ElevationsSHEET TITLE:
SHEET NUMBER:
PROJECT: AC-145 YOUTH BUILDING
REV DATE DESCRIPTION
DO NOT SCALE DRAWING
7-11-2019 PERMITTING SET
PROJECT:
MOUNTAIN WEST ARCHITECTURE | 543 25TH STREET - OGDEN, UT 84401 | PH: 801-388-6052 | www.mountainwestarchitecture.com
SEAL:
EXTERIOR
ELEVATIONS
A201
MERIDIAN,ID 83642
600 N. TEN MILE ROAD
New Youth Building Addition For:
CENTRAL VALLEY BAPTIST CHURCH
1
2
3
4
5
6
7
8
9
10
A
B
C
D
E
F
G
H
I
J
11
12
13
14
15
16
17
18
19
EXTERIOR FINISH SCHEDULE
HARRISTONE UINTAH LEDGESTONE
1X METAL CLADDED DRIP EDGE
1X METAL CLADDED FASCIA
ROOF SCUPPER
BEAM - REFER TO STRUCTURAL
PREFINISHED COLORED METAL WALL CAP
PRE FINISHED "MBCI" PBU HORIZONTAL METAL SIDING
ARCHITECTURAL METAL STANDING SEAM ROOF
COLUMN - REFER TO STRUCTURAL
EIFS
EXTERIOR COLORS
HARRISTONE MATCH EXISTING
DARK BRONZE
MBCI "KOKO BROWN"
MBCI "BROWNSTONE"
SHERWIN WILLIAMS SW 9110 "MALABAR'
MATCH EXISTING
WHITE
SEALED CONCRETE
EXTERIOR MATERIALS
STOREFRONT WINDOW SYSTEM
SEE DOOR SCHEDULE
STOREFRONT WINDOW/DOOR SYSTEM
4" METAL CAP
ARCHITECTURAL GRADE SHINGLE ROOF
PREFINISHED COLORED METAL GUTTER & DOWNSPOUT
4" PREFINISHED METAL TRIM
OVERHEAD DOOR - SEE DOOR SCHEDULE
HOLLOW METAL DOOR - REFER TO DOOR SCHEDULE
CONCRETE COLUMN SUPPORT
MINWAX PERFORMANCE SERIES OIL-BASED WOOD STAIN IN
"WOOD SHED MW 445"
1 2 3 4 5 6 7
110'-0"
120'-9 5/8"
108'-6"
100'-0"
124'-0"
5'-6" 5'-6" 5'-6"
110'-0"
EQ. EQ.
108'-0" 108'-0" 109'-0"
121'-6 3/4"
24'-0" 14'-0" 33'-6" 51'-4" 7'-6"
8'-8" 8'-8" 8'-1" 8'-1"
11'-0"
9'-0"
3
2 A301
A301
F 7
C 9 C 9
C 9
C 9
F 7
11 B
B 11 11 B
11 B
17 G G 17
15 C
14 H
14 H
H 14
C 15
C 15 15 C
C 9
E 6
J 19
6 E
10
5 E
2 C
2 C
C 2
A 1 A 1
B 11
3 D
D 3
13 C
16 C
3 D
C 16
C 16
C 16
C 16
16 C
11 B 16 C
J 19 6 E J 19
E 5
HVAC UNIT
LIGHT FIXTURE
OWNER FURNISHED
SIGNAGE
18 B
15
HVAC UNIT
LIGHT FIXTURE
T.O. PLATE /
T.O. BEAM
T.O.F.F.
T.O. SIDING
BUILDING HEIGHT
T.O. PLATE
B.O. BEAM T.O. ROCK
T.O. PARAPET
C
A
100'-0"
120'-9 5/8"
121'-6 3/4"
100'-0"
108'-6"
109'-6"
3'-6 1/4" EQ. EQ. EQ. 3'-6 1/2"
2'-4" 2'-4" 2'-6"
108'-0" 108'-0"
124'-0"
10'-1" 32'-3" 1'-0"
7'-2"
1
A301
1
A302
14 H
F 7 10
C 9
19 J
E 6
C 9
C 15
11 B
C
D
8 C
5 E
6 E
J 19
E 5
LIGHT FIXTURE LIGHT FIXTURE
C
HVAC UNIT
F 7
T.O.F.F.
B.O. BEAM
EAVE HEIGHT
T.O. SIDING
T.O.F.F.
T.O. PLATE T.O. BEAM
T.O. PARAPET
110'-0"
2
3
2
100'-0"
121'-6 3/4"
110'-0"
108'-6"
110'-0"
124'-0"
9'-0"
108'-0"
1
A301
1
A302
LIGHT
FIXTURE
C 9
8 C
F 7
A 1
C 14 H
D 3
C 9
15 C
E 6
J 19
E 5
5 E
6 E
18 B
16 C
B 12
C 15
HVAC UNIT
T.O. BEAM
T.O. BEAM
T.O. SIDING
T.O.F.F.
T.O. PLATE
T.O. PARAPET
2
4
100'-0"
110'-0"
100'-0"
120'-9 5/8"
110'-0"
112'-0" 112'-0"
3'-6" 7'-8" 7'-8" 3'-6"
4'-0" 5'-0" 2'-6"
109'-0" 108'-0"
124'-0"
121'-6 3/4"
8'-0" 3'-6" 22'-4" 3'-6" 8'-0"
2
A301
3
A301
10
14 H
14 H
H 14
11 B
C 9
C 9
C 9
A 1 11 B
A 1 A 1
A 1
6 E
5 E
15 C
6 E 6 E 6 E
C 9
F 7
2 C
3 D
11 B 15 C
11 B
B
C 15
J 19 J 19 J 19
12 B
8 C
13 C
C 13
13 C
C 15
C 15
C 2
3 D
15 C C 15
4 C C 4
LIGHT FIXTURE LIGHT FIXTURE
LIGHT FIXTURE
OWNER FURNISHED SIGNAGE
C
HVAC UNIT HVAC UNIT
MECH. EQUIPMENT
MECH. EQUIPMENT MECH. EQUIPMENT
C
F 7
T.O. PLATE
T.O.F.F.
T.O. SIDING
BUILDING HEIGHT
T.O. PLATE
T.O.F.F.
T.O. PARAPET
T.O. STONE
18
2
15
1 SOUTH SCALE: 3/16" = ELEVATION 1'-0"
3 WEST SCALE: 3/16" ELEVATION = 1'-0"
4 EAST SCALE: 3/16" ELEVATION = 1'-0"
2 NORTH SCALE: 3/16" = ELEVATION 1'-0"