Loading...
DPW 19-244 ISU West Parking Lot - Approved PlansT BM-1 BM-2 SD SD SD T BM-1 BM-2 T BM-1 BM-2 SD SD SD SD SD SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS T W W W W WM BM-1 BM-2 STUDENT PARKING ADMINISTRATION AND FACULTY PARKING UP UP UP W W W W W T T A L1 1 A L1 1 A L1 1 A L1 1 A L1 1 A L1 1 A L1 1 A L1 1 A L1 1 A L1 1 A L1 1 A L1 1 A L1 1 A L1 1 A L4 1 A L4 1 A L2 1 A L2 1 A L2 1 A L2 1 A L2 1 J IG 3 5 J J J IG IG 4 P-3(5) 2#4-1#4G,1-1/2"C 2 J IG J IG J IG J WP J WP 1H3 4#3-1#3G,1-1/2"C 1H3-21(23,25) 8 7 J A L1 1 A L1 1 A L3 P-2(4) 2#4-1#4G,1-1/2"C #10'S P-1 10 11 'P' 10 J IG J IG J IG J IG J IG J IG 9 6 J IG 2 12 P-9 2#4/0-1#4/0G,2"C P-7 2 13 J IG J WP IG 15 14 6 6 KEYED NOTES: # GENERAL NOTES: 1 POLE LIGHT AND BASE; SEE BASE DETAIL ON SHEET E3.0. 2 ROUTE CIRCUIT THROUGH EXTERIOR LIGHTING CONTACTOR CONTROLLED BY PHOTOCELL AND TIMECLOCK LOCATED IN PEDESTAL. SEE KEYNOTE #4 FOR LOCATION OF PEDESTAL. 3 CONNECTION TO MONUMENT SIGN; COORDINATE CONNECTION TYPE AND LOCATION WITH SIGN PROVIDER PRIOR TO ROUGH-IN. 4 FURNISH AND INSTALL POWER PEDESTAL. PEDESTAL TO BE NEMA 3R 480/277/3Ø/4W, 60A BUS WITH 15A MAIN BREAKER, 9 KVA STEP DOWN TRANSFORMER 480 - 208Y/120/3Ø/4W WITH A 12 CIRCUIT LOAD CENTER, TIMECLOCK AND PHOTOCELL WITH WINDOW FOR CONTROL OF LIGHTING CIRCUITS. PEDESTAL TO BE MILLBANK #CP3B01813Q42PGSP1 OR APPROVED EQUAL. SEE ONE LINE DIAGRAM ON SHEET E3.0 FOR ADDITIONAL INFORMATION. 5 APPROXIMATE LOCATION OF EXISTING BRANCH PANEL INSIDE BUILDING. SEE ONE LINE DIAGRAM ON SHEET E3.0 FOR ADDITIONAL INFORMATION. FIELD VERIFY LOCATION OF PANELBOARD. 6 CONNECTION TO IRRIGATION CONTROLLER. COORDINATE LOCATION AND CONNECTION TYPE WITH EQUIPMENT PROVIDER PRIOR TO ROUGH-IN. 7 DIVISION 16 TO SAWCUT AND PATCH EXISTING ASPHALT PARKING LOT AND SIDEWALK FOR ROUTING OF CONDUIT AND CONDUCTORS. REPAIR OF SIDEWALK AND PARKING LOT SHALL MATCH EXISTING CONDITIONS. 8 ROUTE CONDUIT UP EXTERIOR OF BUILDING TO +18" ABOVE STAIR LANDING. CORE DRILL THROUGH EXTERIOR WALL OF EXISTING BUILDING. CONTINUE CONDUIT AND CONDUCTORS UP THE INTERIOR WALL TO THE CEILING STRUCTURE. ROUTE CONDUIT AND CONDUCTORS TO PANEL '1H3'. PATCH AND REPAIR EXTERIOR WALL TO SEAL AND MAINTAIN THE RATING OF THE WALL. SEAL INSIDE OF RACEWAY TO PREVENT CONDENSATION. 9 ROUTE 3/4" EMPTY CONDUIT TO POWER PEDESTAL FOR FUTURE CONNECTION TO BLUE EMERGENCY PHONE POWER CONNECTION. 10 FURNISH AND INSTALL POLE MOUNTED CAMERA. CAMERA TO BE AXIS NO. Q6055-E-PTZ-UBIQITY-MS. FURNISH AND INSTALL ALL COMPONENTS FOR THE CAMERA TO BE INSTALLED ON AN EXTERIOR POLE. 11 FURNISH AND INSTALL JUNCTION BOX FOR CONNECTION TO FUTURE BLUE EMERGENCY PHONE. COORDINATE LOCATION WITH OWNER PRIOR TO ROUGH-IN. 12 PROVIDE A SEPARATE LINE ITEM IN THE BID FOR ALL ELECTRICAL WORK WHICH IS TO BE INSTALLED IN THIS AREA. THIS IS TO BE IDENTIFIED AS BID ALTERNATE #1. 13 FURNISH AND INSTALL JUNCTION BOX FOR CONNECTION TO FUTURE POLE LIGHT. 14 MOUNT UBIQUITY M5 ANTENNA TO ROOF PARAPET. ROUTE CAT5E CONDUCTOR TO PATCH PANEL LOCATED IN IT ROOM ON THE SECOND FLOOR. FURNISH AND INSTALL IN-LINE ETHERNET SURGE PROTECTION DEVICE INSIDE BUILDING ENVELOPE. SEE KEYNOTE 15 FOR ADDITIONAL INFORMATION. 15 LOCATION OF IT ROOM AND PATCH PANELS. COORDINATE CONNECTION TO PATCH PANEL WITH IDAHO STATE UNIVERSITY IT DEPARTMENT PRIOR TO ROUGH-IN. 1 COORDINATE ALL UNDERGROUND SITE WORK WITH OTHER DISCIPLINES TO AVOID REWORK. 2 ALL IN-GRADE JUNCTION BOXES TO BE FIBERGLASS 12"x12"x18" DEEP. WITH LID LABELED 'ELECTRICAL'. FINISH ELEVATION OF TOP OF LID TO BE FLUSH WITH FINISHED GRADE; UNLESS NOTED OTHERWISE. 3 ALL PENETRATIONS THROUGH SLAB ARE TO BE SCOTCH WRAP RIGID CONDUIT OR PVC COATED RIGID CONDUIT. 4 ALL UNDERGROUND CONDUIT SHALL BE 1" SCHEDULE 40 PVC; UNLESS NOTED OTHERWISE. 5 COORDINATE LOCATION OF POWER, CABLE, AND TELECOMMUNICATION UTILITIES WITH THE LOCAL UTILITY COMPANY PRIOR TO ROUGH-IN OF THE UTILITY CONDUITS. 6 PROJECT: DATE: NO. ITEM DATE 9233 WEST STATE STREET BOISE, IDAHO 83714 PHONE (208) 639-6939 FAX (208) 639-6930 REVISIONS SHEET NO. ENGINEERS . SURVEYORS . PLANNERS CHECKED BY: DRAWN BY: DESIGN BY: DRAWING STATUS: ISU: WEST PARKING LOT DEVELOPMENT DPW PROJECT NO. 19-244 FOR CONSTRUCTION 19-039 6-19-19 JWVS JWS JWS FOR CONSTRUCTION S:\CONSTRUCTION ADMIN PROJECTS\19107 ISU PARKING LOT\DWG\19107 E10 E10A.DWG, JEFF SMITH, 12/5/2019, NONE, ---- 5 NMID COMMENTS 11-12-19 6 WIRELESS ANTENNA CLARIFICATION 12/05/19 # # # # # # # # # # # # # # # eetriaenineerincompany enineerin 4 tomorrow 800 s. industry way, suite 350 meridian, idaho 83642 phone: 208.378.4450 fax: 208.378.4451 e2o proet #: word wide we: e2o.om 19107 N SCALE: 1" = 50'-0" ELECTRICAL SITE LIGHTING PLAN E1.0