Loading...
C01.1 Civil Site Plan - Cope CollisionSS SS SS SS SS SS SS SS SS SS SS SS SS S W W W W W W W W W W W W W W W W W W W W W W GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS CATV CATV CATV CATV CATV CATV CATV CATV CATV CATV EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP W W SD SS SD IRR IRR IRR IRR IRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR W W EP EP X X X X X X X X X X X X X OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP SS SS SS SS W 8 7 6 18.00' 26.02' 9.00' UTILIZE EXISTING ENTRANCE UTILIZE EXISTING ENTRANCE EXISTING SIDEWALK 75.51' 19.80' 66.26' CONCRETE SIDEWALK PER ISPWC SD-709 4.00' 42.37' 17.59' 9.12' R5.00' 44.14' 41.73' 17.59' 9.00' 32.62' PEDESTRIAN ACCESSIBLE ROUTE (SCALE IN FEET) 1:20 (22x34 FULL SIZE) 20 10 0 20 60 SITE PLAN PROPOSED BUILDING COVERED ENTRY AND DROP OFF COVERED STORAGE FUTURE STORAGE BUILDING FUTURE COVERED STORAGE 10.00' DUMPSTER / TRASH RECEPTICAL 7.01' 4.00' 6" VERTICAL CURB PER ISPWC SD-701A, TYP 6.00' 22.00' 20.00' 36.17' R5.00' R4.30' R20.00' 20' WIDE MOTORIZED GATE ENTRY W/ KEYPAD ACCESS 6' HIGH STUCCO CONCEALING WALL 6' HIGH FENCE WITH CONCEALING FABRICK GRAVEL 6' HIGH FENCE WITH CONCEALING FABRICK 6' HIGH STUCCO CONCEALING WALL 20' WIDE MOTORIZED GATE ENTRY W/ KEYPAD ACCESS BICYCLE PARKING 6 SEPTIC DUMP STATION FOR RECREATIONAL VEHICLES CALCULATIONS TABLE # OF STALLS REQUIRED # OF STALLS PROVIDED NON-ADA # OF BICYCLE STALLS REQUIRED # OF BICYCLE STALLS PROVIDED BUILDING SIZE LOT SIZE EASEMENTS AS SHOWN ON PLANS SETBACKS AS SHOWN ON PLANS 75,386 SF 10,391 SF 1; 1 BICYCLE PARKING FOR EVERY 25 VEHICLE PARKING 21; 1 SPACE FOR EVERY 500SF OF GROSS FLOOR AREA # OF STALLS PROVIDED ADA 1; 1 FOR EVERY 25 VEHICLE PARKING 20 6 October 2018 PLOTTED BY: CALEB KENYON DATE PLOTTED: 10/30/2018 3:33:55 PM PATH: A:\ABCO ENGINEERING\JOBS LANDED\184616--COPE COLLISION (MUSSELL CONSTRUCTION)\00 ABCO CAD\XX-XXXX - 03 - CS-101.DWG FILE NUMBER: SHEET NUMBER: DESIGNED BY: DATE DATE DESCRIPTION REVISIONS NO. BY DRAWN BY: ABCO ENGINEERING 119 N. Midland Blvd. Nampa, Idaho 83651 Phone (208) 955-8126 1752 E. FRANKLIN RD. C. KENYON CS-101 MERIDIAN, IDAHO SITE PLAN MUSSELL CONSTRUCTION - ADA COUNTY COPE COLLISION C. KENYON 18-4616 LEGEND CENTER LINE EDGE OF PAVEMENT EDGE OF GRAVEL FENCE LINE GAS LINE OVERHEAD POWER LINE PROPERTY LINE STORMDRAIN LINE SEWER LINE TELEPHONE LINE WATER LINE PRESSURE IRRIGATION LINE GRADE BREAK LINE BENCH MARK BM ELEVATION EL EXISTING EX FINISH GRADE FG GRADE BREAK GB INVERT INV MATCH MA RADIUS R RIM OF FEATURE RIM TOP OF CONCRETE TC TOP OF PAVEMENT TA WATER METER WM ASPHALT PAVEMENT CONCRETE EP EP EG EG X X GAS GAS OHP SD SD SS SS TEL TEL W W PIRR PIRR CALL BEFORE YOU DIG! 1. THE LOCATION OF EXISTING UNDERGROUND UTILITIES SHOWN ARE APPROXIMATE LOCATIONS ONLY. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO INFORM ALL UTILITY COMPANIES OF THE CONSTRUCTION SCHEDULE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK. THE CONTRACTOR IS RESPONSIBLE FOR ANY AND ALL DAMAGE WHICH MAY OCCUR BY FAILURE TO EXACTLY LOCATE AND PROTECT ALL UTILITIES. 2. CONTRACTOR SHALL CONTACT DIGLINE 48 HOURS PRIOR TO ANY EARTH DISTURBING ACTIVITIES ON SITE, AND REQUEST LOCATE OF UNDERGROUND UTILITIES. *The 811 logo is a registered trademark of the CGA. Know what'sbelow. R Call before you dig.