2019-01-10 COM Parks-Pathways Rev. Oct.2019 Reviewer: Kim Warren / Pathways Project Manager Planner Assigned: Sonya Allen Project Name: Shelburne South File No: H-2019- AZ-PP Date: 9 Jan 2020 The following will be required for development of the proposed project: CONDITIONS OF APPROVAL - PATHWAYS 1. Prior to submittal of the final plat for City Engineer signature, the applicant shall submit a public access easement for a multi-use pathway on the south(west) side of Nine Mile Creek across the proposed project to the Planning Division for Council approval and subsequent recordation. The applicant shall also provide a multi-use pathway easement from the Nine Mile Creek alignment to the west boundary along the proposed access road. Pathway may connect to cul-de-sac at S. Amorita Place as attached sidewalk where necessary. The easements shall be 14’ wide (10’ pathway + 2’ shoulder each side). Use standard City template for public access easement. Easement checklist must accompany all easement submittals. 2. Pathway shall not be required NE of the Ten Mile Feeder Canal, nor a pedestrian crossing, as depicted in the original pathways master plan. 3. Construct multi-use pathways per typical paving section(s) shown in the Meridian Pathways Master Plan Chapter 3. 4. The owner (or representative association) of the property affected by each public access easement shall have an ongoing obligation to maintain the multi-use pathway. 5. Project developer shall be responsible for obtaining license agreement and other permission(s) as required for constructing within irrigation district easements. 6. Should any discrepancy exist between these conditions of approval and the requirements of the irrigation district, the developer shall work with Pathways Project Manager to achieve a pathway design that meets both City and irrigation district objectives. City requirements as stated shall not (nor are they intended to) override those of the irrigation district having jurisdiction over the project area.