Loading...
PZ - Geotech ReportZ SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmaii.com - 208-440-6276 CONSULTING, LLC Michael Weaver April 20, 2019 4000 North McDermott Road Page 1 of 20 Meridian, Idaho 83642 File 19174-A Re: Geotechnical Recommendation Report 400 North McDermott Road Meridian, Idaho Michael: As per your authorization, in August 2018, SITE personnel logged and sampled eight test pits at your property located at 4000 North McDermott Road in Meridian, Idaho. It is assumed that the proposed subdivision will include ACHD right of ways and lots for single-family residences. The test pits were excavated on a property consisting of a single parcel. The property is located on the east side of North McDermott Road one half mile south on McMillan Road in Meridian, Idaho. Tax parcel number S-0433234140, 7.0 acres, and the provided address were confirmed on the Ada County Assessor's website. Based upon our research, observations, and laboratory test results, the site is acceptable for the proposed residential subdivision development. Recommendations for construction are included herein. We appreciate this opportunity to be of service. When appropriate, we would like to discuss continuing our role as geotechnical consultant during construction. Please contact our office if additional information or services are required. Respectfully submitted, Bob J. Arnold, PE SITE Consultina.-LL-G-- 0 ®®�rF J. AR to CZ a. Geotechnical Services / Soil Testing & Inspection Services SITE Post Office Box 190637 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC INVESTIGATION SITE observed the excavation of eight test pits at locations intended to provide full coverage of the subject property. Test pit logs and an aerial photo with test pit locations are included in the Appendix. Locations are based upon field observation and handheld GPS and have not been survey located. In general, surface soils consist of a lean clay or low plasticity silt with sand. In two of eight test pits silty sands were the near surface soils. No fat clay soil was observed or sampled. Gravel and sand soil was contacted at an average depth of 4-5 feet but were as shallow as one foot in test pit #TP -8. These sand and gravel soils extend to depths greater than our test pits which were typically terminated just below the depth where groundwater was encountered. Monitoring wells were installed in all eight test pits for future groundwater monitoring. Test pit logs were generated and are included in the Appendix. Additional research was performed searching for well logs within the section where the subject property is located. Well logs for Section 33, township 4 north, range 1 west were reviewed on the IDWR website. A total of four well logs were found and have been included in the Appendix. One is for the subject property. Three shallow wells (110-120 feet deep) located south, east, and north of the subject property indicate the static groundwater elevation is 6 to 20 feet deep. The onsite well is 400 feet deep and the well log indicates artesian flow. The current property owner and client confirm the onsite well is artesian. It was also confirmed that the McFadden Drain, which flows along the north and east boundary, is sourced by two artesian wells, one in the southeast corner of the subject property and one offsite to the east. Groundwater monitoring for this irrigation season has been started and should continue monthly until October. Property owner should contact SITE and authorize continuing groundwater measurements. It is noted that this is a preliminary investigation prepared to determine if development as a residential subdivision is feasible. ACRD and Meridian City have rules concerning test pit placement in relation to proposed stormwater injection facilities. Additional test pits may be required to comply with these rules and should be anticipated. SITE should be contacted by a retained civil engineer to confirm that this report will be acceptable to all reviewing agencies.CZ c C A.. Geotechnical Services / Soil Testing & Inspection Services Post Office Box 190637 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 ZCON2SULTING,LLC DESIGN & CONSTRUCTION RECOMMENDATIONS General Earthwork It is anticipated that this project will be very similar to the Jump Creek Subdivision development to the south of this property on the west side of McDermott Road. ACHD right of ways, lots for single family residences and storm water disposal by shallow injection or surface detention methods. All non-organic soil encountered on the property is acceptable for filling of building or residential lots. Therefore, materials removed from the street sections and subsurface stormwater storage areas can be utilized as structural fill. The only exception is the surface soil that contains excessive organic materials. Removal of the majority of the organic materials will require grubbing of approximately four to six inches of surface soils but deeper areas can be expected. Deeper grubbing may be required in areas along the property boundaries and surface ditches where small trees and bushes are present. The depth of grubbing is to be adjusted in the field to ensure that organic materials are properly removed from beneath future pavements and structural fills. If used for fill, the surface soils will require moisture contents within two percent of optimum for effective compaction. These soils will easily become too wet or too dry for effective compaction. These soils can be expected to perform poorly if wet and subjected to rubber tired equipment. If construction is to occur during wet weather or wet surface soil conditions, low-pressure, tracked mounted construction equipment is recommended. Rutting caused by the contactor using rubber -tired equipment on a wet subgrade can be expected and should be repaired at contractor expense. This information is to be supplied to earthwork contractors prior to construction. Structural fills less than three feet deep are to be compacted to 95 % of the maximum dry density by ASTM D698, Standard Proctor. For deeper fills, and fill intended to contain re-routed ditches or canals or storm water runoff, all fill material and the subgrade surface are to be compacted to 98 % of the maximum dry density as determined by ASTM D698, Standard Proctor. Structural fill is to extend laterally outside foundations a distance equal to the depth of structural fill. Structural fill should be placed in uniform, thin horizontal lifts, moisture conditioned as necessary, and compacted to the above requirements. Compaction of fine-grained soils will greatly reduce the infiltration rate for surface water, effectively sealing the ground surface and crawlspace floors to percolation. Ripping of yard areas prior to placement of topsoil and fine grading may improve percolation in individual back yards. W to ro a Geotechnical Services / Soil Testing & Inspection Services Z E Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmaii.com - 208-440-6276 LTING, LLC Inspection & Testing A qualified engineer or his representative should monitor fill placement to ensure the work is performed in accordance with these recommendations. Testing should be performed in accordance with ASTM Test Methods D3017-88 and D2922-91 (nuclear densometer). Field nuclear moisture - density testing shall be performed on each lift of compacted fill for every 2500 square feet of surface area. It is noted that structural fill can pass compaction tests and still be unacceptable if pumping, rutting, or deflecting under vehicle or foot traffic. It should be anticipated that the Meridian City Engineering and / or Building Department will request these test results prior to or at the time of home / building construction. Structural fill must pass compaction testing and visual inspection for stability. Fill that passes compaction but is observed to rut or deflect under construction traffic is to be rejected. Demolition It is assumed that the existing homes and outbuildings will be demolished. After demolition, inspection is to confirm the removal of all foundation and slab on grade concrete. Any encountered septic tanks and wells are to be abandoned as per IDWR and IDEQ requirements. Excavations caused by demolition, grubbing of ditches, or over excavation of soft or wet areas are to be backfilled with structural fill. All subgrade soils present in the test pits can be used as structural fill on building lots and within right of ways. If encountered, blending clay surface soils with onsite or imported sand and gravels will improve surface drainage. Excavations Shallow excavations and trenches that do not exceed four feet in depth may be constructed with side slopes approaching vertical. Below this depth it is recommended that slopes not exceed a vertical to horizontal ratio of one to one. The ability of the materials on site to maintain a vertical or near vertical excavation when standing open without support over any extended period of time can be expected to be quite variable. This information is provided for planning purposes. It is our opinion that maintaining safe working conditions is the responsibility of the contractor. Jobsite conditions such as soil moisture content, weather condition, earth movements and equipment type and operation can all affect slope stability. All excavations should be sloped or braced as required by applicable local, state, and federal requirements. .N to M a Geotechnical Services / Soil Testing & Inspection Services Z TE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 LTING, LLC Pavement Section Given the lean clay surface soils, ACHD's standard pavement section for residential right of ways is appropriate for this development. Material Layer Residential Street T1=6 Asphaltic Concrete 2.5" Base Coarse (%" minus) 4.0" Subbase (Pitrun) 14.0" It is noted that it is common for the local jurisdiction to require a standard design or to match existing pavement section when working on collector or arterials. Therefore, ACHD (or ITD) should be consulted about construction within the North McDermott Road right of way. Foundation System The proposed single-family residences may be supported on conventional, continuous, and isolated pad foundations founded upon the native soils or upon structural fill extending to these native soils. Based upon proper placement and compaction of structural fill, bearing pressures of up to 1500 psf are allowed. A one-third increase in allowable bearing capacity is permitted when transient loads such as wind or seismic are included. Either crawlspaces or slab on grade floors are acceptable. Foundations outside crawispaces or basements are to be properly waterproofed to prevent surface water from flowing between stem and basement walls and foundations. Foundations drains are encouraged on lots with structural fill placed below foundations. Roof drainage is not to flow through foundation drains. Infiltration pits for drainage are to be at least fifteen feet from and must extend to three feet below the nearest foundation. 1 bz Cz Q. Geotechnical Services / Soil Testing & Inspection Services S1 T E Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC Slab on Grade Concrete Care must be taken so that all excavations below concrete floors and slabs are properly backfilled in accordance with the structural fill recommendations outlined herein. This is very critical where a slab will extend over utility trenches or retaining wall backfill. Trenches and wall backfill areas are to be filled in lifts and benched each lift so that fill is not placed against a vertical soil face greater than three feet tall. Testing is to confirm that compaction has been achieved. Areas of excessive yielding should be excavated and backfilled with structural fill. Slab on grade floors, sidewalks and pavements should be placed atop a minimum of 0.5 feet of granular structural fill materials. Any additional fill used to increase the elevation of slab on grade concrete should meet the requirement for structural fill. After construction of the building pad, a six-inch granular mat should be provided below the floor slabs. The mat should consist of sand or sand - gravel mixture with non -plastic fines. The material should all pass a 3/4 -inch sieve and should contain less than seven percent passing the # 200 sieve. The mat shall be compacted to the requirement for structural fill. All slabs should be suitably reinforced to make them as rigid as possible. Proper joints should be provided at the junctions of the slab and foundation system so that independent movement can occur without causing damage. Storm Water It is recommended that storm runoff be directed away from all open excavations and not be allowed to puddle on subgrade soils. Due to the presence of shallow groundwater, disposal of groundwater in surface detention or retention ponds or constructed lakes or ponds is recommended. If water is to percolate through the surface soils a percolation rate of P= 1.0 inch/hour is recommended for design. If drainage facilities are extended to free draining materials (and backfilled if needed with additional free materials) a percolation rate of P = 6 inch/hour is to be used for design. Extension to free draining conditions is to be confirmed at the time of construction. t1 Geotechnical Services / Soil Testing & Inspection Services ITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 ZC/ONSULTING., LLC Underground Utilities Test pits revealed that deep utilities trenches may require dewatering. It is not anticipated that large excavators will experience any difficulties excavating the onsite materials. No bedrock formation was encountered on the subject property. Sloughing of trenches can be expected when working below the groundwater surface. Contractor Inspections This report has been prepared with the intent to provide specific design information to the developer and the civil engineering consultant. It is not intended to act as any contractors "Due Diligence" or subsurface inspection prior to estimating construction costs or actual construction. Contractors that estimate material quantities, material depths, or the volume and depth to groundwater based solely upon this report do so at their own risk. It is recommended that such values be confirmed as close as possible to the time / date of construction at specific locations as detailed in design plans. Monitoring wells installed by SITE are the property of the landowner and with their permission can be used by contactors to determine the depth to groundwater at the time of construction. Wells should not be destroyed or removed without contacting SITE and the property owner for approval. General Comments After the plans and specifications for construction are completed, it is recommended that this consultant be provided the opportunity to review the final design and specifications. This review will confirm that the earthwork recommendations have been properly interpreted and implemented. At that time, it may be necessary to submit supplementary recommendations. This review is a part of this service and will not result in additional invoicing unless additional research and recommendations are needed. Appendix Follows Geotechnical Services / Soil Testing & Inspection Services LQ a) W Cz a SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC APPENDIX Aerial Photo with Test Pit Location Test Pits Logs (8) Soil Log Legend /Abbreviations and Acronyms Project & Adjacent Well Logs (4) Groundwater Monitoring N bz a. Geotechnical Services / Soil Testing & Inspection Services Z SITE CONSULTING, LLC Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 Locations by handheld GPS W Cz 0. Geotechnical Services / Soil Testing & Inspection Services SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 ZCONSULTING, LLC TEST PIT LOG Test Pit: TP -1 File #: 19174-A Client: Michael Weaver Date Excavated: 8/2/18 Project: 4000 North McDermott Excavated By: Top Grade Location: NE Corner, West Half Logged By: J. Meusch, PM - SITE DEPTH SOILS DESCRIPTION (feet) 3/4" 1/2" 1 3/8" 1 # 4 1 #110 # 40 # 100 1 #200 %M I LL I PI I Fines 0.0-1.0 Brown, Moist, Firm, Sandy, Clay/Silt With Root Zone / Organic Layer 6-8" Brown, Dry, Firm, Sandy, Clay/Silt With Root Zone / Organic Layer 6-8" 1.0-5.0 Brown, Moist, Firm, Sandy, Clay Brown, Moist, Firm, Sticky, Sandy, Lean CLAY (CL) 5.0-8.0 Brown/Tan, Moist, Firm, Sand, Gravel, Cobble 90 79 68.5 16.5 33 15 CL ` 8.0 Bottom of Excavation @ 8.0 Ground Water Encountered '@ 8.0 Monitoring Well Installed TEST PIT LOG Test Pit: TP -2 File #: 19174-A Client: Michael Weaver Date Excavated: 8/2/18 Project: 4000 North McDermott Excavated By: Top Grade Location: SW corner of Property Logged By: J. Meusch, PM - SITE DEPTH SOILS DESCRIPTION (feet) 3/4" 1 1/2" 1 3/8" 1 #4 1 #10 #40 1 #100 r #200 %M'r LL PI 0.0-1.0 Brown, Dry, Firm, Sandy, Clay/Silt With Root Zone / Organic Layer 6-8" 1.0-5.0' Brown, Moist, Firm, Sticky, Sandy, Lean CLAY (CL) 3.0 100 98 97 90 79 68.5 16.5 33 15 CL ` 5.0-6.0 Tan, Wet, Firm, Silty/Clayey, SAND (SM -SC) 5.5 100 1 99 1 98 1 92 1 45 21 15.2 16.4 24 8 ML -CL 6.0-8.0 Brown/Tan, Wet, Firm, Sand, Gravel, Cobble 8.0 Bottom of Excavation @ 8.0 Ground Water Encountered @ 8.0 Monitoring Well Installed a Geotechnical Services / Sal Testing & Inspection Services ZSITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC TEST PIT LOG Test Pit: TP -3 File #: 19174-A Client: Michael Weaver Date Excavated: 8/2/18 Project: 4000 North McDermott Excavated By: Top Grade Location: NW Corner of Property Logged By: J. Meusch, PM - SITE DEPTH SOILS DESCRIPTION SOILS DESCRIPTION (feet) 314" 112" 1 3/8" 1 # 4 1#10 L#40 #100 1 #200 %M LL ' PI Fines 0.0-1.0 Brown, Dry, Firm, Sandy Clay/Slit With Root Zone / Organic Layer 6-8" Brown, Moist, Firm, Sandy, Clay With Root Zone I Organic Layer 6-8" 1.0-5.0 Brown, Moist, Firm, Sticky, Silty, SAND (SM) Brown, Moist, Firm, Sandy, Clay 3.0 100 1 99 1 95 90 82.4 20.8 31 8 ML 5.0-8.0 Brown/Tan, Moist, Firm, Sand, Gravel, Cobble 1 10 1 99 L 72 1 54 1 39 31 25.1 8.0 Bottom of Excavation @ 8.0 Ground Water Encountered @ 8.0 Monitoring Well Installed Tan, Moist, Firm, Sand, Gravel, Cobble TEST PIT LOG Test Pit: TP -4 File #: 19174-A Client: Michael Weaver Date Excavated: 8/2/18 Project: 4000 North McDermott Excavated By: Top Grade Location: SE Corner, West Half Logged By: J. Meusch, PM - SITE DEPTH SOILS DESCRIPTION (feet) 3/4" 1 1/2" 1 318" # 4 # 10 r # 40 # 100 #200 %M''__I LL I PI Fines 0.0-1.0 Brown, Moist, Firm, Sandy, Clay With Root Zone I Organic Layer 6-8" 1.0-2.0 Brown, Moist, Firm, Sandy, Clay 2.0-5.0 Brown/Tan, Moist, Firm, Silty, SAND (SM) 3.0 1 10 1 99 L 72 1 54 1 39 31 25.1 21.7 1 NP I NP ML 5.0-9.0 Tan, Moist, Firm, Sand, Gravel, Cobble 9.0 Bottom of Excavation @ 9.0 Ground Water Encountered @ 9.0 Monitoring Well Installed Geotechnical Services / Soil resting A Inspection Services SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC TEST PIT LOG Test Pit: TP -5 File #: 19174-A Client: Michael Weaver Date Excavated: 8/2/18 Project: 4000 North McDermott Excavated By: Top Grade Location: NNE Corner of Property Logged By: J. Meusch, PM - SITE DEPTH SOILS DESCRIPTION (feet) 314" 1 912" 1 318" 1 #4 1 #10 1 #40 1 #100 1 #200 %M I LL PI Fines 0.0-1.0 Brown, Moist, Firm, Sandy, Clay/Silt With Root Zone / Organic Layer 6-8" 1.0-4.0 Brown, Moist, Firm, Sandy, Lean, CLAY (CL) 3.0 1 1-100 1 98 195 76 671 62.5 10.3 28 9 CL 4.0-6.0 Brown/Tan, Wet, Firm, Sand, Gravel, Cobble 6.0 Bottom of Excavation @ 60 Ground Water Encountered @ 6.0 Monitoring Well Installed TEST PIT LOG Test Pit: TP -6 File #: 19174-A Client: Michael Weaver Date Excavated: 8/2/18 Project: 4000 North McDermott Excavated By: Top Grade Location: NEE Corner of Property Logged By: J. Meusch, PM - SITE DEPTH SOILS DESCRIPTION (feet) 3/4" 112" 1 318" 1 #4 1 #10 1 #40 #100 #200 %M I LL I PI rFines 0.0-1.0 Brown, Dry, Firm, Sand, Clay/Silt With Root Zone I Organic Layer 6-8" 1.0-3.0 Brown, Dry, Firm, Sandy, Clay/Silt 3.0-16.0 Brown/Tan, Moist, Firm, Sand, Gravel, Cobble 16.0 ` Bottom of Excavation @ 16.0 Ground Water Encountered @ 16.0 Monitoring Well installed =1 Geotechnical Services / Soil Testing & Inspection Services SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC TEST PIT LOG Test Pit: TP -7 File #: 19174-A Client: Michael Weaver Date Excavated: 8/2/18 Project: 4000 North McDermott Excavated By: Top Grade Location: SE Corner of Property Logged By: J. Meusch, PM - SITE DEPTH SOILS DESCRIPTION (feet) 314" 1 9/2" 1 3/8" # 4 # 10 # 40 # 100 1 #200 %M I LL I PI Fines 0.0-1.0 Brown, Dry, Firm, Sand, Clay/Silt With Root Zone / Organic Layer 6-8" Brown, Dry, Firm, Sand, Clay/Silt With Root Zone/ Organic Layer 6-8" 1.0.4.0 Brown, Dry, Firm, Sand, Clay/Silt Brown, Moist, Firm,` Sand,' Clay/Silt 3.0-6.0 Brown/Tan, Moist, Firm, Sand, Gravel, Cobble Brown/Tan, Wet, Firm, Sand, Gravel, Cobble 6.0 Bottom of Excavation @ 60 Ground Water Encountered @ 6.0 Monitoring Well Installed Bottom of Excavation @ 9.0 Ground Water Encountered ;@ 9.0 Monitoring Well installed TEST PIT LOG Test Pit: TP -8 File #: 19174-A Client: Michael Weaver Date Excavated: 8/2/18 Project: 4000 North McDermott Excavated By: Top Grade Location: Center, East Half Logged By: J. Meusch, PM - SITE DEPTH SOILS DESCRIPTION (feet) 314" 1 1/2" 1 318" 1 #4 1 #10 #40 #100 #200 %M LL PI ' Fines 0.0-1.0 Brown, Dry, Firm, Sand, Clay/Silt With Root Zone/ Organic Layer 6-8" 1.0-7.0 Brown, Moist, Firm,` Sand,' Clay/Silt 7.0-9.0 Brown/Tan, Wet, Firm, Sand, Gravel, Cobble 9.0 Bottom of Excavation @ 9.0 Ground Water Encountered ;@ 9.0 Monitoring Well installed a� on Cd a Geotechnical Services / Soil Testing & Inspection Services SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 ZNSULTING, LLC SOIL LOG LEGEND UNIFIED SOIL CLASSIFICATION SYSTEM iACTRA QTAPJnARn TFRT MFTHnn n 2AR7 FOR CLASSIFICATION OF SOIL FOR ENGINEERING PURPOSES) MAJOR DIVISIONS F TYPICAL DESCRIPTIONS COARSE GRAINED SOILS < 50% - #200 GRAVEL & GRAVELLY SOILS <50% - #4 < 5% - #200 GW Well -graded gravel, gravel -sand mixture, little or no fines. GP 1 Poorly -graded gravel, gravel sand mixture, little or no fines Silty gravel, gravel -sand -silt mixtures 5-12% 4200 >12% - #200 r GM GC Clayey gravel, gravel -sand -clay mixtures SAND & SANDY SOILS > 50% - # 4 < 5% - #200 SW Well -graded sand, gravelly sand, little or no fines. SP Poorly -graded sand, gravelly sand, little or no fines >12% - #200 SM Silty sand, sand -silt mixtures SC Clayey sand, sand -clay mixtures FINE GRAINED SOILS > 50% - #200 SILTS & CLAYS LL < 50% INORGANIC MLI FC71Lean Inorganic silt and very fine sand, rock flour, silty or clayey fine sand or clayey silt with slight plasticity clay -low to medium plasticity, gravelly, sandy, or silty clay ORGANIC OL Organic silt and organic silty clay of low plasticity SILTS & CLAYS LL > 50% INORGANIC ORGANIC 171 MHElastic silt, micaceous or diatomaceous fine sand or silty soil. r CHFat clay - high plasticity Organic clay-med. or high plasticity: organic silt Peat, humus, swamp soil with high organic content HIGHLY ORGANIC SOILS PT ASTM American Society for Testing and Materials IBC International Building Code ISPWC Idaho Standard for Public Works Construction HMA Hot -Mix Asphalt NP Non -Plastic PCC Portland Cement Concrete TP Test Pit USCS Unified Soil Classification System cf Pounds per Cubic Foot sf Pounds per Square Foot tsf Tons per Square Foot sf/f Pounds per Square Foot / Foot Geotechnical Services / Soil Testing & Inspection Services ZSITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC ADJACENT WELL LOGS Fnnn•136J STATE Or IDAHO --- - -- Il7R DEPARTMENT OF WATER RESOURCES ! L-itfon Cormcted by IDWR To: R)ECr: WELL DRILLER'S REPORT' T04N ROM Soc.93 SWNW n ��p _' I Stnro Taw requires that this repon be filed with me Diseemr, Depanmem of Y y��Ui tC Y'1 widrin 30 days alter the pompletion or abandonmmtof thecae By: manders 2012-02.27 1. WELL OWNER ---- 7. WATER LEVEL 1 Nene �&F—M! St t r w>t.r l 1 fact t l sw Iand sur lace Cpnhohed by Valve Cl Cap Ll P1.1 (hyper' Permit No. _..._ _._. T.mperatur. rF. Ooal W _ 7, NATURE OF WORK G. WELL TEST DATA I] is„iI Ss��lj tI ie�Ncmr well f_l beependf 1111 -0 -am -1 ".JAb.-m I:':1 Pumn fl Rp{ICr Othe`�- '- 1W-6ba.-hod of aband-mgt___:..._.__ n:uw.a f.pu. Punn,.g wiatbe.+.f {ICWR c1 haLJ P�saltct3. 3 PROPOSED USE 11omestic 17 Irri-Ilon O Test f-] MAunlcipal 9. LITHOLOGIC LOG ..I industrial a Stos:k 0 Waste Dkpoaal m 1,.J.Imn O Other Holo De th - Mater IspeclfY type) Diem. From To Material Ye No 4 METHOD DRILLED lr 11 I ' ^ - fl try A L1 Q N Hyd-Aic, p�erse rPt y C b " 0.9 1 Other G. WELL CONSTRUCTION q C n9 bTeiuie: XSteel 0 Corscrotc 11 Othcr ._.-. li is -� •�Th!aincs !> F om ind-es- V i hes_ usches feet Imt ..... ches Inches _ feet _ (eel. 1 Irxl-ps feet _ - 1/ . _J 1 -- __.. 4 nq d a dme medl Yes Cl ho tt 1 acke r anal medl 0 Yes�I No P / a[cdl f7 Yes X No H s+per(nr t 17 I'7 Fact y1 L7 Kmle ❑ Torch Si a of ped tion --._ ;''be by Inch. , N-- hum , perfo t ss _._ feel leaf — _......._.. 1 n at.na _ _I t __- _f- R ' p (TY- �� ------- �lE /X• - _. - _.. pent ti n _ feet feet 4l Il screen siaucdl L] Yes 'Nu - w rxmr :name__ _ -- -- Type.._ _._ M.10 No . O et -Slut S t 1 mn -_ f t t _ feet D. t Slot e - Set bm,,- ftm leaf - G m i f kadt 0 Yrs q N I] Sire I gravel s' I d 1 rn / fCCt t fCCt Su 1 al depth C7 m(I. se 1 ❑ Cer 1 9 t P Jdltng clay �WNI [f n9s Saalin9 1. L 1 SI If / * ^. `�� -- . Fitt✓ -�� Prncc+l rnY pit FI 1 P m i 9 fl Overtime xlv depth )1 j�_ � -.: j_. ... .j' /`. RielhM nl ioimny ws n9; 1) Threadat /V lNNde3 Cl I [ �- Weld ❑ Cemented between Bata Das,:ribo xc.ss lrort __ ' 10. ylark stazled ;- n t iils.d S zy`F.L G. LOCATIONOF WELL It. DRILLERS CERTIFICATION ~� Sketch map location must agree will- written lor:ation. IAN. certify that ail 11,44 unl well ronstrw.tion standards wet. N i S bd nN.me -._— ___- '-" 'T- 1-I'lled with at the ime the' a was aenovm. TK ­ 1 pm Nome F �Af Address Nekirii�Vt" -Df r r L., Nu. Block No. > t Signet by (Firm OlboAY- n and '-: 16 Scc__ T _'"_T, N*,-., j-,011. USE ADDITIONAL SHEETS IF NECESSARY - FORWARD THE WHITE COPY TO THE DEPARTMENT P ccs Geotechnical Services / Soil Testing & Inspection Services SITE CONSULTING, LLC Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 bb Cz a Geotechnical Services / Soil Testing & Inspection Services SITE Post Office Box 190637 - Boise, Idaho 83719 site.consulting.idaho@gmaii.com - 208-440-6276 CONSULTING, LLC ��j /l14 i1NiR l" Office Use Ord Form 238 7�" IDAHO DEPARTMENT OF WATER RESOURCES Well ID No. fV02 WELL DRILL_ER'S REPORT - Inspected by vTwp __- RNe-- ec-- 1. WELLTAG N0. D __ 1!4 _ 1!4 _i/4 DRILLINGPERMITNO. Vta of Right or Infection Welt No. - — � 12. WELL TESTS: Lal: long -- '— 0 Pump Li Bailer "t O Floarrg Artesian 2. OWNER Name__ Address C'ly Y..2. 3. LOCATION OF WELL by legal deserlptlon: Y'ou nwst proud address ur lot, DI Stb. w O'<recliorn Io wdl. Tvp. __ North IST' Of South ❑ Rge( East 0 GM Lot ._. _ Couriiua y 11d Let: mon i �� Address of Well Site.._T��J'-�y�'' CtlY Lt _fled Sub. Name 4. USE; boowsliu 0 Muarcipal iI1luMtot I] Inigal on ❑Thermal LI lro';on DOTI- 5. TYPE OF WORK check all that applydateme+t�dc) Nev Well 0 Modify 01Abardorunent x011rer 8. DRILL METHOD: _A4 Rotary ❑ Cabt. 1: 1 Mud Rotary 0 Oiher ..----.-.-- 7. SEALING PROCEDURES .. To Nt�?# 1 Vc-we Sed V4sxxeiu¢ w: j -- Was drhre shoo used? �0 N Shoe Depth(s} --1 W- ddso shoo seal tesled7 OY XiN How?," 8. CASINGILINER: ver ho bio 6at5 IAL,e J�) (.sHr, dna WeLNM Ih`asl� u ❑ u Length of Headpipe A0_.__ L�/gth o t I'aCJd£/ /-1' _I N type u�✓ _. __. 9. PERFO�RATIONSISCREENS PACKERTYPE PL,Iwation Methal Stmen Type?. Metiad of Insta. a:wn I r _ r smstz r>,.+ac+�n.� n. w•.r.a c� tx.v If"J 0 7iU Water Tmap, \Yater_ alhy m�- test or co--77mef": YQJt-.-q ------ (N�Yt2uL.� _ _1_- � __ _ Dcplh first Watw Erkoumcr �Sv 13. LITHOLOGIC LOG: (Describe repalm or abandonment) W.I. 10. FILTER PACK 1,Wo derby that all hi mm:rm m;1 mnstructien standards wore complied Mh at the r�mr a it1 'V"- ar.crrtr..ma timelhorig wasr ovcd. I� Ccrt�parvy Nair "lid-t%17�1._fL-/.Y�j�-:Lt�SJ Fmm�No.�4/'7..5� 11. STATIC WATER LEVEL OR ARTESIAN PRESSURE: Pdn@pal ur�t�t= i -CP r i 01074"Da1L6/� -.`Y_"mss and .-it.t oo grwee Artecan pressure Ib. Drillerw Operator It ( _ji( _Date 5 Depth Itovr errm;mtercxi _ 11. De :,fnbe aa:eess purl w.mtrtrd dkvn�s ... _. O wator l Pdnd pal DnIot arn1 Rig —..._ .... t g Operates Required. Operator I must hav£ si�tatu•a of DriiwQpcvator II. FORWARD WHIZ E COPY "I0 WATER RESOURCES a) bD tz 0'.. Geotechnical Services / Soil Testing & Inspection Services SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC REPORT OF WELL DRILLER State of Idaho ` State law requires that this report shall be filed with the State Reclamation Engineer within 30 days after completion or abandonment of the veli. WELL Owner's Permit 110.NATURE OF WORK(check . i� 8e 2am:ment well New wall ® DampenedAbandon." [� Water is to be used for: D,.uetTie Uf e METHOD OF CONSTRUCTION: Rotary t3 Cable Dug Q Other explain _ _ CASING SCHSDULE: Threaded Welded tf "Diam, fr.. 0 ft. to y�tt. "Diem, from ft. to ft. "Diam, from. ft. to ft. "Diam. from ft. to ft. Thicknona of coming: Material: Steel X concrete [] wood other C] explain PERFORATED? Yes 0 No Typo of perforator need: Size of perforation.: " by _perforationa from ft, to ft. ^•perforations from ft. to _ft. __perforationa from ft. to ft. perforationa from —ft. to ft. WASSCREEN INSTALLED? Yea No Kennfacturer'a name Type Model No. Diam. Slot size Set from___jt. to ft Diam,_Slot eiteV_Set from_ft, to It CONSTRUCTION: Well gravel packed? Yen No. R) size of gravel Gravel placed from ft. to ft. Surface coal provided?Yeo No To .hat depth? ft. Material used to sal: No. [4 Type of water: - Ge pth ater:Depth of strata ft. Method of muslin strata off: of drilled hole. y" Total of well: 70 Standing .n ter belov ground: 30/ Teap. — T ? - Test delivery: Ogp _CTS Pump? [0Bmil — of non and motor used to make test: ve land surface Give flow of. gpm. Shutoff r....re: trolled b Yclve 8 Cap[Plug control Dons veli lock around .acing? E3 No E] DEPTH MATERIAL •?n�r�NATF.R Surf ac. casing used? Yes No. Cemented in pl.c.7 Yee No C] ------------ --- Locate all in ...tion I r ---I--- I H Vork nt¢rted:_� 7 I eJe/� Work finiahed'71041 1 1 Well Driller's Statement: 'Phi. v.11 was Saa• drillad under my supervision and this report t I is true to he beat of my knowledge. i t Nemo: ui j Addreaa: YAI- . f7: Qeise�Y,/r fo ..a... No. Data: 11 LOCATION OF WELL: County _K _L0 Sec._?,,, 2_T. /1_11/* R.__L_*/W Use other aide for additionalremarka 14A Geotechnical Services / Soil Testing & Inspection Services Z E Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 LTING, LLC Form 238 7 IDAHO DEPARTMENT OF WATER RESOURCES 6412 WELL DRILLER'S REPORT 1. WELLTAG NO. D Q�30$�3 DRILLING PERIAII NO Water Right or Irlecgon WeII No. 2. OWNER n l Name ._. » RI�B++__ Address ._. J�rO a?._.lTi2rlft� (.4DE Star-, zip C ty u 3. LOCATION OF WELL by leget description: You 119,51 pr ode adJreo or Lo:, B'}; Sul. or V rectlons to well, Zp __. North >( or Swdh L I Rge. _.— East f -i or Wast �( Sec. -33_, 1/4 .�_...114 )�j(�....tii (�CL GcJt t of __.. ciumy Let: �c Lon@: A Address o(Well Sre. .,,}.sZ j1/,_.'V�_.i e,*MI t'}' _. ..._ -- `y i7Siiat2.. �__ 4. USE: �Dcrrrsl.^^. Yt�hlcgra', I D1. ntn; —Imgat nn ]Thermal h>jeIXian U Ourer 5. TYPE OFWORK rhocu a1 teat appy (RopacemK4 etc) }CNeu tYa l!"My I lAbandonment C Other 6. DRILL METHOD: Y,Air Roary 1 CaU. M d Roary F Other 7 SEALING PROCEDURES e rea,u : 1 _T_-0 1 k•.n.: sty rs -n r.+enca l L � 1 .as rh a stern os. 0 `J N Shoo Dr •n s 1 p isWas dree Chat seal tested? �I Y VJ How? 6 CASING/LINER: ItY .dN � I !i uzKa r.13NVm USn� lr_M thW' a lw�rlcaf �Co` ✓� !/D�f �P � 3� -r u LI L I' C. t.en,'h el r�i � /l ip o1 Tar p'an q /` pin. y� _ Pacer 1 N Tylx, _e- 9. PERFORATIONStSCREENS PACKERTYPE Perlaatron Method — —I -I ;crcon Type A P.1.'sh+A of ltWelf.6. .,fUnrlrseh m ;wiv I L 10. FILTER PACK F+.�s 1. 'r 'u W�ytf/VW xm Pi .r-vil�3� 11. STATIC (NATER LEVEL OR ARTESIAN PRESSURE: _/� —tt. he ;w grmuj Artr_S pre st rn gib Depth flox encountered_—ft Describe access pat a COn11Q! dcwf•:as: ___ 1 12. WELL TESTS: C.1 Punp _:Baia Office Use 0 Well ID No.00�_ Inspected by Twp ____ Rge--.-._Sec._._...__. __ 1/4 _.._ 1/4 Lot tong; ❑A', C1 PI�re;y Atesun Water le s< nW. — - _. _ ___ t3ulla/nlhole �teyrnp. tdaler/(moi ably ie51 ora/mnknls -�j p�j Jr" /"J� .. H 5 Dep'h lost Waler Ercrrantrr %3 13. LITHOLOGIC LOG: (Describe repairs or abamlonmcm) water C- pl Dereh _ !/.ff re wral.•.y l W : Stand �'/3_Otf 14 DRILLER'S CERTIFICATION 1,49e certify that all a0emam Voll cor.f,mlian slnrulards rxm con Pl ed vo'h al dm 1 Ra Ina rig Was removed. Cunrpaq Name ivr�u tyf.�j(f- a -� {'.t,(aFirm No `�•J� Prirxlpal Unidar ,_ �- Bata / /5oel end Dnker Or Operator _ _ Dat � 15 ----�- L),olawr I _ _ ^- __..._ _._ Date __ pr'ru'pal Unler and Rig Operator Required. Operator I must love signalute of DfVe1i0Im.tor II. FORWARD WHITE COPY TO WATER RESOURCES Geotechnical Services / Sof/ Testing & Inspection Services f— i Remark l'hWnrgy, LJ I (A aidy ATry po trm 4 1 N a o— " 'n70 GAOA,�[/ f e�ay X �36 2vf sand 41 3"01 f RECEIVE -p JAN 2 0 2o%- _ - t ...WATER RE WESTERN REG) y8 C- pl Dereh _ !/.ff re wral.•.y l W : Stand �'/3_Otf 14 DRILLER'S CERTIFICATION 1,49e certify that all a0emam Voll cor.f,mlian slnrulards rxm con Pl ed vo'h al dm 1 Ra Ina rig Was removed. Cunrpaq Name ivr�u tyf.�j(f- a -� {'.t,(aFirm No `�•J� Prirxlpal Unidar ,_ �- Bata / /5oel end Dnker Or Operator _ _ Dat � 15 ----�- L),olawr I _ _ ^- __..._ _._ Date __ pr'ru'pal Unler and Rig Operator Required. Operator I must love signalute of DfVe1i0Im.tor II. FORWARD WHITE COPY TO WATER RESOURCES Geotechnical Services / Sof/ Testing & Inspection Services S1 T E Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC GROUNDWATER MONITORING TP # 1 2 3 4 5 6 7 8 Hub Elevation Casing Height 2.58 3.00 3.67 3.08 4.00 4.58 3.67 4.83 Casing Elevation 3/13/2019 9.0 10.0 9.2 12.1 9.5 1 9.5 9.9 12.5 WaterDe th 6.4 7.0 5.5 9.0 5.5 4.9 6.2 7.7 4/10/2018 9.0 10.0 9.3 12.0 9.3 1 9.7 9.8 12.5 WaterDe th 6.4 7.0 5.6 8.9 5.3 5.1 6.1 7.7 ACHD required Groundwater reported as elevations and not depth. Therefore a surveyor must be retained to locate the the wells both horizontally and vertically. Nothing Follows W, �I W CZ a. Geotechnical Services / Sol/ Testing & Inspection Services