Loading...
ID-1538-1901_AMERIBEN EAST CZC-Layout1 (005)3'-1" 95 8" 3 3 8" 2 3 8" O.D. TUBING SURFACE FLANGE MOUNT GROUND LEVEL 5'-23 8" IN-GROUND ANCHOR MOUNT 8" 3" 1 1 A A 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 B B C C D D ALIGN ALIGN ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss 12'' SD 12'' SD 12'' SD 12'' SD 12'' SD 18'' SD 18'' SD 18'' SD 18'' SD 12'' SD 12'' SD 12'' SD 12'' SD 12'' SD 18'' SD 18'' SD 18'' SD 18'' SD 12'' SD 12'' SD 12'' SD 12'' SD 12'' SD 12'' SD 12'' SD 12'' SD 12'' SD 12'' SD 12'' SD 12'' SD 12'' SD 12'' SD 12'' SD W O:\!2016\PG-852-1601 Ten Mile Crossing\02 CAD\02 Sheet Files\Ameriben East\ID-1538-1901_AMERIBEN EAST CZC.dwg - Layout1 - 3/08/2019 04:16pm, melissak 1 5 REVISIONS REV # DATE DRAWING INFO DATE DESIGNED DRAWN *SEE GENERAL NOTES SHEET WARNING 0 1 2 IF THIS BAR DOES NOT MEASURE 2" THEN DRAWING IS NOT TO SCALE PRELIMINARY NOT FOR CONSTRUCTION www.horrocks.com PAGE C PROJECT CHECKED D B A # 2 3 4 2162 West Grove Pkwy., Suite 400 Pleasant Grove, UT 84062 (801) 763-5100 ID-1538-1901 RS MDK 3/6/19 SITE PLAN MERIDIAN CZC AMERIBEN PHASE 2 MERIDIAN, ID 1 OF 1 1 NOTES 1. DIMENSIONS ARE TO FRONT FACE OF CURB FOR DRIVE ISLES. 2. RADII ARE 3.0' UNLESS OTHERWISE NOTED. ENGINEER HORROCKS ENGINEERS 2775 W. NAVIGATOR DR. SUITE 210 MERIDIAN, ID 83642 CONTACT: ROB SUNDERLAGE PE PHONE: 208-895-2520 H O R R O C K S E N G I N E E R S N 0 30' 60' SCALE: 1" = 30' SITE INFORMATION CONCRETE · TOTAL SITE AREA: 202,085 SF (4.64 Ac.) · TOTAL BUILDING FOOTPRINT: 30,500 SF +/- · TOTAL BUILDING AREA (ALL FLOORS): 121,300 SF MAXIMUM BUILDING HEIGHT: 64' ZONING REQUIREMENTS · ZONING: CITY C-G, GENERAL COMMERCIAL · BUILDING SETBACKS: - FRONT = 0' - REAR = 0' - SIDES = 0' · LANDSCAPE SETBACKS: - LOCAL = 10' - COLLECTOR = 20' - ARTERIAL = 25' - ENTRYWAY CORRIDOR = 35' - INTERSTATE = 50' LEGEND BIKE RACK DETAIL FLEXIBLE (ASPHALT) PAVEMENT SECTION TABLE ASPHALTIC CONCRETE CRUSHED AGGREGATE BASE STRUCTURAL SUBBASE COMPACTED SUBGRADE ASPHALT: ASPHALT MIX DESIGN SHALL MEET ISPWC SECTION 810 CLASS III PLANT MIX AND MATERIALS SHALL BE PLACED IN ACCORDANCE WITH ISPWC STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION (1/2" MIX DESIGN) AGGREGATE BASE: MATERIAL TO COMPLY WITH ISPWC STANDARD FOR CRUSHED AGGREGATE BASE MATERIAL STRUTURAL SUBBASE: MATERIAL TO COMPLY WITH STRUCTURAL FILL SECTI0N OF GEOTECH REPORT. THE PLACED MATERIAL SHALL BE NO GREATER THAN 4". - A QUALIFIED GEOTECHNICAL ENGINEER OR ENGINEERING TECHNICIAN IS REQUIRED TO VERIFY SUBGRADE COMPETENCY AT THE TIME OF CONSTRUCTION. ALL EARTHWORK, FLEXIBLE AND RIDID PAVEMENT CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE SITE GEOTECHNICAL REPORT. 18.0" 4.0" 3.0" SEE PAVEMENT SUBGRADE PREPARATION SECTION HEAVY DUTY SEE PAVEMENT SUBGRADE PREPARATION SECTION LD 12.0" 4.0" 2.5" LIGHT DUTY LIMIT OF DISTURBANCE (LOD) PARKING INFORMATION · PARKING STALLS REQUIRED: 243 (1 STALL/ 500 GFA) · PARKING STALLS PROVIDED: 612 · *HANDICAP STALLS REQUIRED: 13 · **HANDICAP STALLS PROVIDED: 13 · BICYCLE PARKING STALLS PROVIDED PER LANDSCAPE ARCHITECT PLANS (24) NOTES: * PER ADA REQUIREMENTS ** INCLUDES 2 VAN ACCESSIBLE STALLS SAND AND OIL SEPARATOR STORM INFILTRATION SYSTEM POINT OF CONNECTION FOR PRESSURIZED 2" IRRIGATION SERVICE EXISTING 6" SEWER LATERAL EX. FIRE HYDRANT CATCH BASIN (TYP) 25' 90' 5' 90' 5' 90' 5' 99' 11.3' 25.6' 25' 25' 25' 19' 11.1' 5' 8' 24.2' 90' 30.25' 30.25' 22.6' 8.6' 8' 6' 25' 25' 19' 25.9' 25' 26' 26' 26' 28' 26' 22.7' 19' 17' 7.5' 0.5' 7.5' 6' 1' 6' 36' 5' 90' 5' 90' 5' 90' 8.1' 90' 5' 90' 5' 90' 8.1' 90' 5' 5' 90' 5' 90' 5' 90' 8.1' 90' 5' 5' 90' 5' 90' 5' 90' 8.1' 90' 5' 5' 90' 5' 90' 5' 90' 8.1' 90' 5' 5' 63' 5' 90' 5' 90' 5' 90' R18' R18' R2.5' TYP R5' R5' R5' R5' R5' R5' R5' R5' R5' R5' R5' R18' R18' R5' 90' 5' 90' 5' 90' 19' W. NAVIGATOR ST PROPOSED BUILDING 107' 11.9' 13.7' 283.7' INSTALL 8" ISOLATION VALVE, 8"X6" REDUCER, AND 6" FIRE LINE TO BUILDING EX. FIRE HYDRANT EX. 32' SEWER EASEMENT EX. 20' WATER EASEMENT EX. 32' PUID & CROSS ACCESS EASEMENT PROPERTY LINE PROPERTY LINE PROPERTY LINE LIMITS OF DISTURBANCE LOT 19 BLOCK 2 LOT 18 BLOCK 2 LOT 17 BLOCK 2 TM CROSSING SUBDIVISION NO. 4 LOT 10 BLOCK 2 LOT 9 LOT 8 BLOCK 2 BLOCK 2 TM CROSSING SUBDIVISION NO. 1 TM CROSSING SUBDIVISION NO. 1 & 4 BOUNDARY STORM INFILTRATION SYSTEM 1.63' (FUTURE ROADWAY) ROAD TO BE INSTALLED WITH TM CROSSING PHASE 4 PROJECT ROAD TO BE INSTALLED WITH TM CROSSING PHASE 4 PROJECT 4.6' 5.6' INSTALL 2" METER & SERVICE 12'x12' TRASH ENCLOSURE REFER TO ARCHITECTURAL PLAN FOR DETAILS BICYCLE PARKING LOCATION, SEE LANDSCAPE ARCHITECT PLANS FOR DETAILS