C01.1 Civil Site Plan - Cope CollisionSS
SS SS SS
SS
SS
SS
SS
SS
SS SS SS SS
S
W
W W W W W W W W
W W
W W W W W
W
W W W W
W
GAS
GAS GAS GAS GAS
GAS
GAS
GAS GAS
GAS
GAS GAS GAS GAS GAS
CATV CATV
CATV CATV
CATV
CATV
CATV
CATV
CATV
CATV
EP EP
EP
EP
EP
EP
EP EP
EP
EP EP
EP EP
EP
EP
EP
EP EP
W W
SD
SS
SD
IRR
IRR IRR IRR IRR
PIRR
PIRR
PIRR
PIRR PIRR
PIRR PIRR PIRR PIRR
PIRR PIRR PIRR PIRR PIRR PIRR PIRR
W W
EP
EP
X X X
X
X X
X X
X
X X
X
X
OHP OHP
OHP
OHP OHP OHP
OHP OHP
OHP OHP
OHP OHP
SS
SS SS SS
W
8
7
6 18.00'
26.02'
9.00'
UTILIZE EXISTING ENTRANCE
UTILIZE EXISTING
ENTRANCE
EXISTING SIDEWALK
75.51'
19.80'
66.26'
CONCRETE SIDEWALK
PER ISPWC SD-709
4.00'
42.37' 17.59'
9.12'
R5.00'
44.14'
41.73'
17.59'
9.00'
32.62'
PEDESTRIAN
ACCESSIBLE
ROUTE
(SCALE IN FEET)
1:20 (22x34 FULL SIZE) 20 10 0 20 60
SITE PLAN
PROPOSED
BUILDING
COVERED
ENTRY AND
DROP OFF
COVERED STORAGE
FUTURE
STORAGE
BUILDING
FUTURE COVERED
STORAGE
10.00'
DUMPSTER / TRASH
RECEPTICAL
7.01'
4.00'
6" VERTICAL CURB PER
ISPWC SD-701A, TYP
6.00'
22.00' 20.00'
36.17'
R5.00'
R4.30'
R20.00'
20' WIDE MOTORIZED
GATE ENTRY W/
KEYPAD ACCESS
6' HIGH STUCCO
CONCEALING WALL
6' HIGH FENCE WITH
CONCEALING FABRICK
GRAVEL
6' HIGH FENCE WITH
CONCEALING FABRICK
6' HIGH STUCCO
CONCEALING WALL
20' WIDE MOTORIZED
GATE ENTRY W/
KEYPAD ACCESS
BICYCLE PARKING
6
SEPTIC DUMP
STATION FOR
RECREATIONAL
VEHICLES
CALCULATIONS TABLE
# OF STALLS REQUIRED
# OF STALLS PROVIDED
NON-ADA
# OF BICYCLE STALLS REQUIRED
# OF BICYCLE STALLS PROVIDED
BUILDING SIZE
LOT SIZE
EASEMENTS AS SHOWN ON PLANS
SETBACKS AS SHOWN ON PLANS
75,386 SF
10,391 SF
1; 1 BICYCLE PARKING FOR EVERY 25 VEHICLE PARKING
21; 1 SPACE FOR EVERY 500SF OF GROSS FLOOR AREA
# OF STALLS PROVIDED
ADA 1; 1 FOR EVERY 25 VEHICLE PARKING
20
6
October 2018
PLOTTED BY: CALEB KENYON DATE PLOTTED: 10/30/2018 3:33:55 PM PATH: A:\ABCO ENGINEERING\JOBS LANDED\184616--COPE COLLISION (MUSSELL CONSTRUCTION)\00 ABCO CAD\XX-XXXX - 03 - CS-101.DWG
FILE NUMBER:
SHEET NUMBER:
DESIGNED BY:
DATE
DATE DESCRIPTION
REVISIONS
NO. BY
DRAWN BY:
ABCO ENGINEERING
119 N. Midland Blvd.
Nampa, Idaho 83651
Phone (208) 955-8126
1752 E. FRANKLIN RD.
C. KENYON
CS-101
MERIDIAN, IDAHO
SITE PLAN
MUSSELL CONSTRUCTION
-
ADA COUNTY
COPE COLLISION
C. KENYON
18-4616
LEGEND
CENTER LINE
EDGE OF PAVEMENT
EDGE OF GRAVEL
FENCE LINE
GAS LINE
OVERHEAD POWER LINE
PROPERTY LINE
STORMDRAIN LINE
SEWER LINE
TELEPHONE LINE
WATER LINE
PRESSURE IRRIGATION LINE
GRADE BREAK LINE
BENCH MARK BM
ELEVATION EL
EXISTING EX
FINISH GRADE FG
GRADE BREAK GB
INVERT INV
MATCH MA
RADIUS R
RIM OF FEATURE RIM
TOP OF CONCRETE TC
TOP OF PAVEMENT TA
WATER METER WM
ASPHALT PAVEMENT
CONCRETE
EP EP
EG EG
X X
GAS GAS
OHP
SD SD
SS SS
TEL TEL
W W
PIRR PIRR
CALL BEFORE YOU DIG!
1. THE LOCATION OF EXISTING UNDERGROUND UTILITIES SHOWN
ARE APPROXIMATE LOCATIONS ONLY. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO INFORM ALL UTILITY
COMPANIES OF THE CONSTRUCTION SCHEDULE. THE
CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL
EXISTING UTILITIES BEFORE COMMENCING WORK. THE
CONTRACTOR IS RESPONSIBLE FOR ANY AND ALL DAMAGE
WHICH MAY OCCUR BY FAILURE TO EXACTLY LOCATE AND
PROTECT ALL UTILITIES.
2. CONTRACTOR SHALL CONTACT DIGLINE 48 HOURS PRIOR TO ANY
EARTH DISTURBING ACTIVITIES ON SITE, AND REQUEST LOCATE OF
UNDERGROUND UTILITIES.
*The 811 logo is a registered trademark of the CGA.
Know what'sbelow.
R Call before you dig.