Loading...
L1.5 Landscape Details CZCSHEET OF # Sheet Number Drawing Title SEPT.2019 RE 2019-17; 19055 LP JOB NO: DATE: DRAWN BY: CHECKED BY: Seals C O P Y R I G H T A ll rig h ts re s e rv e d . R e p ro d u c tio n w ith o u t w ritte n p e rm is s io n o f A rchitecture N orthw est, P A is unlaw ful and subject to c rim in a l p ro s e c u tio n . RAND ALL HAVERFIELD A.I.. A 224 16th AVENUE SOUTH NAMPA, IDAHO 83651 OFFICE: (208) 467-3377 FAX: (208)467-4343 www.arcnw.com ARCHITECTURE N O R T H W E S T, P A MRK DATE DESCRIPTION 1 10/22/19 CITY COMMENTS 2 10/24/19 CITY COMMENTS MERIDIAN VETERINARY HOSPITAL P A R K I N G L O T E X P A N S I O N F O R: 4 1 5 W E S T F R A N K L I N, M E R I D I A N, I D A H O reandpartners.com + 208-514-3300 + 1014 S. La Pointe, Boise, Idaho 83706 LANDSCAPE ARCHITECTURE + URBAN DESIGN + LAND PLANNING + GRAPHIC COMMUNICATION + PROJECT MANAGEMENT LA-238 S T A T E O F I D A H O L I C E N S E D L A N D S C A P E A R C H I T E C T R O D N E Y P . E V A N S J R . PRELIMINARY NOT FOR C O N S T R U C T I O N CZC LANDSCAPE DETAILS L1.5 4 DECIDUOUS TREE PLANTING NOT TO SCALE SOIL LINE ROOT FLARE TO BE AT SOIL LINE NOTES: 1. REMOVE BURLAP, TWINE, AND WIRE BASKET FROM TOP 2 3 OF ROOTBALL. REMOVE ALL NAILS, TIES, AND PLASTIC FROM ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO WRAP THE ROOTBALL, IT SHALL BE COMPLETELY REMOVED. ONLY BIODEGRADABLE BURLAP SHALL BE LEFT ON THE BOTTOM OF THE ROOTBALL. 2. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO ENSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR LENGTH OF WARRANTY PERIOD OR 1 YEAR AFTER SUBSTANTIAL COMPLETION WHICHEVER IS GREATER. ALL STAKING SHALL BE REMOVED AT THE END OF THE WARRANTY PERIOD. 3. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT BEFORE PROCEEDING. 4. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT MATERIAL. 5. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE. 6. WATER TREE TWICE WITHIN THE FIRST 24 HOURS. 7. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. 8. FOR TREES LOCATED WITHIN ROADSIDE PLANTERS LESS THAN 8'-0" IN WIDTH, PROVIDE TREE ROOT BARRIER (DEEPROOT #24-2 OR APPROVED EQUAL). LOCATE ROOT BARRIER AT BACK OF CURB AND EDGE OF SIDEWALK. ALL TREE INSTALLATIONS SHALL CONFORM TO ALL AGENCY APPROVAL REQUIREMENTS, CONTRACTOR SHALL VERIFY PRIOR TO ANY INSTALLATIONS. REMOVE DEAD/DAMAGED BRANCHES AND PRUNE TO INTERNATIONAL SOCIETY OF ARBORICULTURE STANDARDS; IMPROPERLY PRUNED TREES (AS DETERMINED BY THE LANDSCAPE ARCHITECT) SHALL BE REMOVED AND REPLACED. DO NOT REMOVE MAIN LEADER!! RUBBER CINCH TIE 2"x 2" WOOD STAKE (LENGTH AS REQUIRED)-DO NOT PENETRATE ROOTBALL. SEE NOTE 1. SET STAKES PARALLEL TO PREVAILING WIND. REMOVE TREE WRAP TRUNK PROTECTION, AFTER INSTALLATION CONSTRUCT 2" EARTH BERM AT EDGE OF ROOTBALL, FILL TREE RING W/ MULCH, AS SPECIFIED. 3" THICK MULCH LAYER, KEEP MULCH 3" AWAY FROM TRUNK. FINISH GRADE PREVAILING WIND DIRECTION COMMERCIAL SLOW RELEASE FERTILIZER TABLETS SIDES OF HOLE ROUGH & UNEVEN BACKFILL WITH APPROVED TOPSOIL AND SOIL AMENDMENTS AS SPECIFIED. BACKFILL IN 6" LIFTS, WATER EACH LAYER, TAMP LIGHTLY AS REQUIRED, BACKFILL SOIL EVEN W/ TOP OF ROOTBALL, DO NOT OVER COMPACT!! SET ROOTBALL ON NATIVE, UNDISTURBED SOIL 3 SHRUB PLANTING NOT TO SCALE 1. SHRUB SHALL BEAR SAME RELATIONSHIP TO GRADE AS IT DID IN NURSERY. 2. WATER SHRUB TWICE WITHIN FIRST 24 HOURS. 3. THIN BRANCHES AND FOLIAGE BY 1 3. 4. DO NOT CUT LEADERS TO RETAIN NATURAL SHRUB SHAPE. 5. FOR CONTAINER GROWN PLANTS THAT ARE ROOTBOUND, SPLIT THE ROOTBALL WITH 3 EQUAL SPACED VERTICAL CUTS. NOTES: REMOVE ANY PLASTIC, BURLAP, NAILS, OR OTHER MATERIALS FROM THE ROOTBALL WHICH MAY LIMIT ROOT GROWTH CONSTRUCT 2" EARTH BERM TO FORM A WATER RETENTION BASIN, FILL BERM WITH MULCH, AS SPECIFIED MULCH, PER PLANS, 3" DEPTH OVER ENTIRE BED. DO NOT COVER CROWNS OF PLANTS PROVIDE COMMERCIAL FERTILIZER TABLETS AND BIOSTIMULANT, AS SPECIFIED, FOR EACH SHRUB BACKFILL WITH APPROVED TOPSOIL AND SOIL AMENDMENTS, AS SPECIFIED. BACKFILL IN 6" LIFTS, WATER EACH LAYER, DO NOT TAMP OR OVER COMPACT. CONSTRUCT 6" MOUND OF TOPSOIL 2 GROUNDCOVER PLANTING NOT TO SCALE SECTION PLAN VIEW 1. ALL GROUNDCOVER PLANTS TO BE PLANTED ON CENTER AND IN A TRIANGULAR PATTERN. 2. APPLY SPECIFIED PRE-EMERGENT PER MANUFACTURER'S RECOMMENDATIONS TO ALL GROUNDCOVER BEDS. NOTES: FINISH GRADE PER PLANS GROUNDCOVER PLANTING PER PLANTING PLAN MULCH, PER PLANS, 3" DEPTH OVER ENTIRE BED. DO NOT COVER CROWNS OF PLANTS TILL SOIL TO A DEPTH OF 12", BACKFILL WITH APPROVED TOPSOIL AND SOIL AMENDMENTS, AS SPECIFIED. SUBGRADE A = LENGTH, AS SPECIFIED OR PER PLANT SCHEDULE B = 85% OF 'A' PLANTER BED CUT EDGE 1 (TYPICAL AT TREES IN TURF AREAS) NOT TO SCALE APPROVED TOPSOIL AND SOIL AMENDMENTS AS SPECIFIED 3" DEPTH OF MULCH AT PLANTER BEDS FINISH GRADE, PER PLANS NOTES: 1. SEE DECIDUOUS AND/OR CONIFEROUS TREE PLANTING DETAILS FOR ADDITIONAL INFORMATION. 2. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT BEFORE PROCEEDING. 3. LANDSCAPE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT MATERIAL. 4. WATER TREE TWICE WITHIN THE FIRST 24 HOURS. ENSURE EARTH DAM DOES NOT LEAK OR ERODE AND REPAIR AS REQUIRED. 3" THICK MULCH LAYER, KEEP MULCH 3" AWAY FROM TRUNK. BACKFILL MULCH TO TOP OF EARTH DAM. SIDES OF HOLE ROUGH & UNEVEN BACKFILL WITH APPROVED TOPSOIL AND SOIL AMENDMENTS AS SPECIFIED. FINISH GRADE CONSTRUCT 2" EARTH BERM AT EDGE OF ROOTBALL, FILL TREE RING WITH MULCH, AS SPECIFIED. 3' HGT., 3.5:1 SLOPE FINISH GRADE SET ROOTBALL ON NATIVE, UNDISTURBED SOIL WHERE APPLICABLE. TREE PLANTING ON 5 BERM OR SLOPE NOT TO SCALE 3' HGT., 3.5:1 SLOPE