MER19-0062 Verizon SEC Eagle & River ValleyRebecca W. Arnold, President
Mary May, 1st Vice-President
Sara M. Baker, 2nd Vice-President
Jim D. Hansen, Commissioner
Kent Goldthorpe, Commissioner
_____________________________________________________________________________________________________________
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org
August 26, 2019
To: Jodie Knopp, via email
TAEC/Verizon Wireless
6126 W. State Street, Ste 205
Boise, ID 83703
Subject: MER19-0062/ A-2019-0268
Southeast Corner of Eagle Road & River Valley Street
Verizon Wireless Antenna on ACHD Traffic Light Structure
In response to your request for comment, the Ada County Highway District has reviewed the
submitted application and site plan for the item referenced above. It has been determined that
ACHD has site specific conditions of approval for this application.
A. Findings of Fact
1. Applicant’s Proposal: The applicant is proposing to install one Verizon small cell canister
antenna, one equipment closure, three new technology antennas and two exterior
mounted conduits to the existing traffic light structure and two small ground vaults added
near the base of the pole located in the right-of-way at the southeast corner of Eagle Road
and River Valley Street.
2. Staff Comments/Recommendations: The applicant should comply with the
requirements of the ACHD Master License Agreement dated April 19, 2017, and obtain an
approved site license from ACHD for the southeast corner of Eagle Road and River Valley
Street location in accordance with the Master License Agreement.
The applicant may install one Verizon small cell canister antenna, one equipment closure,
three new technology antennas and two exterior mounted conduits to the existing traffic
light structure and two small ground vaults added near the base of the pole located in the
right-of-way at the southeast corner of Eagle Road and River Valley Street once ACHD
has approved the site license. The site license does not constitute the issuance of a permit.
The applicant is required to apply for and obtain a permit for all work within the ACHD right-
of-way.
B. Site Specific Conditions of Approval
1. Comply with the requirements of the ACHD Master License Agreement dated April 19,
2017, and obtain a site license from ACHD for the southeast corner of Eagle Road and
River Valley Street location in accordance with the Master License Agreement.
2. Comply with the Standard Conditions of Approval as noted below.
C. Attachments
1. Vicinity Map
2. Site Plan
3. Standard Conditions of Approval
_____________________________________________________________________________________________________________
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org
4. Appeal Guidelines
If you have any questions, please feel free to contact me at (208) 387-6218.
Sincerely,
Dawn Battles
Planner
Development Services
cc: City of Meridian (Stacy Hersh), via email
_____________________________________________________________________________________________________________
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org
VICINITY MAP
_____________________________________________________________________________________________________________
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org
SITE PLAN
_____________________________________________________________________________________________________________
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org
Standard Conditions of Approval
1. All proposed irrigation facilities shall be located outside of the ACHD right-of-way
(including all easements). Any existing irrigation facilities shall be relocated outside of
the ACHD right-of-way (including all easements).
2. Private Utilities including sewer or water systems are prohibited from being located within
the ACHD right-of-way.
3. In accordance with District policy, 7203.6, the applicant may be required to update any
existing non-compliant pedestrian improvements abutting the site to meet current
Americans with Disabilities Act (ADA) requirements. The applicant’s engineer should
provide documentation of ADA compliance to District Development Review staff for
review.
4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged
during the construction of the proposed development. Contact Construction Services at
387-6280 (with file number) for details.
5. A license agreement and compliance with the District’s Tree Planter policy is required for
all landscaping proposed within ACHD right-of-way or easement areas.
6. All utility relocation costs associated with improving street frontages abutting the site shall
be borne by the developer.
7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way.
The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant.
The applicant shall be required to call DIGLINE (1-811-342-1585) at least two full
business days prior to breaking ground within ACHD right-of-way. The applicant shall
contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or
filled) are compromised during any phase of construction.
8. Utility street cuts in pavement less than five years old are not allowed unless approved in
writing by the District. Contact the District’s Utility Coordinator at 387-6258 (with file
numbers) for details.
9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC
Standards and approved supplements, Construction Services procedures and all
applicable ACHD Standards unless specifically waived herein. An engineer registered in
the State of Idaho shall prepare and certify all improvement plans.
10. Construction, use and property development shall be in conformance with all applicable
requirements of ACHD prior to District approval for occupancy.
11. No change in the terms and conditions of this approval shall be valid unless they are in
writing and signed by the applicant or the applicant’s authorized representative and an
authorized representative of ACHD. The burden shall be upon the applicant to obtain
written confirmation of any change from ACHD.
12. If the site plan or use should change in the future, ACHD Planning Review will review the
site plan and may require additional improvements to the transportation system at that
time. Any change in the planned use of the property which is the subject of this
application, shall require the applicant to comply with ACHD Policy and Standard
Conditions of Approval in place at that time unless a waiver/variance of the requirements
or other legal relief is granted by the ACHD Commission.
_____________________________________________________________________________________________________________
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org
Request for Appeal of Staff Decision
1. Appeal of Staff Decision: The Commission shall hear and decide appeals by an
applicant of the final decision made by the Development Services Manager when it is
alleged that the Development Services Manager did not properly apply this section
7101.6, did not consider all of the relevant facts presented, made an error of fact or law,
abused discretion or acted arbitrarily and capriciously in the interpretation or
enforcement of the ACHD Policy Manual.
a. Filing Fee: The Commission may, from time to time, set reasonable
fees to be charged the applicant for the processing of appeals, to
cover administrative costs.
b. Initiation: An appeal is initiated by the filing of a written notice of
appeal with the Secretary and Clerk of the District, which must be filed
within ten (10) working days from the date of the decision that is the
subject of the appeal. The notice of appeal shall refer to the decision
being appealed, identify the appellant by name, address and
telephone number and state the grounds for the appeal. The grounds
shall include a written summary of the provisions of the policy relevant
to the appeal and/or the facts and law relied upon and shall include a
written argument in support of the appeal. The Commission shall not
consider a notice of appeal that does not comply with the provisions
of this subsection.
c. Time to Reply: The Development Services Manager shall have ten
(10) working days from the date of the filing of the notice of appeal to
reply to the notice of the appeal, and may during such time meet with
the appellant to discuss the matter, and may also consider and/or
modify the decision that is being appealed. A copy of the reply and
any modifications to the decision being appealed will be provided to
the appellant prior to the Commission hearing on the appeal.
d. Notice of Hearing: Unless otherwise agreed to by the appellant, the
hearing of the appeal will be noticed and scheduled on the
Commission agenda at a regular meeting to be held within thirty (30)
days following the delivery to the appellant of the Development
Services Manager’s reply to the notice of appeal. A copy of the
decision being appealed, the notice of appeal and the reply shall be
delivered to the Commission at least one (1) week prior to the hearing.
e. Action by Commission: Following the hearing, the Commission shall
either affirm or reverse, in whole or part, or otherwise modify, amend
or supplement the decision being appealed, as such action is
adequately supported by the law and evidence presented at the
hearing.