Loading...
Village Storefront D-110 DES A-2019-0278Conditions Document 1 Village Storefront D-110 - DES - A-2019-0278 ADMINISTRATIVE DESIGN REVIEW REPORT DATE: August 22, 2019 TO: Brett G. Labrie, Labrie Architecture FROM: Stacy Hersh, Assistant City Planner SUBJECT: Village Storefront D-110 - DES (A-2019-0278) Meridian CenterCal Properties, LLC OWNER: DESCRIPTION OF APPLICANT'S REQUEST The applicant, Brett G. Labrie, requests Administrative Design Review (DES) approval of a 5,263 square foot “Vanilla Shell” tenant improvement and new storefront at the Village of Meridian on 22.885 acres of land in the C-G zoning district. The scope of work includes minor improvements to the interior to provide a “Vanilla Shell” for a future tenant, a new storefront assembly, and entry vestibule. The site is located at 3505 E. Monarch Sky Lane, Suite 110. DECISION The applicant's request for Administrative Design Review is approved with the conditions listed in this report. Note: This is not a building permit. Please contact Building Services at (208) 887-2211 to verify if you need a building permit and/or inspection. If you do need a building permit, you must complete that process before you commence the use or construction. Please contact Building Services for additional details about building permits and inspections. Process Conditions of Approval 1. No signs are approved with this application. Prior to installing any signs on the property, the applicant shall submit a sign permit application consistent with the standards in UDC Chapter 3 Article D and receive approval for such signs. 2. The applicant shall complete all improvements related to public life, safety, and health as set forth in UDC 11-5C-3B. A surety agreement may be accepted for other improvements in accord with UDC 11-5C-3C. 3. The site plan prepared by Lindgren/Labrie Architecture on August 14, 2019, labeled DR-1, is approved by the City of Meridian Planning Division as shown in Exhibit B. 4. The elevations prepared by Lindgren/Labrie Architecture on August 14, 2019, labeled DR-2, DR-3, and DR-4, are approved by the City of Meridian Planning Division as shown in Exhibit C. 5. The approved site plan, landscape plan and/or elevations may not be altered without prior written approval of the City of Meridian Planning Division. 6. The applicant shall pay any applicable impact fees prior to the issuance of a building permit. Conditions Document 2 Village Storefront D-110 - DES - A-2019-0278 7. The applicant shall complete all required improvements prior to issuance of a Certificate of Occupancy. It is unlawful to use or occupy any building or structure until the Building Official has issued a Certificate of Occupancy. Ongoing Conditions of Approval 1. The project is subject to all current City of Meridian ordinances and previous conditions of approval associated with this site (AZ-07-012, DA #108131103, 111055939, 112025435; VAR-07-017; MDA-11-002; MDA-11-012; PP-11-012; FP-12-008; ALT;- 12-005; CZC-11-021; CZC-12-051; DES-12-032). 2. The issuance of this CZC does not release the applicant from any previous requirements of the other permits issued for the site. 3. The applicant and/or property owner shall have an ongoing obligation to prune all trees to a minimum height of six feet above the ground or sidewalk surface to afford greater visibility of the area. 4. The applicant has a continuing obligation to comply with the outdoor lighting provisions as set forth in UDC 11-3A-11. 5. The applicant and/or property owner shall have an ongoing obligation to maintain all landscaping and constructed features within the clear vision triangle consistent with the standards in UDC 11-3A-3. CITY COUNCIL REVIEW The applicant or a party of record may request City Council review of a decision of the Director. All requests for review shall be filed in writing with the Planning Division on or before September 6, 2019, within fifteen (15) days after the written decision is issued, and contain the information listed in UDC 11-5A-6B. If City Council review of the decision is not requested, the action of the Director represents a final decision on a land use application. You have the right to request a regulatory taking analysis under Idaho Code 67-8003. EXPIRATION The Certificate of Zoning Compliance shall expire if the construction, alteration or the use has not commenced within one year of the date of issuance of the Certificate of Zoning Compliance. In accord with the above provisions, the subject Certificate of Zoning Compliance is valid until August 22, 2020. EXHIBITS A: Vicinity Map B: Site Plan (dated: August 14, 2019) C: Elevations (dated: August 14, 2019) Conditions Document 3 Village Storefront D-110 - DES - A-2019-0278 Exhibit A: Vicinity Map Conditions Document 4 Village Storefront D-110 - DES - A-2019-0278 Exhibit B: Site Plan (dated: August 14, 2019) Conditions Document 5 Village Storefront D-110 - DES - A-2019-0278 Exhibit C: Elevations (dated: August 14, 2019) Conditions Document 6 Village Storefront D-110 - DES - A-2019-0278