A5.0b Elevationstenant sign
2SCALE: SOUTH 1/4" = 1'-0" BUILDING ELEVATION
A5.0b
19-514 A5.0b
MATT RHEES
BUILDING ELEVATIONS
FRONT
1SCALE: NORTH 1/4" = 1'-0" BUILDING ELEVATION REAR
3SCALE: EAST 1/4" = 1'-BUILDING 0" ELEVATION SIDE
4SCALE: WEST 1/4" = 1'-BUILDING 0" ELEVATION SIDE
GENERAL NOTES
KEYNOTES
EXTERIOR FINISH SCHEDULE
5SCALE: TRIM 1-1/2" = DETAIL 1'-0"
SHEET
This document is the property of THE ARCHITECTS
OFFICE, PLLC and is not to be duplicated without
written authorization.
REVISIONS
DRAWN
THE ARCHITECTS OFFICE, PLLC
JULY 12, 2019
FILE
FILE NO.
DATE
SEAL
1879 N. LAKES PL.
MERIDIAN, IDAHO 83646
HOFF
OFFICE BUILDING
PROJECT
499 MAIN STREET ( 2 0 8 ) 3 4 3 - 2 9 3 1
BOISE, IDAHO 83702 T A O I D A H O . C OM
ARCHITECT
Matthew J. Rhees
STATE OF IDAHO
LICENSED
AR-2154
F A I R V I E W L A K E S
PARCEL B