Loading...
Silverstone Subdivision, Blackstone Building Water Main Easement 1 & 2 (2020-008701)ADA COUNTY RECORDER Phil McGrane 2020-008701 BOISE IDAHO Pgs=6 BONNIE OBERBILLIG 01/23/2020 08:13 AM CITY OF MERIDIAN, IDAHO NO FEE Project Name [Subdivision)- -Silverstone Subdivision, Blackstone Building _Water Main Easement Number: 1 & 2 Identify this Easement by sequential number if Project contains more than one Water Main easement. (See Instructions for additional information). WATER MAIN EASEMENT THIS Easement Agreement, made this 21st day of January, 20 20 between Sundance Investments L.L.L.P ("Grantor"), and the City of Meridian, an Idaho Municipal Corporation ("Grantee"); WHEREAS, the Grantor desires to provide a water main right-of-way across the premises and property hereinafter particularly bounded and described; and WHEREAS, the water main is to be provided for through underground pipelines to be constructed by others; and WHEREAS, it will be necessary to maintain and service said pipelines from time to time by the Grantee; NOW, THEREFORE, in consideration of the benefits to be received by the Grantor, and other good and valuable consideration, the Grantor does hereby give, grant and convey unto the Grantee the right-of-way for an easement for the operation and maintenance of water mains over and across the following described property: The easement hereby granted is for the purpose of construction and operation of water mains and their allied facilities, together with their maintenance, repair and replacement at the convenience of the Grantee, with the free right of access to such facilities at any and all times, TO HAVE AND TO HOLD, the said easement and right-of-way unto the said Grantee, it's successors and assigns forever. IT IS EXPRESSLY UNDERSTOOD AND AGREED, by and between the parties hereto, that after making repairs or performing other maintenance, Grantee shall restore the area of the easement and adjacent property to that existent prior to undertaking such repairs and maintenance. However, Grantee shall not be responsible for repairing, replacing or restoring anything placed within the area described in this easement that was placed there in violation of this easement. THE GRANTOR covenants and agrees that Grantor will not place or allow to be placed any permanent structures, trees, brush, or perennial shrubs or flowers within the area described for this easement, which would interfere with the use of said easement, for the purposes stated herein. Water Main Easement Version 12 23 19 M e r i d i a n C i t y C o u n c i l M e e t i n g A g e n d a J a n u a r y 2 1 , 2 0 2 0 – P a g e 1 3 6 o f 2 4 6 GRANTEE: CITY OF MERIDIAN STATE OF IDAHO, ) . ss. County of Ada ) This record was acknowledged before me on 111-20 (date) by Robert E. Simison and Chris Johnson on behalf of the City of Meridian, in their capacities as Mayor and City Clerk, respectively. , a" CHARLES WAY � "' COMMISSION 067390 Notary Signature 1 r �� _ NOTARY PUBLIC My Commission Expires: ` �U� �- STATE OF IDAHO MY COMMISSION EXPIRES 3/28/22 Water Main Easement Version 12 23 19 M e r i d i a n C i t y C o u n c i l M e e t i n g A g e n d a J a n u a r y 2 1 , 2 0 2 0 – P a g e 1 3 8 o f 2 4 6 M e r i d i a n C i t y C o u n c i l M e e t i n g A g e n d a J a n u a r y 2 1 , 2 0 2 0 – P a g e 1 3 9 o f 2 4 6 M e r i d i a n C i t y C o u n c i l M e e t i n g A g e n d a J a n u a r y 2 1 , 2 0 2 0 – P a g e 1 4 0 o f 2 4 6