PZ - Traffic AnalysisENGINEERING, INC. 181 East 50th Street Garden City, ID 83714 (208) 841-4996 MEMORANDUM DATE: February 25, 2019 TO: Laren M. Bailey, MCRP, PMP DevCO, LLC FROM: Chhang Ream, P.E., PTOE CR Engineering, Inc. PROJECT: Delano Subdivision Meridian, Idaho SUBJECT: Trip Generation Update INTRODUCTION Thompson Engineers, Inc. completed an abbreviated traffic analysis for the project containing 87 single- family lots and 36 multi -family dwelling units, and summarized the findings in a letter report dated April 26, 2018. The site plan is revised to contain 85 single-family lots and 78 multi -family dwelling units. As requested, we updated the traffic analysis with the currently site plan and available traffic data to determine the anticipated traffic impacts on the adjacent streets. This memo summarizes the findings. This traffic analysis is not intended to be a traffic impact study and was not prepared to meet ACHD's requirements for a traffic impact study. ACHD or other agencies may require an additional study for the project upon review of this traffic analysis. PROPOSED DEVELOPMENT Figure 1 shows the site location and vicinity. Delano Subdivision is a proposed residential development located on Jasmine Lane west of Eagle Road in Meridian, Idaho. The development is estimated to contain 87 single-family lots and 78 multi -family dwelling units. Figure 2 shows the preliminary site plan. Delano Subdivision is planning to connect to Dashwood Place and Centrepoint Way for site access. Upon build -out of the development, Jasmine Lane will be disconnected at Centre Point Way and no longer connect to Eagle Road. S.Iprojectsl18-29 DelanoldocslDelano Trip Generation 02252019.docv Page 1 of 6 Figure 1 — Site Location and Vicinity fi r t 7' p1b.i 3 r, 1! pa.sc.t?oI �' z . ��o5ttrnc; 1_4t" I V oA m C.F. trlcdevill z A, s.ta r,rdvp c* f ia111 — 0atYS Canyon pf a - P E.G E L r e C) Cary �Ly ROehestz r Dr'. E O V Aver W E StoraLn E Paratluo h � c� l �NtihiDr E hone n Discovery - - ror 10mine lSchool Elen»ntiry c: F X �jAC-,v. asmine - z �mtPri, Delano Subdivision ' W 8.) Fh. n t• Nakano Dr Or E Oniera St <r 4 zi G�1�1 S z 1 ;4Champion rQ f _ Park N -v x 4e yy z ud§ef3� °K, Dr ?� m rF v, > -- z ( E Uslick Rd m e ,ZUj E Kamay,Dr,,; i k irl ` ` E 1 reakL7t , � z -- z g! ' F Chimcrn Dr a r� 1 CGra(ItsUri� �f c rh,nt� q rLesin!5)1 ca , ENG�RIN� INS W Pala f0jsif til a\e n Lowell Scott Middle p� a School - R. `u'a•,ck Dr y NTS W Mch:lilbn Rd Pioneer - £,mentary W Acorn St School Cottonwood W, Fig St Park W G: Male Dr W PainlSt `+ Paitt�Dr W %'Wairmight 0 z k1 Sanko"-ard IadierDf W FI7pw cypress St �yO rs n E z rmc 'tt+ - z� � r, E-Uctick Rd l E Arch Dr o E Race S I � e 9 � j p z N, Dr E SpaaO' I � 1 S:Iprojects118-29 DelanoldocsOelalio h1p Generation 02252019.docx Page 2 Of 6 Figure 2 — Preliminary Site Plan Wainwright Dr ENG � G, INC. S: 1p•ojectsll8-29 DelanoldocslDelano Trip Generation 02252019.docx Page 3 Of 6 ENGINEERING, INC. 1. EXISTING CONDITIONS The adjacent roadway providing the site are described below: • Wainwriaht Drive — A collector street with a posted speed limit of 20 mph. Wainwright Drive has one lane in each direction with curb, gutter, and sidewalk on both sides of the roadway. • Dashwood Place — A local street serving eight (8) existing residential dwelling units. Dashwood Place has one lane in each direction with curb, gutter, and sidewalks on both sides of the roadway. • Centrepoint Way — A collector street with a posted speed limit of 20 mph. Centrepoint Drive has one lane in each direction with curb, gutter, and sidewalks on both sides of the roadway. The most current traffic counts were obtained for these study area roadways from ACHD's website and previous studies in the area. Table 1 summarizes the existing traffic counts available on these roadways. Traffic counts data is attached. Table 1— Existing Traffic Counts u y rea 24 -Hour Peals oadwa Se ment7 Count Date Count Direction AM Peak PM Peak rainwrigh 1,116 EB 76 147 Di —west of Eagle Rd 02/28/2018 (03/12/2015) WB 85 121 Dashwood PI — south of Wainwright Dr' Not available 76 NB 4 3 SB 2 5 NB 21 21 68 68 Centrepoint Wy — north of Ustick Rd 3/22-23/2017 1,961 SB 1 Dashwood Place provides access for 8 lots, 24-hour and peak hour traffic volumes were estimated based on ITE trip generation rates. TRAFFIC ANALYSIS Site trip generation is estimated using the procedures recommended in the latest edition of the Trip Generation Manual (101 edition), published by the Institute of Transportation Engineers. The site trip generation is obtained by applying the trip generation rates obtained from the manual for the proposed land uses within the development. Table 2 summarizes the site trip generation. Delano Subdivision is expected to generate 1,226 trips per weekday, 92 trips during the AM peals hour, and 120 trips during the PM peak hour at full build -out. Based on the existing traffic patterns, site access, and general location of the site within the areas, we anticipated approximately 30% of the trips will have origins/destinations north of the site and 70% south of the site. The Centrepoint Subdivision located south of the site will add traffic to the adjacent roadways. Based on its traffic impact study, this off-site development is expected to generated 1,510 trips per day, 119 trips during the AM peak hour, and 138 trips during the PM peak hour. Off-site traffic generated by Centrepoint Subdivision is distributed and assigned to the transportation system with 30% having origins/destinations north of the site and 70% south of the site. S. Iprojec1sU8-29 DelanoldocslDelano Trip Generation 02252019.docx Page 4 of 6 �j "NGZNG, INC. Table 2 — Site Trip Generation Summary Land Use ITE Code Size Unit Trip Rate per Unit Total Trips Entering Exiting 425 vph 124 175 Weekday Daily (vpd) Centrepoint Wy — north of Ustick Rd 425 vph 157 204 Single -Family Housing 210 85 DU 9.44 802 50% 401 50% 401 Multi -Family Housing 221 78 DU 5.44 424 50% 212 50% 212 Weekday Daily Total Trips 1,226 613 613 Weekday AM Peak Hour (vph) Single -Family Housing 210 85 DU 0.74 63 25% 16 75% 47 Multi -Family Housing 221 78 DU 0.36 29 26% 8 74% 21 Weekdy AM Peak HourTotal Trips 92 24 68 Weekday PM Peak Hour (vph) Single -Family Housing 210 85 DU 0.99 85 66% 56 34% 29 Multi -Family Housing 221 78 DU 0.44 35 61% 21 39% 14 Weekday PM Peak HourTotal Trips 120 77 43 The study area roadway segments were evaluated based on the level of service (LOS) planning thresholds in accordance with Table 2 in ACHD Policy Manual, Section 7106. The roadway segment LOS is based on the maximum peak hour directional volume for different roadway functional classifications, number of through lanes, and left -turn type. The minimum acceptable level of service planning threshold for collector streets is LOS D. Table 2 in ACHD Policy Manual does not include LOS planning thresholds for local streets. According to Section 7207 of ACHD policy, the allowable ADT on local streets is typically 1,000 vpd and under 2,000 vpd when stub streets are connected and adjacent developments are fully developed. Table 3 summarizes the estimated total traffic on the adjacent roadways, which include existing traffic, off- site traffic generated by Centrepoint Subdivision, and site traffic. All study area roadway segments are expected to meet ACHD LOS planning thresholds under total traffic conditions. Table 3 — Study Area Roadway Segment LOS — Existing Plus Off -Site Plus Site Traffic Study Area Roadway S t ACHD LOS Planning Threshold Peak Hour Directional Volume [vphl Meets LOS Planning Threshold? AM Peak PM Peak Wainwright Dr — west of Eagle Rd 425 vph 124 175 Yes Centrepoint Wy — north of Ustick Rd 425 vph 157 204 Yes Dashwood PI — south of Wainwright Dr 1,000-2000 vpd 897 vpd Yes S: Iprojectsl]8-29 DelanoldocsOelano Trip Generation 02252019.docx Page 5 of 6 �{ ENG�RWG INC. CONCLUSIONS Based on the traffic analysis, it is our opinion that traffic generated by the Delano Subdivision is not expected to have a significant impact on the adjacent roadways. The existing collector and local streets adjacent to the site are expected to meet ACHD LOS planning thresholds. 12052 p�vr�OF�P NGS S: Iprojects118-29 DelanoWocsDelano Trip Generation 02252019.docs Page 6 of 6