Loading...
Rock Harbor Church A-2017-0218 (Revision 2)REVISION 2 Conditions Document 1 Rock Harbor Church – CZC A-2017-0218 CERTIFICATE OF ZONING COMPLIANCE REPORT DATE: March 2, 2018 (Revised 5/21/2018) May 15, 2019 TO: Rock Harbor Church, Inc FROM: Joshua Beach, Associate City Planner Stacy Hersh, Assistant City Planner SUBJECT: Rock Harbor Church – A-2017-0218 OWNER: Rock Harbor Church DESCRIPTION OF APPLICANT'S REQUEST The applicant, Rock Harbor Church, requests Certificate of Zoning Compliance (CZC) and Design Review (DES) approval to construct a 59,320 sq. ft. church building and associated site improvements on 15.51 acres of land in the C-N zoning district. The applicant is revising this approval to include the following modifications: 1. The northwest driveway configuration has shifted to the east entirely onto the church’s property. 2. The trash enclosure has been moved approximately 25 feet farther west than originally shown to allow for a larger future Phase 2 building footprint. 3. The church requires an exterior grade-level access to the elevated platform within the Auditorium. An elevated concrete loading dock with an inclined vehicle ramp has been added between the service/fire lane and the rear of the building. 4. The textured (or stamped) concrete has been changed to decorative smooth concrete and the amount of concrete paving in the church’s driveways has been reduced. 5. The concrete paving in the Main and Secondary Driveway approaches off N. Tree Haven Way and the driveway intersection off the Entrance Patio have been eliminated and replaced with asphalt paving. 6. The number of Phase 1 pole-mounted parking lot, driveway, and site lights has been reduced from 58 to 40, and the bollard lights have been eliminated. All new lighting fixture heights are 27’– 28’ except for those along the fire lane which are 17’– 19’. The site is located at 6437 N. Tree Haven Way. DECISION The applicant's request for Certificate of Zoning Compliance and Design Review is approved with the conditions listed in this report. Note: This is not a building permit. Please contact Building Services at (208) 887-2211 to verify if you need a building permit and/or inspection. If you do need a building permit, you must complete that process before you commence the use or construction. Please contact Building Services for additional details about building permits and inspections. REVISION 2 Conditions Document 2 Rock Harbor Church – CZC A-2017-0218 Site Conditions of Approval 1. The applicant shall construct all proposed fencing and/or any fencing required by the UDC, consistent with the standards as set forth in UDC 11-3A-7 and 11-3A-6B. 2. Business hours of operation within the L-O and C-N districts shall be limited from 6 am to 10 pm as set forth in UDC 11-2B-3A4. Process Conditions of Approval 1. No signs are approved with this application. Prior to installing any signs on the property, the applicant shall submit a sign permit application consistent with the standards in UDC Chapter 3 Article D and receive approval for such signs. 2. The applicant shall complete all improvements related to public life, safety, and health as set forth in UDC 11-5C-3B. A surety agreement may be accepted for other improvements in accord with UDC 11-5C-3C. 3. Upon installation of the landscaping and prior to inspection by Planning Division staff, the applicant shall provide a written certificate of completion as set forth in UDC 11-3B- 14A. 4. The site plan prepared by LKV Architects on January 15, 2018 April 29, 2019, labeled SD-1.1, is approved by the City of Meridian Planning Division as shown in Exhibit B. 5. The landscape plan prepared by The Land Group on October 12, 2017 Breckon Landscaping on April 29, 2019, labeled L1.0, is approved by the City of Meridian Planning Division as shown in Exhibit C. with the following changes: a. Per UDC 11-3B-7(5), the landscape buffer along Chinden Blvd may contain 10 feet of gravel; the remainder shall be of the area shall be landscaped with lawn or other vegetative ground cover. The applicant shall revise the plan and submit the revision with the building permit application. b. Per 11-2B-3, the applicant shall construct a 35 foot landscape buffer along Chinden Blvd. The applicant shall revise the landscape plan and submit a revision with the building permit application. c. The applicant shall revise the landscape plan to remove the previously shown access to Chinden Blvd., and provide landscape in this area. The landscape plan should match the site plan. The applicant shall provide a revised plan with submittal of the building permit application. d. Parking area A and its associated site improvements as indicated on the site plan is not approved with this certificate of zoning compliance. The applicant shall obtain a separate certificate of zoning compliance for this area. 6. The approved site plan, landscape plan and/or elevations may not be altered without prior written approval of the City of Meridian Planning Division. 7. Prior to receiving a certificate of occupancy for any structures on the subject property, the applicant shall record the final plat that was approved on December 5, 2017. 8. The elevations prepared by LKV Architects on February 16, 2018 labeled A-5.0, A- 5.01, A-5.02, A-5.03 and A-5.04 are approved by the City of Meridian Planning Division with no changes. 9. The applicant shall pay any applicable impact fees prior to the issuance of a building permit. 10. If any changes must be made to the site plan to accommodate ACHD requirements, the applicant shall submit a new site plan to the City of Meridian Planning Division for approval prior to issuance of the building permit. 11. The applicant shall complete all required improvements prior to issuance of a Certificate of Occupancy. It is unlawful to use or occupy any building or structure until the Building Official has issued a Certificate of Occupancy. REVISION 2 Conditions Document 3 Rock Harbor Church – CZC A-2017-0218 12. The City of Meridian requires that the owner enter into a Warranty Surety Agreement and post a Warranty Surety in the amount of 20% of the total construction cost for all completed public sewer and water infrastructure for a duration of two years. This surety amount will be verified by a line item final cost invoicing provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond, and must be in place prior to Certificate of Occupancy. Applicant must file an application for surety, which can be found on the Community Development Department website. Please contact Land Development Services for more information at 208-887- 2211. Ongoing Conditions of Approval 1. The applicant and/or assigns shall have the continuing obligation to provide irrigation that meets the standards as set forth in UDC 11-3B-6 and to install and maintain all landscaping as set forth in UDC 11-3B-5, UDC 11-3B-13 and UDC 11-3B-14. 2. The project is subject to all current City of Meridian ordinances and previous conditions of approval associated with this site (H-2017-0018; H-2017-0131; DA #2017-089735). 3. The issuance of this CZC does not release the applicant from any previous requirements of the other permits issued for the site. 4. The applicant and/or property owner shall have an ongoing obligation to prune all trees to a minimum height of six feet above the ground or sidewalk surface to afford greater visibility of the area. 5. The applicant has a continuing obligation to comply with the outdoor lighting provisions as set forth in UDC 11-3A-11. 6. The applicant and/or property owner shall have an ongoing obligation to maintain all landscaping and constructed features within the clear vision triangle consistent with the standards in UDC 11-3A-3. 7. Per UDC 11-3A-12, any outdoor equipment areas including utility meters, HVAC equipment and other service equipment shall be incorporated into the design of the project and shall be shielded/enclosed to the maximum extent possible. CITY COUNCIL REVIEW The applicant or a party of record may request City Council review of a decision of the Director. All requests for review shall be filed in writing with the Planning Division on or before March 17, 2018 May 30, 2019, within fifteen (15) days after the written decision is issued, and contain the information listed in UDC 11-5A-6B. If City Council review of the decision is not requested, the action of the Director represents a final decision on a land use application. You have the right to request a regulatory taking analysis under Idaho Code 67-8003. EXPIRATION Certificates of Zoning Compliance issued in conjunction with a proposed use shall expire if the use has not commenced within one year of the date of issuance of the Certificate of Zoning Compliance. Certificates of Zoning Compliance issued in conjunction with construction or alteration of a structure shall expire if the construction or alteration has not commenced within one year of the date of issuance of the Certificate of Zoning Compliance. In accord with the above provisions, the subject Certificate of Zoning Compliance is valid until March 2, 2018 May 15, 2020. REVISION 2 Conditions Document 4 Rock Harbor Church – CZC A-2017-0218 EXHIBITS Vicinity Map Site Plan (dated: January 15, 2018, Sheet SD-1.1 Revised: April 29, 2019) Landscape Plan (dated: October 12, 2017 Sheet L1.0 Revised: April 29, 2019) Elevations (dated: February 16, 2018) REVISION 2 Conditions Document 5 Rock Harbor Church – CZC A-2017-0218 A. Vicinity Map REVISION 2 Conditions Document 6 Rock Harbor Church – CZC A-2017-0218 B. Site Plan (dated: January 15, 2018 April 29, 2019) REVISION 2 Conditions Document 7 Rock Harbor Church – CZC A-2017-0218 C. Landscape Plan (dated: October 12, 2017)(NOT APPROVED April 29, 2019) REVISION 2 Conditions Document 8 Rock Harbor Church – CZC A-2017-0218 D. Elevations (dated: February 16, 2018) REVISION 2 Conditions Document 9 Rock Harbor Church – CZC A-2017-0218 REVISION 2 Conditions Document 10 Rock Harbor Church – CZC A-2017-0218