Loading...
2020-01-21 COMPASSCommunities in Motion 2040 2.0 Development Review The Community Planning Association of Southwest Idaho (COMPASS) is the metropolitan planning organization (MPO) for Ada and Canyon Counties. COMPASS has developed this review as a tool for local governments to evaluate whether land developments are consistent with the goals of Communities in Motion 2040 2.0 (CIM 2040), the regional long-range transportation plan for Ada and Canyon Counties. This checklist is not intended to be prescriptive, but rather a guidance document based on CIM 2040 2.0 goals. Recommendations This proposal for a retail and employment center in a housing-centric area may reduce trip length and encourage bicycle and pedestrian use. The site plan shows an access point on Eagle Road, a principal arterial. This access would be approximately ¼ mile north of the existing access at East Taconic Drive and would reduce traffic flow and make additional conflict points for pedestrians and bicyclists. Eagle Road, from Amity Road to Victory Road, will widened to five lanes with curb-gutter, sidewalk, and level three bike lanes. Project includes enhanced pedestrian crossings at the pedestrian pathway near the Ten Mile Feeder canal with construction scheduled for 2021 (Key RD207-33). Eagle Road, from Lake Hazel Road to Amity Road will also be widened (Key RD216-04). See attached. The site is not currently served by public transportation. ValleyConnect 2.0 proposes bus service from downtown East Taconic Drive to downtown Eagle, via Meridian. The closest bus stop would be approximately ¼ mile in distance when that route is operational. More information about COMPASS and Communities in Motion 2040 2.0: Web: www.compassidaho.org Email info@compassidaho.org More information about the development review process: http://www.compassidaho.org/dashboard/devreview.htm Development Name: Hills Century North Agency: Meridian CIM Vision Category: Future Neighborhoods New households: 137 New jobs: 50 Exceeds CIM forecast: No Farmland contributes to the local economy, creates additional jobs, and provides food security to the region. Development in farm areas decreases the productivity and sustainability of farmland. Farmland consumed: Yes Farmland within 1 mile: 784 acres Housing within 1 mile: 2,530 Jobs within 1 mile: 500 Jobs/Housing Ratio: 0.2 Nearest bus stop: >4 miles Nearest public school: 0.1 miles Nearest public park: 0.1 miles Nearest grocery store: 2.8 miles CIM Corridor: Amity Road Pedestrian level of stress: R Bicycle level of stress: R A good jobs/housing balance – a ratio between 1 and 1.5 – reduces traffic congestion. Higher numbers indicate the need for more housing and lower numbers indicate an employment need. Residents who live or work less than ½ mile from critical services have more transportation choices. Walking and biking reduces congestion by taking cars off the road, while supporting a healthy and active lifestyle. Level of Stress considers facility type, number of vehicle lanes, and speed. Roads with G or PG ratings better support bicyclists and pedestrians of all ages and comfort levels. Nearest police station: 4 miles Nearest fire station: 1.6 miles Developments within 1.5 miles of police and fire stations ensure that emergency services are more efficient and reduce the cost of these important public services. Requesting Agency: Total Cost (Prev. + Prog.):$4,886 Key # : RD207-33 Project Description :Widen Eagle Road from Amity Road to Victory Road in the City of Meridian to five lanes with curb-gutter, sidewalk, and level three bike lanes. Project includes enhanced pedestrian crossings at the pedestrian pathway near the Ten Mile Feeder canal. Eagle Road, Amity Road to Victory Road, Meridian COMPASS PM: Total Previous Expenditures:$320 Inflated Project Year:2021 Total Programmed Cost:$4,566 Federal PM: ACHD Congestion Reduction/System Reliability Transportation Safety Housing Community Infrastructure Local Match 100.00%Program Hwy - Local PartnershipsFunding Source Local (Regionally Significant) TotalCost Year* Preliminary Engineering Preliminary Engineering Consulting Right-of-Way Utilities Construction Engineering Construction Federal Share Local Share 2021 0 4,563003 4,5660 0 4,566 $4,566Fund Totals:$0$4,566$4,563$0$3$0$0$0 Requesting Agency: Total Cost (Prev. + Prog.):$7,459 Key # :RD216-04 Project Description :Widen Eagle Road from Lake Hazel Road to Amity Road in the City of Meridian to five lanes with curb, gutter, sidewalk and a Level 3 bike facility. Eagle Road, Lake Hazel Road to Amity Road, Meridian COMPASS PM: Total Previous Expenditures:$0 Inflated Project Year:PD Total Programmed Cost:$7,459 Federal PM: ACHD Congestion Reduction/System Reliability Local Match 100.00%Program Hwy - Local PartnershipsFunding Source Local (Regionally Significant) TotalCost Year* Preliminary Engineering Preliminary Engineering Consulting Right-of-Way Utilities Construction Engineering Construction Federal Share Local Share 2022 778 0000 7780 0 778 2023 0 001,288 0 1,2880 0 1,288 PD 0 5,21900129 5,39345 0 5,393 $7,459Fund Totals:$0$7,459$5,219$45$129$1,288$778$0 Tuesday, October 1, 2019 3:49 PM Page 11 of 69*PD = Preliminary Development (projects with development activity but no programmed year of construction) Sorted by Project Name All Values in Thousands of Dollars 82