Loading...
Sulamita Church CZC, DES (A-2019-0015)Conditions Document 1 Sulamita Church - DES, CZC - A-2019-0015 CERTIFICATE OF ZONING COMPLIANCE REPORT DATE: February 13, 2019 TO: Matt Garner, Architecture Northwest PA FROM: Kevin Holmes, Assistant City Planner SUBJECT: Sulamita Church - DES, CZC (A-2019-0015) MMGC Sulamita OWNER: DESCRIPTION OF APPLICANT'S REQUEST The applicant, Matt Garner of Architecture Northwest PA, requests Certificate of Zoning Compliance (CZC) and Design Review (DES) approval of a single story 28,457 square foot church on 8.48 acres in the R-8 zoning district. The site is located at 4973 W. Cherry Lane. DECISION The applicant's requests for Certificate of Zoning Compliance and Design Review are approved with the conditions listed in this report. Note: This is not a building permit. Please contact Building Services at (208) 887-2211 to verify if you need a building permit and/or inspection. If you do need a building permit, you must complete that process before you commence the use or construction. Please contact Building Services for additional details about building permits and inspections. General Conditions of Approval 1. 100 Watt and 250 Watt, high-pressure sodium street lights shall be required on all public roadways per the City of Meridian Improvement Standards for Street Lighting. All street lights shall be installed at developer’s expense. Final design shall be submitted as part of the development plan set for approval. Applicant shall also include the location of any existing street lights in the development plan set. Street lighting is required at intersections, corners, cul-de-sacs, and at a spacing that does not exceed that outlined in the Standards. The contractor’s work and materials shall conform to the ISPWC and the City of Meridian Supplemental Specifications to the ISPWC. Site Conditions of Approval 1. The applicant shall construct all proposed fencing and/or any fencing required by the UDC, consistent with the standards as set forth in UDC 11-3A-7 and 11-3A-6B. Any existing barbed wire fence is prohibited and shall be removed. 2. Prior to issuance of Certificate of Occupancy, the applicant shall remove or relocate any existing structures that do not conform to setbacks and/or use in the zone. Conditions Document 2 Sulamita Church - DES, CZC - A-2019-0015 Process Conditions of Approval 1. No signs are approved with this application. Prior to installing any signs on the property, the applicant shall submit a sign permit application consistent with the standards in UDC Chapter 3 Article D and receive approval for such signs. 2. The applicant shall complete all improvements related to public life, safety, and health as set forth in UDC 11-5C-3B. A surety agreement may be accepted for other improvements in accord with UDC 11-5C-3C. 3. Upon installation of the landscaping and prior to inspection by Planning Division staff, the applicant shall provide a written certificate of completion as set forth in UDC 11- 3B-14A. 4. The site plan prepared by Architecture Northwest PA on January 2019, labeled Site Plan, is approved by the City of Meridian Planning Division as shown in Exhibit B. 5. The landscape plan prepared by Architecture Northwest PA on January 2019, labeled Landscape Plan, is approved by the City of Meridian Planning Division as shown in Exhibit C. 6. The elevations prepared by Architecture Northwest PA on February 2019, labeled Exterior Elevations, are approved by the City of Meridian Planning Division as shown in Exhibit D. 7. The approved site plan, landscape plan and/or elevations may not be altered without prior written approval of the City of Meridian Planning Division. 8. The applicant shall pay any applicable impact fees prior to the issuance of a building permit. 9. If any changes must be made to the site plan to accommodate ACHD requirements, the applicant shall submit a new site plan to the City of Meridian Planning Division for approval prior to issuance of the building permit. 10. The applicant shall complete all required improvements prior to issuance of a Certificate of Occupancy. It is unlawful to use or occupy any building or structure until the Building Official has issued a Certificate of Occupancy. 11. The City of Meridian requires that the owner enter into a Warranty Surety Agreement and post a Warranty Surety in the amount of 20% of the total construction cost for all completed public sewer and water infrastructure for a duration of two years. This surety amount will be verified by a line item final cost invoicing provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond, and must be in place prior to Certificate of Occupancy. Applicant must file an application for surety, which can be found on the Community Development Department website. Please contact Land Development Services for more information at 208-887- 2211. 12. Prior to any development occurring on the site within the Overlay District, a floodplain permit application, including hydraulic and hydrologic analysis is required to be completed and submitted to the City and approved by the Floodplain Administrator per MCC 10-6. Ongoing Conditions of Approval 1. The applicant and/or assigns shall have the continuing obligation to provide irrigation that meets the standards as set forth in UDC 11-3B-6 and to install and maintain all landscaping as set forth in UDC 11-3B-5, UDC 11-3B-13 and UDC 11-3B-14. 2. The applicant shall comply with the outdoor storage as an accessory use standards as set forth in UDC 11-3A-14. Conditions Document 3 Sulamita Church - DES, CZC - A-2019-0015 3. The project is subject to all current City of Meridian ordinances and previous conditions of approval associated with this site (AZ-14-014; DA inst. # 2015-023708; CUP H- 2018-0110). 4. The issuance of this CZC does not release the applicant from any previous requirements of the other permits issued for the site. 5. The applicant and/or property owner shall have an ongoing obligation to prune all trees to a minimum height of six feet above the ground or sidewalk surface to afford greater visibility of the area. 6. The applicant shall have an ongoing obligation to maintain all pathways. 7. The Ten Mile Creek, which runs along the southern boundary on this site is required to be protected during development and left open. 8. Prior to any development occurring on the site within the Overlay District, a floodplain permit application, including hydraulic and hydrologic analysis is required to be completed and submitted to the City and approved by the Floodplain Administrator per MCC 10-6. 9. The applicant has a continuing obligation to comply with the outdoor lighting provisions as set forth in UDC 11-3A-11. 10. The applicant and/or property owner shall have an ongoing obligation to maintain all landscaping and constructed features within the clear vision triangle consistent with the standards in UDC 11-3A-3. 11. The applicant and/or assigns shall have the continuing obligation to meet the specific use standards for a Church or Place of Religious Worship as set forth in UDC 11-4-3-6: Schools, child daycare services, meeting facilities for clubs and organizations, and other similar uses not operated primarily for the purpose of religious instruction, worship, government of the church, or the fellowship of its congregation may be permitted to the extent the activity is otherwise permitted in the district. CITY COUNCIL REVIEW The applicant or a party of record may request City Council review of a decision of the Director. All requests for review shall be filed in writing with the Planning Division on or before February 28, 2019, within fifteen (15) days after the written decision is issued, and contain the information listed in UDC 11-5A-6B. If City Council review of the decision is not requested, the action of the Director represents a final decision on a land use application. You have the right to request a regulatory taking analysis under Idaho Code 67-8003. EXPIRATION The Certificate of Zoning Compliance shall expire if the construction, alteration or the use has not commenced within one year of the date of issuance of the Certificate of Zoning Compliance. In accord with the above provisions, the subject Certificate of Zoning Compliance is valid until February 13, 2020. Conditions Document 4 Sulamita Church - DES, CZC - A-2019-0015 EXHIBITS A: Vicinity Map B: Site Plan (dated: January 2019) C: Landscape Plan (dated: January 2019) D: Elevations (dated: February 2019) Conditions Document 5 Sulamita Church - DES, CZC - A-2019-0015 Exhibit A: Vicinity Map Conditions Document 6 Sulamita Church - DES, CZC - A-2019-0015 Exhibit B: Site Plan (dated: January 2019) Conditions Document 7 Sulamita Church - DES, CZC - A-2019-0015 Exhibit C: Landscape Plan (dated: January 2019) Conditions Document 8 Sulamita Church - DES, CZC - A-2019-0015 Exhibit D: Elevations (dated: February 2019)