REVISED D 190422 WoodSpring Suites CZC Landscape Details 118139Revisions
1. CZC COMMENTS 4.23.19
Date of Issuance:
Project No.:
Project Milestone:
----
1
File Location: g:\2018\118139\cad\118139 czc landscapeplan.dwg
Last Plotted By:michael thomas
Date Plotted: Tuesday, April 23 2019 at 01:09 PM
DESIGN REVIEW
LANDSCAPE DETAILS
MERIDIAN, IDAHO 83642
1262 S. RACKHAM WAY
WOOD SPRING SUITES
UNION STREET INVESTMENTS
04-23-2019
118139
CZC Submittal
L150
ARCHITECT
BRR ARCHITECTURE, INC.
6700 ANTIOCH PLAZA, STE 300
MERRIAM, KS 66204
913-262-9095
CONTACT: BRIAN NELSON
Project Team Directory:
4" MIN.
DEPTH
BACKFILL WITH SOIL PLANTING
MIX. SEE SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
WATER RETENTION
BASIN
MULCH LAYER
COMMERCIAL
FERTILIZER TABLETS
2 Shrub Planting
Scale: NTS
NOTES:
1. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR IS
RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN
STRAIGHT FOR A MINIMUM OF 1 YEAR. ALL STAKING SHALL BE REMOVED AT THE END OF THE ONE
YEAR WARRANTY PERIOD.
2. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO
NOTIFY THE LANDSCAPE ARCHITECT BEFORE PROCEEDING.
3. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO
INSTALLATION OF PLANT MATERIAL.
4. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE
STANDARD OR FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH
GALVANIZED NAILS TO PREVENT SLIPPAGE.
5. WATER TREE TWICE WITHIN THE FIRST 24 HOURS.
6. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE
ARCHITECT IMMEDIATELY.
PREVAILING WIND DIRECTION
REMOVE DEAD/DAMAGED BRANCHES AND PRUNE TO
INTERNATIONAL SOCIETY OF ARBORICULTURE STANDARDS;
IMPROPERLY PRUNED TREES (AS DETERMINED BY THE
LANDSCAPE ARCHITECT) SHALL BE REMOVED AND REPLACED.
SET ROOTBALL ON NATIVE UNDISTURBED SUBSOIL
COMMERCIAL SLOW RELEASE FERTILIZER TABLETS
BACKFILL WITH SOIL PLANTING MIX. SEE
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
MULCH LAYER, KEEP MULCH 3" AWAY FROM
TRUNK
2" x 2" x 8' CEDAR STAKE - DO NOT PENETRATE ROOTBALL.
SEE NOTE 1. SET STAKES PARALLEL TO PREVAILING WIND.
RUBBER CINCH TIE
FINISH GRADE
ROOT PROBE
SOIL LINE
UTILIZE SOIL/ROOT PROBE AROUND TRUNK
(APPROX. 3-4" AWAY FROM TRUNK) TO LOCATE
HIGHEST ROOTS. HIGHEST ROOTS SHOULD BE
POSITIONED AT OR SLIGHTLY ABOVE GRADE LEVEL.
REMOVE BURLAP, TWINE, AND WIRE BASKET FROM TOP
1
2 OF ROOTBALL, REMOVE ALL NAILS, TIES, AND PLASTIC
FROM ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO
WRAP THE ROOTBALL, IT SHALL BE COMPLETELY
REMOVED. ONLY BIODEGRADEABLE BURLAP SHALL BE
LEFT ON THE BOTTOM OF THE ROOTBALL.
2x ROOTBALL DIAMETER
3x ROOTBALL DIAMETER
6"
TREE WRAP TRUNK PROTECTION,
REMOVE AFTER INSTALLATION
3"
1 Deciduous Tree Planting
Scale: NTS
NOTES:
1. NOTIFY LANDSCAPE ARCHITECT WHEN PLACING BOULDERS FOR APPROVAL.
2. PLACE BOULDERS PRIOR TO INSTALLATION OF IRRIGATION SYSTEM.
3. CLEAN ALL BOULDERS OF DIRT AND LOOSE DEBRIS.
4. WHEN PLACING BOULDERS, BURY 1/4 TO 1/3 OF BOULDER BELOW FINISH GRADE.
5. DO NOT SCAR OR DAMAGE BOULDERS.
FINISH GRADE
COMPACTED SUBGRADE AS
REQUIRED
30" - 60" DIAMETER SANDSTONE
BOULDER, LOCATED PER PLANS
SHRUB
3 Boulder Installation
Scale: NTS
DEVELOPER / APPLICANT
UNION STREET INVESTMENTS LLC
3426 NW 56TH STREET
SEATTLE, WA 98103
206-641-9020
CONTACT: MATT ORR
CIVIL ENGINEER /
LANDSCAPE ARCHITECT
THE LAND GROUP, INC.
462 EAST SHORE DR, STE 100
EAGLE, IDAHO 83616
208-939-4041
CONTACT: JASON DENSMER, PE/
DOUG RUSSELL, PLA
04/23/2019