAN RD11.KEEP STRAIGHT ONTO S MAIN ST12.TURN RIGHT ONTO E FRANKLIN RDCONTRACTOR SHALL VERIFY ALL PLANS & EXISTINGLOCATIONS, CONDITIONS ON THE JOB SITE & SHALLIMMEDIATELY NOTIFY THE ENGINEER IN WRITING OF ANYDISCREPANCIES BEFORE PROCEEDING WITH THE WORK ORBE RESPONSIBLE FOR SAMEAPPROVALSAPPROVALSIGNATUREDATEREPRESENTATIVERF ENGINEERSITE ACQUISITIONCONSTRUCTION MANAGERSITE OWNERSTARTING FROM 4700 SE INTERNATIONAL WAY, MILWAUKIE, OR 97222:SITERAW LANDMERIDIAN1668 EAST FRANKLIN ROADMERIDIAN, ID 83642REVDESCRIPTIONDATEBYREVDESCRIPTIONDATEBYIT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEYARE ACTING UNDER THE DIRECTION OF A LICENSEDPROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT.NO T FO R CO N S T R U C T IO N 4700 SE INTERNATIONAL WAYMILWAUKIE, OR 97222PNW MARKET OFFICE7117 SW BEVELAND ROADSUITE 101PORTLAND, OR 97223CMB10/23/2019ISSUED FOR 90% ZD REVIEWGCMB01/09/2020ISSUED FOR 100% ZDHCMB01/24/2020ISSUED FOR 100% ZDIMERIDIANA06/13/2019ISSUED FOR 90% ZD REVIEWCMBB 06/17/2019ISSUED FOR 90% ZD REVIEWCMBC08/23/2019ISSUED FOR 90% ZD REVIEWRKSD 09/27/2019ISSUED FOR 90% ZD REVIEW CMB E09/30/2019 ISSUED FOR 90% ZD REVIEWCMBF10/01/2019ISSUED FOR 90% ZD REVIEWCMB CODE COMPLIANCEENGINEER:IDAHO STATE CODE COMPLIANCE:ALL WORK AND MATERIALS SHALL BE PERFORMED AND INSTALLED IN ACCORDANCE WITHTHE CURRENT EDITIONS OF THE FOLLOWING CODES AS ADOPTED BY THE LOCALGOVERNING AUTHORITIES. NOTHING IN THESE PLANS IS TO BE CONSTRUCTED TO PERMITWORK NOT CONFORMING TO THESE CODES. THE IDAHO STATE BUILDING CODE ISCOMPRISED OF THE MODEL CODE EDITIONS BELOW WITH IDAHO STATE AMENDMENTS:-2015 INTERNATIONAL BUILDING CODE-2012 INTERNATIONAL RESIDENTIAL CODE: PARTS I, II, III, IV, AND IX-2015 INTERNATION ENERGY CONSERVATION CODE-IDAPA 07.03.01-RULES OF BUILDING SAFETY-2017 NATIONAL ELECTRICAL CODE-IDAPA 07.01.06, ELECTRICAL ADMINISTRATIVE RULES 07.01.01-07.01.11-2012 INTERNATIONAL MECHANICAL CODE: IDAPA RULE 07.07.01.004-2012 INTERNATIONAL FUEL GAS CODE: IDAPA RULE 07.07.01.005-2015 INTERNATIONAL FIRE CODE-IDAHO STATE PLUMBING CODE BASED ON 2015 UNIFORM PLUMBING CODE-IDAPA 07.02.02-07.02.07-LOCAL CODES AND AMENDMENTSFCC NOTE:THIS WIRELESS COMMUNICATION FACILITY COMPLIES WITH FEDERAL STANDARDS FORRADIO FREQUENCY IN ACCORDANCE WITH THE TELECOMMUNICATION ACT OF 1996 ANDSUBSEQUENT AMENDMENTS AND ANY OTHER REQUIREMENTS IMPOSED BY STATE ORFEDERAL REGULATORY AGENCIES.CONTACT INFORMATIONSITE INFORMATIONPROPERTY & TOWER OWNER:DAY MANAGEMENT CORPORATIONDAY WIRELESS SYSTEMPS4700 SE INTERNATIONAL WAYMILWAUKIE, OR 97222PHONE: (503) 659-1240PROJECT DESCRIPTIONxINSTALL (1) NEW DAY WIRELESS 125 FT SELF SUPPORT TOWERxINSTALL (2) NEW CONCRETE EQUIPMENT PADSxINSTALL (1) NEW SHELTERxINSTALL (9) NEW BOLLARDSxINSTALL (3) NEW ANTENNASxINSTALL (3) NEW ANTENNA MOUNTSxINSTALL (1) NEW ICE BRIDGESHEETDESCRIPTIONSHEET INDEXT-1TITLE SHEETA-1A-2A-3SITE PLANENLARGED SITE PLANELEVATIONTECHNOLOGY ASSOCIATES EC, INC7117 SW BEVELAND ST. SUITE 101TIGARD, OR 97223OFFICE:(971) 245-3120 Ext: 1401EMAIL:tia.loverro@taec.netCONTACT: TIA LOVERROTECHNOLOGY ASSOCIATES EC, INCOFFICE:(801) 463-1020 x 2107EMAIL:joel.hartman@taec.netCONTACT: JOEL R. HARTMAN, PE7896 SOUTH HIGHLAND DRIVE, STE. 200COTTONWOOD HEIGHTS, UT 84121DO NOT SCALE DRAWINGSDAY MANAGEMENT CORPORATIONDAY WIRELESS SYSTEMPS4700 SE INTERNATIONAL WAYMILWAUKIE, OR 97222PHONE: (503) 659-1240G-1GROUNDING PLAN REVDESCRIPTIONDATEBYREVDESCRIPTIONDATEBYIT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEYARE ACTING UNDER THE DIRECTION OF A LICENSEDPROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT.NO T FO R CO N S T R U C T IO N 4700 SE INTERNATIONAL WAYMILWAUKIE, OR 97222PNW MARKET OFFICE7117 SW BEVELAND ROADSUITE 101PORTLAND, OR 97223CMB10/23/2019ISSUED FOR 90% ZD REVIEWGCMB01/09/2020ISSUED FOR 100% ZDHCMB01/24/2020ISSUED FOR 100% ZDIMERIDIANA06/13/2019ISSUED FOR 90% ZD REVIEWCMBB 06/17/2019ISSUED FOR 90% ZD REVIEWCMBC08/23/2019ISSUED FOR 90% ZD REVIEWRKSD 09/27/2019ISSUED FOR 90% ZD REVIEW CMB E09/30/2019 ISSUED FOR 90% ZD REVIEWCMBF10/01/2019ISSUED FOR 90% ZD REVIEWCMB A-1SITE PLANSITE PLAN1NPROPOSED DAY WIRELESS TOWERAND EQUIPMENT AREA, FORENLARGED PLAN SEE:1A-2PROPERTY LINE (TYP.)NEWBUILDING(PERMITTEDSEPARATELY)NEW TRASHENCLOSURE(PERMITTEDSEPARATELY)PROPOSED ACCESSTO SITEFUTUREDEVELOPMENTNEWPARKINGLOT (TYP.)(PERMITTEDSEPARATELY)E FRANKLIN ROADN LOCUST GROVE ROAD PROPOSED ACCESSTO SITEDISCLAIMERTHESE DRAWINGS WERE PRODUCED WITHOUT THE BENEFIT OFA CURRENT LAND SURVEY AND A RECENT SITE WALK. ALLPROPERTY LINES, EASEMENTS, AND SETBACKS SHALL BEVERIFIED PRIOR TO START OF CONSTRUCTION. TAEC DOES NOTGUARANTEE THE ACCURACY OF SAID PROPERTY LINES,EASEMENTS, ROADS AND SETBACKS. PROPOSEDFUTUREBUILDINGPROPOSEDIRRIGATIONEASEMENTREVDESCRIPTIONDATEBYREVDESCRIPTIONDATEBYIT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEYARE ACTING UNDER THE DIRECTION OF A LICENSEDPROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT.NO T FO R CO N S T R U C T IO N 4700 SE INTERNATIONAL WAYMILWAUKIE, OR 97222PNW MARKET OFFICE7117 SW BEVELAND ROADSUITE 101PORTLAND, OR 97223CMB10/23/2019ISSUED FOR 90% ZD REVIEWGCMB01/09/2020ISSUED FOR 100% ZDHCMB01/24/2020ISSUED FOR 100% ZDIMERIDIANA06/13/2019ISSUED FOR 90% ZD REVIEWCMBB 06/17/2019ISSUED FOR 90% ZD REVIEWCMBC08/23/2019ISSUED FOR 90% ZD REVIEWRKSD 09/27/2019ISSUED FOR 90% ZD REVIEW CMB E09/30/2019 ISSUED FOR 90% ZD REVIEWCMBF10/01/2019ISSUED FOR 90% ZD REVIEWCMB ENLARGED SITE PLANN1A-2ENLARGED SITEPLANPROPOSED DAY WIRELESSTOWER FOUNDATION PERSTRUCTURAL (TYP.)(BELOW GRADE)PROPERTY LINE (TYP.)24'-6" PROPOSED TOWER FOUNDATION 10'-0"10'-0"1'-0"16'-0"4'-0"2A-3NEWPARKINGSPACE(TYP.)(PERMITTEDSEPARATELY)NEW CURB (TYP.)(PERMITTED SEPARATELY)PROPOSEDDAY WIRELESSPRE-FABRICATEDEQUIPMENTBUILDINGON PROPOSEDCONCRETE PADNEW CHAIN LINK FENCEW/ VINYL SLATS (TYP.)(PERMITTED SEPARATELY)PROPOSED BOLLARDS(TYP.)4'-0"9'-0"3'-0"24'-6"PROPOSED TOWER FOUNDATIONPROPOSED DAY WIRELESSCONCRETE PAD FORPROPOSED GENERATOR3'-6"9'-0"5'-0"8'-0"7'-0"5'-0"17'-6"5'-0"5'-0"1'-0"EQ.EQ.1'-0"1'-0"4'-0"29'-0"35'-0"NBƒNAƒNAƒPROPOSED DAYWIRELESS ANTENNAAND MOUNT (2 TOTAL)PROPOSED DAY WIRELESSYAGI ANTENNA AND MOUNT(1 TOTAL)PROPOSEDGRAVELPROPOSEDASPHALTR 2 ' - 0 "PROPOSED SELFSUPPORT TOWERPROPOSED DAYWIRELESS ICE BRIDGE REVDESCRIPTIONDATEBYREVDESCRIPTIONDATEBYIT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEYARE ACTING UNDER THE DIRECTION OF A LICENSEDPROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT.NO T FO R CO N S T R U C T IO N 4700 SE INTERNATIONAL WAYMILWAUKIE, OR 97222PNW MARKET OFFICE7117 SW BEVELAND ROADSUITE 101PORTLAND, OR 97223CMB10/23/2019ISSUED FOR 90% ZD REVIEWGCMB01/09/2020ISSUED FOR 100% ZDHCMB01/24/2020ISSUED FOR 100% ZDIMERIDIANA06/13/2019ISSUED FOR 90% ZD REVIEWCMBB 06/17/2019ISSUED FOR 90% ZD REVIEWCMBC08/23/2019ISSUED FOR 90% ZD REVIEWRKSD 09/27/2019ISSUED FOR 90% ZD REVIEW CMB E09/30/2019 ISSUED FOR 90% ZD REVIEWCMBF10/01/2019ISSUED FOR 90% ZD REVIEWCMB A-3ELEVATIONS2NOT USEDPROPOSED EAST ELEVATIONTOP OF PROPOSED SELF-SUPPORT TOWERELEV. 125.0' AGLDISCLAIMER:1. CAPACITY OF THE TOWER TOSUPPORT PROPOSED LOADS IS TOBE DETERMINED BY OTHERS.2. DAY WIRELESS TO CALL OUTPROPOSED TOWER MOUNTEDANTENNAS, EQUIPMENT ANDHEIGHTS.FINISH GRADEELEV. 0'-0" REFPROPOSED DAY WIRELESS 125 FT.SELF-SUPPORT TOWER (DESIGN BYOTHERS) TO ACCOMMODATEFUTURE CARRIER STRUCTURALLYAND ELECTRICALLY. SEE TOWERDRAWINGS FOR ADDITIONALINFORMATION.NEW FENCE (TYP.)(PERMITTED SEPARATELY)PROPOSED FUTURE BUILDING1PROPOSED ANTENNAAND MOUNT (2 TOTAL)PROPOSED YAGIANTENNA AND MOUNT(1 TOTAL)FUTURE ANTENNAS BYOTHERSCENTERLINE OF MOUNTELEV. 116.0' AGLTOP HEIGHT OF ANTENNAELEV. 30.0' AGLPROPOSED DAY WIRELESSCONCRETE PAD FORPROPOSED PRE-FABRICATEDEQUIPMENT BUILDINGPROPOSED DAYWIRELESS ICE BRIDGE REVDESCRIPTIONDATEBYREVDESCRIPTIONDATEBYIT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEYARE ACTING UNDER THE DIRECTION OF A LICENSEDPROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT.NO T FO R CO N S T R U C T IO N 4700 SE INTERNATIONAL WAYMILWAUKIE, OR 97222PNW MARKET OFFICE7117 SW BEVELAND ROADSUITE 101PORTLAND, OR 97223CMB10/23/2019ISSUED FOR 90% ZD REVIEWGCMB01/09/2020ISSUED FOR 100% ZDHCMB01/24/2020ISSUED FOR 100% ZDIMERIDIANA06/13/2019ISSUED FOR 90% ZD REVIEWCMBB 06/17/2019ISSUED FOR 90% ZD REVIEWCMBC08/23/2019ISSUED FOR 90% ZD REVIEWRKSD 09/27/2019ISSUED FOR 90% ZD REVIEW CMB E09/30/2019 ISSUED FOR 90% ZD REVIEWCMBF10/01/2019ISSUED FOR 90% ZD REVIEWCMB G-1GROUNDINGPLANSNOTES & LEGENDNOTE:1. CONTRACTOR TO REPLACE ALL MISSING GROUND BARSAND GROUNDING CONNECTIONS AS REQUIRED.EXOTHERMIC CONNECTIONMECHANICAL CONNECTIONEQUIPMENT GROUND BARANTENNA GROUND BAR (AS REQUIRED)#2 AWG GROUND LEAD (AS REQUIRED)LEGENDELECTRICAL GROUNDING SPECIFICATIONS1.GROUNDING SHALL COMPLY WITH ARTICLE 250 OFTHE NATIONAL ELECTRICAL CODE CURRENTLY INEFFECT FOR THE AUTHORITY HAVINGJURISDICTION.2.ALL GROUNDING DEVICES SHALL BE U.L. LISTEDFOR THEIR INTENDED USE.3.GROUND WIRES SHALL BE TINNED #2 AWG BARESOLID COPPER UNLESS OTHERWISE NOTED.4.CONNECTIONS OF ALL GROUND WIRES TO THEGROUND RING SHALL BE EXOTHERMIC(CAD-WELDED), UNLESS OTHERWISE NOTED. ANDSHALL BE INSTALLED IN ACCORDANCE WITHMANUFACTURER'S RECOMMENDATIONS ANDT-MOBILE WIRELESS BROADBAND STANDARDS.5.GROUNDING CONDUCTORS SHALL BE ROUTEDALONG THE SHORTEST AND STRAIGHTEST PATHPOSSIBLE. WHEN REQUIRED, GROUND LEADSSHALL BE BENT TO A MINIMUM OF 8" RADIUS.6.WHERE GROUND WIRES ARE ROUTED FROM ANYCONNECTION ABOVE GRADE TO THE GROUND RING.INSTALL WIRE IN 3/4" HEAVY WALL LIQUID TIGHTFLEXIBLE CONDUIT FROM CONNECTION POINT TO 5"BELOW GRADE AND SEAL THE TOP WITH SILICONESEALANT.7.ALL GROUND BARS SHALL BE TINNED, 1/4" COPPER,SECTOR BARS 2", COLLECTOR AND MGB BARS 4",OF SUFFICIENT LENGTH TO ACCOMMODATE ALLREQUIRED CONNECTIONS WITHOUT DOUBLINGLUGS, AND EACH INSTALLED WITH ISOLATORS.WHEN CONNECTING GROUND BARS (WITHIN 10FEET OF GRADE) DIRECTLY TO THE GROUND RING,2 EA. #2 SOLID DOWNLEADS SHALL BE CAD-WELDEDTO THE GROUND BAR, 1 AT EACH OPPOSITEBOTTOM CORNER, AND EACH SHALL RUN IN 3/4"HEAVY WALL LIQUID TIGHT FLEXIBLE CONDUITFROM GROUND BAR DOWN TO THE GROUND RING.WHEN CONNECTING SECTOR GROUND BARS,DAISY-CHAIN THE GROUND BARS AND RUN 1 EA. #2AWG STRANDED COPPER WIRE WITH THWNINSULATION FROM THE MIDDLE GROUND BAR TOTHE GROUND RING AND CAD-WELD TO THE RING.8.WHEN ATTACHING STRANDED GROUND LEADS TOTHE GROUND BARS, 2 HOLE COMPRESSION LUGSSHALL BE USED, PROTECT WITH WEATHERPROOFHEAT SHRINK, AND WITH A THIN COAT OF "KOP'RSHIELD" OR EQUIVALENT PROPERLY APPLIED ANDATTACHED ONLY WITH STAINLESS STEELHARDWARE.9.WHEN GROUNDING EQUIPMENT ENCLOSURES,PANELS, FRAMES, AND OTHER METAL APPARATUS,A #6 AWG STRANDED COPPER WIRE WITH THWNINSULATION SHALL BE ATTACHED UTILIZING A 2HOLE COMPRESSION TYPE LUG, PROTECTED WITHWEATHERPROOF HEAT A CLEAN AND CORROSIONFREE METALLIC SURFACE UTILIZING STAINLESSSTEEL SELF-TAPPING SCREWS AS NOTED IN NOTE10 BELOW.10.PREPARE ALL BONDING SURFACES FOR GROUNDCONNECTIONS BY REMOVING ANY AND ALL PAINTAND CORROSION TO SHINY METAL. FOLLOWINGCAD-WELDED CONNECTIONS TO NON-COPPERSURFACES, APPLY ONE COAT OF ANYANTI-OXIDIZING PAINT, "COLD GALV" OREQUIVALENT.11.GROUND RODS SHALL BE COPPER-CLAD STEEL5/8"x10', SPACED NO LESS THAN 10' ON CENTER.12.ALL GROUND SYSTEM CONDUCTORS ANDCONDUITS SHALL BE SECURED UTILIZING ONLYNONMETALLIC, NON-CONDUCTIVE, UV RATEDCLAMPS, BRACKET, AND OR SUPPORTS.13.WHEN REQUIRED, THE CONTRACTOR SHALLENGAGE THE SERVICES OF AN INDEPENDENTTESTING FIRM TO VERIFY, UTILIZING A MEGGERTEST, THAT THE RESISTANCE TO EARTH OF THENEW GROUND SYSTEM IS EQUAL TO OR LESS THAN5 (OHMS). A COPY OF THE COMPLETE TESTINGREPORT SHALL BE PROVIDED TO THE T-MOBILEREPRESENTATIVE.14.ALL MATERIALS AND HARDWARE SHALL BRINSTALLED IN A WORKMAN-LIKE MANNER INACCORDANCE WITH MANUFACTURER'SRECOMMENDATIONS, AND DEFINED IN NFPA-70 ANDAPPROVED BY A,H,J,12NGROUNDING PLANNEW #2 AGW SOLID TINNEDCOPPER CONDUCTOR FROMTOWER LEGS TO GROUND RINGNEW #2 GREEN STRANDEDCOPPER WIRE HALO GROUNDNEW GROUND ROD (TYP)NEW #2 AGW SOLID TINNEDCOPPER CONDUCTOR FROMFENCE POST TO GROUND RINGNEW GROUND TEST WELL (TYP)NEW TOWER GROUND BARNEW #2 GREEN STRANDED COPPER WIREHALO GROUND FOR FUTURE SHELTER