Loading...
Right of Way Easement J.E. Clouss1h8TrWgMNT N01 , 3946'75 BoeR 31 PAU537 RIGHT OF WAY EASEMENT , Tai.s;indenture, made and entered into this _Zday er day of March , 1956, by!and. between J. E. Clouss and Olive Clouss, husband and wife of Meridian, Idaho , as grantor and'the City of Meridian, Ada County, Idaho, a municipal corpora- tion, as grantee, WITNESSED:- - i WPdEREAS, the said grantor is the owner in fee simple of a i parcel of land lying and being within the corporate limits of. said City of Meridian, Ada County, Idaho,' particularly described as follows: A strip of land 16 feet wide and 83 feet long, the East boundary of said strip being the North-South centerline of the South 83 feet of the North 150 feet of Block 2, Noursefs Third Addition to Meridian, Ada County, Idaho. AND WIiEREAS, the grantee herein desires to construct a pipe line for conveying sewage upon and across the above described land in connection with additional sewer lines and sewage treatment plant authorized by bond election in said city held August 30, 1955. THEREFORE, in consideration of the sum of one dollar ("1.00) lawful money of the United States and other good snd valuable con- sideration in hand paid, the receipt for which is hereby acknow- ledged, the undersigned, J. E. Clouss and Olive Clouss, do_ hereby give and grant the City of Meridian, its successors, and assigns forever, the right to lay, maintain, operate, use, re- pair and remove a certain pipe line for conveying sewage through, over and across the above described real property for the purpose aforesaid. - Grantee will repair all damage to said land caused, y - 31 F>rj5 structiori, operation and use or compensate grantor therefor. l• Said pipe and pipe liAe shall be laid•under the surfape of the ground and the soil around the same shall be packed reasonably -level with, the surface of the,ground. The grantee shalllat all times,have full and free access to the right of way for said pipe line for 'any; necessary purpose connected with the use, operation,.repair and,enjoyment of said pipe line, ;acid shall'have full and free access 'at all times _ through its agents, servants and employees, to and across the - above' described lands of the grantor for all purposes connected with this easement. This easement and the considerations paid thereunder are I agreed by the undersigned grantor to be in full settlement of all damages which in any way or manner may be sustained by reason of the installation, construction, repair, use and occupancy of the said pipe line thru and across the within described lands of the said grantors, except as herein specifically stated. _ DATED This / �r day of March , 1956. GRANTOR STATE OF IDAHO ) ss. County of Ada ) On this /i day of March , 1956, before me, undersigned, a Notar� Public in and for said State, personally the - appeared J. E. Clouss and Olive Clouss, husband and wife , the persons who executed the foregoing instrument and acknowledged to me that _he (they) executed the same. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year in this certificate first above written. 42 45t Pub is for Idaho Residence: Meridian, Idaho STATE OF IDAHO, COUNTY OF ADA This instrument was filed for record at the request of___,_t�/ at-0_i0atiinutes hf.past__i� --o'clock -- -------------, thisl-�-dnv of._`""-- Bv__ - Recorded in Ueputy V: It r. 't'EIt1S1:1S /a?/'Z�'�