Loading...
ElevationsSHEET TITLE: SHEET NUMBER: PROJECT: AC-145 YOUTH BUILDING REV DATE DESCRIPTION DO NOT SCALE DRAWING 7-11-2019 PERMITTING SET PROJECT: MOUNTAIN WEST ARCHITECTURE | 543 25TH STREET - OGDEN, UT 84401 | PH: 801-388-6052 | www.mountainwestarchitecture.com SEAL: EXTERIOR ELEVATIONS A201 MERIDIAN,ID 83642 600 N. TEN MILE ROAD New Youth Building Addition For: CENTRAL VALLEY BAPTIST CHURCH 1 2 3 4 5 6 7 8 9 10 A B C D E F G H I J 11 12 13 14 15 16 17 18 19 EXTERIOR FINISH SCHEDULE HARRISTONE UINTAH LEDGESTONE 1X METAL CLADDED DRIP EDGE 1X METAL CLADDED FASCIA ROOF SCUPPER BEAM - REFER TO STRUCTURAL PREFINISHED COLORED METAL WALL CAP PRE FINISHED "MBCI" PBU HORIZONTAL METAL SIDING ARCHITECTURAL METAL STANDING SEAM ROOF COLUMN - REFER TO STRUCTURAL EIFS EXTERIOR COLORS HARRISTONE MATCH EXISTING DARK BRONZE MBCI "KOKO BROWN" MBCI "BROWNSTONE" SHERWIN WILLIAMS SW 9110 "MALABAR' MATCH EXISTING WHITE SEALED CONCRETE EXTERIOR MATERIALS STOREFRONT WINDOW SYSTEM SEE DOOR SCHEDULE STOREFRONT WINDOW/DOOR SYSTEM 4" METAL CAP ARCHITECTURAL GRADE SHINGLE ROOF PREFINISHED COLORED METAL GUTTER & DOWNSPOUT 4" PREFINISHED METAL TRIM OVERHEAD DOOR - SEE DOOR SCHEDULE HOLLOW METAL DOOR - REFER TO DOOR SCHEDULE CONCRETE COLUMN SUPPORT MINWAX PERFORMANCE SERIES OIL-BASED WOOD STAIN IN "WOOD SHED MW 445" 1 2 3 4 5 6 7 110'-0" 120'-9 5/8" 108'-6" 100'-0" 124'-0" 5'-6" 5'-6" 5'-6" 110'-0" EQ. EQ. 108'-0" 108'-0" 109'-0" 121'-6 3/4" 24'-0" 14'-0" 33'-6" 51'-4" 7'-6" 8'-8" 8'-8" 8'-1" 8'-1" 11'-0" 9'-0" 3 2 A301 A301 F 7 C 9 C 9 C 9 C 9 F 7 11 B B 11 11 B 11 B 17 G G 17 15 C 14 H 14 H H 14 C 15 C 15 15 C C 9 E 6 J 19 6 E 10 5 E 2 C 2 C C 2 A 1 A 1 B 11 3 D D 3 13 C 16 C 3 D C 16 C 16 C 16 C 16 16 C 11 B 16 C J 19 6 E J 19 E 5 HVAC UNIT LIGHT FIXTURE OWNER FURNISHED SIGNAGE 18 B 15 HVAC UNIT LIGHT FIXTURE T.O. PLATE / T.O. BEAM T.O.F.F. T.O. SIDING BUILDING HEIGHT T.O. PLATE B.O. BEAM T.O. ROCK T.O. PARAPET C A 100'-0" 120'-9 5/8" 121'-6 3/4" 100'-0" 108'-6" 109'-6" 3'-6 1/4" EQ. EQ. EQ. 3'-6 1/2" 2'-4" 2'-4" 2'-6" 108'-0" 108'-0" 124'-0" 10'-1" 32'-3" 1'-0" 7'-2" 1 A301 1 A302 14 H F 7 10 C 9 19 J E 6 C 9 C 15 11 B C D 8 C 5 E 6 E J 19 E 5 LIGHT FIXTURE LIGHT FIXTURE C HVAC UNIT F 7 T.O.F.F. B.O. BEAM EAVE HEIGHT T.O. SIDING T.O.F.F. T.O. PLATE T.O. BEAM T.O. PARAPET 110'-0" 2 3 2 100'-0" 121'-6 3/4" 110'-0" 108'-6" 110'-0" 124'-0" 9'-0" 108'-0" 1 A301 1 A302 LIGHT FIXTURE C 9 8 C F 7 A 1 C 14 H D 3 C 9 15 C E 6 J 19 E 5 5 E 6 E 18 B 16 C B 12 C 15 HVAC UNIT T.O. BEAM T.O. BEAM T.O. SIDING T.O.F.F. T.O. PLATE T.O. PARAPET 2 4 100'-0" 110'-0" 100'-0" 120'-9 5/8" 110'-0" 112'-0" 112'-0" 3'-6" 7'-8" 7'-8" 3'-6" 4'-0" 5'-0" 2'-6" 109'-0" 108'-0" 124'-0" 121'-6 3/4" 8'-0" 3'-6" 22'-4" 3'-6" 8'-0" 2 A301 3 A301 10 14 H 14 H H 14 11 B C 9 C 9 C 9 A 1 11 B A 1 A 1 A 1 6 E 5 E 15 C 6 E 6 E 6 E C 9 F 7 2 C 3 D 11 B 15 C 11 B B C 15 J 19 J 19 J 19 12 B 8 C 13 C C 13 13 C C 15 C 15 C 2 3 D 15 C C 15 4 C C 4 LIGHT FIXTURE LIGHT FIXTURE LIGHT FIXTURE OWNER FURNISHED SIGNAGE C HVAC UNIT HVAC UNIT MECH. EQUIPMENT MECH. EQUIPMENT MECH. EQUIPMENT C F 7 T.O. PLATE T.O.F.F. T.O. SIDING BUILDING HEIGHT T.O. PLATE T.O.F.F. T.O. PARAPET T.O. STONE 18 2 15 1 SOUTH SCALE: 3/16" = ELEVATION 1'-0" 3 WEST SCALE: 3/16" ELEVATION = 1'-0" 4 EAST SCALE: 3/16" ELEVATION = 1'-0" 2 NORTH SCALE: 3/16" = ELEVATION 1'-0"