Z - Project Final Acceptance Letter - Little Creek Apartments Phase 1Mayor Tammy de Weerd
City Council Members:
Joe Borton
Ty Palmer
Treg Bernt
Genesis Milam
Luke Cavener
Anne Little Roberts
Public Works Department 33 E Broadway Ave, Suite 200, Meridian, ID 83642
Phone 208-898-5500 Fax 208-898-9551 www.meridiancity.org
March 6, 2019
Mr. Erik Nielsen Pilegaard
Little Creek Partners, LLC
1310 South Vista Avenue, Suite 27
Boise, ID 83705
Granite Excavation, Inc.
23 Warm Lake Hwy
Cascade, ID 83611
RE Little Creek Subdivision Phase 1 – Final Acceptance
Dear Mr. Pilegaard:
Installation of this project’s sanitary sewer and/or domestic water systems has been
satisfactorily completed in accordance with the approved plans. These systems have passed
the required testing in accordance with City of Meridian Standard Specifications and Drawings,
and therefore are hereby accepted by the City for ownership and normal maintenance.
Record drawings submitted to us for this project are also accepted and are being forwarded to
the Idaho Department of Environmental Quality. The engineer of record is responsible for
certification of the record drawings as to horizontal and vertical location of all public water and
sewer facilities installed.
In accordance with the City of Meridian’s Unified Development Code §11-5C-3, and the City of
Meridian’s Supplemental Specifications and Drawings to the Idaho Standards for Public Works
Construction, Current Edition, the installation and materials of the sewer and domestic water
systems are to be warranted against defect by the owner for a period of two-years from the date
of this letter.
Sincerely,
Warren Stewart, P.E.
City Engineer
cc. City Clerk
PW - Water Division
PW - Wastewater Division
PW - Construction Division
File
DEQ