Loading...
Gramercy Office Building (Lot 4) CZC, DES A20190193Conditions Document 1 Gramercy Office Building (Lot 4) - DES, CZC - A-2019-0193 CERTIFICATE OF ZONING COMPLIANCE REPORT DATE: June 17, 2019 TO: Amanda Bidwell, neUdesign Architecture FROM: Stacy Hersh, Assistant City Planner SUBJECT: Gramercy Office Building (Lot 4) - DES, CZC (A-2019-0193) Gramercy, LLC OWNER: DESCRIPTION OF APPLICANT'S REQUEST The applicant, Amanda Bidwell of neUdesign Architecture, requests Certificate of Zoning Compliance (CZC) and Design Review (DES) to construct a 30,600 square foot 3-story office building. The building will be similar in finishes, style and scale to the existing buildings within the development. The property consists of 2.076 acres of land in the C-G zoning district. The site is located at 1861 S. Wells Avenue. DECISION The applicant's request for Certificate of Zoning Compliance and Design Review is approved with the conditions listed in this report. Note: This is not a building permit. Please contact Building Services at (208) 887-2211 to verify if you need a building permit and/or inspection. If you do need a building permit, you must complete that process before you commence the use or construction. Please contact Building Services for additional details about building permits and inspections. Site Conditions of Approval 1. The applicant shall construct all proposed fencing and/or any fencing required by the UDC, consistent with the standards as set forth in UDC 11-3A-7 and 11-3A-6B. Process Conditions of Approval 1. An application to vacate all or a portion of the Meridian City Water and Sewer easement in the northeast corner of the property and the Meridian City Water easement in the southeast corner of the property is required to be submitted and approved prior to issuance of the Certificate of Occupancy. Please contact the Planning Division to start the application process at (208) 884-5533. 2. No signs are approved with this application. Prior to installing any signs on the property, the applicant shall submit a sign permit application consistent with the standards in UDC Chapter 3 Article D and receive approval for such signs. 3. The applicant shall complete all improvements related to public life, safety, and health as set forth in UDC 11-5C-3B. A surety agreement may be accepted for other improvements in accord with UDC 11-5C-3C. Conditions Document 2 Gramercy Office Building (Lot 4) - DES, CZC - A-2019-0193 4. Upon installation of the landscaping and prior to inspection by Planning Division staff, the applicant shall provide a written certificate of completion as set forth in UDC 11- 3B-14A. 5. The site utility plan prepared by Civil Innovations on May 17, 2019, labeled C.400, is approved by the City of Meridian Planning Division as shown in Exhibit B. 6. The landscape plans prepared by Breckon Landscaping on May 24, 2019, labeled L1.1 and L1.5, are approved by the City of Meridian Planning Division as shown in Exhibit C. 7. The elevations prepared by neUdesign on April 25, 2019, labeled A-211 and A-212, are approved by the City of Meridian Planning Division as shown in Exhibit D. 8. The approved site plan, landscape plan and/or elevations may not be altered without prior written approval of the City of Meridian Planning Division. 9. The applicant shall pay any applicable impact fees prior to the issuance of a building permit. 10. If any changes must be made to the site plan to accommodate ACHD requirements, the applicant shall submit a new site plan to the City of Meridian Planning Division for approval prior to issuance of the building permit. 11. The applicant shall complete all required improvements prior to issuance of a Certificate of Occupancy. It is unlawful to use or occupy any building or structure until the Building Official has issued a Certificate of Occupancy. 12. The City of Meridian requires that the owner enter into a Warranty Surety Agreement and post a Warranty Surety in the amount of 20% of the total construction cost for all completed public sewer and water infrastructure for a duration of two years. This surety amount will be verified by a line item final cost invoicing provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond, and must be in place prior to Certificate of Occupancy. Applicant must file an application for surety, which can be found on the Community Development Department website. Please contact Land Development Services for more information at 208-887- 2211. Ongoing Conditions of Approval 1. The applicant and/or assigns shall have the continuing obligation to provide irrigation that meets the standards as set forth in UDC 11-3B-6 and to install and maintain all landscaping as set forth in UDC 11-3B-5, UDC 11-3B-13 and UDC 11-3B-14. 2. The applicant shall comply with the outdoor storage as an accessory use standards as set forth in UDC 11-3A-14. 3. The project is subject to all current City of Meridian ordinances and previous conditions of approval associated with this site (AZ-06-021, DA #106141056; PP-06-019; FP-06- 048). 4. The issuance of this CZC does not release the applicant from any previous requirements of the other permits issued for the site. 5. The applicant and/or property owner shall have an ongoing obligation to prune all trees to a minimum height of six feet above the ground or sidewalk surface to afford greater visibility of the area. 6. The applicant has a continuing obligation to comply with the outdoor lighting provisions as set forth in UDC 11-3A-11. Conditions Document 3 Gramercy Office Building (Lot 4) - DES, CZC - A-2019-0193 7. The applicant and/or property owner shall have an ongoing obligation to maintain all landscaping and constructed features within the clear vision triangle consistent with the standards in UDC 11-3A-3. CITY COUNCIL REVIEW The applicant or a party of record may request City Council review of a decision of the Director. All requests for review shall be filed in writing with the Planning Division on or before July 2, 2019, within fifteen (15) days after the written decision is issued, and contain the information listed in UDC 11-5A-6B. If City Council review of the decision is not requested, the action of the Director represents a final decision on a land use application. You have the right to request a regulatory taking analysis under Idaho Code 67-8003. EXPIRATION The Certificate of Zoning Compliance shall expire if the construction, alteration or the use has not commenced within one year of the date of issuance of the Certificate of Zoning Compliance. In accord with the above provisions, the subject Certificate of Zoning Compliance is valid until June 17, 2020. EXHIBITS A: Vicinity Map B: Site Utility Plan (dated: May 17, 2019) C: Landscape Plans (dated: May 24, 2019) D: Elevations (dated: April 25, 2019) Conditions Document 4 Gramercy Office Building (Lot 4) - DES, CZC - A-2019-0193 Exhibit A: Vicinity Map Conditions Document 5 Gramercy Office Building (Lot 4) - DES, CZC - A-2019-0193 Exhibit B: Site Utility Plan (dated: May 17, 2019) Conditions Document 6 Gramercy Office Building (Lot 4) - DES, CZC - A-2019-0193 Exhibit C: Landscape Plan (dated: May 24, 2019) Conditions Document 7 Gramercy Office Building (Lot 4) - DES, CZC - A-2019-0193 Exhibit D: Elevations (dated: April 25, 2019)