DPW 19-244 ISU West Parking Lot - Approved PlansT
BM-1
BM-2
SD SD SD
T
BM-1
BM-2
T
BM-1
BM-2
SD
SD SD SD SD
SS SS
SS SS SS SS
SS
SS SS
SS
SS
SS SS SS
SS
SS SS SS
SS
SS SS SS
SS
SS SS SS
SS
SS
SS
T
W
W
W
W
WM
BM-1
BM-2
STUDENT
PARKING
ADMINISTRATION
AND
FACULTY
PARKING
UP
UP
UP
W W W
W W
T T
A L1
1
A L1
1
A L1
1
A L1
1
A L1
1
A L1
1
A L1
1
A L1
1
A L1
1
A L1
1
A L1
1
A L1
1
A L1
1
A L1
1
A L4
1
A L4
1
A L2
1
A L2
1
A L2
1
A L2
1
A L2
1
J
IG
3
5
J
J
J
IG
IG
4
P-3(5)
2#4-1#4G,1-1/2"C
2
J
IG
J
IG
J
IG
J
WP
J
WP
1H3
4#3-1#3G,1-1/2"C
1H3-21(23,25)
8
7
J
A L1
1
A L1
1
A L3
P-2(4)
2#4-1#4G,1-1/2"C
#10'S
P-1
10
11
'P'
10
J
IG
J
IG
J
IG
J
IG
J
IG
J
IG
9
6
J IG
2
12
P-9
2#4/0-1#4/0G,2"C
P-7
2
13
J IG
J
WP
IG
15
14
6
6
KEYED NOTES: #
GENERAL NOTES:
1 POLE LIGHT AND BASE; SEE BASE DETAIL ON SHEET E3.0.
2 ROUTE CIRCUIT THROUGH EXTERIOR LIGHTING CONTACTOR CONTROLLED
BY PHOTOCELL AND TIMECLOCK LOCATED IN PEDESTAL. SEE KEYNOTE #4
FOR LOCATION OF PEDESTAL.
3 CONNECTION TO MONUMENT SIGN; COORDINATE CONNECTION TYPE AND
LOCATION WITH SIGN PROVIDER PRIOR TO ROUGH-IN.
4 FURNISH AND INSTALL POWER PEDESTAL. PEDESTAL TO BE NEMA 3R
480/277/3Ø/4W, 60A BUS WITH 15A MAIN BREAKER, 9 KVA STEP DOWN
TRANSFORMER 480 - 208Y/120/3Ø/4W WITH A 12 CIRCUIT LOAD CENTER,
TIMECLOCK AND PHOTOCELL WITH WINDOW FOR CONTROL OF LIGHTING
CIRCUITS. PEDESTAL TO BE MILLBANK #CP3B01813Q42PGSP1 OR
APPROVED EQUAL. SEE ONE LINE DIAGRAM ON SHEET E3.0 FOR
ADDITIONAL INFORMATION.
5 APPROXIMATE LOCATION OF EXISTING BRANCH PANEL INSIDE BUILDING.
SEE ONE LINE DIAGRAM ON SHEET E3.0 FOR ADDITIONAL INFORMATION.
FIELD VERIFY LOCATION OF PANELBOARD.
6 CONNECTION TO IRRIGATION CONTROLLER. COORDINATE LOCATION AND
CONNECTION TYPE WITH EQUIPMENT PROVIDER PRIOR TO ROUGH-IN.
7 DIVISION 16 TO SAWCUT AND PATCH EXISTING ASPHALT PARKING LOT
AND SIDEWALK FOR ROUTING OF CONDUIT AND CONDUCTORS. REPAIR
OF SIDEWALK AND PARKING LOT SHALL MATCH EXISTING CONDITIONS.
8 ROUTE CONDUIT UP EXTERIOR OF BUILDING TO +18" ABOVE STAIR
LANDING. CORE DRILL THROUGH EXTERIOR WALL OF EXISTING BUILDING.
CONTINUE CONDUIT AND CONDUCTORS UP THE INTERIOR WALL TO THE
CEILING STRUCTURE. ROUTE CONDUIT AND CONDUCTORS TO PANEL
'1H3'. PATCH AND REPAIR EXTERIOR WALL TO SEAL AND MAINTAIN THE
RATING OF THE WALL. SEAL INSIDE OF RACEWAY TO PREVENT
CONDENSATION.
9 ROUTE 3/4" EMPTY CONDUIT TO POWER PEDESTAL FOR FUTURE
CONNECTION TO BLUE EMERGENCY PHONE POWER CONNECTION.
10 FURNISH AND INSTALL POLE MOUNTED CAMERA. CAMERA TO BE AXIS NO.
Q6055-E-PTZ-UBIQITY-MS. FURNISH AND INSTALL ALL COMPONENTS FOR
THE CAMERA TO BE INSTALLED ON AN EXTERIOR POLE.
11 FURNISH AND INSTALL JUNCTION BOX FOR CONNECTION TO FUTURE BLUE
EMERGENCY PHONE. COORDINATE LOCATION WITH OWNER PRIOR TO
ROUGH-IN.
12 PROVIDE A SEPARATE LINE ITEM IN THE BID FOR ALL ELECTRICAL WORK
WHICH IS TO BE INSTALLED IN THIS AREA. THIS IS TO BE IDENTIFIED AS BID
ALTERNATE #1.
13 FURNISH AND INSTALL JUNCTION BOX FOR CONNECTION TO FUTURE POLE
LIGHT.
14 MOUNT UBIQUITY M5 ANTENNA TO ROOF PARAPET. ROUTE CAT5E
CONDUCTOR TO PATCH PANEL LOCATED IN IT ROOM ON THE SECOND
FLOOR. FURNISH AND INSTALL IN-LINE ETHERNET SURGE PROTECTION
DEVICE INSIDE BUILDING ENVELOPE. SEE KEYNOTE 15 FOR ADDITIONAL
INFORMATION.
15 LOCATION OF IT ROOM AND PATCH PANELS. COORDINATE CONNECTION
TO PATCH PANEL WITH IDAHO STATE UNIVERSITY IT DEPARTMENT PRIOR
TO ROUGH-IN.
1 COORDINATE ALL UNDERGROUND SITE WORK WITH OTHER DISCIPLINES
TO AVOID REWORK.
2 ALL IN-GRADE JUNCTION BOXES TO BE FIBERGLASS 12"x12"x18" DEEP.
WITH LID LABELED 'ELECTRICAL'. FINISH ELEVATION OF TOP OF LID TO BE
FLUSH WITH FINISHED GRADE; UNLESS NOTED OTHERWISE.
3 ALL PENETRATIONS THROUGH SLAB ARE TO BE SCOTCH WRAP RIGID
CONDUIT OR PVC COATED RIGID CONDUIT.
4 ALL UNDERGROUND CONDUIT SHALL BE 1" SCHEDULE 40 PVC; UNLESS
NOTED OTHERWISE.
5 COORDINATE LOCATION OF POWER, CABLE, AND TELECOMMUNICATION
UTILITIES WITH THE LOCAL UTILITY COMPANY PRIOR TO ROUGH-IN OF THE
UTILITY CONDUITS.
6
PROJECT:
DATE:
NO. ITEM DATE
9233 WEST STATE STREET
BOISE, IDAHO 83714
PHONE (208) 639-6939
FAX (208) 639-6930
REVISIONS
SHEET NO.
ENGINEERS . SURVEYORS . PLANNERS
CHECKED BY:
DRAWN BY:
DESIGN BY:
DRAWING STATUS:
ISU: WEST PARKING LOT DEVELOPMENT
DPW PROJECT NO. 19-244
FOR CONSTRUCTION
19-039
6-19-19
JWVS
JWS
JWS
FOR CONSTRUCTION
S:\CONSTRUCTION ADMIN PROJECTS\19107 ISU PARKING LOT\DWG\19107 E10 E10A.DWG, JEFF SMITH, 12/5/2019, NONE, ----
5 NMID COMMENTS 11-12-19
6 WIRELESS ANTENNA CLARIFICATION 12/05/19
# # #
# # #
# # #
# # #
# # #
eetriaenineerincompany
enineerin 4 tomorrow
800 s. industry way, suite 350
meridian, idaho 83642
phone: 208.378.4450
fax: 208.378.4451
e2o proet #:
word wide we: e2o.om
19107
N
SCALE: 1" = 50'-0"
ELECTRICAL SITE LIGHTING PLAN
E1.0